Block 0642, lot 036
1601 Van Ness Ave
- City’s use
- Commercial Retail
- Built
- 1988
- Stories
- 7
- Building
- 6,444 sq ft
- Zoning
- RC4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
96 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2025 | Completed final sign-off Jul 2025 | 1700 California St | Rago Neon Inc. | 1 electric wall sign - indentifying signDetails
1 electric wall sign - indentifying sign | $15,000 |
| Jul 12, 2023 | Never finaled filed Jul 2023, never issued | 1700 California St | Luminous Fire Alarm | fire alarm upgradeDetails
fire alarm upgrade | $114,400 |
| Jun 8, 2023 | Never finaled issued Jun 2023, no final | 1700 California St | administrative permit to change the planning use from office to health service use on floors g-2 to 5th floor per pc motion #21255. no change of occupancy. no physical work proposedDetails
administrative permit to change the planning use from office to health service use on floors g-2 to 5th floor per pc motion #21255. no change of occupancy. no physical work proposed | ||
| Feb 24, 2023 | Completed final sign-off Apr 2023 | 1700 California St | Tcg Builders Inc Dba The Core Group | interior demo of dining room at (e) restaurant ab-017Details
interior demo of dining room at (e) restaurant ab-017 | $30,000 |
| Jul 27, 2022 | Completed final sign-off Aug 2022 | 1700 California St | Pye-Barker Fire & Safety | as-builts to add & relocate pendents fire sprinklers to accommondate new t.i. chaneges in ste #570. ref to 2019 1227 0850Details
as-builts to add & relocate pendents fire sprinklers to accommondate new t.i. chaneges in ste #570. ref to 2019 1227 0850 | |
| Apr 6, 2022 | Completed final sign-off Aug 2022 | 1700 California St | Centric Building Inc. | revision to pa#202203220591. mechanical revision to duct work. #570Details
revision to pa#202203220591. mechanical revision to duct work. #570 | |
| Mar 22, 2022 | Completed final sign-off Aug 2022 | 1700 California St | Centric Building Inc. | 5th fl, ste 570 deferred mechanical work for pa 2019-1227-0850Details
5th fl, ste 570 deferred mechanical work for pa 2019-1227-0850 | |
| Feb 1, 2022 | Completed final sign-off Aug 2022 | 1700 California St | Pye-Barker Fire & Safety | add and relocate pendent fire sprinklers to accommodate new ti changes in sute 570. ref pa 2019-1227-0850Details
add and relocate pendent fire sprinklers to accommodate new ti changes in sute 570. ref pa 2019-1227-0850 | $1,500 |
| Jan 14, 2022 | Completed final sign-off Aug 2022 | 1700 California St | Ericksen Electric | additional work to ew202012102167 additional work ew202012102167. submitting engineered plans rev to pa 201912270850.Details
additional work to ew202012102167 additional work ew202012102167. submitting engineered plans rev to pa 201912270850. | |
| Dec 27, 2019 | Completed final sign-off Aug 2022 | 1700 California St | Centric Building Inc. | office remodel and addition-interior remodel to (e) office & expansion into (e) vacant space. design/ build new offices and exam rooms.relocate reception and waiting room. mep defferred submittal.Details
office remodel and addition-interior remodel to (e) office & expansion into (e) vacant space. design/ build new offices and exam rooms.relocate reception and waiting room. mep defferred submittal. | $100,000 |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 1700 California St | Thomas Swan Sign Co Inc | revision to 201812208834 change in lettering per attached plans. copy only. maher n/a. "brown & toland physicans"Details
revision to 201812208834 change in lettering per attached plans. copy only. maher n/a. "brown & toland physicans" | |
| Jan 18, 2019 | Completed final sign-off Aug 2020 | 1700 California St | Ayoob & Peery Plumbing Co Inc | level g2: add (2), relocate (21), and plug (1) sprinkler to conform with the new wall/ceiling layout of the t.i.Details
level g2: add (2), relocate (21), and plug (1) sprinkler to conform with the new wall/ceiling layout of the t.i. | $5,775 |
| Dec 27, 2018 | Never finaled issued Dec 2018, no final | 1700 California St | Nomellini Construction * Ask For Id * | suite #335 on 3rd fl: install demising wall. add electrical outlet. no change to hvac or ceiling grid. add 2 new doors. install carpet. one of doors 20 min 8Details
