Permit GraphShortlistSan Francisco building permits since 2000

Justin Martinkovic

License
C30752
Look the license up with the state
Listed as
architect, authorized agent-others, designer, engineer
Firm
Martinkovic Milford Architects
Based in
San Francisco
On San Francisco permits
Nov 2001 to Sep 2023

168 permits since 2000 (architect on 160 permits, authorized agent-others on 10 permits, designer on 4 permits, engineer on 2 permits): 123 completed, 24 never finaled, 21 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 168.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 13, 2023Completed
final sign-off Nov 2025
550 Montgomery StRoebuck Constructionground floor: convert from retail store to new bar, new ada restrooms, interior finishes & millwork. retain (e) historic finishes, mep under separate permit. no cooking in this facility, no exterior work. no structural work.
Details
Permit
202309136478
Status
complete
Filed
Sep 13, 2023
Permit issued
Nov 29, 2023
Final sign-off
Nov 20, 2025
Declared cost
$420,020
Address
550 Montgomery St

ground floor: convert from retail store to new bar, new ada restrooms, interior finishes & millwork. retain (e) historic finishes, mep under separate permit. no cooking in this facility, no exterior work. no structural work.

Open the permit page

$420,020
Mar 18, 2022Completed
final sign-off Apr 2022
2100 Webster StDerry Casey Builders Incinterior work: operational permit, new rated gas closet for oxygen & medical air system. reference approved t.i. pa#202006028073. no exterior work
Details
Permit
202203180354
Status
complete
Filed
Mar 18, 2022
Permit issued
Mar 23, 2022
Final sign-off
Apr 15, 2022
Address
2100 Webster St

interior work: operational permit, new rated gas closet for oxygen & medical air system. reference approved t.i. pa#202006028073. no exterior work

Open the permit page

Nov 28, 2018Expired or cancelled
expired Aug 2026
121 Gates StKanler Inc, Mse Developers Incerect (n) 2-story single family residence
Details
Permit
201811286925
Status
expired
Filed
Nov 28, 2018
Permit issued
Feb 19, 2020
Declared cost
$191,000
Address
121 Gates St

erect (n) 2-story single family residence

Open the permit page

$191,000
Nov 28, 2018Never finaled
issued Feb 2020, no final
121 Gates StKanler Inc, Mse Developers Incdemolish 2-story single family residence
Details
Permit
201811286928
Status
issued
Filed
Nov 28, 2018
Permit issued
Feb 19, 2020
Declared cost
$2,700
Address
121 Gates St

demolish 2-story single family residence

Open the permit page

$2,700
Aug 13, 2018Completed
final sign-off Feb 2019
180 Sutter StAecore Inc.(n) partitions and (n) doors in (e) storage rooms on basement level. no change in occupant load to (e) basement spaces
Details
Permit
201808137214
Status
complete
Filed
Aug 13, 2018
Permit issued
Nov 1, 2018
Final sign-off
Feb 7, 2019
Declared cost
$6,500
Address
180 Sutter St

(n) partitions and (n) doors in (e) storage rooms on basement level. no change in occupant load to (e) basement spaces

Open the permit page

$6,500
Jul 24, 2018Completed
final sign-off Mar 2019
450 Sutter StMarchetti Group#1108: 11/f ti including (n) non-bearing partitions, fixtures, & finishes in (e) tenant suite to accomodate a medical office. no change in use. mech, elec, plumb, lighting & life safety work performed on a design-build basis under sep. permit. no exterior work. not oshpd. no med gas. maher na
Details
Permit
201807245299
Status
complete
Filed
Jul 24, 2018
Permit issued
Aug 3, 2018
Final sign-off
Mar 4, 2019
Declared cost
$226,864
Address
450 Sutter St

#1108: 11/f ti including (n) non-bearing partitions, fixtures, & finishes in (e) tenant suite to accomodate a medical office. no change in use. mech, elec, plumb, lighting & life safety work performed on a design-build basis under sep. permit. no exterior work. not oshpd. no med gas. maher na

Open the permit page

$226,864
Jul 13, 2018Completed
final sign-off Feb 2020
350 Post StSource Planning And Construction Increvision to pa# 201802201711. suite 901. interior work: new suspended ceiling finishes, new decorative wall finishes. new lighting.
Details
Permit
201807134567
Status
complete
Filed
Jul 13, 2018
Permit issued
Jul 23, 2018
Final sign-off
Feb 14, 2020
Declared cost
$75,000
Address
350 Post St

revision to pa# 201802201711. suite 901. interior work: new suspended ceiling finishes, new decorative wall finishes. new lighting.

Open the permit page

$75,000
Jun 26, 2018Completed
final sign-off Aug 2019
450 Sutter StDerry Casey Builders Inc22nd flr, suite 2225: ti - 341 sq ft area new non bearing partitions, fixtures, finishes in (e) tenant suite to accomodate medical office. mep/lighting/life saftey under sep permit. no ext work, no oshfd
Details
Permit
201806262999
Status
complete
Filed
Jun 26, 2018
Permit issued
Nov 16, 2018
Final sign-off
Aug 8, 2019
Declared cost
$43,218
Address
450 Sutter St

22nd flr, suite 2225: ti - 341 sq ft area new non bearing partitions, fixtures, finishes in (e) tenant suite to accomodate medical office. mep/lighting/life saftey under sep permit. no ext work, no oshfd

Open the permit page

$43,218
May 15, 2018Completed
final sign-off Jun 2019
490 Post StDooher Constructioninterior t.i. including (n) non-bearig partitions, flooring and finishes in an (e) tenant suite on the 8th fl. no exterior work maher n/a
Details
Permit
201805159123
Status
complete
Filed
May 15, 2018
Permit issued
May 18, 2018
Final sign-off
Jun 18, 2019
Declared cost
$155,000
Address
490 Post St

interior t.i. including (n) non-bearig partitions, flooring and finishes in an (e) tenant suite on the 8th fl. no exterior work maher n/a

Open the permit page

$155,000
Apr 2, 2018Completed
final sign-off Jun 2018
555 Hayes StAdam Lewis Construction Companyinterior non bearing partition opening infill at one location and door addition at one location. no exterior work. revision to pa #201710020095 & #201801098234 for disabled access entry.
Details
Permit
201804025289
Status
complete
Filed
Apr 2, 2018
Permit issued
Apr 20, 2018
Final sign-off
Jun 21, 2018
Declared cost
$1,000
Address
555 Hayes St

interior non bearing partition opening infill at one location and door addition at one location. no exterior work. revision to pa #201710020095 & #201801098234 for disabled access entry.

Open the permit page

$1,000
Feb 20, 2018Completed
final sign-off Feb 2020
360 Post StSource Planning And Construction Inc9th fl: renovate office suite with new partitions, ceilings, and doors, new and revised lighting and mech systems, new electrical & data communicaiton cabling. new finishes throughout . life safety work to be design build under sep. permit. no ohspd.
Details
Permit
201802201711
Status
complete
Filed
Feb 20, 2018
Permit issued
Mar 14, 2018
Final sign-off
Feb 14, 2020
Declared cost
$275,000
Address
360 Post St

9th fl: renovate office suite with new partitions, ceilings, and doors, new and revised lighting and mech systems, new electrical & data communicaiton cabling. new finishes throughout . life safety work to be design build under sep. permit. no ohspd.

Open the permit page

$275,000
Jan 9, 2018Completed
final sign-off Jun 2018
555 Hayes StAdam Lewis Construction Companyrevision to app#201710020095 to complete work including new sloped entry floor finish and new power door operator per sf dbi information sheets da-04 and da-05 as a technical infeasibility with equivalent facilitation for disabled access.
Details
Permit
201801098234
Status
complete
Filed
Jan 9, 2018
Permit issued
Feb 21, 2018
Final sign-off
Jun 21, 2018
Declared cost
$3,000
Address
555 Hayes St

revision to app#201710020095 to complete work including new sloped entry floor finish and new power door operator per sf dbi information sheets da-04 and da-05 as a technical infeasibility with equivalent facilitation for disabled access.

