Donald David
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Double D Engineering
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2026
1,888 permits since 2000 (engineer on 1,783 permits, architect on 80 permits, authorized agent-others on 13 permits, designer on 13 permits, attorney on 4 permits): 1,301 completed, 159 in progress, 182 never finaled, 246 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 1,888.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 2833 Fillmore St | provide new site retaining wall along south property line.Details
provide new site retaining wall along south property line. | $20,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 341 Park St | revision to pa #202512051094. proposed roof deck on existing one story rear addition. proposed outswing door french door pair in existing wall opening.Details
revision to pa #202512051094. proposed roof deck on existing one story rear addition. proposed outswing door french door pair in existing wall opening. | $40,000 | |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 353 Lexington St | structural foundation replacement & building upgrade. (e) brick foundation to be removed & replaced w/ (n) concrete foundation. (n) shearwalls & holddowns for building upgrade. (n) foundation, walls & roof for single-story 37 s.f. addition. architectural work under separate permit.Details
structural foundation replacement & building upgrade. (e) brick foundation to be removed & replaced w/ (n) concrete foundation. (n) shearwalls & holddowns for building upgrade. (n) foundation, walls & roof for single-story 37 s.f. addition. architectural work under separate permit. | $200,000 | |
| Sep 28, 2026 | In progress issued Sep 2026 | 38 Idora Av | Magnolia Development Inc. | remodel existing kitchen and bathroom. new kitchen cabinets, counters and appliances. new bathroom finishes and plumbing fixtures. replace existing kitchen and bathroom windows at side yard, not visible from the street.Details
remodel existing kitchen and bathroom. new kitchen cabinets, counters and appliances. new bathroom finishes and plumbing fixtures. replace existing kitchen and bathroom windows at side yard, not visible from the street. | $150,000 |
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 447 Minna St | 4th fl-install 2 pre-manufactured zenbooth duo office pods. work includes anchorage of pod base frames to (e) floor joists. fire sprinkler under separate permit. no exterior work, demo, building envelop modifications, or load-bearing wall work. no change of use, occupancy, building area, storiesDetails
4th fl-install 2 pre-manufactured zenbooth duo office pods. work includes anchorage of pod base frames to (e) floor joists. fire sprinkler under separate permit. no exterior work, demo, building envelop modifications, or load-bearing wall work. no change of use, occupancy, building area, stories | $5,100 | |
| Sep 24, 2026 | In progress issued Sep 2026 | 1346 Alabama St | Pattani Construction Co Inc | revision to pa 202212017475 (1346 alabama b,b1) & 202212017472 (1346 alabama a,a1) revise retaining wall @ rear of buildingDetails
revision to pa 202212017475 (1346 alabama b,b1) & 202212017472 (1346 alabama a,a1) revise retaining wall @ rear of building | |
| Sep 24, 2026 | In progress issued Sep 2026 | 149 Anderson St | Edri Construction Inc *See Notes* | add a bathroom to the basement.Details
add a bathroom to the basement. | $150,000 |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 674 Rockdale Dr | interior remodel, conversion of new conditioned space (868 sf), new interior stair and bathrooms, replace (e) bath, relocate kitchen. new finishes + fixtures. new rear deck. no change to use occupancy or bulk. ab112Details
interior remodel, conversion of new conditioned space (868 sf), new interior stair and bathrooms, replace (e) bath, relocate kitchen. new finishes + fixtures. new rear deck. no change to use occupancy or bulk. ab112 | $350,000 | |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 321 Franconia St | renovation of (e) sfr incl: new master suite in (e) unfinished basement of house. no excv. renovation of entry level to add a 2nd bedroom by shortening the long garage space. remove upstairs bedroom & create an open plan. living /dining /kitchen /powder room. reno kitchen cabinetry: subject to ab112Details
renovation of (e) sfr incl: new master suite in (e) unfinished basement of house. no excv. renovation of entry level to add a 2nd bedroom by shortening the long garage space. remove upstairs bedroom & create an open plan. living /dining /kitchen /powder room. reno kitchen cabinetry: subject to ab112 | $610,000 | |
| Sep 16, 2026 | In progress issued Sep 2026 | 348 Hazelwood Av | Gil Construction & Assoc Inc. | convert a portion of crawl space and storage space into a den w/ closet. add 1 window facing the street.Details
convert a portion of crawl space and storage space into a den w/ closet. add 1 window facing the street. | $30,000 |
| Sep 15, 2026 | In progress issued Sep 2026 | 424 Francisco St | Gil Construction & Assoc Inc. | voluntary retrofit existing front entry stairs.Details
voluntary retrofit existing front entry stairs. | $40,000 |