suite #335 on 3rd fl: install demising wall. add electrical outlet. no change to hvac or ceiling grid. add 2 new doors. install carpet. one of doors 20 min 8 | $15,000 |
| Dec 20, 2018 | Completed final sign-off Aug 2019 | 1700 California St | Thomas Swan Sign Co Inc | non illuminated sign. "brown & toland physicians"Details
non illuminated sign. "brown & toland physicians" | $3,000 |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 1700 California St | Ad Art Inc. | install illuminated single-faced wall sign for address number "1700".Details
install illuminated single-faced wall sign for address number "1700". | $5,000 |
| Oct 10, 2018 | Expired or cancelled cancelled Feb 2024 | 1700 California St | Gci, Inc | revision to pa 2016-0928-8977 - demo carpet, new non-structural partitions. demo ductwork, patch (e) duct 9e) exhaust air plenum connected to gef 1 fan, reuse heat pump title 24Details
revision to pa 2016-0928-8977 - demo carpet, new non-structural partitions. demo ductwork, patch (e) duct 9e) exhaust air plenum connected to gef 1 fan, reuse heat pump title 24 | |
| Jul 27, 2018 | Never finaled issued Dec 2019, no final | 1700 California St | Gci, Inc | level g2 - revision to pa #201612296226. scope includes change in ceiling & lighting types at locker rooms & corridors, changes in ligting type at elevator lobby, elimination of lighting fixture at main lobby & interior finishes at reception desk wall.Details
level g2 - revision to pa #201612296226. scope includes change in ceiling & lighting types at locker rooms & corridors, changes in ligting type at elevator lobby, elimination of lighting fixture at main lobby & interior finishes at reception desk wall. | |
| Apr 27, 2018 | Completed final sign-off Jul 2022 | 1700 California St | Gci, Inc | non-bearing concrete masonry wall - garage level ref pa 2016-0928-8977. n/a for maherDetails
non-bearing concrete masonry wall - garage level ref pa 2016-0928-8977. n/a for maher | $12,000 |
| Feb 5, 2018 | Completed final sign-off Jul 2022 | 1700 California St | Gci, Inc | exterior planter box . electrical - lighting and plumbing - irrigation maher naDetails
exterior planter box . electrical - lighting and plumbing - irrigation maher na | $25,000 |
| Jun 28, 2017 | Completed final sign-off Oct 2017 | 1700 California St | Gci, Inc | disabled access toilet, accessories, and plulmbing at levels 2, 3, 4 and 5 to be relocated from previous permit drawings under pa 2016-0830-6354 to avoid existing steel columnDetails
disabled access toilet, accessories, and plulmbing at levels 2, 3, 4 and 5 to be relocated from previous permit drawings under pa 2016-0830-6354 to avoid existing steel column | |
| May 1, 2017 | Never finaled issued May 2017, no final | 1700 California St | Tack Eg | 2-5/f: new evacuation maps on 4 floors undergoung; interior remodel under sep permit. maher ord 155-13 na.Details
2-5/f: new evacuation maps on 4 floors undergoung; interior remodel under sep permit. maher ord 155-13 na. | $8,000 |
| Mar 3, 2017 | Completed final sign-off Jul 2017 | 1700 California St | Red Hawk Fire & Security Ca Llc | 2nd, 3rd, 4th & 5th floor fire alarm for t.i. - corridor renovation - add (4) smoke detectors on each floor, total (16) smoke detectors. ref #201608306354. n/a maher ordinanceDetails
2nd, 3rd, 4th & 5th floor fire alarm for t.i. - corridor renovation - add (4) smoke detectors on each floor, total (16) smoke detectors. ref #201608306354. n/a maher ordinance | $2,400 |
| Feb 7, 2017 | Completed final sign-off Sep 2017 | 1700 California St | Golden Gate Fire Protection Inc | 3rd flr lobby: fire sprinklers relocate 3 pendents 5th flr lobby/restroom: relocate 7 pendentsDetails
3rd flr lobby: fire sprinklers relocate 3 pendents 5th flr lobby/restroom: relocate 7 pendents | $2,500 |
| Jan 25, 2017 | Never finaled issued Jan 2017, no final | 1700 California St | Gci, Inc | level 1-5 common area, electrical only. t.i. pa#201608306354. n/a ordinance #155-13Details
level 1-5 common area, electrical only. t.i. pa#201608306354. n/a ordinance #155-13 | |
