Block 0288, lot 007
110 Sutter St
- City’s use
- Commercial Office
- Built
- 1906
- Stories
- 10
- Building
- 47,665 sq ft
- Lot
- 4,809 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
107 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 29, 2025 | In progress filed Oct 2025, not yet issued | 110 Sutter St | interior remodel @ 5th fl tenant space includes demo, new partitions, doors, lighting and electrical and plumbing. any mep, title 24 energy calcs, and life safety work to be permitted separatelyDetails
interior remodel @ 5th fl tenant space includes demo, new partitions, doors, lighting and electrical and plumbing. any mep, title 24 energy calcs, and life safety work to be permitted separately | $150,000 | |
| Jan 2, 2025 | In progress issued Mar 2025 | 110 Sutter St | Pyro-Comm Systems, Inc. | addition to existing fire alarm system. pyro-comm will be adding a cellular communication dialer to an existing fire alarm system. all noftifications devices will remain. all addressible devices will be connected to existing fire alarm control unit intelligent loop.Details
addition to existing fire alarm system. pyro-comm will be adding a cellular communication dialer to an existing fire alarm system. all noftifications devices will remain. all addressible devices will be connected to existing fire alarm control unit intelligent loop. | $10,699 |
| Aug 2, 2021 | Completed final sign-off Nov 2021 | 110 Sutter St | Giampolini & Co Dba Giampolini/Courtney | sw corner stuctural repairs. ref facade repair & maintenance pa# 202011168984. install new verical supports for (e) stone with ss anchorage & plaets to (e) steel columng. patch holes to match (e) characteristics & color of (e) stone.Details
sw corner stuctural repairs. ref facade repair & maintenance pa# 202011168984. install new verical supports for (e) stone with ss anchorage & plaets to (e) steel columng. patch holes to match (e) characteristics & color of (e) stone. | $100,000 |
| Feb 25, 2021 | Expired or cancelled cancelled Jan 2026 | 110 Sutter St | Ad Art Inc. | install non-electric projecting double faced wall sign (one medical)Details
install non-electric projecting double faced wall sign (one medical) | $5,000 |
| Nov 16, 2020 | Completed final sign-off Nov 2021 | 110 Sutter St | Giampolini & Co Dba Giampolini/Courtney | facade repair and maintenance at sutter street and trinity street include sandstone crack & spall repair, refurbishement of (e) windows and (e) guardrails. maher n/aDetails
facade repair and maintenance at sutter street and trinity street include sandstone crack & spall repair, refurbishement of (e) windows and (e) guardrails. maher n/a | $600,000 |
| Apr 9, 2019 | Never finaled issued Apr 2019, no final | 110 Sutter St | Peacock Construction | revision to 201808207736 change to mechanical layout.Details
revision to 201808207736 change to mechanical layout. | $10,400 |
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 110 Sutter St | Pyro-Comm Systems, Inc. | ref pa # 201808207736; fire alarm t.i. adding (2) smoke detectors and (21) strobes & horn stobesDetails
ref pa # 201808207736; fire alarm t.i. adding (2) smoke detectors and (21) strobes & horn stobes | $11,500 |
| Oct 15, 2018 | Completed final sign-off Nov 2018 | 110 Sutter St | Matrix Hg Inc | structural monitoring of vrf system and addition of split system to serve idf rooms. ref mech pa 2018 07275782 ref arch 201805240048Details
structural monitoring of vrf system and addition of split system to serve idf rooms. ref mech pa 2018 07275782 ref arch 201805240048 | $22,000 |
| Oct 4, 2018 | Expired or cancelled cancelled Jan 2026 | 110 Sutter St | Matrix Hg Inc | 2/f: installat of brf system on second floor to feed into fifth floor. ref. t.i. pa201805240048. maher n/a.Details
2/f: installat of brf system on second floor to feed into fifth floor. ref. t.i. pa201805240048. maher n/a. | $10,000 |
| Sep 10, 2018 | Completed final sign-off Nov 2018 | 110 Sutter St | Evolv Commercial Construction Inc | revision to app # 201805240048. suite 500. rev to electrical workDetails
revision to app # 201805240048. suite 500. rev to electrical work | $55,000 |
| Aug 31, 2018 | Completed final sign-off Nov 2018 | 110 Sutter St | Pyro-Comm Systems, Inc. | 5th flr - full floor fa ti - 1 new rps, 5 duct det for 5 fcu, 8 control relays to include optional, elective unlocking of stairwell doors and drops for smoke guard on elevator doors, 20 new audio/visual devices ref 201805240048, mech ref pa 201807275782Details