| Aug 26, 2026 | In progress issued Sep 2026 | 42 Homestead St | Pio Mcgarr Inc | revision to bpa#202307283261 to include rear yard layout & patio wallsDetails
revision to bpa#202307283261 to include rear yard layout & patio walls | |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 1721 15th St | The Toboni Group | front bldg, relocate (e) soloar panel array including structural support from rear bldg to the roof; ref pa 2025-0506-5847 (front bldg), pa 2025-0506-5848 (rear bldg). no other work is included in this revisionDetails
front bldg, relocate (e) soloar panel array including structural support from rear bldg to the roof; ref pa 2025-0506-5847 (front bldg), pa 2025-0506-5848 (rear bldg). no other work is included in this revision | $25,000 |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 1721 15th St | The Toboni Group | rear bldg, add (n) sqft private roof deck at the 4th level & relocate (e) soloar panel to the front bldg. ref pa 2025-0506-5847 (front bldg), pa 2025-0506-5848 (rear bldg). no other work is included in this revisionDetails
rear bldg, add (n) sqft private roof deck at the 4th level & relocate (e) soloar panel to the front bldg. ref pa 2025-0506-5847 (front bldg), pa 2025-0506-5848 (rear bldg). no other work is included in this revision | $75,000 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 2155 Jackson St | L H Construction | revision to bpa#202212208821 to reflect minor adjustments to the adu layout based on the field conditions.Details
revision to bpa#202212208821 to reflect minor adjustments to the adu layout based on the field conditions. | $3,000 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 555 Broderick St | Sure, Inc. | 2 new adus on 1st floor per state adu program, ordinance no.95-17, new fire sprinkler system to be installed throughout the entire 1st floor in compliance with 2025 nfpa13 and eg-05, new heat pump water heaters and heating systems for each adu. a manual fire alarm system in compliance w/2025 nfpa72Details
2 new adus on 1st floor per state adu program, ordinance no.95-17, new fire sprinkler system to be installed throughout the entire 1st floor in compliance with 2025 nfpa13 and eg-05, new heat pump water heaters and heating systems for each adu. a manual fire alarm system in compliance w/2025 nfpa72 | $250,000 |
| Jul 27, 2026 | In progress issued Sep 2026 | 4339 26th St | Woods Const Co | add temporary 2x6 stud wall @ basement of subject residence. install three hand-dug piers & replace 30 ft length of perimenter conc. ftg. leaving & cosmetic repairs of upper floors, walls, doors etc. as needed. to comply with nov202659138Details
add temporary 2x6 stud wall @ basement of subject residence. install three hand-dug piers & replace 30 ft length of perimenter conc. ftg. leaving & cosmetic repairs of upper floors, walls, doors etc. as needed. to comply with nov202659138 | $20,000 |
| Jul 18, 2026 | In progress filed Jul 2026, not yet issued | 49 Chula Ln | Eco Logic Construction & Design Inc. | vert add'n and renovation.maintain/mod (e) gas hydronic heating and gas systems.mep deferred.1/f: new bathroom,enlarge laundry rm and reconfig switchback stair.2/f: relocation of (e) bath, englarge (e) bed, new bedroom & family rm. 3/f: relocate kitchen, dining and living space.Details
vert add'n and renovation.maintain/mod (e) gas hydronic heating and gas systems.mep deferred.1/f: new bathroom,enlarge laundry rm and reconfig switchback stair.2/f: relocation of (e) bath, englarge (e) bed, new bedroom & family rm. 3/f: relocate kitchen, dining and living space. | $650,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 819 Lombard St | Level 8 Construction Inc | correct and revise pa# 201511233346 to addresss nov 202029546 and change engineer of record. ref recommencement pa# 202604270172.Details
correct and revise pa# 201511233346 to addresss nov 202029546 and change engineer of record. ref recommencement pa# 202604270172. | $10,000 |
| Jul 10, 2026 | Expired or cancelled suspend Jul 2026 | 42 Homestead St | Pio Mcgarr Inc | revision 202307283261 and ref 202410039947 to include rear yard layout and patio walls. revisie foundation details at north and south property lines to match (e) conditions. revise framing details at property to accomadate windowsDetails
revision 202307283261 and ref 202410039947 to include rear yard layout and patio walls. revisie foundation details at north and south property lines to match (e) conditions. revise framing details at property to accomadate windows | |
| Jul 10, 2026 | In progress issued Jul 2026 | 1925 Gough St | Add A Garage Inc. | to comply with nov 202650860- replace rear yard retaining wall -80 ft west property line and 25 feet north property lineDetails
to comply with nov 202650860- replace rear yard retaining wall -80 ft west property line and 25 feet north property line | $50,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 2679 California St | Zack De Vito Inc | demolish 2nd fl rear exterior bay wall and reframe for new door system. new 53 sf deck. replace in kind 2 kitchen windows. replace in kind partio doors and downstairs rear bedroom window, enlarge rear upstairs bedroom window. add window to downstairs rear bedroom. steps from patio to garden.Details
