Heidi Liebes
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Lieves Architects
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Sep 2026
97 permits since 2000 (architect on 92 permits, authorized agent-others on 3 permits, engineer on 2 permits): 68 completed, 8 in progress, 9 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1441 Mendell St | to comply w/ enforcement case# 2021-01003 en & comply w/ nov# 202289039, remove (e) portable restrooms on vacant lot.Details
to comply w/ enforcement case# 2021-01003 en & comply w/ nov# 202289039, remove (e) portable restrooms on vacant lot. | $700 | |
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 1861 Laguna St | remodel existing 2nd and 3rd flooors and existing garage. new rear stairs and decks over existing garage.Details
remodel existing 2nd and 3rd flooors and existing garage. new rear stairs and decks over existing garage. | $1,200,000 | |
| Jul 8, 2026 | In progress issued Jul 2026 | 325 Lawton St | Del Plata Builders Inc | rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding.Details
rebuild (e) exterior stairs in kind at rear yard. repair front balcony curbs at 3/f and replace front guardrail. new ext. door and window frames to replace damaged ones at sides and rear. new awning over side alley door (not encroaching prow). waterproofing repair at ext. wood siding. | $55,000 |
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 2721 Santiago St | interior kitchen remodel of single family residence. work includes new cabinetry and 2 replacement windows to covered covered courtyard not visible from street.Details
interior kitchen remodel of single family residence. work includes new cabinetry and 2 replacement windows to covered covered courtyard not visible from street. | $28,000 | |
| May 6, 2026 | Completed final sign-off Aug 2026 | 958 Capp St | Hon's Construction Inc. | revision to application 202509094906, install new stair guardrail in existing location.Details
revision to application 202509094906, install new stair guardrail in existing location. | $2,000 |
| Apr 22, 2026 | In progress issued Jun 2026 | 2736 Bush St | Ggd Inc. | small remodel of 1 residentail unit in a 2 unit building: replace 3 e) vinyl windows, adding a sauna at the front deck, not visible from street, new interior bookcaseDetails
small remodel of 1 residentail unit in a 2 unit building: replace 3 e) vinyl windows, adding a sauna at the front deck, not visible from street, new interior bookcase | $41,000 |
| Dec 19, 2025 | Completed final sign-off Jul 2026 | 2360 Polk St | Hon's Construction Inc. | t.i. of e) fast casual restaurant to accommodate new sushi handrool restaurant: included adding hall to e) restroom, update e) restroom to accommodate new access, relocate some e) kitchen equipment, adding some kitchen equipmentDetails
t.i. of e) fast casual restaurant to accommodate new sushi handrool restaurant: included adding hall to e) restroom, update e) restroom to accommodate new access, relocate some e) kitchen equipment, adding some kitchen equipment | $60,000 |
| Dec 9, 2025 | Completed final sign-off Mar 2026 | 1436 Pacific Av | Hon's Construction Inc. | scope of work under this permit includes: rebuild existing rear stairway in like kind configureation with new guardrails.Details
scope of work under this permit includes: rebuild existing rear stairway in like kind configureation with new guardrails. | $20,000 |
| Sep 18, 2025 | Completed final sign-off Feb 2026 | 2523 Steiner St | Larkspur Builders Inc. | (n) garage door and entry door. (n) entry vestibule with package drop and mail slot. new scissor gate of interior of garage door.Details
(n) garage door and entry door. (n) entry vestibule with package drop and mail slot. new scissor gate of interior of garage door. | $15,000 |
| Sep 9, 2025 | Completed final sign-off Aug 2026 | 958 Capp St | Hon's Construction Inc. | interior remodel of 1 residential unit in a 4 unit building. work includes adding a bathroom and relocating the kitchen relocate bedroomDetails
interior remodel of 1 residential unit in a 4 unit building. work includes adding a bathroom and relocating the kitchen relocate bedroom | $58,000 |
| May 13, 2025 | Completed final sign-off Mar 2026 | 65 Division St | Black Creek Builders | revision to approved pa #202411155106. reduce stuctural steel by removing clerestory windows/simplifying roof shape. replace restroom sink, add handrail to existing stair.Details
revision to approved pa #202411155106. reduce stuctural steel by removing clerestory windows/simplifying roof shape. replace restroom sink, add handrail to existing stair. | |