Open the permit page

$3,000
Nov 21, 2017Completed
final sign-off May 2018
450 Sutter StDerry Casey Builders Inc, Derry Casey Builderssuite #1338: interior t.i. including (n) non-bearing partitions, fixtures & finishes in (e) tenant suite on 13th fl to accomodate a medical office build out. mep & lighting & life safety work performed on a design build basis as required & submitted as sep. permits. no exterior work. maher na
Details
Permit
201711214478
Status
complete
Filed
Nov 21, 2017
Permit issued
Dec 1, 2017
Final sign-off
May 16, 2018
Declared cost
$25,290
Address
450 Sutter St

suite #1338: interior t.i. including (n) non-bearing partitions, fixtures & finishes in (e) tenant suite on 13th fl to accomodate a medical office build out. mep & lighting & life safety work performed on a design build basis as required & submitted as sep. permits. no exterior work. maher na

Open the permit page

$25,290
Oct 20, 2017Completed
final sign-off May 2018
450 Sutter StDerry Casey Builders Inc, Derry Casey Buildersunit 825: interior tenant improvement including new non bearing partitions, fixtures, finishes in e tenant suite on 8th fl to accommodate new dermatology office. mep lighting, life safety on desisn build basis as req and submitted as separate permits. no exterior work. maher n/a.
Details
Permit
201710201770
Status
complete
Filed
Oct 20, 2017
Permit issued
Oct 24, 2017
Final sign-off
May 16, 2018
Declared cost
$71,107
Address
450 Sutter St

unit 825: interior tenant improvement including new non bearing partitions, fixtures, finishes in e tenant suite on 8th fl to accommodate new dermatology office. mep lighting, life safety on desisn build basis as req and submitted as separate permits. no exterior work. maher n/a.

Open the permit page

$71,107
Oct 2, 2017Completed
final sign-off Jun 2018
555 Hayes StAdam Lewis Construction Companyground floor retail ti, including (n) non-bearing partitions, (n) structural beams & posts. new accessible restroom, new lighting. finishes & electrical throughout. mep under separate permit
Details
Permit
201710020095
Status
complete
Filed
Oct 2, 2017
Permit issued
Oct 25, 2017
Final sign-off
Jun 21, 2018
Declared cost
$160,000
Address
555 Hayes St

ground floor retail ti, including (n) non-bearing partitions, (n) structural beams & posts. new accessible restroom, new lighting. finishes & electrical throughout. mep under separate permit

Open the permit page

$160,000
Sep 27, 2017Completed
final sign-off Sep 2018
450 Sutter StMarchetti Groupsuites 1900 & 1918: interior tenant imporoevemtns including (n) non-bearing partitions, fixtures & finishes in (e) 19/f suites to accommodate a (n) medical office. mep, lighting and life safety work performed on a design build basis basis as required and submitted as separate permits. no exterior.
Details
Permit
201709279663
Status
complete
Filed
Sep 27, 2017
Permit issued
Nov 1, 2017
Final sign-off
Sep 26, 2018
Declared cost
$218,446
Address
450 Sutter St

suites 1900 & 1918: interior tenant imporoevemtns including (n) non-bearing partitions, fixtures & finishes in (e) 19/f suites to accommodate a (n) medical office. mep, lighting and life safety work performed on a design build basis basis as required and submitted as separate permits. no exterior.

Open the permit page

$218,446
Aug 2, 2017Completed
final sign-off Apr 2018
1 Market StMarchetti Grouprevision to pa #201704174154. single tenant ground fl space to have unrated non-load bearing partition between a-2 and s-2 occupancies. maher na
Details
Permit
201708023692
Status
complete
Filed
Aug 2, 2017
Permit issued
Aug 17, 2017
Final sign-off
Apr 27, 2018
Address
1 Market St

revision to pa #201704174154. single tenant ground fl space to have unrated non-load bearing partition between a-2 and s-2 occupancies. maher na

Open the permit page

Jun 28, 2017Completed
final sign-off Oct 2017
1700 California StGci, Incdisabled access toilet, accessories, and plulmbing at levels 2, 3, 4 and 5 to be relocated from previous permit drawings under pa 2016-0830-6354 to avoid existing steel column
Details
Permit
201706280635
Status
complete
Filed
Jun 28, 2017
Permit issued
Jul 10, 2017
Final sign-off
Oct 10, 2017
Address
1700 California St

disabled access toilet, accessories, and plulmbing at levels 2, 3, 4 and 5 to be relocated from previous permit drawings under pa 2016-0830-6354 to avoid existing steel column

Open the permit page

Jun 23, 2017Never finaled
issued Aug 2017, no final
155 Montgomery StM C S Construction Servicesrevision to pa #201612205424 - revise reflected ceiling plan from dropped ceiling with recessed lights to exposed concrete ceiling with suspended lights. no other changes to scope of work. no exterior work. mech, elec, plbg, lighting & life safety work performed on a design blild under separate perm
Details
Permit
201706230171
Status
issued
Filed
Jun 23, 2017
Permit issued
Aug 8, 2017
Address
155 Montgomery St

revision to pa #201612205424 - revise reflected ceiling plan from dropped ceiling with recessed lights to exposed concrete ceiling with suspended lights. no other changes to scope of work. no exterior work. mech, elec, plbg, lighting & life safety work performed on a design blild under separate perm

Open the permit page

Jun 7, 2017Expired or cancelled
cancelled Feb 2019
450 Hayes Stchangein use from retail to limited restaurant. a new 3 compartment sink is added to b.o.h with gypsum ceiling and recessed lighting above sink.
Details
Permit
201706078658
Status
cancelled
Filed
Jun 7, 2017
Declared cost
$10,000
Address
450 Hayes St

changein use from retail to limited restaurant. a new 3 compartment sink is added to b.o.h with gypsum ceiling and recessed lighting above sink.

Open the permit page

$10,000
May 9, 2017Completed
final sign-off Jun 2017
3870 24th StTaylor Resaurant Systemground flr: interior work: demo work, new partitions, equip, casework and finishes. no exterior work
Details
Permit
201705096138
Status
complete
Filed
May 9, 2017
Permit issued
May 17, 2017
Final sign-off
Jun 16, 2017
Declared cost
$30,000
Address
3870 24th St

ground flr: interior work: demo work, new partitions, equip, casework and finishes. no exterior work

Open the permit page

$30,000
May 1, 2017Completed
final sign-off Apr 2018
1 Market StMarchetti Groupnew communicating openings between 2 proper w/ 3 hour rated horizontal accordion door and hollow metal door. both doors to close automatically and be tied to fire alarm and life safety. floor slabs to be infilled and leveled. tenant space to remain unoccupied. mep, fire sprks are deferred.
Details
Permit
201705015330
Status
complete
Filed
May 1, 2017
Permit issued
May 23, 2017
Final sign-off
Apr 30, 2018
Declared cost
$20,000
Address
1 Market St

new communicating openings between 2 proper w/ 3 hour rated horizontal accordion door and hollow metal door. both doors to close automatically and be tied to fire alarm and life safety. floor slabs to be infilled and leveled. tenant space to remain unoccupied. mep, fire sprks are deferred.

Open the permit page

$20,000
Apr 18, 2017Completed
final sign-off Oct 2017
450 Sutter StDerry Casey Builderssuite #1341: interior tenant improvement including new non bearing partitions, fixutures in e tenant suite on 13th fl to accommodate new medical office. mechanical, elec, plumbing, lighting, life safety on design build basis as req and submitted as separate permits. no exterior work
Details
Permit
201704184290
Status
complete
Filed
Apr 18, 2017
Permit issued
May 5, 2017
Final sign-off
Oct 31, 2017
Declared cost
$31,687
Address
450 Sutter St

suite #1341: interior tenant improvement including new non bearing partitions, fixutures in e tenant suite on 13th fl to accommodate new medical office. mechanical, elec, plumbing, lighting, life safety on design build basis as req and submitted as separate permits. no exterior work

Open the permit page

$31,687
Apr 17, 2017Completed
final sign-off Apr 2018
1 Market StMarchetti Groupg/f- cafe at ground fl. new interior partitions, doors, interior glazing, gyp. bd. and acoustic ceilings for restaurant a-2 use at g/f. mep, fire sprinkler and fire alarm under seperate permit. n/a ordinance #155-13 communicating openings between lot 6 and lot 7 ref pa 201705015330. maher na
Details
Permit
201704174154
Status
complete
Filed
Apr 17, 2017
Permit issued
Jul 20, 2017
Final sign-off
Apr 30, 2018
Declared cost
$587,525
Address
1 Market St

g/f- cafe at ground fl. new interior partitions, doors, interior glazing, gyp. bd. and acoustic ceilings for restaurant a-2 use at g/f. mep, fire sprinkler and fire alarm under seperate permit. n/a ordinance #155-13 communicating openings between lot 6 and lot 7 ref pa 201705015330. maher na

Open the permit page

$587,525
Apr 14, 2017Completed
final sign-off Apr 2018
45 Spear StMarchetti Grouprelocate & replace in kind of (e) storefront door and glazing along spear street at an unoccupied future tenant space, no other changes to exterior and no changes to interior. space to remain unoccupied. n/a ordinance #155-13
Details
Permit
201704143986
Status
complete
Filed
Apr 14, 2017
Permit issued
Sep 25, 2017
Final sign-off
Apr 27, 2018
Declared cost
$30,000
Address
45 Spear St

relocate & replace in kind of (e) storefront door and glazing along spear street at an unoccupied future tenant space, no other changes to exterior and no changes to interior. space to remain unoccupied. n/a ordinance #155-13

Open the permit page

$30,000
Apr 12, 2017Completed
final sign-off Jun 2018
1823 Union StAdam Lewis Construction Company1st fl: new partitions, suspended ceiling, casework, finishes, restrooms, mech, plumbing, elec, lighting for tenant improvement on gr fl. per plan, no exterior work
Details
Permit
201704123817
Status
complete
Filed
Apr 12, 2017
Permit issued
Apr 28, 2017
Final sign-off
Jun 14, 2018
Declared cost
$500,000
Address
1823 Union St

1st fl: new partitions, suspended ceiling, casework, finishes, restrooms, mech, plumbing, elec, lighting for tenant improvement on gr fl. per plan, no exterior work

Open the permit page

$500,000
Mar 28, 2017Completed
final sign-off Jun 2018
1823 Union StAdam Lewis Construction Companyremoving interior non-structural partitions, doors per ab-017. tenant improvement under separate permit.
Details
Permit
201703282509
Status
complete
Filed
Mar 28, 2017
Permit issued
Mar 28, 2017
Final sign-off
Jun 14, 2018
Declared cost
$18,000
Address
1823 Union St

removing interior non-structural partitions, doors per ab-017. tenant improvement under separate permit.