demolish 2nd fl rear exterior bay wall and reframe for new door system. new 53 sf deck. replace in kind 2 kitchen windows. replace in kind partio doors and downstairs rear bedroom window, enlarge rear upstairs bedroom window. add window to downstairs rear bedroom. steps from patio to garden. | $42,645 |
| Jul 6, 2026 | In progress issued Jul 2026 | 474 Valley St | Zm Builders Inc | revision to bpa: 202411215504 - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref bpa: 202001313281Details
revision to bpa: 202411215504 - remove the package door on the 1st floor, reconfigure the kitchen layout on the 3rd floor. add electric fireplace and steam shower room at 3rd floor. reduce size on 2 skylights on the 3rd floor. ref bpa: 202001313281 | $2,000 |
| Jun 22, 2026 | In progress issued Jun 2026 | 466 Arch St | revise p/a # 202605060767 to show the construction of about 48 lineal feet of new perimeter foundation beneath the rear-yard facing, concrete slab on grade, bedroom, to document the removal of a previously shown water heater, and to document the performance of various, isolated, dry rot repair.Details
revise p/a # 202605060767 to show the construction of about 48 lineal feet of new perimeter foundation beneath the rear-yard facing, concrete slab on grade, bedroom, to document the removal of a previously shown water heater, and to document the performance of various, isolated, dry rot repair. | $10,000 | |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 1631 North Point St | revision to pa#202211015684. reduction in demo scope and structural framing scope at level 2 & 3 living, dining and kitchen area. addition of sauna at level 1.Details
revision to pa#202211015684. reduction in demo scope and structural framing scope at level 2 & 3 living, dining and kitchen area. addition of sauna at level 1. | $200,000 | |
| Jun 17, 2026 | In progress issued Jul 2026 | 1027 Hayes St | Andrew Gallagher Construction | revision to 202308295507 to inlcude renovation to primary suite and interior renovation to unit 3.Details
revision to 202308295507 to inlcude renovation to primary suite and interior renovation to unit 3. | $55,000 |
| May 27, 2026 | In progress issued Jun 2026 | 1868 Greenwich St | Iy Development & Renovation Inc | all work limited to exterior building envelope, no interior changes. construction of a new 245.7 sq ft roof deck, including associated guardrails & 1-hr fire rated parapet walls. install of a new exterior steel spiral staircase connecting to the 4th fl deck. removal of the (e) wall mounted roof...Details
all work limited to exterior building envelope, no interior changes. construction of a new 245.7 sq ft roof deck, including associated guardrails & 1-hr fire rated parapet walls. install of a new exterior steel spiral staircase connecting to the 4th fl deck. removal of the (e) wall mounted roof... | |
| May 14, 2026 | In progress issued Aug 2026 | 2043 19th Av | Giampolini & Co Dba Giampolini/Courtney, Mulhall Construction Inc. | to comply with nov #202541502, repair concrete roof at rear of property, waterproof top side of concrete roof.Details
to comply with nov #202541502, repair concrete roof at rear of property, waterproof top side of concrete roof. | $50,000 |
| May 13, 2026 | In progress filed May 2026, not yet issued | 10 Winfield St | replacement of (e) fire escape, deck & stair at rear. enlarge windows @ 2nd floor. new siding & insulation at rear facade.Details
replacement of (e) fire escape, deck & stair at rear. enlarge windows @ 2nd floor. new siding & insulation at rear facade. | $35,000 | |
| May 8, 2026 | In progress filed May 2026, not yet issued | 1311 South Van Ness Av | Mrcc | rear stairs to be replaced in kind.Details
rear stairs to be replaced in kind. | $15,000 |
| May 7, 2026 | Completed final sign-off Sep 2026 | 2799 Clay St | increase door opening size in living room & dining room area at central bearing wall, added new concrete footingDetails
increase door opening size in living room & dining room area at central bearing wall, added new concrete footing | $10,000 | |
| May 6, 2026 | Completed final sign-off Aug 2026 | 958 Capp St | Hon's Construction Inc. | revision to application 202509094906, install new stair guardrail in existing location.Details
revision to application 202509094906, install new stair guardrail in existing location. | $2,000 |
| Apr 25, 2026 | In progress issued Jul 2026 | 8 Hill Point Av | Christopher's Construction Inc | revision to permit 202507080372. relocate partition for workout room at 1/l. remove (e) walls at (e) 2/l and 3/l. relocate (e) bathroom at 2/l and remove shower. add pantry & reconfigure office at 2/l. add new bathroom at 3/l and reconfigure closet and study. replace n & e metal windows in kind.Details
revision to permit 202507080372. relocate partition for workout room at 1/l. remove (e) walls at (e) 2/l and 3/l. relocate (e) bathroom at 2/l and remove shower. add pantry & reconfigure office at 2/l. add new bathroom at 3/l and reconfigure closet and study. replace n & e metal windows in kind. | $100,000 |
| Apr 21, 2026 | In progress issued Jun 2026 | 2900 Alemany Bl | Tci Construction Inc | prop h - revision to permit 202411145010 for new structural footings for manufacturer suppliers climbing equipment. climbing equipment drawings submitted as reference only.Details