5th flr - full floor fa ti - 1 new rps, 5 duct det for 5 fcu, 8 control relays to include optional, elective unlocking of stairwell doors and drops for smoke guard on elevator doors, 20 new audio/visual devices ref 201805240048, mech ref pa 201807275782 | $15,500 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 110 Sutter St | Peacock Construction | removal of interior t.i. including restrooms, partitons, suspended ceilings, fixtures and finishes. no disabled acess per ab-017Details
removal of interior t.i. including restrooms, partitons, suspended ceilings, fixtures and finishes. no disabled acess per ab-017 | $20,000 |
| Aug 20, 2018 | Never finaled issued Oct 2018, no final | 110 Sutter St | Peacock Construction | 6th fl - full floor a/mep renovation of interior 6th fl tenant space. new restrooms and doctor's office. file ab005/ab037 for 1-hr corridors and 20 min doors to meet exit separation requirements. unsprinklered building. fire alarm under separate permit.Details
6th fl - full floor a/mep renovation of interior 6th fl tenant space. new restrooms and doctor's office. file ab005/ab037 for 1-hr corridors and 20 min doors to meet exit separation requirements. unsprinklered building. fire alarm under separate permit. | $471,770 |
| Jul 31, 2018 | Never finaled issued Jul 2018, no final | 110 Sutter St | Pyro-Comm Systems, Inc. | 10th fl - fire alarm ti 1 rps, 6 new audiovisual devices, replace 2 old audio/visual devices, and 3 modules. ref pa 2018-0621-2552Details
10th fl - fire alarm ti 1 rps, 6 new audiovisual devices, replace 2 old audio/visual devices, and 3 modules. ref pa 2018-0621-2552 | $6,000 |
| Jul 27, 2018 | Completed final sign-off Nov 2018 | 110 Sutter St | Matrix Hg Inc | 5/f - suite 500: t.i.: install vrf system for floor. new ducted fan coils,duct work. ref pa#201805240048.Details
5/f - suite 500: t.i.: install vrf system for floor. new ducted fan coils,duct work. ref pa#201805240048. | $190,000 |
| Jun 21, 2018 | Completed final sign-off Oct 2018 | 110 Sutter St | Evolv Commercial Construction Inc | interior remodel at 10th floor tenant space. work includes new partitions, doors. lighting, electrical and accessibility upgrade restroom. mep and life safety permitted separatelyDetails
interior remodel at 10th floor tenant space. work includes new partitions, doors. lighting, electrical and accessibility upgrade restroom. mep and life safety permitted separately | $80,000 |
| May 24, 2018 | Completed final sign-off Nov 2018 | 110 Sutter St | Evolv Commercial Construction Inc | remodel of extg 5th fl: for use by single tenant. work includes interior partitions, susp. ceiling, lighting, electrical, plmg, casework and finishes. work includes one new toilet room. mep, title 24 and life safety to be permitted seperately.Details
remodel of extg 5th fl: for use by single tenant. work includes interior partitions, susp. ceiling, lighting, electrical, plmg, casework and finishes. work includes one new toilet room. mep, title 24 and life safety to be permitted seperately. | $300,000 |
| Jan 31, 2018 | Never finaled issued Mar 2018, no final | 110 Sutter St | Evolv Commercial Construction Inc | interior demolition at 5th floor. includes demolition of interior partitions and restroom in preparation for future improvement. no ceiling demo.Details
interior demolition at 5th floor. includes demolition of interior partitions and restroom in preparation for future improvement. no ceiling demo. | $24,000 |
| Dec 22, 2017 | Completed final sign-off Mar 2018 | 110 Sutter St | Pacific Auxiliary Fire Alarm | f/a 2nd fl: (1) strobe power supply; (1) control module; (6) horn/strobes; (1) strobe; (1) smoke detector. (10) devices total. building pa #201710252144Details
f/a 2nd fl: (1) strobe power supply; (1) control module; (6) horn/strobes; (1) strobe; (1) smoke detector. (10) devices total. building pa #201710252144 | $6,000 |
| Oct 25, 2017 | Never finaled issued Nov 2017, no final | 110 Sutter St | Evolv Commercial Construction Inc | 2nd floor #200 - amep remodel of ~1300 sq ft tenant space work includes new partitions, susp ceiling, lighting, electrical, plumbing, casework & finsihes. fire under separate permit(s).Details
2nd floor #200 - amep remodel of ~1300 sq ft tenant space work includes new partitions, susp ceiling, lighting, electrical, plumbing, casework & finsihes. fire under separate permit(s). | $120,000 |