| Dec 29, 2016 | Never finaled issued Mar 2017, no final | 1700 California St | Ca United Mechanical, Inc | 2,3,4,5th flr: replace (e) diffusers in central cooridors & restrooms. add new registers & rebalance vavs for improved air distribution maher na. no new duct work. no cfm changes. ref arch 2016/08/30/6354Details
2,3,4,5th flr: replace (e) diffusers in central cooridors & restrooms. add new registers & rebalance vavs for improved air distribution maher na. no new duct work. no cfm changes. ref arch 2016/08/30/6354 | $4,000 |
| Aug 30, 2016 | Completed final sign-off Oct 2017 | 1700 California St | Gci, Inc | finishes and lighting updates in common corridors, elevator lobbies, and restroom interior at levels 2,3,4 and 5 only. restrooms at level 2 and3 consist of partial update to meet ada requirement. restrooms at level 4 and 5 encompass complete renovationDetails
finishes and lighting updates in common corridors, elevator lobbies, and restroom interior at levels 2,3,4 and 5 only. restrooms at level 2 and3 consist of partial update to meet ada requirement. restrooms at level 4 and 5 encompass complete renovation | $396,488 |
| Nov 4, 2015 | Never finaled issued Dec 2015, no final | 1700 California St | Nomellini Construction * Ask For Id * | 5th floor, ste 570 - interior demo single tenant. remove (e) non-structural partitions, doors, suspended ceilings and finishes. ab-017.Details
5th floor, ste 570 - interior demo single tenant. remove (e) non-structural partitions, doors, suspended ceilings and finishes. ab-017. | $1,000 |
| Jun 23, 2015 | Completed final sign-off Jul 2015 | 1700 California St | for admin purposes to document legal use/occupancy/correct # of units. building constr under pa8109763 w/47 dwelling units/no cfc issued. work completed under pa9909000 to combine 2 units, subsequently pa200007286640 to sepearate same 2 units/no cfc issued. this permit to confirm 47 units at siteDetails
for admin purposes to document legal use/occupancy/correct # of units. building constr under pa8109763 w/47 dwelling units/no cfc issued. work completed under pa9909000 to combine 2 units, subsequently pa200007286640 to sepearate same 2 units/no cfc issued. this permit to confirm 47 units at site | ||
| Feb 3, 2015 | Completed final sign-off Feb 2015 | 1700 California St | Interstate Restoration California Lp | sheetrock repair limited to 48 sq. ft.Details
sheetrock repair limited to 48 sq. ft. | $2,500 |
| Oct 22, 2014 | Completed final sign-off Nov 2014 | 1700 California St | Westridge Builders, Inc. | ste 200: remove (e) dental cabinetry in (e) office redo flooring and wall finishes; maher n/aDetails
ste 200: remove (e) dental cabinetry in (e) office redo flooring and wall finishes; maher n/a | $15,000 |
| May 9, 2014 | Completed final sign-off Jun 2014 | 1700 California St | Red Hawk Fire & Security Ca Llc | #205- add 3 strobes and 2 speaker strobes into existing circuits. t.i. pa#201403059918. n/a ordinance #155-13Details
#205- add 3 strobes and 2 speaker strobes into existing circuits. t.i. pa#201403059918. n/a ordinance #155-13 | $5,000 |
| May 2, 2014 | Never finaled issued May 2014, no final | 1700 California St | street space permitDetails
street space permit | ||
| Apr 8, 2014 | Completed final sign-off Jun 2014 | 1700 California St | Foothill Fire Protection Inc. | on 2nd floor, suite 205 - fire sprinkler tenant improvement relocate 6 sprinklers, add 4 new sprinkler. ref.# 201403059918. maher ord. 155-13 not applicable.Details
on 2nd floor, suite 205 - fire sprinkler tenant improvement relocate 6 sprinklers, add 4 new sprinkler. ref.# 201403059918. maher ord. 155-13 not applicable. | $3,000 |
| Mar 25, 2014 | Never finaled issued Mar 2014, no final | 1700 California St | street space permitDetails
street space permit | ||
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 1700 California St | Westridge Builders, Inc. | suite #205: t.i. to 924 sq ft for a dental office. construct interior partitions for business office , operatories dental support areas,and casework. related plmg and electrical work. n/a for the maher ordinance #155-13Details