| Feb 27, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | emergency evacuation sign in a restaurantDetails
emergency evacuation sign in a restaurant | $1,000 |
| Feb 5, 2025 | Completed final sign-off Mar 2025 | 31 Orben Pl | Ggd Inc. | revision to 202202087588: remove scope of work that was not completed- rear yard awning, 3rd fl powder rm, 3rd fl guardrail, 4th fl rear balcony, & decorative entablative at front were removed from the scopeDetails
revision to 202202087588: remove scope of work that was not completed- rear yard awning, 3rd fl powder rm, 3rd fl guardrail, 4th fl rear balcony, & decorative entablative at front were removed from the scope | |
| Nov 15, 2024 | Completed final sign-off Mar 2026 | 65 Division St | Black Creek Builders | remodel (e) outdoor restaurant patio to include (n) partially covered outdoor bar & upgraded exterior canopy structure. remodel interior of (e) restaurant with (n) kitchen equipment & lightingDetails
remodel (e) outdoor restaurant patio to include (n) partially covered outdoor bar & upgraded exterior canopy structure. remodel interior of (e) restaurant with (n) kitchen equipment & lighting | $580,000 |
| Jun 28, 2024 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | rev 202304045050- basement,1st, 2nd floor- includes mijor work on 3 floors : basement- structrually modify (e) steel beam, leave door @ fire control panel room, leave (e) elevator machine room walls. 1st flr- relocated access seating, (n) bathroom sink, leave stair wall. exterior work under separteDetails
rev 202304045050- basement,1st, 2nd floor- includes mijor work on 3 floors : basement- structrually modify (e) steel beam, leave door @ fire control panel room, leave (e) elevator machine room walls. 1st flr- relocated access seating, (n) bathroom sink, leave stair wall. exterior work under separte | |
| Aug 14, 2023 | In progress issued Apr 2024 | 494 Jackson St | to comply w/accessible business entrance program abe# 202308013106, install accessible door lever hardware, new handrails at existing steps and new 2" wide contrasting color striping to the exterior steps. fabricate & install new signage in the door window for disabled customers.Details
to comply w/accessible business entrance program abe# 202308013106, install accessible door lever hardware, new handrails at existing steps and new 2" wide contrasting color striping to the exterior steps. fabricate & install new signage in the door window for disabled customers. | $1,250 | |
| Jul 28, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | new exterior entry doors in (e) locations, new exhaust louvers for the restrnt in transom window area this permit application is for the exterior work only for a new restrnt. interior work under sep bpa#202304045050. minor pta approved #2023-001035pta.separte permit for sign will be obtained.Details
new exterior entry doors in (e) locations, new exhaust louvers for the restrnt in transom window area this permit application is for the exterior work only for a new restrnt. interior work under sep bpa#202304045050. minor pta approved #2023-001035pta.separte permit for sign will be obtained. | $45,000 |
| Jul 18, 2023 | Never finaled issued Aug 2023, no final | 802 Montgomery St | to comply w/ accessible business entramce program 51-16, abe #2000131609. install accessible door lever hardware, new 2" wide contrasting color striping to exterior steps.Details
to comply w/ accessible business entramce program 51-16, abe #2000131609. install accessible door lever hardware, new 2" wide contrasting color striping to exterior steps. | $250 | |
| Jul 18, 2023 | In progress issued Apr 2024 | 498 Jackson St | to comply w/ accessible business entramce program 51-16, abe #202306267665. install accessible door lever hardware, install new handrails both steps, new 2" wide contrasting color striping to exterior steps. exterior work only.Details
to comply w/ accessible business entramce program 51-16, abe #202306267665. install accessible door lever hardware, install new handrails both steps, new 2" wide contrasting color striping to exterior steps. exterior work only. | $2,500 | |
| Jul 18, 2023 | Never finaled issued Aug 2023, no final | 804 Montgomery St | to comply w/ accessible business entramce program 51-16, abe #202306267664. replace double doors w/ a 36" wide door, install accessible door lever hardware, new 2" wide contrasting color striping to exterior steps.Details
to comply w/ accessible business entramce program 51-16, abe #202306267664. replace double doors w/ a 36" wide door, install accessible door lever hardware, new 2" wide contrasting color striping to exterior steps. | $4,500 | |