prop h - revision to permit 202411145010 for new structural footings for manufacturer suppliers climbing equipment. climbing equipment drawings submitted as reference only. | $10,000 |
| Apr 21, 2026 | Completed final sign-off Jun 2026 | 2505 Noriega St | Mulhall Construction Inc. | repair store front at ne corner due to damage sustained from truck collision. to comply with nov 202548434Details
repair store front at ne corner due to damage sustained from truck collision. to comply with nov 202548434 | $15,000 |
| Apr 16, 2026 | In progress issued Sep 2026 | 769 Clayton St | Gil Construction & Assoc Inc. | 1. remodel (e) garden apartment. 2. reconfigure/rebuild (e) ground floor deck. 3. reconfigure (e) ground floor garage and utility area to provide dedicated shared laundry. 4. voluntary replacement of portion of (e) perimeter foundation. 5. no work at (e) primary dwelling (second and third floor).Details
1. remodel (e) garden apartment. 2. reconfigure/rebuild (e) ground floor deck. 3. reconfigure (e) ground floor garage and utility area to provide dedicated shared laundry. 4. voluntary replacement of portion of (e) perimeter foundation. 5. no work at (e) primary dwelling (second and third floor). | $150,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 4333 26th St | Woods Const Co | ref 201906062699 s1- temporay shoring for excavation and consturcoitn of new 3-story house and basementDetails
ref 201906062699 s1- temporay shoring for excavation and consturcoitn of new 3-story house and basement | $55,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 166 Bonview St | Frederic Grasset Design-Build | revision to 202603036872, remnove & replace portions of (e) foundation, revisions to stairs & bathroom @ lower level, remove/replace stucco siding in front.Details
revision to 202603036872, remnove & replace portions of (e) foundation, revisions to stairs & bathroom @ lower level, remove/replace stucco siding in front. | $45,000 |
| Apr 10, 2026 | In progress filed Apr 2026, not yet issued | 1039 Green St | rev. to approved roof deck permit bpa#2019 0311 4863. subtitute wood frame lass rail w/ a. metal frame glass rail(not visible from street)Details
rev. to approved roof deck permit bpa#2019 0311 4863. subtitute wood frame lass rail w/ a. metal frame glass rail(not visible from street) | $7,800 | |
| Apr 6, 2026 | In progress issued May 2026 | 2925 Cabrillo St | Great Ocean Construction Inc. | ground floor remodel: new kitchenette+ bathroom to replace (e). new laundry closet, new wall finish at (e) stair, new rear deck and stair, new siding + trim at rear, no work visible from the street. no expansion to envelope.Details
ground floor remodel: new kitchenette+ bathroom to replace (e). new laundry closet, new wall finish at (e) stair, new rear deck and stair, new siding + trim at rear, no work visible from the street. no expansion to envelope. | $136,600 |
| Mar 27, 2026 | In progress filed Mar 2026, not yet issued | 68 Santa Marina St | to comply with complaint 202298597.legalization of the rear deck through variance #2022-012041var;addition of a 1-hour-rated firewall along deck at the rear property line. remove portion of deck to allow for 3' between adjacent property lineDetails
to comply with complaint 202298597.legalization of the rear deck through variance #2022-012041var;addition of a 1-hour-rated firewall along deck at the rear property line. remove portion of deck to allow for 3' between adjacent property line | $2,500 | |
| Mar 23, 2026 | In progress issued Mar 2026 | 642 22nd Av | Amber - Tru Construction Inc. | revision to pa # 202312223057. revised foundation details to account for (e) conditions.Details
revision to pa # 202312223057. revised foundation details to account for (e) conditions. | |
| Mar 23, 2026 | In progress issued Mar 2026 | 646 22nd Av | Amber - Tru Construction Inc. | soil grouting to facilitate work at 642 22nd ave. reference pa # 202312223057.Details
soil grouting to facilitate work at 642 22nd ave. reference pa # 202312223057. | $10,000 |
| Mar 23, 2026 | In progress issued Mar 2026 | 638 22nd Av | Amber - Tru Construction Inc. | soil grouting to facilitate work on 642 22nd ave. reference pa # 202312223057.Details
soil grouting to facilitate work on 642 22nd ave. reference pa # 202312223057. | $10,000 |
| Mar 18, 2026 | In progress issued Jul 2026 | 240 Bosworth St | Brighter Legacy Builders Inc. | modifications to an (e) multi-unit building. convert the (e) 2 car garage into an adu-one bedroom, one bath of 516sf per state adu policyDetails
modifications to an (e) multi-unit building. convert the (e) 2 car garage into an adu-one bedroom, one bath of 516sf per state adu policy | $185,000 |
| Mar 4, 2026 | In progress filed Mar 2026, not yet issued | 2450 Van Ness Av | voluntary strengthening per ab-094.Details
voluntary strengthening per ab-094. | $40,000 | |
| Feb 20, 2026 | Completed final sign-off Jun 2026 | 146 02nd Av | minor revision on pa#2022-0119-6246.remove middle shear wall & boltig @ rear of building from scope of voluntary strengthening.Details
minor revision on pa#2022-0119-6246.remove middle shear wall & boltig @ rear of building from scope of voluntary strengthening. | $10,000 | |
