J M E Construction Services Inc
- Based in
- Cupertino
- On San Francisco permits
- Apr 2001 to Mar 2024
- Last 24 months
- 0 permits filed
68 permits since 2000: 53 completed, 15 never finaled.
Of the 15 never-finaled permits, 6 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2024 | Completed final sign-off Jul 2024 | 688 Mission St | rev 202401053503- remove (e) bar equipment to keep (e) floor sink and change seating layout to keep (e) low wall for restaurantDetails
rev 202401053503- remove (e) bar equipment to keep (e) floor sink and change seating layout to keep (e) low wall for restaurant | $500 |
| Jan 5, 2024 | Completed final sign-off Jul 2024 | 688 Mission St | tenant improvement to remodel (e) bar w/ new equipment and finishes. open cased opening between the (e) grove restaurant and (e) pizza restaurant.Details
tenant improvement to remodel (e) bar w/ new equipment and finishes. open cased opening between the (e) grove restaurant and (e) pizza restaurant. | $56,000 |
| Feb 4, 2020 | Completed final sign-off Mar 2021 | 130 Sutter St | revision to app#201911016184 to clarify fire rating of 2 hour wallDetails
revision to app#201911016184 to clarify fire rating of 2 hour wall | |
| Nov 1, 2019 | Completed final sign-off Mar 2021 | 130 Sutter St | construction of new elevator machikne room in basement for (e) frieght elevator. mep/title 24 energy calcs, fire sprinklers and life saety under seperate permit. maher n/a.Details
construction of new elevator machikne room in basement for (e) frieght elevator. mep/title 24 energy calcs, fire sprinklers and life saety under seperate permit. maher n/a. | $15,000 |
| Apr 25, 2019 | Completed final sign-off Oct 2019 | 251 Rhode Island St | ste 201, 202 and 203 non structural remodel to existing tenant space per new ti scope of work includes new ceiling, lighting, partitions, doors glazing, plumbing, electrical, data and new finishesDetails
ste 201, 202 and 203 non structural remodel to existing tenant space per new ti scope of work includes new ceiling, lighting, partitions, doors glazing, plumbing, electrical, data and new finishes | $2,300,000 |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 251 Rhode Island St | demo of suites 200, 201 & 203. demo ceiling, lighting, (e) partitions, doors & glazing millwork, plumbing, electrical and dataDetails
demo of suites 200, 201 & 203. demo ceiling, lighting, (e) partitions, doors & glazing millwork, plumbing, electrical and data | $219,420 |
| Jan 14, 2019 | Never finaled issued Jan 2019, no final | 212 Church St | interior demo of restaurant space preparation for new restaurant, interior improvements under sep permitDetails
interior demo of restaurant space preparation for new restaurant, interior improvements under sep permit | $12,000 |
| May 10, 2018 | Never finaled issued Jun 2018, no final | 2699 Taylor St | tenant improvement of fresh tea and juice shop, non structural walls, equipement finishes with associated plumbing, electrical, and mechanical. maher naDetails
tenant improvement of fresh tea and juice shop, non structural walls, equipement finishes with associated plumbing, electrical, and mechanical. maher na | $52,000 |
| Apr 18, 2018 | Never finaled issued Apr 2019, no final | 75 Yerba Buena Ln | revision to 201703201819. existing tropisueno restaurant expanding into vacant space & providing take out concept w/new cold-prep kitchen area & service counters with associted electrical, mechanical & plumbing. **maher n/a**Details
revision to 201703201819. existing tropisueno restaurant expanding into vacant space & providing take out concept w/new cold-prep kitchen area & service counters with associted electrical, mechanical & plumbing. **maher n/a** | $25,000 |
| Apr 17, 2018 | Never finaled issued Jun 2018, no final | 71 03rd St | new canopy, awning, exterior planters, railing and seating. ref app#201710040347. n/a for maherDetails
new canopy, awning, exterior planters, railing and seating. ref app#201710040347. n/a for maher | $25,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2018 | 855 Brannan St | non structural ti of new restaurant on the ground level of a multi story building with associated mepDetails