| Apr 25, 2023 | Completed final sign-off Mar 2026 | 1651 09th Av | Urban Builder General Contracting Inc | horizontal rear addition to existing single family residence. remodel existing second and third floors. new rear deck.Details
horizontal rear addition to existing single family residence. remodel existing second and third floors. new rear deck. | $400,000 |
| Apr 19, 2023 | Completed final sign-off Aug 2024 | 1635 Chestnut St | Hon's Construction Inc. | interior remodel of existing 1st & 2nd flrs residential unit including new interior stairs, new bathroom & small lightwell in-fill.Details
interior remodel of existing 1st & 2nd flrs residential unit including new interior stairs, new bathroom & small lightwell in-fill. | $150,000 |
| Apr 4, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | remodel basement, 1st & 2nd fl. for (n) restaurant in an (e) 6 story bldg. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes (n) main stair, (n) kitchens at all 3 fls, (n) bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit.Details
remodel basement, 1st & 2nd fl. for (n) restaurant in an (e) 6 story bldg. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes (n) main stair, (n) kitchens at all 3 fls, (n) bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit. | $980,000 |
| Dec 28, 2022 | Never finaled filed Dec 2022, never issued | 2124 Union St | suite a: removal of sales counter to clear bid nov#201877651 dated 7/18/2018. see pa#202102184936 & 202212027560Details
suite a: removal of sales counter to clear bid nov#201877651 dated 7/18/2018. see pa#202102184936 & 202212027560 | ||
| Dec 13, 2022 | Completed final sign-off Feb 2026 | 253 05th Av | Michael Mc Nulty Construction***Ask Id | interior remodel of lower 2 apt. units. relocate bathrooms and remodel kitchens. new powder room in lower unit. rebuild existing exterior exit stairs in kind. rebuild existing front entry steps.Details
interior remodel of lower 2 apt. units. relocate bathrooms and remodel kitchens. new powder room in lower unit. rebuild existing exterior exit stairs in kind. rebuild existing front entry steps. | $207,000 |
| Aug 16, 2022 | In progress issued Aug 2024 | 1431 Mendell St | to comply w/ 202101003en. ground flr: add exit corridor for church exiting, upgrade church & retail tenant entrances, upgrade church accessible restroom. 2/f: provide living rm for residential, legalize bathrms added w/o permit. upgrade roof decks provide guardrails, support parapet walls/stairs.Details
to comply w/ 202101003en. ground flr: add exit corridor for church exiting, upgrade church & retail tenant entrances, upgrade church accessible restroom. 2/f: provide living rm for residential, legalize bathrms added w/o permit. upgrade roof decks provide guardrails, support parapet walls/stairs. | $185,000 | |
| Feb 8, 2022 | Completed final sign-off Mar 2025 | 31 Orben Pl | Ggd Inc. | interior and exterior changes to previously approved building permit 9813301. add rear awning serving 2nd floor deck, enlarge kitchen and add 3rd floor powder room. "no package drop at main entry"Details
interior and exterior changes to previously approved building permit 9813301. add rear awning serving 2nd floor deck, enlarge kitchen and add 3rd floor powder room. "no package drop at main entry" | $320,000 |
| Dec 15, 2021 | Expired or cancelled cancelled Feb 2026 | 3059 25th St | vertical addition to (e) single family residence, new floor to include 3 (n) bedrooms and two (n) bathrooms. remodel (e) second floor to accomodate (n) third floor. (n) roof deck.Details
vertical addition to (e) single family residence, new floor to include 3 (n) bedrooms and two (n) bathrooms. remodel (e) second floor to accomodate (n) third floor. (n) roof deck. | $643,000 | |
| Nov 24, 2021 | Completed final sign-off Feb 2023 | 962 Capp St | Hon's Construction Inc. | rev to pa# 202008212311: new powder room at ground fl.Details
rev to pa# 202008212311: new powder room at ground fl. | |
| Oct 26, 2021 | Expired or cancelled cancelled Jan 2026 | 1278 Church St | interior remodel includes new hardwood floor in 2 rooms. replace (e) gas fireplace. new room divider.Details
interior remodel includes new hardwood floor in 2 rooms. replace (e) gas fireplace. new room divider. | $19,000 | |
| Aug 20, 2021 | Completed final sign-off Nov 2022 | 2678 16th Av | Modern Construction Inc | interior remodel: add 2 new bathrooms and 1 new powder room. 1-1/2 bathrooms on lower floor, 1 new bathroom on upper. rebuild rear yard deck and exterior stairs to rear newDetails
interior remodel: add 2 new bathrooms and 1 new powder room. 1-1/2 bathrooms on lower floor, 1 new bathroom on upper. rebuild rear yard deck and exterior stairs to rear new | $40,000 |