Open the permit page

$18,000
Mar 27, 2017Completed
final sign-off Jun 2017
555 California StNorthern Sun Associatesgrnd flr: ti from an (e) food service to a new food service tenant, new service area, case work, int lighting, plumb, electrical work. food prepared and packages off site w/no addl food prep. no exterior work no change to (e) storefront maher na
Details
Permit
201703272367
Status
complete
Filed
Mar 27, 2017
Permit issued
Mar 29, 2017
Final sign-off
Jun 23, 2017
Declared cost
$100,000
Address
555 California St

grnd flr: ti from an (e) food service to a new food service tenant, new service area, case work, int lighting, plumb, electrical work. food prepared and packages off site w/no addl food prep. no exterior work no change to (e) storefront maher na

Open the permit page

$100,000
Mar 22, 2017Completed
final sign-off Oct 2017
450 Sutter StDerry Casey Builders13th floor - interior tenant improvements including (n) demising wall, (n) non bearing partitions, fixtures and finishes in (e) tenant suite to accommodate a (n) medical practice. mechanical, electrical, plumbing, lighting & life safety work performed in a design build bases as req and submitted
Details
Permit
201703222065
Status
complete
Filed
Mar 22, 2017
Permit issued
Mar 28, 2017
Final sign-off
Oct 31, 2017
Declared cost
$128,636
Address
450 Sutter St

13th floor - interior tenant improvements including (n) demising wall, (n) non bearing partitions, fixtures and finishes in (e) tenant suite to accommodate a (n) medical practice. mechanical, electrical, plumbing, lighting & life safety work performed in a design build bases as req and submitted

Open the permit page

$128,636
Feb 17, 2017Completed
final sign-off Oct 2017
450 Sutter StDerry Casey Builderssuite #1440: interior t.i. including nw non-bearing partitions, fixtures & finishes in extg tenant suite on 14th flr to accomodate a nw plastic surg. office. mech, elec, plmg, lighting & life safety work performed on a design bild basis as required & sumitted as seperate permits. no exterior work.
Details
Permit
201702179628
Status
complete
Filed
Feb 17, 2017
Permit issued
Mar 7, 2017
Final sign-off
Oct 31, 2017
Declared cost
$32,893
Address
450 Sutter St

suite #1440: interior t.i. including nw non-bearing partitions, fixtures & finishes in extg tenant suite on 14th flr to accomodate a nw plastic surg. office. mech, elec, plmg, lighting & life safety work performed on a design bild basis as required & sumitted as seperate permits. no exterior work.

Open the permit page

$32,893
Feb 17, 2017Completed
final sign-off Oct 2017
450 Sutter StDerry Casey Builderssuite #1415: interior t.i. including nw non-bearing partitions, fixtures & finishes in extg tenant suite on 14th flr to accomodate a nw dermatology office. mech, elec, plmg, lighting & life safety work performed on a design bild basis as required & sumitted as seperate permits. no exterior work.
Details
Permit
201702179626
Status
complete
Filed
Feb 17, 2017
Permit issued
Mar 7, 2017
Final sign-off
Oct 31, 2017
Declared cost
$32,302
Address
450 Sutter St

suite #1415: interior t.i. including nw non-bearing partitions, fixtures & finishes in extg tenant suite on 14th flr to accomodate a nw dermatology office. mech, elec, plmg, lighting & life safety work performed on a design bild basis as required & sumitted as seperate permits. no exterior work.

Open the permit page

$32,302
Feb 9, 2017Completed
final sign-off May 2017
2 Embarcadero CenterC B F Inc, Peacock Constructionground flr: t-24 electrical for work under: 201611082277 maher na
Details
Permit
201702099091
Status
complete
Filed
Feb 9, 2017
Permit issued
Feb 10, 2017
Final sign-off
May 18, 2017
Address
2 Embarcadero Center

ground flr: t-24 electrical for work under: 201611082277 maher na

Open the permit page

Jan 26, 2017Completed
final sign-off Jun 2017
525 Market StNorthern Sun Associatest.i. from (e) food service to new food service. new food service area, partition walls, casework, interior lighting, plumbing & electrical. food is prepared & packaged off site with no food preparation on site. no exterior work. no change to bldg footprint, area, height, no changes to mech sys.
Details
Permit
201701267948
Status
complete
Filed
Jan 26, 2017
Permit issued
Feb 1, 2017
Final sign-off
Jun 7, 2017
Declared cost
$110,000
Address
525 Market St

t.i. from (e) food service to new food service. new food service area, partition walls, casework, interior lighting, plumbing & electrical. food is prepared & packaged off site with no food preparation on site. no exterior work. no change to bldg footprint, area, height, no changes to mech sys.

Open the permit page

$110,000
Dec 29, 2016Completed
final sign-off Jul 2022
1700 California StGci, Incti to commercial lobby and changerooms under pa# 201609288977, including millwork, finishes, and fittings. deferred submittals include mechanical, electrical, plmg, fire sprinklers, life safety, and title 24 energy calculations. n/a for maher.
Details
Permit
201612296226
Status
complete
Filed
Dec 29, 2016
Permit issued
Aug 3, 2017
Final sign-off
Jul 5, 2022
Declared cost
$181,874
Address
1700 California St

ti to commercial lobby and changerooms under pa# 201609288977, including millwork, finishes, and fittings. deferred submittals include mechanical, electrical, plmg, fire sprinklers, life safety, and title 24 energy calculations. n/a for maher.

Open the permit page

$181,874
Dec 29, 2016Expired or cancelled
cancelled Jan 2026
450 Sutter Strecord path of travel set no. construction maher na
Details
Permit
201612296225
Status
cancelled
Filed
Dec 29, 2016
Address
450 Sutter St

record path of travel set no. construction maher na

Open the permit page

Dec 20, 2016Never finaled
issued May 2017, no final
155 Montgomery StM C S Construction Services3rd floor - interior tenant improvements including (n) non-bearing partitoins, fixtures & finishes to accommodate an office. no exterior work. mech, elec, plbg, lighting & life safety work performed on a design build basis as required & submitted as a separate permit.
Details
Permit
201612205424
Status
issued
Filed
Dec 20, 2016
Permit issued
May 5, 2017
Declared cost
$139,650
Address
155 Montgomery St

3rd floor - interior tenant improvements including (n) non-bearing partitoins, fixtures & finishes to accommodate an office. no exterior work. mech, elec, plbg, lighting & life safety work performed on a design build basis as required & submitted as a separate permit.

Open the permit page

$139,650
Oct 19, 2016Completed
final sign-off Jan 2018
2 Embarcadero CenterPeacock Construction21st floor:demo selected non-structural partitions, ceilings, doors, new non-structural partitions, millwork, ada shower, ceiling, doors, frames and finishes. mep, fire life safty sprinkler under seperate permit. n/a for maher
Details
Permit
201610190673
Status
complete
Filed
Oct 19, 2016
Permit issued
Nov 1, 2016
Final sign-off
Jan 9, 2018
Declared cost
$715,000
Address
2 Embarcadero Center

21st floor:demo selected non-structural partitions, ceilings, doors, new non-structural partitions, millwork, ada shower, ceiling, doors, frames and finishes. mep, fire life safty sprinkler under seperate permit. n/a for maher

Open the permit page

$715,000
Oct 5, 2016Completed
final sign-off Feb 2017
450 Hayes StKr Construction Of Ca Llcspace #1 - first time tenant improvement of an (e) shell space to accommodate a new ground floor retail space & accessible restroom. electrical, plumbing & lighting & life safety work performed under separat permit. no demolitoin, no exterior work. ref #201306260573.
Details
Permit
201610059630
Status
complete
Filed
Oct 5, 2016
Permit issued
Nov 21, 2016
Final sign-off
Feb 3, 2017
Declared cost
$60,767
Address
450 Hayes St

space #1 - first time tenant improvement of an (e) shell space to accommodate a new ground floor retail space & accessible restroom. electrical, plumbing & lighting & life safety work performed under separat permit. no demolitoin, no exterior work. ref #201306260573.