suite #205: t.i. to 924 sq ft for a dental office. construct interior partitions for business office , operatories dental support areas,and casework. related plmg and electrical work. n/a for the maher ordinance #155-13 | $92,400 |
| Feb 14, 2014 | Completed final sign-off Mar 2014 | 1700 California St | Interstate Restoration California Lp | disabled access improvements associated with 3rd fl common area restrooms including the drinking fountain. to delete this scope from 201304195020. n/a for compliance with ordinance no.155-13 not required.Details
disabled access improvements associated with 3rd fl common area restrooms including the drinking fountain. to delete this scope from 201304195020. n/a for compliance with ordinance no.155-13 not required. | $31,000 |
| Feb 14, 2014 | Completed final sign-off Mar 2014 | 1700 California St | Interstate Restoration California Lp | disabled access improvments associated with 2nd fl common area restrooms including drinking fountain. scope deleted from application 201308096495 for clarify the scope of work purpose. n/a for compliance with ordinance no.155-13 not required.Details
disabled access improvments associated with 2nd fl common area restrooms including drinking fountain. scope deleted from application 201308096495 for clarify the scope of work purpose. n/a for compliance with ordinance no.155-13 not required. | $31,000 |
| Feb 5, 2014 | Completed final sign-off Mar 2014 | 1700 California St | Red Hawk Fire & Security Ca Llc | add 22 speaker/strobes, 1 strobe, 6 speakers, 28 duct detectors, 28 control relays and 28 interposing relays. ref 201309045960/201311121645Details
add 22 speaker/strobes, 1 strobe, 6 speakers, 28 duct detectors, 28 control relays and 28 interposing relays. ref 201309045960/201311121645 | $17,500 |
| Dec 31, 2013 | Never finaled issued Dec 2013, no final | 1700 California St | street spaceDetails
street space | ||
| Dec 17, 2013 | Never finaled issued Dec 2013, no final | 1700 California St | Red Hawk Fire & Security Ca Llc | 2nd floor, ste 200: addition of 2 speaker strobes to extg fa system. ti ref #201309045960Details
2nd floor, ste 200: addition of 2 speaker strobes to extg fa system. ti ref #201309045960 | $1,000 |
| Nov 13, 2013 | Never finaled issued Nov 2013, no final | 1700 California St | Superior Automatic Sprinkler | work at suite #260:install 70 new automatic sparinkels 10 1/2 " upright, 41 1/2 " pendant and 19 3/4" ec pendant at 9266 sq ft ti at 2nd fl of e bldg. upgrade existing seismic brcing of sprinkler system to 2010 nfpa standardsDetails
work at suite #260:install 70 new automatic sparinkels 10 1/2 " upright, 41 1/2 " pendant and 19 3/4" ec pendant at 9266 sq ft ti at 2nd fl of e bldg. upgrade existing seismic brcing of sprinkler system to 2010 nfpa standards | $18,500 |
| Nov 12, 2013 | Completed final sign-off Apr 2014 | 1700 California St | Tcg Builders Inc Dba The Core Group | revision to permit #2013-05-09-6495 existing structural conditions prohibit proposed mechanical design in part of the space. area with conflict will re-use existing mechanical system in lieu of new design.Details
revision to permit #2013-05-09-6495 existing structural conditions prohibit proposed mechanical design in part of the space. area with conflict will re-use existing mechanical system in lieu of new design. | |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 1700 California St | Foothill Fire Protection Inc. | fire sprinkler ti relocate fire sprinklers ti pa# 201309045960 (4) add (3) relocate (1) deleteDetails
fire sprinkler ti relocate fire sprinklers ti pa# 201309045960 (4) add (3) relocate (1) delete | $2,900 |
| Oct 4, 2013 | Never finaled issued Oct 2013, no final | 1700 California St | street space w/mtaDetails
street space w/mta | ||
| Oct 2, 2013 | Expired or cancelled cancelled Jan 2026 | 1700 California St | Westridge Builders, Inc. | suite #200:connect to extg med-gas system for one new outlet station in quiet operatory.Details
suite #200:connect to extg med-gas system for one new outlet station in quiet operatory. | $3,200 |