| Feb 20, 2026 | In progress issued Apr 2026 | 2900 Alemany Bl | Sf Plumbing & Fire Protection Inc | partial modification of (e) fire sprinkler system in the building areas (locker room, open excercise & customer lounge) total heads= 119. ref pa #2024-1114-5010Details
partial modification of (e) fire sprinkler system in the building areas (locker room, open excercise & customer lounge) total heads= 119. ref pa #2024-1114-5010 | $73,899 |
| Feb 18, 2026 | In progress issued Feb 2026 | 642 Edinburgh St | Baires Construction Inc | revision of existing foundation to pa#: 202506168750.Details
revision of existing foundation to pa#: 202506168750. | $3,500 |
| Feb 16, 2026 | In progress issued Sep 2026 | 249 21st Av | Rohan Wallace & Aherne Inc | alter interior floor plan of g/f & top floor. addition limited to rear of building. no change to bldg height or in unit count. new deck at building rear. fill-in nw 3/f corner & extend habitable space 6'. add habitable space in (e) garage.Details
alter interior floor plan of g/f & top floor. addition limited to rear of building. no change to bldg height or in unit count. new deck at building rear. fill-in nw 3/f corner & extend habitable space 6'. add habitable space in (e) garage. | $430,000 |
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 263 Lee Av | demolish existing type 5b, 1-story church.Details
demolish existing type 5b, 1-story church. | $50,000 | |
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 263 Lee Av | erect new 3-story, type 5b, 3-unit residential building with 1-unit on level 2, 1-unit on level 3 and 1-adu on ground floor per state adu program.Details
erect new 3-story, type 5b, 3-unit residential building with 1-unit on level 2, 1-unit on level 3 and 1-adu on ground floor per state adu program. | $1,188,036 | |
| Jan 29, 2026 | In progress issued Feb 2026 | 1721 15th St | The Toboni Group | temporary shoring at west and south property lines for (n) bldg to be built under bpa: 202505065847 and 202505065848Details
temporary shoring at west and south property lines for (n) bldg to be built under bpa: 202505065847 and 202505065848 | |
| Jan 21, 2026 | In progress issued Jan 2026 | 350 Frederick St | Doyle Developments | compliance with mandatory soft story program per sfebc 106d.2.5 appendix a4Details
compliance with mandatory soft story program per sfebc 106d.2.5 appendix a4 | $15,000 |
| Jan 19, 2026 | In progress filed Jan 2026, not yet issued | 76 Liberty St | raise (e) building 18in. insert (n) garage below gradeDetails
raise (e) building 18in. insert (n) garage below grade | $350,000 | |
| Jan 16, 2026 | In progress issued Jan 2026 | 42 Homestead St | Pio Mcgarr Inc | reference building permits 202307283261 and 202409039947: to show "sectional pour" on north & south property line walls. work to be done in sectionsDetails
reference building permits 202307283261 and 202409039947: to show "sectional pour" on north & south property line walls. work to be done in sections | $20,000 |
| Jan 14, 2026 | In progress issued Jan 2026 | 476 38th Av | On Square Corporation | demolish the existing powder room to enlarge and renovate the kitchen. perform structural modification to create an open connection between the kitchen and dining room. provide a new powder room within the existing sunroom.Details
demolish the existing powder room to enlarge and renovate the kitchen. perform structural modification to create an open connection between the kitchen and dining room. provide a new powder room within the existing sunroom. | $78,342 |
| Jan 5, 2026 | In progress issued Jan 2026 | 2519 Mission St | Angotti & Reilly Inc. | revision to permit application 2020-0311-6802 s1 changes per uncovered site conditions.Details
revision to permit application 2020-0311-6802 s1 changes per uncovered site conditions. | $5,000 |
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 369 Valley St | to abate and comply with nov 202546638 and enf 2025010797enj to include temp shoring for sturctural stabilization only . no moving or lifting house under this permitDetails
to abate and comply with nov 202546638 and enf 2025010797enj to include temp shoring for sturctural stabilization only . no moving or lifting house under this permit | $3,000 | |
| Dec 22, 2025 | In progress issued May 2026 | 227 07th Av | Burton Builders Llc | revision to permit 202404129912. installation of 1 "as-of-right" unit on ground floor. legalize stairs between 2nd and 3rd floor. install new ext. stair from grade to 2nd floor at rear yard. reconfigure recessed entry and garage door.Details
revision to permit 202404129912. installation of 1 "as-of-right" unit on ground floor. legalize stairs between 2nd and 3rd floor. install new ext. stair from grade to 2nd floor at rear yard. reconfigure recessed entry and garage door. | |
| Dec 22, 2025 | In progress filed Dec 2025, not yet issued | 78 Eastwood Dr | convert portion of (e) unfinished first fl garage to (n) habitble area consisting of (n) family room, (n) bath, and (n) bedroom. excavate portion of (e) slab to provide required ceiling height.Details
convert portion of (e) unfinished first fl garage to (n) habitble area consisting of (n) family room, (n) bath, and (n) bedroom. excavate portion of (e) slab to provide required ceiling height. | $150,000 | |