non structural ti of new restaurant on the ground level of a multi story building with associated mep | $121,000 |
| Mar 20, 2017 | Never finaled issued Apr 2018, no final | 75 Yerba Buena Ln | extg tropisueno restaurant expanding into vacant space and providing take-out concept with new kitchen area and service counters with associated electric, mechanical and plumbing.n/a for maherDetails
extg tropisueno restaurant expanding into vacant space and providing take-out concept with new kitchen area and service counters with associated electric, mechanical and plumbing.n/a for maher | $75,000 |
| Aug 4, 2015 | Completed final sign-off Dec 2015 | 400 Grove St | demo non-structural concrete for plumbing installation under seperate permit. ab-017. t.i. under review per app#201412083313. n/a for maher.Details
demo non-structural concrete for plumbing installation under seperate permit. ab-017. t.i. under review per app#201412083313. n/a for maher. | $5,000 |
| Jul 16, 2015 | Completed final sign-off Sep 2015 | 969 Hayes St | unit #1: bathroom remodel of (e) bathroom. no new walls, replacement of fixtures, new tile. no wall modification/no structural work. n/a maher ord. # 155-13Details
unit #1: bathroom remodel of (e) bathroom. no new walls, replacement of fixtures, new tile. no wall modification/no structural work. n/a maher ord. # 155-13 | $7,500 |
| Dec 8, 2014 | Completed final sign-off Dec 2015 | 400 Grove St | construction of new restaurant on ground floor of mixed use building. ** maher: compliance with ordinance no# 155-13 not required **Details
construction of new restaurant on ground floor of mixed use building. ** maher: compliance with ordinance no# 155-13 not required ** | $150,000 |
| Jun 24, 2014 | Completed final sign-off Feb 2015 | 220 Bush St | minor ti of e 1062 (b) restaurant on gr fl. includes demo of e non bearing walls and finishes. new casework, new partitons, relocation of sink and some new kitchen equipmentDetails
minor ti of e 1062 (b) restaurant on gr fl. includes demo of e non bearing walls and finishes. new casework, new partitons, relocation of sink and some new kitchen equipment | $52,000 |
| Dec 23, 2013 | Completed final sign-off Mar 2014 | 1707 Powell St | change in ownership - remove bearing wall, replace with beam & post system, new powered door operators at main entry.Details
change in ownership - remove bearing wall, replace with beam & post system, new powered door operators at main entry. | $26,500 |
| Oct 16, 2013 | Completed final sign-off Dec 2013 | 620 Folsom St | new non structural partitions and doors. some new light fixtures and relocation of power outlets. no change in occupancy or use. project is design buildDetails
new non structural partitions and doors. some new light fixtures and relocation of power outlets. no change in occupancy or use. project is design build | $15,000 |
| Aug 27, 2013 | Never finaled issued Nov 2013, no final | 3189 16th St | remodel of extg restaurant to provide an ada compliant restroom. t.i. includes new finishes, equipment and plmg fixtures. mep's included.Details
remodel of extg restaurant to provide an ada compliant restroom. t.i. includes new finishes, equipment and plmg fixtures. mep's included. | $62,000 |
| Mar 27, 2013 | Never finaled issued Apr 2013, no final | 1501 Cortland Av | build out closet for pg&e gas meters. paint to match existing building.Details
build out closet for pg&e gas meters. paint to match existing building. | $15,200 |
| Mar 27, 2013 | Completed final sign-off Jun 2013 | 251 Rhode Island St | t.i. to include interior demo of non- structural partitions, millwork, lighting and minor, plmg demolition, new non structural partitions, doors frames and hardware. mep & life safety under seperate permit.Details
t.i. to include interior demo of non- structural partitions, millwork, lighting and minor, plmg demolition, new non structural partitions, doors frames and hardware. mep & life safety under seperate permit. | $118,000 |
| Mar 8, 2013 | Completed final sign-off Nov 2013 | 620 Folsom St | 3rd floor new tenant improvement full floor to include non-load bearing partitions, doors, millwork & ceiling. m.e.p. under separate permit.Details