Open the permit page

$60,767
Aug 30, 2016Completed
final sign-off Oct 2017
1700 California StGci, Incfinishes and lighting updates in common corridors, elevator lobbies, and restroom interior at levels 2,3,4 and 5 only. restrooms at level 2 and3 consist of partial update to meet ada requirement. restrooms at level 4 and 5 encompass complete renovation
Details
Permit
201608306354
Status
complete
Filed
Aug 30, 2016
Permit issued
Aug 31, 2016
Final sign-off
Oct 10, 2017
Declared cost
$396,488
Address
1700 California St

finishes and lighting updates in common corridors, elevator lobbies, and restroom interior at levels 2,3,4 and 5 only. restrooms at level 2 and3 consist of partial update to meet ada requirement. restrooms at level 4 and 5 encompass complete renovation

Open the permit page

$396,488
Aug 10, 2016Completed
final sign-off Aug 2017
155 Montgomery StPeacock Constructioninterior extg common floor restroom renovation at floors 2 -16, including new fixtures, finishes, accessories and lighting. extg restroom at floors 4,7,10, & 14 to be converted for accessibility. no exterior work. elec, mech, & plmg under seperate permits.
Details
Permit
201608104721
Status
complete
Filed
Aug 10, 2016
Permit issued
Sep 9, 2016
Final sign-off
Aug 22, 2017
Declared cost
$160,000
Address
155 Montgomery St

interior extg common floor restroom renovation at floors 2 -16, including new fixtures, finishes, accessories and lighting. extg restroom at floors 4,7,10, & 14 to be converted for accessibility. no exterior work. elec, mech, & plmg under seperate permits.

Open the permit page

$160,000
Jun 17, 2016Completed
final sign-off Jul 2016
450 Sutter StDerry Casey Builders4/f- (n) interior demising wall in (e) tenant suite to accommodate (n) x-ray machine. electrical, plumbing, life safety work performed on design build basis submitted as seperate permit. no exterior or mechanical work. n/a ordinance #155-13
Details
Permit
201606170204
Status
complete
Filed
Jun 17, 2016
Permit issued
Jun 22, 2016
Final sign-off
Jul 19, 2016
Declared cost
$22,968
Address
450 Sutter St

4/f- (n) interior demising wall in (e) tenant suite to accommodate (n) x-ray machine. electrical, plumbing, life safety work performed on design build basis submitted as seperate permit. no exterior or mechanical work. n/a ordinance #155-13

Open the permit page

$22,968
Mar 18, 2016Completed
final sign-off Sep 2016
450 Sutter StMarchetti Group14th flr: new interior ti including demising walls and new finishes in (e) suite. ele/plumb/fire/life safety undersep permit. no exterior work. maher na
Details
Permit
201603182500
Status
complete
Filed
Mar 18, 2016
Permit issued
May 16, 2016
Final sign-off
Sep 13, 2016
Declared cost
$95,565
Address
450 Sutter St

14th flr: new interior ti including demising walls and new finishes in (e) suite. ele/plumb/fire/life safety undersep permit. no exterior work. maher na

Open the permit page

$95,565
Jan 11, 2016Completed
final sign-off Sep 2016
535 Mission StSwinerton Buildersnew partition, suspended ceiling, fiishes, restrooms, mechanical, plumbing, electrical, lighting & structural. no exterior work or changes (except mechanical equiment pad at 2nd floor roof)
Details
Permit
201601116811
Status
complete
Filed
Jan 11, 2016
Permit issued
Feb 5, 2016
Final sign-off
Sep 9, 2016
Declared cost
$730,000
Address
535 Mission St

new partition, suspended ceiling, fiishes, restrooms, mechanical, plumbing, electrical, lighting & structural. no exterior work or changes (except mechanical equiment pad at 2nd floor roof)

Open the permit page

$730,000
Jan 7, 2016Completed
final sign-off Jul 2016
180 Montgomery StField Construction Inc.the project proposes an interior remodel to create additional seating areas for existing ground flr cafe. no exterior work,all work performed at grnd flr only.note: bldg is equipped w/fully auto sprinkler syste,mech,elec & plmbg under separate permit.
Details
Permit
201601076608
Status
complete
Filed
Jan 7, 2016
Permit issued
Mar 1, 2016
Final sign-off
Jul 1, 2016
Declared cost
$65,000
Address
180 Montgomery St

the project proposes an interior remodel to create additional seating areas for existing ground flr cafe. no exterior work,all work performed at grnd flr only.note: bldg is equipped w/fully auto sprinkler syste,mech,elec & plmbg under separate permit.

Open the permit page

$65,000
Oct 1, 2015Completed
final sign-off Mar 2018
450 Sutter StDerry Casey Builders8th flr: new accessible restrooms & showers for common use of building occupants,new mail area & phone rooms for use by bldg occupants.new accessible ramps to (e)bldg areas,elec,plmbg,light & l/s work performed on a design built basis as reqd &submitted as separate permit,no exterior work; maher n/a
Details
Permit
201510018539
Status
complete
Filed
Oct 1, 2015
Permit issued
Feb 18, 2016
Final sign-off
Mar 19, 2018
Declared cost
$53,361
Address
450 Sutter St

8th flr: new accessible restrooms & showers for common use of building occupants,new mail area & phone rooms for use by bldg occupants.new accessible ramps to (e)bldg areas,elec,plmbg,light & l/s work performed on a design built basis as reqd &submitted as separate permit,no exterior work; maher n/a

Open the permit page

$53,361
Oct 1, 2015Completed
final sign-off Jun 2016
450 Sutter StMarchetti Group10th flr,ste #1023: new interior partition walls & new finishes in existing suite on 10th flr, mechanical,elec,plmbg & l/s work performed on a design built basis as required & submitted on a separate permit, no exterior work; maher n/a
Details
Permit
201510018538
Status
complete
Filed
Oct 1, 2015
Permit issued
Feb 17, 2016
Final sign-off
Jun 28, 2016
Declared cost
$125,587
Address
450 Sutter St

10th flr,ste #1023: new interior partition walls & new finishes in existing suite on 10th flr, mechanical,elec,plmbg & l/s work performed on a design built basis as required & submitted on a separate permit, no exterior work; maher n/a

Open the permit page

$125,587
Sep 16, 2015Completed
final sign-off Feb 2016
580 Valencia StAdam Lewis Construction Companyrevision to pa#201504133498, minor layout changes, add details for millwork, security grille, mechanical, electrical, plumbing included.
Details
Permit
201509167190
Status
complete
Filed
Sep 16, 2015
Permit issued
Sep 24, 2015
Final sign-off
Feb 5, 2016
Address
580 Valencia St

revision to pa#201504133498, minor layout changes, add details for millwork, security grille, mechanical, electrical, plumbing included.

Open the permit page

Jul 31, 2015Completed
final sign-off Jan 2016
130 Sutter StPeacock Construction4th floor:for documentation of installation of smoke guard doors at elevator doors for work done under app#201505065513.
Details
Permit
201507313005
Status
complete
Filed
Jul 31, 2015
Permit issued
Aug 3, 2015
Final sign-off
Jan 6, 2016
Address
130 Sutter St

4th floor:for documentation of installation of smoke guard doors at elevator doors for work done under app#201505065513.

Open the permit page

May 14, 2015Never finaled
issued Aug 2015, no final
550 Montgomery StNovo Construction Inc10th flr: interior tenant improvement revision to pa 201210172221; remove (e) non load bearing interior partitions in storage areas only for single open storage area. no additional occupant loads. n/a ordinance #155-13
Details
Permit
201505146326
Status
issued
Filed
May 14, 2015
Permit issued
Aug 27, 2015
Declared cost
$8,000
Address
550 Montgomery St

10th flr: interior tenant improvement revision to pa 201210172221; remove (e) non load bearing interior partitions in storage areas only for single open storage area. no additional occupant loads. n/a ordinance #155-13

Open the permit page

$8,000
May 6, 2015Completed
final sign-off Jan 2016
130 Sutter StPeacock Construction4th floor: new non structural partitions, doors, casework, restrooms, lighting and accostic ceilings includes mechanical, electrical & plumbing. life safety under seperate permit.
Details
Permit
201505065513
Status
complete
Filed
May 6, 2015
Permit issued
May 19, 2015
Final sign-off
Jan 6, 2016
Declared cost
$938,000
Address
130 Sutter St

4th floor: new non structural partitions, doors, casework, restrooms, lighting and accostic ceilings includes mechanical, electrical & plumbing. life safety under seperate permit.