| Sep 4, 2013 | Completed final sign-off Apr 2014 | 1700 California St | Westridge Builders, Inc. | ste 200: build new partiton walls. interior finish work, paint, floor coverings, cabinetry. plumbing, new water adn waste lines, vacuum, airlines. elec, lighting and power. reconfigure hvac layout, new gyp bd and act ceiling; sprinkler under separate permitDetails
ste 200: build new partiton walls. interior finish work, paint, floor coverings, cabinetry. plumbing, new water adn waste lines, vacuum, airlines. elec, lighting and power. reconfigure hvac layout, new gyp bd and act ceiling; sprinkler under separate permit | $35,000 |
| Sep 3, 2013 | Expired or cancelled expired May 2015 | 1700 California St | Eagle Ridge Construction And Roofing | 2/f divide up (e)suite 200 into 2 seperate suites (200 and 205-ti under separate permit) by construction a new suite demising wall. electrical, mech and lifie safety systems will be adjusted to accomodate new suite. and will be submitted under seperate permit. extg ceiling will be slightly adjusted.Details
2/f divide up (e)suite 200 into 2 seperate suites (200 and 205-ti under separate permit) by construction a new suite demising wall. electrical, mech and lifie safety systems will be adjusted to accomodate new suite. and will be submitted under seperate permit. extg ceiling will be slightly adjusted. | $4,778 |
| Aug 13, 2013 | Completed final sign-off Oct 2013 | 1700 California St | Northern Pacific Roofing | remove & recycle & replace 5 rooftop fans, fans identified as sf-8,sf-10, ef-6, ef-7, ef-9. disconnect electrical at existing fan, reconnect electrical to new fan. mount to roof using existing detail & new vibration isolation springs.Details
remove & recycle & replace 5 rooftop fans, fans identified as sf-8,sf-10, ef-6, ef-7, ef-9. disconnect electrical at existing fan, reconnect electrical to new fan. mount to roof using existing detail & new vibration isolation springs. | $46,908 |
| Jul 24, 2013 | Expired or cancelled expired May 2015 | 1700 California St | Ralls Construction | #530- remove approx. 20' of undergrid walls, rebuild walls at new location using (e) doors, remove part of (e) kitchen counter & install owner's combo washer/dryer, reconfigure electric switching for relocated walls, patch flooring at removed walls.Details
#530- remove approx. 20' of undergrid walls, rebuild walls at new location using (e) doors, remove part of (e) kitchen counter & install owner's combo washer/dryer, reconfigure electric switching for relocated walls, patch flooring at removed walls. | $25,000 |
| Jun 13, 2013 | Completed final sign-off May 2014 | 1700 California St | Golden State Plumbing | unit #310: relocate 16 extg add 3 fire sprinkler head.Details
unit #310: relocate 16 extg add 3 fire sprinkler head. | $2,000 |
| May 30, 2013 | Completed final sign-off Sep 2013 | 1700 California St | Arcon Construction Corp | 4th floor-interior office t.i consist of the re-configuration of & installation of new interior partitions, relocation of light fixtures & installation of electrical outlets. reference to bpa# 201305298072. f/a and sprinkler under seperate permit.Details
4th floor-interior office t.i consist of the re-configuration of & installation of new interior partitions, relocation of light fixtures & installation of electrical outlets. reference to bpa# 201305298072. f/a and sprinkler under seperate permit. | $27,000 |
| May 23, 2013 | Completed final sign-off Aug 2013 | 1700 California St | O'reilly Electrical | 3rd floor suite 310 rework fire alarm - 2 new wall mount fire alarm device, relocate (e) ceiling mount life safety speaker. ti: 201004195020Details
3rd floor suite 310 rework fire alarm - 2 new wall mount fire alarm device, relocate (e) ceiling mount life safety speaker. ti: 201004195020 | $2,500 |
| May 9, 2013 | Completed final sign-off Apr 2014 | 1700 California St | Tcg Builders Inc Dba The Core Group | 2/f(#260)-ti; change use to i-2.1 4344 sf; clinic 12 hr/day, no areas req'd for bed movement & caring for nonambulatory person. mep lsDetails
2/f(#260)-ti; change use to i-2.1 4344 sf; clinic 12 hr/day, no areas req'd for bed movement & caring for nonambulatory person. mep ls | $750,000 |