| Jul 7, 2021 | Completed final sign-off Sep 2021 | 101 Lombard St | rev to pa# 202002265526: interior work only. existing closet walls to remain. layout change to be coordinated w/ sprinkler plans per fire dept.Details
rev to pa# 202002265526: interior work only. existing closet walls to remain. layout change to be coordinated w/ sprinkler plans per fire dept. | ||
| May 3, 2021 | Completed final sign-off Dec 2021 | 2525 Gough St | Reveal Partners | rebuild existing exterior rear stair in kind.Details
rebuild existing exterior rear stair in kind. | $10,000 |
| Feb 18, 2021 | Expired or cancelled withdrawn Sep 2022 | 2124 Union St | to install electric wall sign: "hint"Details
to install electric wall sign: "hint" | $5,000 | |
| Feb 18, 2021 | Expired or cancelled withdrawn Sep 2023 | 2124 Union St | comply with nov 201877651. remodel ground floor for change of tenancy. add exterior siding and new sales counter. upgrade front entry for suite a only per abe program. refrigerators to be 25sqft or less and will only be selling bottled water.Details
comply with nov 201877651. remodel ground floor for change of tenancy. add exterior siding and new sales counter. upgrade front entry for suite a only per abe program. refrigerators to be 25sqft or less and will only be selling bottled water. | $31,000 | |
| Feb 18, 2021 | Expired or cancelled withdrawn Apr 2023 | 2124 Union St | suite b: to install non-electric sign at gate: "reid's tailoring"Details
suite b: to install non-electric sign at gate: "reid's tailoring" | $2,000 | |
| Jan 14, 2021 | Completed final sign-off Jun 2023 | 694 Valencia St | Cookline Construction Inc | revision to pa#2020-0114-1881. structural drawings to support new mechanical units and revised structural drawings to accommodate existing conditions. also deffered mechanical permit for pa202001141881. maher n/a.Details
revision to pa#2020-0114-1881. structural drawings to support new mechanical units and revised structural drawings to accommodate existing conditions. also deffered mechanical permit for pa202001141881. maher n/a. | $30,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 4409 20th St | Modern Construction Inc | interior remodel of 3rd fl apartment unit including new bathroom, new kitchen island, and remodel existing bathroom.Details
interior remodel of 3rd fl apartment unit including new bathroom, new kitchen island, and remodel existing bathroom. | $60,000 |
| Aug 21, 2020 | Completed final sign-off Mar 2023 | 962 Capp St | Hon's Construction Inc. | interior remodel and small rear addition of existing 2nd flr apt unit.Details
interior remodel and small rear addition of existing 2nd flr apt unit. | $115,000 |
| Feb 26, 2020 | Completed final sign-off Sep 2021 | 101 Lombard St | interior remodel of (e) 2/f condo unit. infill existing floor opening, add walls to make office. interior work only. sprinkler/fire alarm under sep permit.Details
interior remodel of (e) 2/f condo unit. infill existing floor opening, add walls to make office. interior work only. sprinkler/fire alarm under sep permit. | $14,000 | |
| Jan 14, 2020 | Completed final sign-off Aug 2023 | 694 Valencia St | Faith N Jason Construction Llc | revision to app#201603081452. interior remodel of ground floor extg restaurant. includes new bathroom layout, new kitchen equipment plan and new lighting.Details
revision to app#201603081452. interior remodel of ground floor extg restaurant. includes new bathroom layout, new kitchen equipment plan and new lighting. | |
| Oct 15, 2019 | Completed final sign-off Jan 2020 | 962 Capp St | Pop Construction A Parnership | dry rot repair of (e) apt exit stair, to comply with nov 201985601 dated 9/20/2019, repair only, not to exceed 50% of entire stair structure.Details
dry rot repair of (e) apt exit stair, to comply with nov 201985601 dated 9/20/2019, repair only, not to exceed 50% of entire stair structure. | $2,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2020 | 4407 20th St | Modern Construction Inc | remodel 2nd fl apartment unit. replace existing rear windows.Details
remodel 2nd fl apartment unit. replace existing rear windows. | $60,000 |
| Dec 19, 2018 | Completed final sign-off Aug 2020 | 4407 20th St | Modern Construction Inc | add unit per ord #162-16. remodel ground floor to accommodate 1 new studio apartment unit. soft story permit is approved & issued 201805250265.Details
add unit per ord #162-16. remodel ground floor to accommodate 1 new studio apartment unit. soft story permit is approved & issued 201805250265. | $95,000 |
| Dec 4, 2017 | Never finaled filed Dec 2017, never issued | 2250 Buchanan St | remodel ground floor to accommodate (2) new adu apartment units per ordinance# 162-16.Details