Open the permit page

$938,000
Apr 13, 2015Completed
final sign-off Feb 2016
580 Valencia StAdam Lewis Construction Companyinterior work: new partitions, suspended ceiling, casework, finishes, restrooms, mechanical, electrical, lighting for ground floor tenant. no exterior work. mechanical, electrical, plumbing, title 24 energy analysis under separate permits. to correct planning code violation 2015000777enf
Details
Permit
201504133498
Status
complete
Filed
Apr 13, 2015
Permit issued
Apr 27, 2015
Final sign-off
Feb 5, 2016
Declared cost
$273,091
Address
580 Valencia St

interior work: new partitions, suspended ceiling, casework, finishes, restrooms, mechanical, electrical, lighting for ground floor tenant. no exterior work. mechanical, electrical, plumbing, title 24 energy analysis under separate permits. to correct planning code violation 2015000777enf

Open the permit page

$273,091
Mar 11, 2015Completed
final sign-off Oct 2015
450 Sutter StMarchetti Group26/f, #2640 - new interior partitions and new finishes in (e) tenant ofc. ele, plum, lighting, energy calcs, fire sprinkles & life safety work performed on design/build basis as required and submitted under seperate permit. maher - not req'd
Details
Permit
201503110512
Status
complete
Filed
Mar 11, 2015
Permit issued
Apr 2, 2015
Final sign-off
Oct 14, 2015
Declared cost
$69,777
Address
450 Sutter St

26/f, #2640 - new interior partitions and new finishes in (e) tenant ofc. ele, plum, lighting, energy calcs, fire sprinkles & life safety work performed on design/build basis as required and submitted under seperate permit. maher - not req'd

Open the permit page

$69,777
Feb 27, 2015Expired or cancelled
expired Feb 2021
450 Sutter StDerry Casey Builderssuite #1003: interior tenant remodel of 10th flr offices to accomodate new waiting room and reception area, exam rooms, offices, breakroom and storage. no exterior work, note: building is equipped with partial automatic sprinkler system (not fully sprinklered) ; maher n/a
Details
Permit
201502279528
Status
expired
Filed
Feb 27, 2015
Permit issued
May 5, 2015
Declared cost
$268,811
Address
450 Sutter St

suite #1003: interior tenant remodel of 10th flr offices to accomodate new waiting room and reception area, exam rooms, offices, breakroom and storage. no exterior work, note: building is equipped with partial automatic sprinkler system (not fully sprinklered) ; maher n/a

Open the permit page

$268,811
Feb 5, 2015Never finaled
issued Feb 2015, no final
1 Embarcadero CenterGci, Inclobby level - disabled acccess barrier removal of rpubliv space raised platform seating area only. n/a maher ordinance
Details
Permit
201502057574
Status
issued
Filed
Feb 5, 2015
Permit issued
Feb 24, 2015
Declared cost
$2,000
Address
1 Embarcadero Center

lobby level - disabled acccess barrier removal of rpubliv space raised platform seating area only. n/a maher ordinance

Open the permit page

$2,000
Dec 22, 2014Never finaled
issued Dec 2014, no final
1346 Leavenworth StPjcon Incto obtain final inspection for work approved under pa#201106158145. all work is complete. compliance with maher ordinance no 155-13 not required.
Details
Permit
201412224325
Status
issued
Filed
Dec 22, 2014
Permit issued
Dec 22, 2014
Address
1346 Leavenworth St

to obtain final inspection for work approved under pa#201106158145. all work is complete. compliance with maher ordinance no 155-13 not required.

Open the permit page

Dec 16, 2014Completed
final sign-off Apr 2016
360 Post StBalfour Beatty Construction Llc8/f: office ti on the 8th fl including new partitions, fixtures, finishes, mechanical and electrical. no exterior work. fire protection under sep permit
Details
Permit
201412163862
Status
complete
Filed
Dec 16, 2014
Permit issued
Dec 23, 2014
Final sign-off
Apr 25, 2016
Declared cost
$386,000
Address
360 Post St

8/f: office ti on the 8th fl including new partitions, fixtures, finishes, mechanical and electrical. no exterior work. fire protection under sep permit

Open the permit page

$386,000
Nov 26, 2014Completed
final sign-off Jan 2015
220 Montgomery StPeacock Construction12th floor: office tenant improvement to include new non-structural partitions, casework, finishes and fixture, demo of selected non-structural partitions. n/a ordinance #155-13
Details
Permit
201411262576
Status
complete
Filed
Nov 26, 2014
Permit issued
Nov 26, 2014
Final sign-off
Jan 21, 2015
Declared cost
$95,000
Address
220 Montgomery St

12th floor: office tenant improvement to include new non-structural partitions, casework, finishes and fixture, demo of selected non-structural partitions. n/a ordinance #155-13

Open the permit page

$95,000
Nov 25, 2014Completed
final sign-off Nov 2015
450 Sutter StDerry Casey Builders#1708- new interior partitions and new finishes in existing tenant office. electrical, plumbing, lighting, energy calculations, fire sprinkler and life safety work performed on design/build basis under seperate permits as required. n/a ordinance #155-13.
Details
Permit
201411252545
Status
complete
Filed
Nov 25, 2014
Permit issued
Feb 25, 2015
Final sign-off
Nov 3, 2015
Declared cost
$120,494
Address
450 Sutter St

#1708- new interior partitions and new finishes in existing tenant office. electrical, plumbing, lighting, energy calculations, fire sprinkler and life safety work performed on design/build basis under seperate permits as required. n/a ordinance #155-13.

Open the permit page

$120,494
Oct 14, 2014Completed
final sign-off Mar 2015
550 Montgomery StBevilacqua & Sonsconstruction new tenant improvement, new interior partitions, doors, finishes on 9th fl. upgrade restroms to make accessible. mech, elec, plumbing, life safety on sep permit
Details
Permit
201410148782
Status
complete
Filed
Oct 14, 2014
Permit issued
Oct 24, 2014
Final sign-off
Mar 10, 2015
Declared cost
$160,000
Address
550 Montgomery St

construction new tenant improvement, new interior partitions, doors, finishes on 9th fl. upgrade restroms to make accessible. mech, elec, plumbing, life safety on sep permit

Open the permit page

$160,000
Aug 18, 2014Expired or cancelled
cancelled Jan 2026
550 Montgomery Strevision to pa #201210172221 to exclude all work on 11th flr, there will be no demolition or new construction on the 11th flr. no interior or exterior work, no construction. maher n/a. no hood/duct work. no public assembly on 11th floor.
Details
Permit
201408184109
Status
cancelled
Filed
Aug 18, 2014
Address
550 Montgomery St

revision to pa #201210172221 to exclude all work on 11th flr, there will be no demolition or new construction on the 11th flr. no interior or exterior work, no construction. maher n/a. no hood/duct work. no public assembly on 11th floor.

Open the permit page

Aug 11, 2014Completed
final sign-off Mar 2015
550 Montgomery StBevilacqua & Sonssuite 925: demolition of interior partitions, doors and ceiling. no exterior work. building is equipped with full automatic sprinkler system. adminstrative bulletin 017 is exempt for demo only. compliance with maher ordinance 155-13 not required.
Details
Permit
201408113566
Status
complete
Filed
Aug 11, 2014
Permit issued
Aug 15, 2014
Final sign-off
Mar 10, 2015
Declared cost
$8,000
Address
550 Montgomery St

suite 925: demolition of interior partitions, doors and ceiling. no exterior work. building is equipped with full automatic sprinkler system. adminstrative bulletin 017 is exempt for demo only. compliance with maher ordinance 155-13 not required.

Open the permit page

$8,000
Jun 30, 2014Completed
final sign-off Mar 2015
550 Montgomery StBevilacqua & Sons2nd floor - work includes removing interior, non-structural partitions & doors. no exterior work. (building is equipped with fully automatic sprinkelr system. demolished space will be unoccupied.) ab-017. n/a maher ordinance
Details
Permit
201406309978
Status
complete
Filed
Jun 30, 2014
Permit issued
Aug 6, 2014
Final sign-off
Mar 10, 2015
Declared cost
$7,000
Address
550 Montgomery St

2nd floor - work includes removing interior, non-structural partitions & doors. no exterior work. (building is equipped with fully automatic sprinkelr system. demolished space will be unoccupied.) ab-017. n/a maher ordinance

Open the permit page

$7,000
Jun 30, 2014Never finaled
issued Sep 2014, no final
475 Brannan StBevilacqua & Sonsground floor - work includes new partial height walls & galss partitions & doors. no exterior work. (building is equipped with full automatic sprinkler system). compliance with maher ordinance no 155-13 not required.
Details
Permit
201406309983
Status
issued
Filed
Jun 30, 2014
Permit issued
Sep 26, 2014
Declared cost
$20,374
Address
475 Brannan St

ground floor - work includes new partial height walls & galss partitions & doors. no exterior work. (building is equipped with full automatic sprinkler system). compliance with maher ordinance no 155-13 not required.