3rd floor new tenant improvement full floor to include non-load bearing partitions, doors, millwork & ceiling. m.e.p. under separate permit. | $865,000 |
| Oct 11, 2012 | Completed final sign-off Dec 2012 | 865 Market St | space c28b: t.i. of pacific puffs restaurant in an extg restaurant located at basement level of s.f. center (bar level) with new cabinetry and equipment and related electrical and plumbing.Details
space c28b: t.i. of pacific puffs restaurant in an extg restaurant located at basement level of s.f. center (bar level) with new cabinetry and equipment and related electrical and plumbing. | $85,000 |
| Sep 21, 2012 | Completed final sign-off Jan 2013 | 848 Battery St | slab excavation to install new ramp, handrail with wheel guides and truncated dollies. barrier removalDetails
slab excavation to install new ramp, handrail with wheel guides and truncated dollies. barrier removal | $45,000 |
| Sep 18, 2012 | Completed final sign-off Nov 2012 | 3235 Sacramento St | interior t.i. of non structural partitions, fixtures and finishes. updates restroom for ada compliance. all related mechanical. electircal & plumbing/sprinklers work to be design/build under seperate permit.Details
interior t.i. of non structural partitions, fixtures and finishes. updates restroom for ada compliance. all related mechanical. electircal & plumbing/sprinklers work to be design/build under seperate permit. | $50,000 |
| Sep 17, 2012 | Never finaled issued Sep 2012, no final | 3235 Sacramento St | demo partial walls & fix any damage sheetrock, prep for new paint, per ab-017. exception to required for diabled access to vacant spacesDetails
demo partial walls & fix any damage sheetrock, prep for new paint, per ab-017. exception to required for diabled access to vacant spaces | $1,000 |
| Sep 11, 2012 | Completed final sign-off Feb 2013 | 620 Folsom St | new non-load bearing partitions and doors. relocate one duplex outlet. no mechanical or plumbing.Details
new non-load bearing partitions and doors. relocate one duplex outlet. no mechanical or plumbing. | $13,000 |
| Aug 7, 2012 | Completed final sign-off Jun 2013 | 848 Battery St | demolition of (e) facade molding, new paint and exterior landscaping new lights as finishes as noted. install 2 new awnings. outdoor lighting under separate permit.Details
demolition of (e) facade molding, new paint and exterior landscaping new lights as finishes as noted. install 2 new awnings. outdoor lighting under separate permit. | $40,000 |
| Aug 2, 2012 | Never finaled issued Sep 2012, no final | 1501 Cortland Av | suite a - t.i. for commercial shared kitchen w/ cooking equipment and storage w/ electrical and plumbing as required. mechanical under separate permit.Details
suite a - t.i. for commercial shared kitchen w/ cooking equipment and storage w/ electrical and plumbing as required. mechanical under separate permit. | $22,000 |
| Jul 9, 2012 | Completed final sign-off Aug 2012 | 1501 Cortland Av | t.i. of wood window millwork co. demo staircase to exterior, replace (e) treads & handrails & stair to mezzanine, (n) gwb at walls & ceiling. provide electrical as required.Details
t.i. of wood window millwork co. demo staircase to exterior, replace (e) treads & handrails & stair to mezzanine, (n) gwb at walls & ceiling. provide electrical as required. | $25,000 |
| Jun 25, 2012 | Completed final sign-off Aug 2012 | 275 Post St | #600- non-structural interior demolition ab-017Details
#600- non-structural interior demolition ab-017 | $8,000 |
| May 24, 2012 | Completed final sign-off Oct 2012 | 1700 California St | suites #340 & 370-office t.i of 4375 sq ft scope of work includes demolition of partitions, new partitions, relocate (e) doors & lights. new plumbing & paint, carpet & sheet flooringDetails
suites #340 & 370-office t.i of 4375 sq ft scope of work includes demolition of partitions, new partitions, relocate (e) doors & lights. new plumbing & paint, carpet & sheet flooring | $85,000 |