remodel ground floor to accommodate (2) new adu apartment units per ordinance# 162-16. | $100,000 | |
| Sep 7, 2017 | Completed final sign-off Dec 2018 | 750 14th St | Modern Construction Inc | revision to 2015-0623-9703. relocate 1 accessible restroom to 1st fl. relocate unit kitchen to opposite wallDetails
revision to 2015-0623-9703. relocate 1 accessible restroom to 1st fl. relocate unit kitchen to opposite wall | $10,000 |
| Sep 7, 2017 | Completed final sign-off May 2018 | 651 Gates St | new stair to basement and new bathroom with new windowDetails
new stair to basement and new bathroom with new window | $20,000 | |
| Mar 28, 2017 | Never finaled filed Mar 2017, never issued | 10 Glendale St | adu per ordinance no.162-16. remodel ground floor to accommodate 1 new apt. unit at (e) apartment building. new windows to accommodate. sofe story under separate permit app#201703242316.Details
adu per ordinance no.162-16. remodel ground floor to accommodate 1 new apt. unit at (e) apartment building. new windows to accommodate. sofe story under separate permit app#201703242316. | $105,000 | |
| Feb 13, 2017 | Completed final sign-off Nov 2017 | 27 South Park | All Bay Construction Inc | remodel ground floor tenant space to include 2 new conference rooms, new kitchenette and new lighting. n/a ordinance #155-13Details
remodel ground floor tenant space to include 2 new conference rooms, new kitchenette and new lighting. n/a ordinance #155-13 | $70,000 |
| Nov 29, 2016 | Never finaled issued Nov 2016, no final | 26 Hodges Al | All Bay Construction Inc | revise sprinkler requirement from 13r to 13d. ref app#201303212735Details
revise sprinkler requirement from 13r to 13d. ref app#201303212735 | |
| Nov 18, 2016 | Never finaled issued Nov 2016, no final | 10 Glendale St | European Homecraft Inc | unit #310: remodel of 2 bathrooms and kitchen, enlarge closets, change window, add extra bedroom in extg apartment.Details
unit #310: remodel of 2 bathrooms and kitchen, enlarge closets, change window, add extra bedroom in extg apartment. | $38,000 |
| Oct 12, 2016 | Expired or cancelled expired Apr 2026 | 1265 Washington St | Modern Construction Inc | ordinance 30-15 remodel ground floor to accommodate 2 (n) apartment units. (n) windows on rear facade. each (n) unit has bathroom & kitchen.Details
ordinance 30-15 remodel ground floor to accommodate 2 (n) apartment units. (n) windows on rear facade. each (n) unit has bathroom & kitchen. | $120,000 |
| Oct 5, 2016 | Completed final sign-off Dec 2018 | 750 14th St | Modern Construction Inc | soft story upgrade. drawings reference remodel permit appln #201506239703. 2012 iebc appendix a-4Details
soft story upgrade. drawings reference remodel permit appln #201506239703. 2012 iebc appendix a-4 | $60,000 |
| Apr 26, 2016 | Expired or cancelled cancelled Jan 2026 | 558 Sacramento St | Faith N Jason Construction Llc | revision to app#2014031810550 includes 2 new fire station pulls, one new smoke detectors emergency lighting and new horn strobe. n/a for maher. fire alrm and sprinklers separte permitDetails
revision to app#2014031810550 includes 2 new fire station pulls, one new smoke detectors emergency lighting and new horn strobe. n/a for maher. fire alrm and sprinklers separte permit | $200 |
| Feb 4, 2016 | Never finaled issued Feb 2016, no final | 558 Sacramento St | Faith N Jason Construction Llc | revision to 201403181050, new wall at offices, new lights new closetDetails
revision to 201403181050, new wall at offices, new lights new closet | |
| Jul 30, 2015 | Completed final sign-off Nov 2015 | 491 Utah St | Modern Construction Inc | to comply with nov 201556821. rebuild existing rear exit stairs to comply with cbc. change in stair configurations stairs to exit all 3 storiesDetails
to comply with nov 201556821. rebuild existing rear exit stairs to comply with cbc. change in stair configurations stairs to exit all 3 stories | $12,000 |
| Jun 23, 2015 | Completed final sign-off Dec 2018 | 750 14th St | Modern Construction Inc | remodel ground fl & basement to accommodate 4 new apart units to an existing mixed use bldg. remodel existing exterior rear stair, remove existing rear garage to accommodate new rear yard. no soft story work included.Details
remodel ground fl & basement to accommodate 4 new apart units to an existing mixed use bldg. remodel existing exterior rear stair, remove existing rear garage to accommodate new rear yard. no soft story work included. | $650,000 |
| Jun 4, 2015 | Completed final sign-off Nov 2016 | 489 Utah St | Modern Construction Inc | new stair in top floor unit to new roof deckDetails