Open the permit page

$20,374
Jun 20, 2014Expired or cancelled
expired Feb 2021
450 Sutter StDerry Casey Builders13th flr: addition of new interior partitions and new finishes on the 13th flr, ste 1300; compliance with ord 155-13 not required
Details
Permit
201406208947
Status
expired
Filed
Jun 20, 2014
Permit issued
Aug 15, 2014
Declared cost
$28,548
Address
450 Sutter St

13th flr: addition of new interior partitions and new finishes on the 13th flr, ste 1300; compliance with ord 155-13 not required

Open the permit page

$28,548
Jun 20, 2014Completed
final sign-off Mar 2015
450 Sutter StMarchetti Construction Inc.suite #1314:new interior demising walls and nw finishes in extg tenant suite & expansion into adjacent suites on the 13th flr. electrical, plmg, lighting and lifesafty work performed on a design build basis as required and submitted as a separate permit. no exterior work. n/a for the maher/155-13
Details
Permit
201406208946
Status
complete
Filed
Jun 20, 2014
Permit issued
Oct 9, 2014
Final sign-off
Mar 26, 2015
Declared cost
$280,000
Address
450 Sutter St

suite #1314:new interior demising walls and nw finishes in extg tenant suite & expansion into adjacent suites on the 13th flr. electrical, plmg, lighting and lifesafty work performed on a design build basis as required and submitted as a separate permit. no exterior work. n/a for the maher/155-13

Open the permit page

$280,000
Jun 17, 2014Never finaled
issued Jun 2014, no final
1280 10th AvAdam Lewis Construction Companybuild new partition walls, new suspended ceiling, new casework, new finishes, and new restrooms. no exterior work: note c.u.p. approved under case #201316556 on may 8th 2014 from planning to convert grocery store to medical service use.
Details
Permit
201406178584
Status
issued
Filed
Jun 17, 2014
Permit issued
Jun 26, 2014
Declared cost
$279,000
Address
1280 10th Av

build new partition walls, new suspended ceiling, new casework, new finishes, and new restrooms. no exterior work: note c.u.p. approved under case #201316556 on may 8th 2014 from planning to convert grocery store to medical service use.

Open the permit page

$279,000
Mar 13, 2014Completed
final sign-off May 2014
2 Embarcadero CenterField Construction Inc.r 2107:scope of work includes new relocated demising wall and partial remodel of tenant space. new flooring, ceiling, and lighting as noted on plans. mep, electrical, plumbing, life safety lighting and pipe sprinklers f/a, sprinkler under separate permit. n/a for the maher ordinance #155-13
Details
Permit
201403130611
Status
complete
Filed
Mar 13, 2014
Permit issued
Mar 19, 2014
Final sign-off
May 7, 2014
Declared cost
$35,570
Address
2 Embarcadero Center

r 2107:scope of work includes new relocated demising wall and partial remodel of tenant space. new flooring, ceiling, and lighting as noted on plans. mep, electrical, plumbing, life safety lighting and pipe sprinklers f/a, sprinkler under separate permit. n/a for the maher ordinance #155-13

Open the permit page

$35,570
Jan 30, 2014Never finaled
issued Sep 2014, no final
220 Battery StDerry Casey Builders Inc, Derry Casey Buildersrevision to pa#2012-05-30-1433. repaired store front system matching (e) in kind. new elevator penthouse. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.
Details
Permit
201401307435
Status
issued
Filed
Jan 30, 2014
Permit issued
Sep 8, 2014
Declared cost
$50,000
Address
220 Battery St

revision to pa#2012-05-30-1433. repaired store front system matching (e) in kind. new elevator penthouse. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.

Open the permit page

$50,000
Nov 20, 2013Completed
final sign-off Nov 2014
520 Montgomery StDettaglio Construction Inc Dba Dci Constdemolish existing mezzanine and stair only, demo permit only, no new construction. building is vacant, no occupants. per ab-017.
Details
Permit
201311202377
Status
complete
Filed
Nov 20, 2013
Permit issued
Nov 22, 2013
Final sign-off
Nov 3, 2014
Declared cost
$25,000
Address
520 Montgomery St

demolish existing mezzanine and stair only, demo permit only, no new construction. building is vacant, no occupants. per ab-017.

Open the permit page

$25,000
Sep 16, 2013Completed
final sign-off Oct 2014
520 Montgomery StDettaglio Construction Inc Dba Dci Constremove(e)stair & mezz.fl level,interior t/i include/n stair no change/n mezz.fl,struct.& support members/n accessible restrm at g/f,/n restrms at basemt & 2/f, no exterior wk,n interior partitns,mep under sep.permits(compl. w/maher ord. extended #155-13 not requir'd. excavation less than 50 cu. yd.)
Details
Permit
201309166849
Status
complete
Filed
Sep 16, 2013
Permit issued
Dec 31, 2013
Final sign-off
Oct 29, 2014
Declared cost
$225,000
Address
520 Montgomery St

remove(e)stair & mezz.fl level,interior t/i include/n stair no change/n mezz.fl,struct.& support members/n accessible restrm at g/f,/n restrms at basemt & 2/f, no exterior wk,n interior partitns,mep under sep.permits(compl. w/maher ord. extended #155-13 not requir'd. excavation less than 50 cu. yd.)

Open the permit page

$225,000
Mar 13, 2013Never finaled
issued Feb 2015, no final
220 Battery StBarber Construction2nd floor:new partition walls, fixutres, finishes and ada compliant restroom. mechanical, electrical, plmg, and life safety engineering to be performed as required on a design/build basis and shall be submitted as part of a seperate permit shell and core improvements under permit #201205301433.
Details
Permit
201303132063
Status
issued
Filed
Mar 13, 2013
Permit issued
Feb 26, 2015
Declared cost
$148,025
Address
220 Battery St

2nd floor:new partition walls, fixutres, finishes and ada compliant restroom. mechanical, electrical, plmg, and life safety engineering to be performed as required on a design/build basis and shall be submitted as part of a seperate permit shell and core improvements under permit #201205301433.

Open the permit page

$148,025
Mar 1, 2013Completed
final sign-off Aug 2013
180 Montgomery StMarchetti Construction Inc.ground floor suite 100 - propose an interior remodel to create a new cafe. mechanical, mech, plbg, life safety perform on a design build basis & submitted as a separate permit. all work at ground floor only
Details
Permit
201303011258
Status
complete
Filed
Mar 1, 2013
Permit issued
Jun 21, 2013
Final sign-off
Aug 15, 2013
Declared cost
$400,000
Address
180 Montgomery St

ground floor suite 100 - propose an interior remodel to create a new cafe. mechanical, mech, plbg, life safety perform on a design build basis & submitted as a separate permit. all work at ground floor only

Open the permit page

$400,000
Feb 26, 2013Never finaled
issued Apr 2013, no final
2 Embarcadero CenterGci, Incground floor:demolish extg water feature and concrete bench.replace with new concrete benches, wood decking,planters, & accent lighting. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit.
Details
Permit
201302260947
Status
issued
Filed
Feb 26, 2013
Permit issued
Apr 17, 2013
Declared cost
$150,000
Address
2 Embarcadero Center

ground floor:demolish extg water feature and concrete bench.replace with new concrete benches, wood decking,planters, & accent lighting. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit.

Open the permit page

$150,000
Feb 26, 2013Never finaled
issued Apr 2013, no final
3 Embarcadero CenterGci, Incground floor:demolish extg water feature and concrete bench. replace with new concrete bench.wood decking,planters & accent lighting. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit.
Details
Permit
201302260948
Status
issued
Filed
Feb 26, 2013
Permit issued
Apr 17, 2013
Declared cost
$150,000
Address
3 Embarcadero Center

ground floor:demolish extg water feature and concrete bench. replace with new concrete bench.wood decking,planters & accent lighting. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit.

Open the permit page

$150,000
Feb 26, 2013Expired or cancelled
cancelled Jan 2026
4 Embarcadero Center(n) blade sign on (e) conc. wall above. structural, mech., elec., plumbing and life safety engineering to be performed as required, on a design/built basis and shall be submitted as part of a separate permit.
Details
Permit
201302260944
Status
cancelled
Filed
Feb 26, 2013
Declared cost
$50,000
Address
4 Embarcadero Center

(n) blade sign on (e) conc. wall above. structural, mech., elec., plumbing and life safety engineering to be performed as required, on a design/built basis and shall be submitted as part of a separate permit.