| Apr 19, 2013 | Never finaled issued May 2013, no final | 1700 California St | S C K Builders Inc. | suite #310-tenant improvement-new interior partitions, lighting layout & finishes.Details
suite #310-tenant improvement-new interior partitions, lighting layout & finishes. | $80,000 |
| Jul 18, 2012 | Never finaled issued Jul 2012, no final | 1700 California St | street spaceDetails
street space | ||
| Jun 15, 2012 | Completed final sign-off Aug 2012 | 1700 California St | Sjk Development | #440-tenant improvement per plan for medical office: remove non-structural ceiling height walls, install flooring, elec outlets, new sink, cabinets & paint. speakler & fire alarm under separate permit if required.(no change in lighting).Details
#440-tenant improvement per plan for medical office: remove non-structural ceiling height walls, install flooring, elec outlets, new sink, cabinets & paint. speakler & fire alarm under separate permit if required.(no change in lighting). | $10,000 |
| May 24, 2012 | Completed final sign-off Oct 2012 | 1700 California St | J M E Construction Services Inc | suites #340 & 370-office t.i of 4375 sq ft scope of work includes demolition of partitions, new partitions, relocate (e) doors & lights. new plumbing & paint, carpet & sheet flooringDetails
suites #340 & 370-office t.i of 4375 sq ft scope of work includes demolition of partitions, new partitions, relocate (e) doors & lights. new plumbing & paint, carpet & sheet flooring | $85,000 |
| Dec 15, 2011 | Completed final sign-off Feb 2012 | 1700 California St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. at 1700 california, 1st floor, brown and toland. 6 speakers, 30 speaker/strobesDetails
fire alarm t.i. at 1700 california, 1st floor, brown and toland. 6 speakers, 30 speaker/strobes | $13,297 |
| Dec 13, 2011 | Never finaled issued Dec 2011, no final | 1700 California St | Aquamatic Fire Protection | relocate (e) sprinklers due to interior remodel. add branch lines restraint upgrade (e) eq bracing.Details
relocate (e) sprinklers due to interior remodel. add branch lines restraint upgrade (e) eq bracing. | $29,000 |
| Nov 23, 2011 | Never finaled issued Nov 2011, no final | 1700 California St | streetspace and mtaDetails
streetspace and mta | ||
| Nov 18, 2011 | Completed final sign-off Feb 2012 | 1700 California St | Marchetti Construction Inc. | unit #100-demo (e) interior partitions, fixtures, ceiling & flooring per ab-017.Details
unit #100-demo (e) interior partitions, fixtures, ceiling & flooring per ab-017. | $15,000 |
| Aug 10, 2011 | Completed final sign-off Jun 2012 | 1700 California St | Red Hawk Fire & Security Ca Llc | asbuilt submission & engineer comments for 1700 california, fire alarm retrofit. added 17 duct dectectors, 3 control relage, 11 smoke detectors.Details
asbuilt submission & engineer comments for 1700 california, fire alarm retrofit. added 17 duct dectectors, 3 control relage, 11 smoke detectors. | $14,000 |
| Jul 6, 2011 | Never finaled issued Jul 2011, no final | 1700 California St | Hennessy Construciton | revision to pa# 2001-0623-8765-revise notation regarding hvac, plumbing on stamped set & see original plan noting no chnages to mechanical, plumbing, hvac. (e) to remainDetails
revision to pa# 2001-0623-8765-revise notation regarding hvac, plumbing on stamped set & see original plan noting no chnages to mechanical, plumbing, hvac. (e) to remain | |
| Jul 5, 2011 | Completed final sign-off Jul 2011 | 1700 California St | Hennessy Construciton | revision to pa# 2011.06.23.8765. add one sprinkler head at suite 520.Details
revision to pa# 2011.06.23.8765. add one sprinkler head at suite 520. | $500 |
| Jun 24, 2011 | Never finaled issued Jun 2011, no final | 1700 California St | street space and mta parkingDetails
street space and mta parking | ||
| Jun 23, 2011 | Completed final sign-off Jul 2011 | 1700 California St | Hennessy Construciton | unit #520:demolition extg interior partitions, build new interior patitions, new door. mep part on seperate permit.Details
unit #520:demolition extg interior partitions, build new interior patitions, new door. mep part on seperate permit. | $20,000 |