new stair in top floor unit to new roof deck | $18,000 |
| May 28, 2015 | Completed final sign-off Oct 2016 | 26 Hodges Al | Soil Engineering Construction | structural site work to stabilize (e) slope to comply with nov 201413221 dated 12/12/2014, 201296253 ref pa 2013 0321 2735Details
structural site work to stabilize (e) slope to comply with nov 201413221 dated 12/12/2014, 201296253 ref pa 2013 0321 2735 | $70,000 |
| Sep 3, 2014 | Completed final sign-off Nov 2015 | 27 South Park | All Bay Construction Inc | upgrade existing bathrooms at ground floor only including new fixtures + finishes, new carpet & new lights in existing grid in hallway. remove existing posts and install new beams per plan. maher n/a.Details
upgrade existing bathrooms at ground floor only including new fixtures + finishes, new carpet & new lights in existing grid in hallway. remove existing posts and install new beams per plan. maher n/a. | $60,000 |
| Apr 2, 2014 | Expired or cancelled expired Mar 2016 | 668 Elizabeth St | Brendan Lalor Construction | new bathroom in existing residential condo unit.Details
new bathroom in existing residential condo unit. | $15,000 |
| Mar 18, 2014 | Completed final sign-off Jul 2016 | 558 Sacramento St | Make Ready Maintenance Inc, Faith N Jason Construction Llc | interior remodel of the 4th fl of existing 4 story building that is mostly restaurant. 4th fl is being renovated from office to restaurant. 3rd floor to be permitted for dining. sprinklers thorughout and f/a under separate permit. maher-compliance with ordinance no.155-13 not required.Details
interior remodel of the 4th fl of existing 4 story building that is mostly restaurant. 4th fl is being renovated from office to restaurant. 3rd floor to be permitted for dining. sprinklers thorughout and f/a under separate permit. maher-compliance with ordinance no.155-13 not required. | $73,000 |
| Mar 17, 2014 | Completed final sign-off Aug 2016 | 558 Sacramento St | Make Ready Maintenance Inc, Faith N Jason Construction Llc | new skylight in (e) 4 story restaurant. ** maher: compliance with ordinance no# 155-13 not required **Details
new skylight in (e) 4 story restaurant. ** maher: compliance with ordinance no# 155-13 not required ** | $25,000 |
| Jan 10, 2014 | Completed final sign-off Mar 2016 | 450 Sansome St | Peacock Construction Inc | compliance with ordinance no. 15-133 not required. excation less than 50 cu yard or no excavation: demo of non structural partitions, ceilings, lighting to remain. build new non structural wall, relocate doors and frames, new electrical. f/a and sprinklers under separate permit.Details
compliance with ordinance no. 15-133 not required. excation less than 50 cu yard or no excavation: demo of non structural partitions, ceilings, lighting to remain. build new non structural wall, relocate doors and frames, new electrical. f/a and sprinklers under separate permit. | $105,000 |
| Nov 13, 2013 | Completed final sign-off Jul 2014 | 1451 Montgomery St | Duffin Construction | #8- repair existing deck to include new guardrail & deck tile, new glass door in existing location location at rear of building.Details
#8- repair existing deck to include new guardrail & deck tile, new glass door in existing location location at rear of building. | $9,000 |
| Aug 15, 2013 | Never finaled issued Aug 2013, no final | 110 Sutter St | 3rd floor-t.i. new partitions, doors, relocate light fixturesDetails
3rd floor-t.i. new partitions, doors, relocate light fixtures | $62,000 | |
| Mar 21, 2013 | Completed final sign-off Nov 2018 | 26 Hodges Al | All Bay Construction Inc | to comply with n.o.v#201296253. remodel & addition of third flr of single family house. new stair enlarge kitchen and add master bedroom suite at new third flor.Details
to comply with n.o.v#201296253. remodel & addition of third flr of single family house. new stair enlarge kitchen and add master bedroom suite at new third flor. | $145,000 |
| Sep 10, 2012 | Completed final sign-off Dec 2012 | 1474 Grove St | Modern Construction Inc | referace to application 2012 0801-6244 build new bathroom, construct one new partition wall for bathroom, install one new door.Details
referace to application 2012 0801-6244 build new bathroom, construct one new partition wall for bathroom, install one new door. | $6,000 |
| Sep 10, 2012 | Completed final sign-off Dec 2012 | 510 Baker St | Modern Construction Inc | referance to application number 20120601-1670- replace 4 windows (not visable from street) build new bathroom next to existing bathroom, construct one new partiton wall, install one door.Details