| Dec 19, 2025 | In progress issued Dec 2025 | 57 Winfield St | Appetite For Construction Inc | reconfigure 2 laundry room walls in the garage. remodel the kitchen, living and bathroom on level 1. add remodel the primary bathroom on the level 2.Details
reconfigure 2 laundry room walls in the garage. remodel the kitchen, living and bathroom on level 1. add remodel the primary bathroom on the level 2. | $125,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 1601 Monterey Bl | The Toboni Group | revision 202511179730 to include structrual detailsDetails
revision 202511179730 to include structrual details | |
| Dec 16, 2025 | Completed final sign-off Mar 2026 | 1558 46th Av | Mulhall Construction Inc. | voluntary strengthening 2022 cebc section a3. earthquake brace and bolt program.Details
voluntary strengthening 2022 cebc section a3. earthquake brace and bolt program. | $18,000 |
| Dec 10, 2025 | In progress issued Jan 2026 | 350 Frederick St | Doyle Developments | revision 202501067810- provide sleeper framing to replace existing. add new foundation, replace existing post and beam with new bearing wallDetails
revision 202501067810- provide sleeper framing to replace existing. add new foundation, replace existing post and beam with new bearing wall | $20,000 |
| Dec 10, 2025 | In progress issued Apr 2026 | 45 Glenbrook Av | Gama Construction Inc | 1st fl:add wet bar. reconfigure laundry & mech room,relocatebathroom & reconfigure bedroom and bathrooms 2nd fl: convert bedroom to den w/ wet bar. expand kitchen reconfigure powder & storage room. 3rd fl: open vault ceiling. stair access to 2nd fl. exterior changes sharing under bpa.2026-0326-8338.Details
1st fl:add wet bar. reconfigure laundry & mech room,relocatebathroom & reconfigure bedroom and bathrooms 2nd fl: convert bedroom to den w/ wet bar. expand kitchen reconfigure powder & storage room. 3rd fl: open vault ceiling. stair access to 2nd fl. exterior changes sharing under bpa.2026-0326-8338. | $250,000 |
| Dec 9, 2025 | Completed final sign-off Mar 2026 | 1436 Pacific Av | Hon's Construction Inc. | scope of work under this permit includes: rebuild existing rear stairway in like kind configureation with new guardrails.Details
scope of work under this permit includes: rebuild existing rear stairway in like kind configureation with new guardrails. | $20,000 |
| Dec 8, 2025 | In progress issued Dec 2025 | 46 Homestead St | Pio Mcgarr Inc | revision 201710171386- detail revision changes for (n) landscape. retaining walls rear yard retaining wall at back property lineDetails
revision 201710171386- detail revision changes for (n) landscape. retaining walls rear yard retaining wall at back property line | $18,000 |
| Dec 8, 2025 | In progress issued May 2026 | 9 14th Av | H I & D Construction | addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl.Details
addition of habitable space at the rear on the 1st fl. infill lightwell to the south fl 1 & 2. infill lightwell to the north 2nd fl only. remodel kitchen in unit 9 & 11 14th ave. remodel/reconfigure baths to units 9 & 11. all (n) interior finishes to replace (e) finishes. new deck at rear 3rd fl. | $380,000 |
| Dec 5, 2025 | Completed final sign-off Jun 2026 | 480 29th St | Greenberg Construction Co | revision to pa # 2025-0312-2089 & 2025-0709-0459: revise shearwall at landing to existing concrete wall.Details
revision to pa # 2025-0312-2089 & 2025-0709-0459: revise shearwall at landing to existing concrete wall. | |
| Nov 24, 2025 | Completed final sign-off Apr 2026 | 646 Head St | Mrm Ventures Llc. | revision to permit 202509165424. replace 45 feet of property line retaining wall at north side. add new planters.Details
revision to permit 202509165424. replace 45 feet of property line retaining wall at north side. add new planters. | $10,000 |
| Nov 19, 2025 | In progress issued Dec 2025 | 2467 Harrison St | Gb Construction Company | remodel and reconfigure existing kitchen, dining, and laundry at 2nd floor.Details
remodel and reconfigure existing kitchen, dining, and laundry at 2nd floor. | $75,000 |
| Nov 17, 2025 | In progress issued Dec 2025 | 1601 Monterey Bl | The Toboni Group | exterior work and rear yard only. new sports court, trellis, 5' and 8' high property line fences, planters and associated structural work. refer to permit# 202510036676 for previous rear yard demo work.Details
exterior work and rear yard only. new sports court, trellis, 5' and 8' high property line fences, planters and associated structural work. refer to permit# 202510036676 for previous rear yard demo work. | $100,000 |
| Nov 17, 2025 | Completed final sign-off Jan 2026 | 871 Sanchez St | Beyond The Horizon Construction | revision to detail 7/s3 for wet set anchors instead of epoxy bolts. revision to 201605066812.Details
revision to detail 7/s3 for wet set anchors instead of epoxy bolts. revision to 201605066812. | |
| Nov 6, 2025 | Completed final sign-off Jun 2026 | 3024 California St | Mud Worx Inc, Flanagan Construction | replace 25 ft of failing retaining wall at rear property lineDetails
replace 25 ft of failing retaining wall at rear property line | $10,000 |
| Nov 4, 2025 | In progress issued Nov 2025 | 50 Juniper St | demolition of walls, all mezzaninene floors, plumbing, interior gas lines and electrical. cutting, capping and decomissioning of gas lines. no construction demo only.Details