| Feb 9, 2009 | Never finaled issued Feb 2009, no final | 1700 California St | Capitol Electric Const | to complete work and obtain final inspection for work approved under pa#2007/10/09/4783.Details
to complete work and obtain final inspection for work approved under pa#2007/10/09/4783. | $30,000 |
| Sep 3, 2008 | Completed final sign-off Nov 2008 | 1700 California St | revision to appl #200807025823 - change rating of full height non-bearing partition from 1-hr to non-rated. life safety under seperate permit.Details
revision to appl #200807025823 - change rating of full height non-bearing partition from 1-hr to non-rated. life safety under seperate permit. | ||
| Aug 15, 2008 | Never finaled issued Aug 2008, no final | 1700 California St | street space permit only.Details
street space permit only. | ||
| Aug 1, 2008 | Never finaled issued Aug 2008, no final | 1700 California St | Ayoob & Peery Plumbing Co Inc | 3rd floor-relocate and change out (e) fire sprinkler heads per tenant improvements. 19 relocated, 6 changed outDetails
3rd floor-relocate and change out (e) fire sprinkler heads per tenant improvements. 19 relocated, 6 changed out | $3,400 |
| Jul 2, 2008 | Completed final sign-off Nov 2008 | 1700 California St | 3rd floor-tenant improvement of 3rd floor office suite #300-work includes demolition of (e) partitions, new partitions, electrical, plumbing, mechanical, finishes & x-ray equipment support @ head track. change from real estate office to doctor's offfice.Details
3rd floor-tenant improvement of 3rd floor office suite #300-work includes demolition of (e) partitions, new partitions, electrical, plumbing, mechanical, finishes & x-ray equipment support @ head track. change from real estate office to doctor's offfice. | $220,000 | |
| Mar 7, 2008 | Never finaled issued Mar 2008, no final | 1700 California St | street space permitDetails
street space permit | ||
| Oct 9, 2007 | Expired or cancelled expired Dec 2008 | 1700 California St | Capitol Electric Const | life safety/fire alarm retrofit for entire building including smoke detectore, manula pull stations, lightand sound devices. complete building fire alarm replacement. no construction of walls or relocatin.no construction of walls or relocationDetails
life safety/fire alarm retrofit for entire building including smoke detectore, manula pull stations, lightand sound devices. complete building fire alarm replacement. no construction of walls or relocatin.no construction of walls or relocation | $285,000 |
| Sep 25, 2007 | Never finaled issued Sep 2007, no final | 1700 California St | Potter Fire Protection | suite 335 - relocate 2 and plug 1 fire sprinklers.Details
suite 335 - relocate 2 and plug 1 fire sprinklers. | $950 |
| Sep 6, 2007 | Expired or cancelled expired Dec 2008 | 1700 California St | tenant improvement to add 870 sq.ft of office space ,new partitions, t-bar ceiling.Details
tenant improvement to add 870 sq.ft of office space ,new partitions, t-bar ceiling. | $58,000 | |
| Sep 14, 2006 | Completed final sign-off Dec 2006 | 1700 California St | 2nd floor - mechanical revision to approved 200604128808 and 200604270114, per distruct inspector's request. delete 2 smoke dampers (never installed) that are not supported by (e) fire alarm system. no other work or changed.Details
2nd floor - mechanical revision to approved 200604128808 and 200604270114, per distruct inspector's request. delete 2 smoke dampers (never installed) that are not supported by (e) fire alarm system. no other work or changed. | ||
| Apr 27, 2006 | Completed final sign-off Dec 2006 | 1700 California St | t.i. for 2nd floor office suite. work includes (n) doors & partitions to create 2 (n) offices, (n) sink & casework, (n) i.t. rack & fence in telecom room, (n) mechanical, replace lighting in kind. no exterior work. fire protection under separate permit.Details
t.i. for 2nd floor office suite. work includes (n) doors & partitions to create 2 (n) offices, (n) sink & casework, (n) i.t. rack & fence in telecom room, (n) mechanical, replace lighting in kind. no exterior work. fire protection under separate permit. | $40,000 | |