referance to application number 20120601-1670- replace 4 windows (not visable from street) build new bathroom next to existing bathroom, construct one new partiton wall, install one door. | $6,000 |
| Jun 11, 2012 | Completed final sign-off Jul 2014 | 3855 25th St | Travis General Contractors | rear addition: new living room +bathroom at ground floor, new stair from main level fown. new bathroom + enlarged bedrooms at top floor. total four new skylightsDetails
rear addition: new living room +bathroom at ground floor, new stair from main level fown. new bathroom + enlarged bedrooms at top floor. total four new skylights | $175,000 |
| Apr 26, 2012 | Completed final sign-off Sep 2012 | 1157 Masonic Av | O'keeffe Mikumo Co | revision to pa# 201111108670. adding walls and sinks in existing retail space for new tatoo and piercing studio.Details
revision to pa# 201111108670. adding walls and sinks in existing retail space for new tatoo and piercing studio. | $15,000 |
| Oct 13, 2011 | Completed final sign-off Nov 2011 | 2 Shaw Al | Hon's Construction Inc. | new wall to create private office in an (e) office areaDetails
new wall to create private office in an (e) office area | $5,000 |
| Jul 12, 2011 | Completed final sign-off Oct 2011 | 552 Page St | Christopher Coppersmith Construction | new skylight 5 feet away from side property line. approx 4'-6" x 5'-0" opening.Details
new skylight 5 feet away from side property line. approx 4'-6" x 5'-0" opening. | $8,000 |
| Apr 21, 2011 | Completed final sign-off Jul 2011 | 176 Sutter St | Angotti & Reilly Inc. | new dressing rooms and sales counter ( street level )Details
new dressing rooms and sales counter ( street level ) | $7,200 |
| Mar 28, 2011 | Completed final sign-off May 2011 | 575 Sutter St | Modern Construction Inc | 3rd floor - install 3 new hc-access restrooms with/34" h kitchenette counter in 3 extg office spaces.Details
3rd floor - install 3 new hc-access restrooms with/34" h kitchenette counter in 3 extg office spaces. | $36,000 |
| Oct 18, 2010 | Completed final sign-off Dec 2010 | 160 Folsom St | Modern Construction Inc | build free standing walls interiorDetails
build free standing walls interior | $20,000 |
| Oct 12, 2010 | Completed final sign-off Jun 2011 | 3465 19th St | Travis General Contractors | revision to extg permit application #200804109369. relocate kitchen and relocate bar.Details
revision to extg permit application #200804109369. relocate kitchen and relocate bar. | |
| Aug 23, 2010 | Completed final sign-off Aug 2011 | 338 Highland Av | Modern Construction Inc | remove exsiting rear bay windows & change to deck. rebuild rear existing stairs. replace 3 windows.Details
remove exsiting rear bay windows & change to deck. rebuild rear existing stairs. replace 3 windows. | $6,000 |
| Apr 29, 2010 | Completed final sign-off Aug 2010 | 3855 25th St | Adrian Collins | revision to application 2010-0311-8009. reframe existing wall with 4x6 according to drawing sk-01.Details
revision to application 2010-0311-8009. reframe existing wall with 4x6 according to drawing sk-01. | |
| Mar 11, 2010 | Completed final sign-off Aug 2010 | 3855 25th St | Adrian Collins | remodeling kitchen area in single family house including relocating powder rm., replacing windows and new skylights.Details
remodeling kitchen area in single family house including relocating powder rm., replacing windows and new skylights. | $35,000 |
| Mar 9, 2010 | Completed final sign-off May 2010 | 575 Sutter St | Modern Construction Inc | unit #204 -to comply to the report of physical inspection application 3r-5031. ref. appl. 200701030882(204) & 200704179016(301).Details
unit #204 -to comply to the report of physical inspection application 3r-5031. ref. appl. 200701030882(204) & 200704179016(301). | $13,000 |
| Mar 9, 2010 | Completed final sign-off May 2010 | 575 Sutter St | Modern Construction Inc | unit #301 -to comply the report of physical inspection application 3r-5031. ref. appl.#200704179016. install bathroom & kitchenette.Details
unit #301 -to comply the report of physical inspection application 3r-5031. ref. appl.#200704179016. install bathroom & kitchenette. | $12,000 |
| Nov 17, 2009 | Completed final sign-off Jan 2012 | 2010 Pacific Av | new one bedroom apartment unit at ground floor. property is zoned for 14 units. adequate parking is existing but new space to be provided. this is a site permit application.Details
new one bedroom apartment unit at ground floor. property is zoned for 14 units. adequate parking is existing but new space to be provided. this is a site permit application. | $100,000 | |