| Jun 30, 2017 | Never finaled issued Jun 2017, no final | 110 Sutter St | street spaceDetails
street space | ||
| Sep 15, 2016 | Completed final sign-off Dec 2016 | 110 Sutter St | Evolv Commercial Construction Inc | interior demolition at 4th floor, includes demolition of interior partitions and restrooms in preparation for future tenant improvements under separate permit application. no exterior work. fire under separate permitDetails
interior demolition at 4th floor, includes demolition of interior partitions and restrooms in preparation for future tenant improvements under separate permit application. no exterior work. fire under separate permit | $26,000 |
| Apr 1, 2015 | Never finaled issued Apr 2015, no final | 110 Sutter St | Art-Tek Builders | 6th flr: remove non-bearing interior walls and doors for spec spaces. no structural changes t-bar ceiling & lights - demo onlyDetails
6th flr: remove non-bearing interior walls and doors for spec spaces. no structural changes t-bar ceiling & lights - demo only | $8,750 |
| Dec 22, 2014 | Completed final sign-off May 2015 | 110 Sutter St | Art-Tek Builders | convert e office room into new unisex restroom with 1 ada toilet and lavatory. (e) door to be moved to left by 18", new ceiling joists to be installed below existing concrete ceiling, add electrical outlets and new exaust fanDetails
convert e office room into new unisex restroom with 1 ada toilet and lavatory. (e) door to be moved to left by 18", new ceiling joists to be installed below existing concrete ceiling, add electrical outlets and new exaust fan | $26,000 |
| Sep 8, 2014 | Never finaled issued Sep 2014, no final | 110 Sutter St | Bilcor Inc | install 3 ceiling mount horn strobes. 2 ceiling mount strobes, remove 2 wall mount strobes in 1st floor yoga studio. ti 201407090839Details
install 3 ceiling mount horn strobes. 2 ceiling mount strobes, remove 2 wall mount strobes in 1st floor yoga studio. ti 201407090839 | $2,800 |
| Aug 19, 2014 | Never finaled issued Aug 2014, no final | 110 Sutter St | E J G A | as builts to pa# 2014-0709-0839. remove requirement for ti "sprinklers under seperate permit". no sprinklers in (e) building. fire only permit. no drawings required.Details
as builts to pa# 2014-0709-0839. remove requirement for ti "sprinklers under seperate permit". no sprinklers in (e) building. fire only permit. no drawings required. | |
| Jul 9, 2014 | Completed final sign-off Oct 2014 | 110 Sutter St | E J G A | change use from a printing shop to a new yoga studio. work includes demo walls, new restrooms and yoga rooms. mep under separate permit.Details
change use from a printing shop to a new yoga studio. work includes demo walls, new restrooms and yoga rooms. mep under separate permit. | $30,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 110 Sutter St | Pacific Auxiliary Fire Alarm | add 2 horntrobes and 1 strobe on 3rd floor ref app 201308154463Details
add 2 horntrobes and 1 strobe on 3rd floor ref app 201308154463 | $2,200 |
| Nov 26, 2013 | Completed final sign-off Jul 2014 | 110 Sutter St | Westridge Builders, Inc. | demolition of some (e) walls (non-structural) new framing of dental office, (n) plumbing, (n) electrical & (n) interior finishes cabinetry etc.Details
demolition of some (e) walls (non-structural) new framing of dental office, (n) plumbing, (n) electrical & (n) interior finishes cabinetry etc. | $111,882 |
| Aug 15, 2013 | Never finaled issued Aug 2013, no final | 110 Sutter St | 3rd floor-t.i. new partitions, doors, relocate light fixturesDetails
3rd floor-t.i. new partitions, doors, relocate light fixtures | $62,000 | |
| Apr 23, 2013 | Completed final sign-off May 2013 | 110 Sutter St | Bevilacqua & Sons | 7th floor suite 700 - commercial t.i. for office space, scope of work including (n) millwork @ (e) breakroom & finishes, (n) elec under separate permit, (e) partitions to remain, no new prtitions, no modifications to hvac or fire sprinklers.Details
7th floor suite 700 - commercial t.i. for office space, scope of work including (n) millwork @ (e) breakroom & finishes, (n) elec under separate permit, (e) partitions to remain, no new prtitions, no modifications to hvac or fire sprinklers. | $21,000 |
| Mar 21, 2013 | Completed final sign-off May 2013 | 110 Sutter St | Bevilacqua & Sons | 7th floor-suite #700-interior demolition of 55' linear ft of non structural interior partitions. 7th floor to remain vacant as per ab-017Details