| Apr 12, 2006 | Completed final sign-off Apr 2006 | 1700 California St | install new 20 min door into office suite for calif pac med center. work includes patching wall as needed w 5/8 type x gyp bd and insallting new exit lights. no other workDetails
install new 20 min door into office suite for calif pac med center. work includes patching wall as needed w 5/8 type x gyp bd and insallting new exit lights. no other work | $8,000 | |
| Dec 6, 2004 | Completed final sign-off May 2005 | 1700 California St | oti-2, 2nd floor, el, me.Details
oti-2, 2nd floor, el, me. | $20,000 | |
| Dec 6, 2004 | Completed final sign-off May 2005 | 1700 California St | oti-1, 2nd floor, el, me, sp.Details
oti-1, 2nd floor, el, me, sp. | $30,000 | |
| Oct 6, 2004 | Expired or cancelled expired Jan 2006 | 1700 California St | reference app 200409103773- pay 9x penalty based upon 10,000 construction costDetails
reference app 200409103773- pay 9x penalty based upon 10,000 construction cost | ||
| Apr 21, 2004 | Never finaled issued Apr 2004, no final | 1700 California St | sidewalk repairDetails
sidewalk repair | ||
| Mar 5, 2004 | Completed final sign-off Mar 2004 | 1700 California St | Skyline Construction | renew permit 2s00302288559 for final inspection onlyDetails
renew permit 2s00302288559 for final inspection only | |
| Mar 5, 2004 | Expired or cancelled expired Dec 2008 | 1700 California St | Rudolph Caler/Lumen Electric | install 4 ceiling mount speaker,7 wall mount strobes & 1 smoke.work related to appl#200402095912Details
install 4 ceiling mount speaker,7 wall mount strobes & 1 smoke.work related to appl#200402095912 | $7,000 |
| Jan 27, 2004 | Expired or cancelled expired Jan 2006 | 1700 California St | 3/f- interior demolition of non-structural partitions,cabinets,carpet,new t.i. under seperate permitDetails
3/f- interior demolition of non-structural partitions,cabinets,carpet,new t.i. under seperate permit | $7,500 | |
| Jul 25, 2003 | Never finaled issued Jul 2003, no final | 1700 California St | Pribuss Engineering Inc | replace ex. diesel fire pump renew #200108307215Details
replace ex. diesel fire pump renew #200108307215 | $26,000 |
| Mar 7, 2003 | Expired or cancelled expired Jan 2006 | 1700 California St | Young Electric Co | add 4 strobes, add 3 speakers @ 4th flDetails
add 4 strobes, add 3 speakers @ 4th fl | $5,000 |
| Mar 28, 2002 | Completed final sign-off Aug 2002 | 1700 California St | Skyline Construction | @ ste#260,2nd flr, tenant improvements including new partitions, new duck work, lighting changes & oDetails
@ ste#260,2nd flr, tenant improvements including new partitions, new duck work, lighting changes & o | $75,000 |
| Feb 21, 2002 | Expired or cancelled expired Sep 2002 | 1700 California St | Skyline Construction | oti-4, 4th floor, lsDetails
oti-4, 4th floor, ls | $15,000 |
| Feb 20, 2002 | Expired or cancelled expired Sep 2002 | 1700 California St | Skyline Construction | oti-3 3rd floor elDetails
oti-3 3rd floor el | $6,000 |
| Feb 20, 2002 | Expired or cancelled expired Sep 2002 | 1700 California St | Skyline Construction | oti-3 4th floor, elDetails
oti-3 4th floor, el | $7,000 |
| Jan 29, 2002 | Expired or cancelled expired Aug 2002 | 1700 California St | Skyline Construction | oti-2, 3rd floor, mech onlyDetails
oti-2, 3rd floor, mech only | $10,000 |
| Aug 30, 2001 | Expired or cancelled expired Sep 2002 | 1700 California St | Pribuss Engineering Inc | replace extg diesel fire pumpDetails
replace extg diesel fire pump | $26,000 |
| Apr 3, 2001 | Completed final sign-off Aug 2001 | 1700 California St | Pacific Automatic Sprinkler | relocate 12 fire sprinklers & cap off 1 fire sprinker. to properly protect the tenant space in #400Details
relocate 12 fire sprinklers & cap off 1 fire sprinker. to properly protect the tenant space in #400 | $2,400 |
| Mar 18, 2000 | Completed final sign-off Jul 2000 | 1700 California St | 17' of steel stud wall with 5/8 sheetrock instal 3 doors in new wallsDetails
17' of steel stud wall with 5/8 sheetrock instal 3 doors in new walls | $10,000 | |
| Jan 26, 2000 | Completed final sign-off Sep 2000 | 1700 California St | oti-1:el, me,l/s & spDetails
oti-1:el, me,l/s & sp | $60,000 |
Find contractors for work like this