| May 5, 2009 | Completed final sign-off Nov 2010 | 780 Valencia St | Maverick Construction***See Notes*** | revision to pa# 2008-1118-6870-addition to (e) mezzanine & installing more efficient radiant heat instead of central air, new title 24. adding 440 sq ft to (e) mezzanineDetails
revision to pa# 2008-1118-6870-addition to (e) mezzanine & installing more efficient radiant heat instead of central air, new title 24. adding 440 sq ft to (e) mezzanine | |
| Nov 18, 2008 | Completed final sign-off Jan 2011 | 780 Valencia St | change of occupancy, remodel existing warehouse to accommodate cafe & business center, remodel entry to make hc-accessible, relocate bathrooms, add non-structural walls, relocate stair to existing messanine. sprinkler under separate permit.Details
change of occupancy, remodel existing warehouse to accommodate cafe & business center, remodel entry to make hc-accessible, relocate bathrooms, add non-structural walls, relocate stair to existing messanine. sprinkler under separate permit. | $180,000 | |
| Jun 10, 2008 | Completed final sign-off Jun 2009 | 531 Octavia St | revision to pa# 2007-0404-8075-work includes adding 1 rear facing window, 5 skylights and removing one interior wall to make unit larger. work in 539 octaviaDetails
revision to pa# 2007-0404-8075-work includes adding 1 rear facing window, 5 skylights and removing one interior wall to make unit larger. work in 539 octavia | $15,000 | |
| Apr 4, 2007 | Expired or cancelled expired Jan 2011 | 539 Octavia St | adding bathrooms and kitchennettes to 19 residential rooms. on second and third floors. no reduction of residitial rooms. construct pge 3 hr rated vault en ground floor.Details
adding bathrooms and kitchennettes to 19 residential rooms. on second and third floors. no reduction of residitial rooms. construct pge 3 hr rated vault en ground floor. | $250,000 | |
| Feb 14, 2007 | Expired or cancelled expired May 2010 | 233 Cumberland St | horizontal addition: new one car garage in front setback of residential property and below existing house. excavating under existing house to build new garage.Details
horizontal addition: new one car garage in front setback of residential property and below existing house. excavating under existing house to build new garage. | $60,000 | |
| Oct 13, 2006 | Completed final sign-off Mar 2008 | 279 Cumberland St | Keegan Contruction Inc. | change 3' high 1 hour guardwall to 3'high metal non combustible guardrail at roof deck over new garage. revision to an existing permit appln #2005/05/03/1465Details
change 3' high 1 hour guardwall to 3'high metal non combustible guardrail at roof deck over new garage. revision to an existing permit appln #2005/05/03/1465 | |
| Aug 8, 2006 | Completed final sign-off Jul 2008 | 2820 Scott St | interior remodel sfd with new roof deck and stairs. elevator to roof. upgrade fire escape at rear.Details
interior remodel sfd with new roof deck and stairs. elevator to roof. upgrade fire escape at rear. | $100,000 | |
| Aug 7, 2006 | Completed final sign-off Mar 2007 | 3500 Market St | infill 2 walls at elevatior shaft s/subseuent ada upgrades 1hr constructionDetails
infill 2 walls at elevatior shaft s/subseuent ada upgrades 1hr construction | $39,283 | |
| Sep 21, 2005 | Completed final sign-off Nov 2005 | 2123 Fillmore St | Angotti & Reilly Inc. | new casework flooring transition ,heat,heat pump/new owner of extg useDetails
new casework flooring transition ,heat,heat pump/new owner of extg use | $32,500 |
| Jun 10, 2005 | Completed final sign-off Aug 2005 | 471 Jersey St | rebuild exist rear exterior stair.Details
rebuild exist rear exterior stair. | $8,000 | |
| May 6, 2005 | Expired or cancelled expired May 2006 | 28 Cyril Magnin St | Angotti & Reilly Inc. | renew appl#200403017432,200404131199,200403158685 for final inspectionDetails
renew appl#200403017432,200404131199,200403158685 for final inspection | |
| May 3, 2005 | Completed final sign-off Aug 2008 | 279 Cumberland St | addition of 2 car garage in front of existing house. new entry steps up to house. no change to existing house. add curb cut for driveway.Details
addition of 2 car garage in front of existing house. new entry steps up to house. no change to existing house. add curb cut for driveway. | $60,000 | |
| Feb 25, 2005 | Completed final sign-off Apr 2006 | 741 47th Av | Cornelius Regan Const. | remodel kitchens in both units. rmove eisting damaged rear exterior stair and install new stair withDetails
remodel kitchens in both units. rmove eisting damaged rear exterior stair and install new stair with | $80,000 |
| Apr 13, 2004 | Expired or cancelled expired Mar 2006 | 28 Cyril Magnin St | rev. appl#200403158685 change bathroom layoutDetails
rev. appl#200403158685 change bathroom layout |