7th floor-suite #700-interior demolition of 55' linear ft of non structural interior partitions. 7th floor to remain vacant as per ab-017 | $6,000 |
| Aug 8, 2012 | Completed final sign-off Oct 2012 | 110 Sutter St | Pacific Auxiliary Fire Alarm | add 2 horn strobes and 2 strobes, replace 2 existing horn strobes on the 1st floorDetails
add 2 horn strobes and 2 strobes, replace 2 existing horn strobes on the 1st floor | $2,700 |
| Jun 15, 2012 | Completed final sign-off Jun 2013 | 110 Sutter St | Bevilacqua & Sons | 1st floor - relocation of power & data, new barber station with sink, new dressing room with partial height wall & new finishes. mep, sprinklers & life safety under separate permit.Details
1st floor - relocation of power & data, new barber station with sink, new dressing room with partial height wall & new finishes. mep, sprinklers & life safety under separate permit. | $50,000 |
| Jun 6, 2012 | Expired or cancelled cancelled Jan 2026 | 110 Sutter St | Bevilacqua & Sons | relocation of power and data, new barber station with sink, construction of new dressing room with partial height walls, new finishes. mech, elec,life safety and sprinkler system, plumbing, under separate permitDetails
relocation of power and data, new barber station with sink, construction of new dressing room with partial height walls, new finishes. mech, elec,life safety and sprinkler system, plumbing, under separate permit | $50,000 |
| Mar 22, 2012 | Never finaled issued Mar 2012, no final | 110 Sutter St | street space and mta parkingDetails
street space and mta parking | ||
| Jan 23, 2012 | Completed final sign-off Jul 2012 | 110 Sutter St | Bevilacqua & Sons | 3rd floor:revision to app#201108253222. revision includes demolition of extg telephone closet and construction of new including power receptacles,lighting, and finishes. also furring out of extg partition. mech, elect, plmg under seperate permit.Details
3rd floor:revision to app#201108253222. revision includes demolition of extg telephone closet and construction of new including power receptacles,lighting, and finishes. also furring out of extg partition. mech, elect, plmg under seperate permit. | |
| Jan 13, 2012 | Never finaled issued Jan 2012, no final | 110 Sutter St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Oct 14, 2011 | Completed final sign-off May 2012 | 110 Sutter St | Pacific Auxiliary Fire Alarm | 3rd floor - add 2 manual alarms, 1 smoke detector, 7 horn/strobes, 3 strobes & 1 module.Details
3rd floor - add 2 manual alarms, 1 smoke detector, 7 horn/strobes, 3 strobes & 1 module. | $5,000 |
| Aug 29, 2011 | Completed final sign-off May 2012 | 110 Sutter St | Pacific Auxiliary Fire Alarm | 2nd & 4th floor-relocate (e) strobe-add 1 new strobeDetails
2nd & 4th floor-relocate (e) strobe-add 1 new strobe | $1,900 |
| Aug 25, 2011 | Completed final sign-off Jul 2012 | 110 Sutter St | Bevilacqua & Sons | floor 3rd - demolition of (e) plumbing fixtures, light fixtures, ceiling grid, partitions, doors/frames/hardware & finiahes. new const women's & men's restroomsincluding partitions, doors/frames, gyp ceiling, light fixtures, plbg fixtures & finishes. new light fixtures, me & sprinkler under separatDetails
floor 3rd - demolition of (e) plumbing fixtures, light fixtures, ceiling grid, partitions, doors/frames/hardware & finiahes. new const women's & men's restroomsincluding partitions, doors/frames, gyp ceiling, light fixtures, plbg fixtures & finishes. new light fixtures, me & sprinkler under separat | $125,000 |
| Jul 20, 2011 | Completed final sign-off Aug 2011 | 110 Sutter St | Mc Millan Electric | to obtain final inspection for work approved under pa# 200601242912. all work is complete.Details
to obtain final inspection for work approved under pa# 200601242912. all work is complete. | |
| Jun 8, 2011 | Completed final sign-off Jul 2012 | 110 Sutter St | Bevilacqua & Sons | barrior removal project demolition of existing plumbing fixtures light fixtures, ceiling grid, partitions, doors/frames/hardware and finishes on 2nd and 4th floor men's restrooms. constrution of new partitions, door/frames, gyp ceiling, light fixtures, plumbing fixtures and finishes.Details
barrior removal project demolition of existing plumbing fixtures light fixtures, ceiling grid, partitions, doors/frames/hardware and finishes on 2nd and 4th floor men's restrooms. constrution of new partitions, door/frames, gyp ceiling, light fixtures, plumbing fixtures and finishes. | $115,000 |