Open the permit page

$50,000
Feb 26, 2013Never finaled
issued Apr 2013, no final
1 Embarcadero CenterGci, Incground floor:new finishes on extg retail area courtyard benches. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit.
Details
Permit
201302260941
Status
issued
Filed
Feb 26, 2013
Permit issued
Apr 17, 2013
Declared cost
$100,000
Address
1 Embarcadero Center

ground floor:new finishes on extg retail area courtyard benches. structural,mech, elect, plmg, and life safety engineering to be performed as required, on a design/bld basic and shall be submitted as part of a separate permit.

Open the permit page

$100,000
Oct 30, 2012Completed
final sign-off Jan 2013
501 02nd StGci, Inc4th floor ste 415 - demo (e) non structural partitions to accomodate (e) work, demo (e) casework, build (n) partition walls, new suspended ceiling, new caswork, new finishes. mep & life safety work performed on a design build basis & submitted as a separate permit. nitrogen removed from plan;
Details
Permit
201210303079
Status
complete
Filed
Oct 30, 2012
Permit issued
Nov 2, 2012
Final sign-off
Jan 30, 2013
Declared cost
$256,756
Address
501 02nd St

4th floor ste 415 - demo (e) non structural partitions to accomodate (e) work, demo (e) casework, build (n) partition walls, new suspended ceiling, new caswork, new finishes. mep & life safety work performed on a design build basis & submitted as a separate permit. nitrogen removed from plan;

Open the permit page

$256,756
Oct 17, 2012Completed
final sign-off Nov 2015
550 Montgomery Stchange of use from vacant office & lounge to private lounge, office, bar & wine storage spikes. (e) kitchen to be updated for code compliance (e) 10th & 11th flrs bathrms will be upgraded to ada compliance. 11th fl (e) bathrm will be upgraded & a (n) accessible bathrm will be added. mep, life safety
Details
Permit
201210172221
Status
complete
Filed
Oct 17, 2012
Permit issued
Jun 5, 2013
Final sign-off
Nov 18, 2015
Declared cost
$130,000
Address
550 Montgomery St

change of use from vacant office & lounge to private lounge, office, bar & wine storage spikes. (e) kitchen to be updated for code compliance (e) 10th & 11th flrs bathrms will be upgraded to ada compliance. 11th fl (e) bathrm will be upgraded & a (n) accessible bathrm will be added. mep, life safety

Open the permit page

$130,000
Sep 24, 2012Never finaled
issued Oct 2012, no final
550 Montgomery StBevilacqua & Sonsdemo of interior parition walls and bathrooms for future tenant improvement on 10th and 11th fl. future improvement under seperate permit ab-017
Details
Permit
201209240432
Status
issued
Filed
Sep 24, 2012
Permit issued
Oct 5, 2012
Declared cost
$20,000
Address
550 Montgomery St

demo of interior parition walls and bathrooms for future tenant improvement on 10th and 11th fl. future improvement under seperate permit ab-017

Open the permit page

$20,000
Aug 21, 2012Completed
final sign-off Dec 2012
3885 24th StR 3 Builders Inc.revision to 201205150522. remove e wood flooring. replce any floor joists (with structural damage) in kind. build new sub floor sheathing and new wood flooring
Details
Permit
201208217939
Status
complete
Filed
Aug 21, 2012
Permit issued
Aug 23, 2012
Final sign-off
Dec 11, 2012
Declared cost
$6,000
Address
3885 24th St

revision to 201205150522. remove e wood flooring. replce any floor joists (with structural damage) in kind. build new sub floor sheathing and new wood flooring

Open the permit page

$6,000
Jun 22, 2012Completed
final sign-off Oct 2012
550 Montgomery StBevilacqua & Sonsnew mens apparel store. includes barbershop fixtures in e guard room, new interior window opening at barber shop on non historic wall. replace carpet, paint non historical walls and change non historic liht fixtures. due to histric nature of space majority of walls and ceilings left as it including
Details
Permit
201206223196
Status
complete
Filed
Jun 22, 2012
Permit issued
Jul 16, 2012
Final sign-off
Oct 30, 2012
Declared cost
$30,000
Address
550 Montgomery St

new mens apparel store. includes barbershop fixtures in e guard room, new interior window opening at barber shop on non historic wall. replace carpet, paint non historical walls and change non historic liht fixtures. due to histric nature of space majority of walls and ceilings left as it including

Open the permit page

$30,000
May 30, 2012Completed
final sign-off Jul 2018
220 Battery Stcomplete voluntary seismic retrofit & upgrade of (e) bldg. demo (e) stairs & fright elevator. (n) stairs & ada compliant elevator, ada compliant restrooms. mep, life safety engineering ad req'd as design build & separate permit. int. work only.
Details
Permit
201205301433
Status
complete
Filed
May 30, 2012
Permit issued
Dec 2, 2013
Final sign-off
Jul 20, 2018
Declared cost
$200,000
Address
220 Battery St

complete voluntary seismic retrofit & upgrade of (e) bldg. demo (e) stairs & fright elevator. (n) stairs & ada compliant elevator, ada compliant restrooms. mep, life safety engineering ad req'd as design build & separate permit. int. work only.

Open the permit page

$200,000
Mar 15, 2012Completed
final sign-off Sep 2013
4 Embarcadero CenterPeacock Construction Inc22nd floor - demo (e) partition walls, ceiling, floorign & finishes. replace fixtures in (e) restrooms to be fully compliant.demo unused interconnecting stair bet 21st & 22nd flrs in tenant space & infill stair slab opening w/new struct slab. life safety on design/build under separate permit.
Details
Permit
201203156130
Status
complete
Filed
Mar 15, 2012
Permit issued
Mar 15, 2012
Final sign-off
Sep 4, 2013
Declared cost
$140,000
Address
4 Embarcadero Center

22nd floor - demo (e) partition walls, ceiling, floorign & finishes. replace fixtures in (e) restrooms to be fully compliant.demo unused interconnecting stair bet 21st & 22nd flrs in tenant space & infill stair slab opening w/new struct slab. life safety on design/build under separate permit.

Open the permit page

$140,000
Mar 15, 2012Completed
final sign-off Sep 2013
4 Embarcadero CenterPeacock Construction Inc23nd floor - demo (e) partition walls, ceiling, flooring & finishes. replace fixtures in (e) restrooms. new common tenant corridor. life safety on design/build under separate permit.
Details
Permit
201203156133
Status
complete
Filed
Mar 15, 2012
Permit issued
Mar 15, 2012
Final sign-off
Sep 4, 2013
Declared cost
$110,000
Address
4 Embarcadero Center

23nd floor - demo (e) partition walls, ceiling, flooring & finishes. replace fixtures in (e) restrooms. new common tenant corridor. life safety on design/build under separate permit.

Open the permit page

$110,000
Mar 15, 2012Completed
final sign-off Jun 2012
4 Embarcadero CenterPeacock Construction Increlocate (e) plumbing fixtures to accommodate (n) ada accessible entry doors. (n) partition walls to accommodate (n) work. plumbing engineering to be perfomred on a design/build basis and shall be submitted as part of a separate permit if required.
Details
Permit
201203156129
Status
complete
Filed
Mar 15, 2012
Permit issued
Mar 15, 2012
Final sign-off
Jun 14, 2012
Declared cost
$27,000
Address
4 Embarcadero Center

relocate (e) plumbing fixtures to accommodate (n) ada accessible entry doors. (n) partition walls to accommodate (n) work. plumbing engineering to be perfomred on a design/build basis and shall be submitted as part of a separate permit if required.

Open the permit page

$27,000
Mar 6, 2012Never finaled
issued Mar 2012, no final
2125 Fillmore StR 3 Builders Inc.minor t.i to (e) full service restaurant, build new wall betweem bar & kitchen. extend (e) bar.no increase in occupant load less than 49- b occupancy
Details
Permit
201203065419
Status
issued
Filed
Mar 6, 2012
Permit issued
Mar 15, 2012
Declared cost
$24,000
Address
2125 Fillmore St

minor t.i to (e) full service restaurant, build new wall betweem bar & kitchen. extend (e) bar.no increase in occupant load less than 49- b occupancy

Open the permit page

$24,000
Feb 24, 2012Completed
final sign-off May 2012
114 12th AvMoroso Construction Increvision to appl #201202083827: revisiion proposes to incorporate addiiton of (n) planters, trellis, new wall sconces & (n) guardrail at entry porch. electrical & plumbing to be part of separate permit.
Details
Permit
201202244800
Status
complete
Filed
Feb 24, 2012
Permit issued
Mar 13, 2012
Final sign-off
May 22, 2012
Declared cost
$12,500
Address
114 12th Av

revision to appl #201202083827: revisiion proposes to incorporate addiiton of (n) planters, trellis, new wall sconces & (n) guardrail at entry porch. electrical & plumbing to be part of separate permit.