demolition of walls, all mezzaninene floors, plumbing, interior gas lines and electrical. cutting, capping and decomissioning of gas lines. no construction demo only. | $7,500 | |
| Nov 4, 2025 | In progress filed Nov 2025, not yet issued | 62 Vista Verde Ct | replace existing wood deck @ rear of houseDetails
replace existing wood deck @ rear of house | $28,000 | |
| Oct 27, 2025 | In progress issued Jan 2026 | 1631 North Point St | rear yard improvements including new 12" tall deck, new fences, new paving, new planters, hot tub, gas firepit, bbq and shade structure.Details
rear yard improvements including new 12" tall deck, new fences, new paving, new planters, hot tub, gas firepit, bbq and shade structure. | $75,000 | |
| Oct 22, 2025 | In progress issued Oct 2025 | 3441 Washington St | Nova Designs Builds Inc | rev to pa# 2025-0829-4188: remodel (e) guest bath in basement, remodel kitchen at 1st fl. remodel 2 exisiting bathrooms and add 1 bathroom at 2nd fl. add 4 skylightsDetails
rev to pa# 2025-0829-4188: remodel (e) guest bath in basement, remodel kitchen at 1st fl. remodel 2 exisiting bathrooms and add 1 bathroom at 2nd fl. add 4 skylights | $150,000 |
| Oct 21, 2025 | Completed final sign-off Jul 2026 | 41 Mallorca Wy | Pacific Gateway Builders Inc | convert existing ground floor storage to master suite. add warm board radiant heat, bathroom, new pell. all wood lifestyle windows in like kind of existing; remove any residual knob/tub replace with romex move electrical meters from rear to front near gas/ water. new sewer lateral & slab on gradeDetails
convert existing ground floor storage to master suite. add warm board radiant heat, bathroom, new pell. all wood lifestyle windows in like kind of existing; remove any residual knob/tub replace with romex move electrical meters from rear to front near gas/ water. new sewer lateral & slab on grade | $75,000 |
| Oct 17, 2025 | In progress issued Jan 2026 | 1601 Monterey Bl | The Toboni Group | int.remodel: replacement of ext wdws & doors. addition of state adu at the basement level. addition of 3 dormer windows at the rear and (n) skylights at the roof. vertical alterations exempt from neighbor notifications per 311Details
int.remodel: replacement of ext wdws & doors. addition of state adu at the basement level. addition of 3 dormer windows at the rear and (n) skylights at the roof. vertical alterations exempt from neighbor notifications per 311 | $1,718,690 |
| Oct 15, 2025 | In progress issued Dec 2025 | 1601 Monterey Bl | The Toboni Group | replace 64 ft of property line retaining walls with new soldier piles and laggingDetails
replace 64 ft of property line retaining walls with new soldier piles and lagging | $10,000 |
| Oct 10, 2025 | Completed final sign-off May 2026 | 2174 California St | L H Construction | excavate parking area to reconfigure parking space.Details
excavate parking area to reconfigure parking space. | $75,000 |
| Sep 24, 2025 | In progress issued Jul 2026 | 1060 Fulton St | revision to pa#202104229137 - interior remodel throughout w/ rear expansion to 30% rear yard setback & a bay projection allowable under sf planning code 136. new roof deck, (n) windows @ sides & rear. no alterations @ front of bldg, (e) front facing wood windows to remain.Details
revision to pa#202104229137 - interior remodel throughout w/ rear expansion to 30% rear yard setback & a bay projection allowable under sf planning code 136. new roof deck, (n) windows @ sides & rear. no alterations @ front of bldg, (e) front facing wood windows to remain. | $180,000 | |
| Sep 19, 2025 | Completed final sign-off Jun 2026 | 945 Faxon Av | dry rot repair @ main entry stairway. revision to 202507080309. replace (e) landing framing. add new foundation cap. replace (e) entry stair foundation. replace in kind and within property lines.Details
dry rot repair @ main entry stairway. revision to 202507080309. replace (e) landing framing. add new foundation cap. replace (e) entry stair foundation. replace in kind and within property lines. | $12,000 | |
| Sep 18, 2025 | Completed final sign-off Aug 2026 | 2174 California St | L H Construction | revision 202504184748- add (n) foundation at northwest corner to match (e) perimeter foundation. adjust location of (n) headers. revise (e) perimeter foundation to match (e) conditionDetails
revision 202504184748- add (n) foundation at northwest corner to match (e) perimeter foundation. adjust location of (n) headers. revise (e) perimeter foundation to match (e) condition | $15,000 |
| Sep 18, 2025 | In progress issued Feb 2026 | 8 Hill Point Av | Christopher's Construction Inc | relocate (e) laundry, remove (e) non bearing walls at (e) basement level. install new partitions for workout room, reconfigure stair between 1st level and basement. remove fireplace.Details
relocate (e) laundry, remove (e) non bearing walls at (e) basement level. install new partitions for workout room, reconfigure stair between 1st level and basement. remove fireplace. | $200,000 |
| Sep 16, 2025 | Completed final sign-off Apr 2026 | 646 Head St | Mrm Ventures Llc. | replace 107 linear feet of rear site walls with new reinforced concrete walls. to comply with nov 202426842Details