| Mar 9, 2010 | Completed final sign-off Jun 2010 | 110 Sutter St | Bevilacqua & Sons | demolition of walls, make safe electrical.Details
demolition of walls, make safe electrical. | $9,000 |
| Jul 29, 2009 | Never finaled issued Jul 2009, no final | 110 Sutter St | Pacific Auxiliary Fire Alarm | addition of 2 monitoring modules and 2 relay modules to relase door locks on the 7th and 9th floors.Details
addition of 2 monitoring modules and 2 relay modules to relase door locks on the 7th and 9th floors. | $1,500 |
| Mar 24, 2009 | Completed final sign-off Apr 2009 | 110 Sutter St | Bevilacqua & Sons | renew pa# 2007/05/23/2068 to obtain final inspection. all work has been completed.Details
renew pa# 2007/05/23/2068 to obtain final inspection. all work has been completed. | |
| Mar 24, 2009 | Completed final sign-off Apr 2009 | 110 Sutter St | Bevilacqua & Sons | renew pa# 2008/03/14/7141 to obtain final inspection. all work has been completed.Details
renew pa# 2008/03/14/7141 to obtain final inspection. all work has been completed. | |
| Mar 5, 2009 | Completed final sign-off Apr 2009 | 110 Sutter St | Pacific Auxiliary Fire Alarm | addition of 1 smoke detector and reloacation of 1 manual pull stationDetails
addition of 1 smoke detector and reloacation of 1 manual pull station | $2,000 |
| Jan 20, 2009 | Never finaled issued Jan 2009, no final | 110 Sutter St | Pacific Auxiliary Fire Alarm | renew pa# 2007/12/11/0216 to obtain final inspection. all work has been completed.Details
renew pa# 2007/12/11/0216 to obtain final inspection. all work has been completed. | |
| Dec 19, 2008 | Completed final sign-off Apr 2009 | 110 Sutter St | Pacific Auxiliary Fire Alarm | 1st floor - to obtain fianl inspection for work done under appl 200805272887. all work is complete.Details
1st floor - to obtain fianl inspection for work done under appl 200805272887. all work is complete. | |
| Sep 18, 2008 | Completed final sign-off Apr 2009 | 110 Sutter St | Bevilacqua & Sons | revision to 200708078965: as built sheet notes and details as requested by fire inspector.Details
revision to 200708078965: as built sheet notes and details as requested by fire inspector. | |
| Sep 12, 2008 | Never finaled issued Sep 2008, no final | 110 Sutter St | street space permit only.Details
street space permit only. | ||
| May 29, 2008 | Never finaled issued May 2008, no final | 110 Sutter St | Mc Millan Electric | 1st floor, install lighting for office lobby.Details
1st floor, install lighting for office lobby. | $7,000 |
| May 27, 2008 | Expired or cancelled expired Apr 2009 | 110 Sutter St | Pacific Auxiliary Fire Alarm | 1st floor-addition of 1 horn/strobe and 1 manual alarm to the (e) fire alarm system due to a remodel (lobbby)Details
1st floor-addition of 1 horn/strobe and 1 manual alarm to the (e) fire alarm system due to a remodel (lobbby) | $2,000 |
| Mar 14, 2008 | Expired or cancelled expired Apr 2009 | 110 Sutter St | 1st floor: revision to appl #200705232068 -re-clad existing storefront framing & install two new entry doors in existing openingsDetails
1st floor: revision to appl #200705232068 -re-clad existing storefront framing & install two new entry doors in existing openings | $15,000 | |
| Jan 24, 2008 | Expired or cancelled cancelled Jan 2026 | 110 Sutter St | 6th floor - addition of 4 horn/strobes, 1 ceiling mount strobe & 1 wall mount strobe to the existing fire alarm system.Details
6th floor - addition of 4 horn/strobes, 1 ceiling mount strobe & 1 wall mount strobe to the existing fire alarm system. | ||
| Jan 24, 2008 | Completed final sign-off Mar 2008 | 110 Sutter St | Pacific Auxiliary Fire Alarm | 6th fl addition of 4 horn/strobes, 1 ceiling mount strobe & 1 wall mount strobe to the existing fire alarm system.Details
6th fl addition of 4 horn/strobes, 1 ceiling mount strobe & 1 wall mount strobe to the existing fire alarm system. | $4,000 |
| Jan 9, 2008 | Completed final sign-off Mar 2008 | 110 Sutter St | Mc Millan Electric | install lights to meet t-24 on 6th floor for building requirement. reference approved pa# 2007.10.23.6140 for arch. plansDetails
install lights to meet t-24 on 6th floor for building requirement. reference approved pa# 2007.10.23.6140 for arch. plans | $55,000 |