Open the permit page

$12,500
Feb 6, 2012Completed
final sign-off Feb 2013
801 Grove Stremodel kitchen, remodel master bathroom, remodel 2 bedrooms, remodel living room. replace bathroom window at rear, move (e) exterior exit to hallway. change lighting, change plumbing in bathroom. enlarge closets in bedrooms. work on 801 grove street.
Details
Permit
201202063603
Status
complete
Filed
Feb 6, 2012
Permit issued
Feb 14, 2012
Final sign-off
Feb 7, 2013
Declared cost
$60,000
Address
801 Grove St

remodel kitchen, remodel master bathroom, remodel 2 bedrooms, remodel living room. replace bathroom window at rear, move (e) exterior exit to hallway. change lighting, change plumbing in bathroom. enlarge closets in bedrooms. work on 801 grove street.

Open the permit page

$60,000
Feb 3, 2012Completed
final sign-off Jul 2012
3659 Buchanan StCht Properties Developmentproject proposes the interior remodel of existing restaurant with new equipment, new ventilation hood, and a remodeled front counter
Details
Permit
201202033543
Status
complete
Filed
Feb 3, 2012
Permit issued
May 21, 2012
Final sign-off
Jul 20, 2012
Declared cost
$50,000
Address
3659 Buchanan St

project proposes the interior remodel of existing restaurant with new equipment, new ventilation hood, and a remodeled front counter

Open the permit page

$50,000
Dec 2, 2011Completed
final sign-off May 2012
4 Embarcadero CenterPeacock Construction Incnew finishes and fixtures in extg restrooms. new ada compliant drinking fountain. demo unused interconnection, stair btwn 29th and 30th floors in the tenant space and infill the stair slab opening w/a new structural slab per structural dwgs,suspended ceiling in the bathrooms. mep & life safety sep.
Details
Permit
201112029968
Status
complete
Filed
Dec 2, 2011
Permit issued
Dec 7, 2011
Final sign-off
May 1, 2012
Declared cost
$110,000
Address
4 Embarcadero Center

new finishes and fixtures in extg restrooms. new ada compliant drinking fountain. demo unused interconnection, stair btwn 29th and 30th floors in the tenant space and infill the stair slab opening w/a new structural slab per structural dwgs,suspended ceiling in the bathrooms. mep & life safety sep.

Open the permit page

$110,000
Nov 17, 2011Never finaled
issued Dec 2011, no final
2 Embarcadero CenterThomas Swan Sign Co Incfloor 7th,8th & 9th - new emergency evacuation signage.
Details
Permit
201111179178
Status
issued
Filed
Nov 17, 2011
Permit issued
Dec 21, 2011
Declared cost
$1,800
Address
2 Embarcadero Center

floor 7th,8th & 9th - new emergency evacuation signage.

Open the permit page

$1,800
Nov 17, 2011Completed
final sign-off Jan 2012
4 Embarcadero CenterPeacock Construction Inc39th floor - revision to appl #201108092056: all (e) walls shown as existing construction to remain. contractor to verify & maintain all existing rated walls as required.
Details
Permit
201111179177
Status
complete
Filed
Nov 17, 2011
Permit issued
Nov 28, 2011
Final sign-off
Jan 9, 2012
Address
4 Embarcadero Center

39th floor - revision to appl #201108092056: all (e) walls shown as existing construction to remain. contractor to verify & maintain all existing rated walls as required.

Open the permit page

Nov 17, 2011Completed
final sign-off Jan 2012
4 Embarcadero CenterPeacock Construction Inc31st floor - revision to appl #201108092059: all (e) walls shown as existing construction to remain. contractor to verify & maintain all existing rated walls as required.
Details
Permit
201111179176
Status
complete
Filed
Nov 17, 2011
Permit issued
Nov 28, 2011
Final sign-off
Jan 9, 2012
Address
4 Embarcadero Center

31st floor - revision to appl #201108092059: all (e) walls shown as existing construction to remain. contractor to verify & maintain all existing rated walls as required.

Open the permit page

Nov 17, 2011Completed
final sign-off May 2012
2 Embarcadero CenterPeacock Construction Inc22nd floor - revision to appl #201108031611: all (e) walls shown as existing construction to remain. contractor to verify & maintain all existing rated walls as required.
Details
Permit
201111179129
Status
complete
Filed
Nov 17, 2011
Permit issued
Nov 28, 2011
Final sign-off
May 1, 2012
Address
2 Embarcadero Center

22nd floor - revision to appl #201108031611: all (e) walls shown as existing construction to remain. contractor to verify & maintain all existing rated walls as required.

Open the permit page

Oct 7, 2011Completed
final sign-off Oct 2011
2410 California StFisher Development Increvision to pa# 2011.10.07.0151 clarify path of travel & exit.
Details
Permit
201110076392
Status
complete
Filed
Oct 7, 2011
Permit issued
Oct 7, 2011
Final sign-off
Oct 13, 2011
Address
2410 California St

revision to pa# 2011.10.07.0151 clarify path of travel & exit.

Open the permit page

Aug 3, 2011Completed
final sign-off May 2012
2 Embarcadero CenterPeacock Construction Incnew finishes and fixtures in e floor common ada compliant restrooms and elev lobby layout and configuration shall remain as is. new ada compliant drinking fountain. dmo unused interconnecting stair btwn 21st/22ndfl, infill stair slab opening w/ struc slab.mep,sp, ls separate permit
Details
Permit
201108031611
Status
complete
Filed
Aug 3, 2011
Permit issued
Aug 15, 2011
Final sign-off
May 1, 2012
Declared cost
$156,395
Address
2 Embarcadero Center

new finishes and fixtures in e floor common ada compliant restrooms and elev lobby layout and configuration shall remain as is. new ada compliant drinking fountain. dmo unused interconnecting stair btwn 21st/22ndfl, infill stair slab opening w/ struc slab.mep,sp, ls separate permit

Open the permit page

$156,395
Aug 3, 2011Completed
final sign-off May 2012
4 Embarcadero CenterPeacock Construction Incremove e greenhouse, install new temporary partition. install new waterproofing and new area drains. mech, elec,plumb, life safety eng on design build basis on sep permit. will remain vacant per ab017
Details
Permit
201108031616
Status
complete
Filed
Aug 3, 2011
Permit issued
Aug 15, 2011
Final sign-off
May 2, 2012
Declared cost
$45,000
Address
4 Embarcadero Center

remove e greenhouse, install new temporary partition. install new waterproofing and new area drains. mech, elec,plumb, life safety eng on design build basis on sep permit. will remain vacant per ab017

Open the permit page

$45,000
Jul 13, 2011Completed
final sign-off Oct 2011
2410 California StFisher Development Incdemo (e) non structural walls, build new partition walls, new suspended ceiling, new finishes. remove (e) storefront & build new storefront. m.e.p under seperate permit
Details
Permit
201107130151
Status
complete
Filed
Jul 13, 2011
Permit issued
Jul 25, 2011
Final sign-off
Oct 14, 2011
Declared cost
$175,000
Address
2410 California St

demo (e) non structural walls, build new partition walls, new suspended ceiling, new finishes. remove (e) storefront & build new storefront. m.e.p under seperate permit

Open the permit page

$175,000
Jun 29, 2011Completed
final sign-off Feb 2012
220 Battery StCci Com'l Constr & Improv**See 985808***demo e partition walls, fixtures, finish all new work to be performed under sep permit per ab017
Details
Permit
201106299173
Status
complete
Filed
Jun 29, 2011
Permit issued
Jun 29, 2011
Final sign-off
Feb 28, 2012
Declared cost
$6,000
Address
220 Battery St

demo e partition walls, fixtures, finish all new work to be performed under sep permit per ab017

Open the permit page

$6,000
Jun 22, 2011Completed
final sign-off Oct 2011
1 Embarcadero CenterPeacock Construction Incfloor 13,suite 1350: new demising wall to separate area of work from adjacent suite. new partial height walls. (e) ada compliant drinking fountain and restrooms. mech, elec, plumb,life safety engineering performed as required on design/build basis on sep permit
Details
Permit
201106228659
Status
complete
Filed
Jun 22, 2011
Permit issued
Jun 22, 2011
Final sign-off
Oct 27, 2011
Declared cost
$29,000
Address
1 Embarcadero Center

floor 13,suite 1350: new demising wall to separate area of work from adjacent suite. new partial height walls. (e) ada compliant drinking fountain and restrooms. mech, elec, plumb,life safety engineering performed as required on design/build basis on sep permit

Open the permit page