replace 107 linear feet of rear site walls with new reinforced concrete walls. to comply with nov 202426842 | $25,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 314 Hale St | ground fl single story horizontal addition into the rear yard including an office and hallway. ground fl remodel including bathroom, laundry room and hallway. revise (e) stair between ground fl and second fl.Details
ground fl single story horizontal addition into the rear yard including an office and hallway. ground fl remodel including bathroom, laundry room and hallway. revise (e) stair between ground fl and second fl. | $200,000 | |
| Sep 11, 2025 | Completed final sign-off Apr 2026 | 104 Collins St | Gerson Construction Inc. | new pocket doors at kitchen and bath. new steel beam at roof between kitchen and den. structural work only, no remodel work.Details
new pocket doors at kitchen and bath. new steel beam at roof between kitchen and den. structural work only, no remodel work. | $15,000 |
| Sep 10, 2025 | Completed final sign-off May 2026 | 2960 Clement St | Gil Construction & Assoc Inc. | replace 2 beams post and footing at corner of bldgDetails
replace 2 beams post and footing at corner of bldg | $15,000 |
| Sep 9, 2025 | Completed final sign-off Aug 2026 | 958 Capp St | Hon's Construction Inc. | interior remodel of 1 residential unit in a 4 unit building. work includes adding a bathroom and relocating the kitchen relocate bedroomDetails
interior remodel of 1 residential unit in a 4 unit building. work includes adding a bathroom and relocating the kitchen relocate bedroom | $58,000 |
| Sep 5, 2025 | Completed final sign-off May 2026 | 225 Vasquez Av | Bergquist Builders | addendum to prev permit 201706018092 & 202002033372. revision of interior stair from center stringer to cantilevered treads at upper level. new access required for pge electrical meter located on east side of house. concrete planter altered to include steps.Details
addendum to prev permit 201706018092 & 202002033372. revision of interior stair from center stringer to cantilevered treads at upper level. new access required for pge electrical meter located on east side of house. concrete planter altered to include steps. | $20,000 |
| Sep 4, 2025 | In progress issued Oct 2025 | 372 West Portal Av | Lara's Concrete Inc | level grade in rear yard. new slab and new retaining wall comply with nov 202540654. plumbing permit under separte permitDetails
level grade in rear yard. new slab and new retaining wall comply with nov 202540654. plumbing permit under separte permit | $15,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 46 Homestead St | Pio Mcgarr Inc | revision to permit 201710171386. change layout including stairs and retaining walls and guards at rear yard, adjacent to rear of proposed addition.Details
revision to permit 201710171386. change layout including stairs and retaining walls and guards at rear yard, adjacent to rear of proposed addition. | $9,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 46 Homestead St | Pio Mcgarr Inc | revision to pa # 202504083991. install foundation in sections on south property line as per plan foundation to be done in numbered sections. no greater than 6 foot add shoring sequence to south property line.Details
revision to pa # 202504083991. install foundation in sections on south property line as per plan foundation to be done in numbered sections. no greater than 6 foot add shoring sequence to south property line. | $15,000 |
| Aug 14, 2025 | Completed final sign-off Jul 2026 | 1467 Funston Av | Bay Build Design Inc | bathroom remodel. remove rear yard deck & stairs and replace with new landing w/ stairs. new hallway in family room. replace foundation and damaged wall at lightwell. (n) windows are rear and side.Details
bathroom remodel. remove rear yard deck & stairs and replace with new landing w/ stairs. new hallway in family room. replace foundation and damaged wall at lightwell. (n) windows are rear and side. | $90,000 |
| Aug 13, 2025 | In progress issued May 2026 | 1516 Shrader St | Andrew Gallagher Construction | renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom.Details
renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom. | $135,000 |
| Jul 31, 2025 | In progress issued Dec 2025 | 173 Downey St | Shoshan Construction Services | renovate kitchen. renovate 3 bathrooms. add (1) new bathroom on 3/f and (1) half bath on 2/f. new elevator, new radiant heating at all 3 floors. new air conditioning at 3/f.Details
renovate kitchen. renovate 3 bathrooms. add (1) new bathroom on 3/f and (1) half bath on 2/f. new elevator, new radiant heating at all 3 floors. new air conditioning at 3/f. | $378,000 |
| Jul 30, 2025 | In progress issued Dec 2025 | 4100 03rd St | Achill Beg Construction Inc | this project is to implement the change of use from residential(r) & assembly(a) occupancies to business(b) occupancy. the interior only renovation will include updates to the basement, ground lvl-1 & upper lvl-2.Details
this project is to implement the change of use from residential(r) & assembly(a) occupancies to business(b) occupancy. the interior only renovation will include updates to the basement, ground lvl-1 & upper lvl-2. | $848,905 |