| Dec 21, 2007 | Expired or cancelled withdrawn Mar 2008 | 110 Sutter St | expansion/additions to fire alarm system as part of a tenant improvement on 6th floor.Details
expansion/additions to fire alarm system as part of a tenant improvement on 6th floor. | $10,000 | |
| Dec 11, 2007 | Expired or cancelled expired Jul 2011 | 110 Sutter St | Pacific Auxiliary Fire Alarm | relocation of 1 smoke detector, 1 heat detector, 4 modules, 1 relay and installation of 2 additional smoke detectors, 1 additional heat detector and 2 horn/strobes as part of the elevator alteration and modernizationDetails
relocation of 1 smoke detector, 1 heat detector, 4 modules, 1 relay and installation of 2 additional smoke detectors, 1 additional heat detector and 2 horn/strobes as part of the elevator alteration and modernization | $10,000 |
| Nov 2, 2007 | Completed final sign-off Mar 2008 | 110 Sutter St | Pacific Auxiliary Fire Alarm | addition to existing fire alarm systemDetails
addition to existing fire alarm system | $4,300 |
| Oct 23, 2007 | Completed final sign-off Mar 2008 | 110 Sutter St | tenant improvement on the vacant 6th floor. new partitions,ceilings, lighting,mechanical and electrical workDetails
tenant improvement on the vacant 6th floor. new partitions,ceilings, lighting,mechanical and electrical work | $200,000 | |
| Sep 10, 2007 | Completed final sign-off Mar 2008 | 110 Sutter St | 6th floor-enclose (e) interior stairs with 1hr-fire rated construction; new fire-rated elevator lobby; new accessible restrooms. mech. elec. and plumbing under separate permit. no exterior work.Details
6th floor-enclose (e) interior stairs with 1hr-fire rated construction; new fire-rated elevator lobby; new accessible restrooms. mech. elec. and plumbing under separate permit. no exterior work. | $150,000 | |
| Aug 15, 2007 | Expired or cancelled cancelled Jan 2026 | 110 Sutter St | demolition of 6th floor office space. office space must remain vacant until t.i. permit is filed and approved. fire safety devices to remain functional.Details
demolition of 6th floor office space. office space must remain vacant until t.i. permit is filed and approved. fire safety devices to remain functional. | $25,000 | |
| Aug 15, 2007 | Completed final sign-off Mar 2008 | 110 Sutter St | Bevilacqua & Sons | demolition of 6th floor office space, office sace must remain vacant until permit for tenant improvement is filed and apprved fire safety devic4es to remain opperationalDetails
demolition of 6th floor office space, office sace must remain vacant until permit for tenant improvement is filed and apprved fire safety devic4es to remain opperational | $25,000 |
| Aug 7, 2007 | Expired or cancelled expired Apr 2009 | 110 Sutter St | construct new stairs from 1st floor to basement; existing stair at store front shall remain intact and be covered w/ new floor framing.Details
construct new stairs from 1st floor to basement; existing stair at store front shall remain intact and be covered w/ new floor framing. | $45,000 | |
| Aug 7, 2007 | Never finaled issued Aug 2007, no final | 110 Sutter St | Mc Millan Electric | add to annunciator panel per approved app #200703146204Details
add to annunciator panel per approved app #200703146204 | $8,500 |
| May 23, 2007 | Expired or cancelled expired Apr 2009 | 110 Sutter St | Bevilacqua & Sons | construct new wall to separate building lobby and vacant retail shell space, match existing conditions, 1st floorDetails
construct new wall to separate building lobby and vacant retail shell space, match existing conditions, 1st floor | $20,000 |
| Mar 14, 2007 | Expired or cancelled expired Jul 2011 | 110 Sutter St | Mc Millan Electric | ground floor corridor: install 3 2x4 light fixtures, 1 ceiling mounted occupancy sensor, 2 gang switch, 1 duplex receptacle.Details
ground floor corridor: install 3 2x4 light fixtures, 1 ceiling mounted occupancy sensor, 2 gang switch, 1 duplex receptacle. | $15,000 |
| Mar 14, 2007 | Expired or cancelled expired Jul 2011 | 110 Sutter St | Mc Millan Electric | elevator upgrade: 8 smoke detector, 1 heat detector, 3 control relay & 1 module, 1 strobe light.Details
elevator upgrade: 8 smoke detector, 1 heat detector, 3 control relay & 1 module, 1 strobe light. | $12,000 |
| Dec 8, 2006 | Completed final sign-off Jul 2007 | 110 Sutter St | demolition and minor construction on ground floor. relocation of light fixtures, new ceiling grid, new receptacles.Details
demolition and minor construction on ground floor. relocation of light fixtures, new ceiling grid, new receptacles. | $15,000 | |
| Jul 28, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | oti-1. rev. 1st flDetails
oti-1. rev. 1st fl | $3,000 | |
| Jul 18, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | Pacific Auxiliary Fire Alarm | installation of 2 smoke detectors, 5 horn/strobes and 2 door holders as part of remodel of the 7th floor.Details
installation of 2 smoke detectors, 5 horn/strobes and 2 door holders as part of remodel of the 7th floor. | $10,000 |
| Jul 14, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | Bevilacqua & Sons | oti 2 7th floor elDetails
oti 2 7th floor el | $25,000 |
| Jun 20, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | Bevilacqua & Sons | oti-1, 7th floor, el, ls.Details
oti-1, 7th floor, el, ls. | $103,000 |
| Apr 12, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | Pacific Auxiliary Fire Alarm | addition of 2 horn/strobes due to a tenant improvement of 1st flrDetails
addition of 2 horn/strobes due to a tenant improvement of 1st flr | $4,000 |
| Mar 10, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | Bevilacqua & Sons | tenant imporvemtns on ground floor retail/offie space. electrical & plubing, mechanical under separte permit .Details
tenant imporvemtns on ground floor retail/offie space. electrical & plubing, mechanical under separte permit . | $90,000 |
| Feb 16, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | Mc Millan Electric | 7th floor only 4 extg lights 4 b-1 fixture/9 downlights/6 pending/4 wall sconces/hune fixtureDetails
7th floor only 4 extg lights 4 b-1 fixture/9 downlights/6 pending/4 wall sconces/hune fixture | $12,000 |
| Feb 15, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | Pacific Auxiliary Fire Alarm | 7th floor - additions to the extg fire alarm system for the 7th floor core & shell area.Details
7th floor - additions to the extg fire alarm system for the 7th floor core & shell area. | $7,000 |
| Jan 24, 2006 | Expired or cancelled expired Feb 2009 | 110 Sutter St | Pacific Auxiliary Fire Alarm | installation of a door lock releasing device , 1 control moduel and 1 relay moduel on the 10th floor. door lock will release in an alarm cndition of he fire alarm systemDetails
installation of a door lock releasing device , 1 control moduel and 1 relay moduel on the 10th floor. door lock will release in an alarm cndition of he fire alarm system | $3,000 |
| Jan 12, 2006 | Completed final sign-off Sep 2006 | 110 Sutter St | oti-1 7th floor, el, ls. new men & women restroom, enclosing 2 fire exit stairs.Details
oti-1 7th floor, el, ls. new men & women restroom, enclosing 2 fire exit stairs. | $166,000 | |
| Nov 15, 2004 | Completed final sign-off Dec 2004 | 110 Sutter St | Haddon Engineering Inc | install ventilation fans & ductingDetails
install ventilation fans & ducting | $5,000 |
| Oct 29, 2004 | Completed final sign-off Dec 2004 | 110 Sutter St | Pacific Auxiliary Fire Alarm | installation of 3 horn/strobes, 2 strobes & one smoke detector on the 9th flDetails
installation of 3 horn/strobes, 2 strobes & one smoke detector on the 9th fl | $12,000 |
| Sep 14, 2004 | Completed final sign-off Dec 2004 | 110 Sutter St | Team Commercial Construction Inc. | oti-1 9th floor el, me, l/sDetails
oti-1 9th floor el, me, l/s | $200,000 |
| Apr 11, 2003 | Completed final sign-off May 2003 | 110 Sutter St | remodel to existing 4th floor space no hvac. no elecDetails
remodel to existing 4th floor space no hvac. no elec | $6,000 | |
| Jul 19, 2002 | Expired or cancelled expired Jan 2004 | 110 Sutter St | Pacific Auxiliary Fire Alarm | additions tothe fire alarm system dueto the tenant improvement on the 3rd floorDetails
additions tothe fire alarm system dueto the tenant improvement on the 3rd floor | $17,000 |
| Apr 9, 2002 | Completed final sign-off Nov 2002 | 110 Sutter St | In Site Design Build Associates | remodel of 3rd fl for medical office spaceDetails
remodel of 3rd fl for medical office space | $325,000 |
| Dec 28, 2001 | Completed final sign-off Aug 2002 | 110 Sutter St | 7th floor -install steel reinforcement at masonry opening (2 each on 7th floor)Details
7th floor -install steel reinforcement at masonry opening (2 each on 7th floor) | $3,500 | |
| Dec 28, 2001 | Completed final sign-off Aug 2002 | 110 Sutter St | 3rd floor -install steel reinforcement at masonry opening (2 each on 3rd floor)Details
3rd floor -install steel reinforcement at masonry opening (2 each on 3rd floor) | $3,500 | |
| Nov 6, 2001 | Expired or cancelled expired Aug 2003 | 110 Sutter St | 2/f & 6/f fire alarm new restrooms and elevator lobbiesDetails
2/f & 6/f fire alarm new restrooms and elevator lobbies | $4,400 | |
| Sep 18, 2001 | Expired or cancelled expired Dec 2003 | 110 Sutter St | 7/fl. -new (2) restrooms, enclose (2) stairwellsDetails
7/fl. -new (2) restrooms, enclose (2) stairwells | $38,000 | |
| Sep 18, 2001 | Completed final sign-off Nov 2002 | 110 Sutter St | 3/fl.-new (2) restroom enclose (2) stairwellsDetails
3/fl.-new (2) restroom enclose (2) stairwells | $36,000 | |
| Apr 20, 2001 | Completed final sign-off Jul 2001 | 110 Sutter St | West And East Bay Cosntruction, Inc | oti-2:9th fl, el onlyDetails
oti-2:9th fl, el only | $25,000 |
| Apr 20, 2001 | Completed final sign-off Jul 2001 | 110 Sutter St | West And East Bay Cosntruction, Inc | oti-1 (10th fl) el onlyDetails
oti-1 (10th fl) el only | $25,000 |
| Apr 3, 2001 | Completed final sign-off Jul 2001 | 110 Sutter St | West And East Bay Cosntruction, Inc | oti-1 9th floor, el, me, ls, sp.Details
oti-1 9th floor, el, me, ls, sp. | $10,000 |
| Apr 3, 2001 | Completed final sign-off Jul 2001 | 110 Sutter St | West And East Bay Cosntruction, Inc | oti-1, 10th floor, el, me, ls, sp.Details
oti-1, 10th floor, el, me, ls, sp. | $10,000 |
| Mar 5, 2001 | Completed final sign-off Jul 2001 | 110 Sutter St | Pacific Auxiliary Fire Alarm | add new facp for t/i of 10/f build owner to submit corrective action plan within 60 daysDetails
add new facp for t/i of 10/f build owner to submit corrective action plan within 60 days | $21,000 |
| Feb 2, 2001 | Completed final sign-off Jul 2001 | 110 Sutter St | West And East Bay Cosntruction, Inc | oti-1 (rev) 9th flr, el, me, l/s & spDetails
oti-1 (rev) 9th flr, el, me, l/s & sp | $100,000 |
| Feb 2, 2001 | Completed final sign-off Jul 2001 | 110 Sutter St | West And East Bay Cosntruction, Inc | oti-1 10th flr el, me, l/s spDetails
oti-1 10th flr el, me, l/s sp | $100,000 |
| Dec 15, 2000 | Expired or cancelled cancelled Aug 2001 | 110 Sutter St | oti-1 7th floor, electrical, lifesafty, sprinklerDetails
oti-1 7th floor, electrical, lifesafty, sprinkler | $40,000 | |
| Dec 15, 2000 | Expired or cancelled cancelled Aug 2001 | 110 Sutter St | oti-1 3rd floor/electrical, lifesadty, sprinklerDetails
oti-1 3rd floor/electrical, lifesadty, sprinkler | $40,000 | |
| Nov 30, 2000 | Expired or cancelled expired Mar 2002 | 110 Sutter St | mitigate complnt #9901859 floors 1,2,4,5,8,6 new doors on 1/f (n)hc restrms on 2/f auto door openersDetails
mitigate complnt #9901859 floors 1,2,4,5,8,6 new doors on 1/f (n)hc restrms on 2/f auto door openers | $15,000 | |
| Sep 20, 2000 | Expired or cancelled cancelled Feb 2001 | 110 Sutter St | oti-1 9th floor elDetails
oti-1 9th floor el | $150,000 | |
| Sep 18, 2000 | Expired or cancelled cancelled Jun 2001 | 110 Sutter St | oti-1 10th floor, el, lsDetails
oti-1 10th floor, el, ls | $150,000 | |
| Sep 18, 2000 | Completed final sign-off Jul 2001 | 110 Sutter St | oti-1, 10th floor elDetails
oti-1, 10th floor el | ||
| Sep 18, 2000 | Completed final sign-off Jul 2001 | 110 Sutter St | oti-1, 9th floor elDetails
oti-1, 9th floor el | $50,000 | |
| Apr 8, 2000 | Completed final sign-off Jul 2001 | 110 Sutter St | t/i cludes demo of (e) n/n partition wallsDetails
t/i cludes demo of (e) n/n partition walls | $45,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pacific Auxiliary Fire Alarm (20), Bevilacqua & Sons (16), Mc Millan Electric (7), Evolv Commercial Construction Inc (6), West And East Bay Cosntruction, Inc (6), Pyro-Comm Systems, Inc. (4), Matrix Hg Inc (3), Peacock Construction (3), Art-Tek Builders (2), E J G A (2), Giampolini & Co Dba Giampolini/Courtney (2), Ad Art Inc., Bilcor Inc, Haddon Engineering Inc, In Site Design Build Associates, Team Commercial Construction Inc., Westridge Builders, Inc.
- Architects
- Michael Zucker (6), Douglas Booth (4), Robbin Mcdonald (3), David Cassidy (2), Yi-Tso Jeff Chen (2), Douglas Booth, Megan Stevens, Michael Knauff, Michael Steiner, Russ Beaudin, Sarah Louie-Roitman, Virginie Manichon
- Engineers
- Pablo Orozco (2), Alan C. Burr, Carl Milsum, Chris Oliveira, Kylie Lo, Paul R. Kiley
- Authorized agent-otherss
- Chris Shackley, Heidi Liebes, Kay Young, Velba Villanueva
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.