| May 10, 2012 | Completed final sign-off Oct 2012 | 1750 Cesar Chavez St | suite d- tenant improvement-remodel for new commissary kitchen for tout sweet patissere at macy's. upgrade (e) restroom to comply with ada. provide kitchen equipment for cooking pastries. (e) office area to remainDetails
suite d- tenant improvement-remodel for new commissary kitchen for tout sweet patissere at macy's. upgrade (e) restroom to comply with ada. provide kitchen equipment for cooking pastries. (e) office area to remain | $62,000 |
| Feb 21, 2012 | Completed final sign-off Jun 2012 | 541 Castro St | to obtain final inspection for work approved under pa# 200505031484 all work is complete.Details
to obtain final inspection for work approved under pa# 200505031484 all work is complete. | |
| Feb 17, 2012 | Completed final sign-off Jun 2012 | 531 Castro St | to obtain final inspection for work approved under pa 9510569, all work is complete, sp insp reqdDetails
to obtain final inspection for work approved under pa 9510569, all work is complete, sp insp reqd | |
| Feb 17, 2012 | Completed final sign-off Jun 2012 | 531 Castro St | to obtain final inspection for work approved under pa 9221678s, all work is complete, sp insp requiredDetails
to obtain final inspection for work approved under pa 9221678s, all work is complete, sp insp required | |
| Nov 4, 2011 | Completed final sign-off Nov 2011 | 2170 Mission St | install new non-illuminated signDetails
install new non-illuminated sign | $1,000 |
| Sep 14, 2011 | Completed final sign-off Nov 2011 | 251 Rhode Island St | 2nd floor-revision to app#201107190516 to add details to plans per field inspectors request.Details
2nd floor-revision to app#201107190516 to add details to plans per field inspectors request. | |
| Aug 4, 2011 | Completed final sign-off Oct 2011 | 620 Folsom St | 1st floor, new non-load bearing partitions, doors , millwork and ceiling ti in existing full floor tenant space. mep and sprinkler under separate permitDetails
1st floor, new non-load bearing partitions, doors , millwork and ceiling ti in existing full floor tenant space. mep and sprinkler under separate permit | $375,000 |
| Jul 19, 2011 | Completed final sign-off Nov 2011 | 251 Rhode Island St | #203- office tenant improvement on 2nd floor to include new interior partitions, doors, glazing, and millwork. mep, life safety,fire sprinkler under sep permitDetails
#203- office tenant improvement on 2nd floor to include new interior partitions, doors, glazing, and millwork. mep, life safety,fire sprinkler under sep permit | $150,000 |
| Jul 15, 2011 | Completed final sign-off Feb 2012 | 1501 Cortland Av | build-out of shell for proposed tenant's with shared unisex restrooms. exit corridor & stairs to existing mezzanine.Details
build-out of shell for proposed tenant's with shared unisex restrooms. exit corridor & stairs to existing mezzanine. | $60,000 |
| May 4, 2011 | Completed final sign-off Nov 2011 | 2170 Mission St | remodel of (e) restaurant space: includes new accessible restrooms, kitchen, dining, bar, & micro-brewing space. storefront renovation has been submitted to the city planning dept under separate pa #201103303153.Details
remodel of (e) restaurant space: includes new accessible restrooms, kitchen, dining, bar, & micro-brewing space. storefront renovation has been submitted to the city planning dept under separate pa #201103303153. | $165,000 |
| Mar 30, 2011 | Completed final sign-off Feb 2012 | 2170 Mission St | a new storefront under the existing facade to enclose an additional 42 sq ft. the new storefront will include an entry door, sliding windows & awning. new signage will be under a different permit. no interior work is planned under this permit.Details
a new storefront under the existing facade to enclose an additional 42 sq ft. the new storefront will include an entry door, sliding windows & awning. new signage will be under a different permit. no interior work is planned under this permit. | $15,000 |
| Feb 18, 2011 | Never finaled issued Feb 2011, no final | 814 Irving St | relocation of some existing equipment & installation of 48" high partial ht. partition to separate food prep area.Details
relocation of some existing equipment & installation of 48" high partial ht. partition to separate food prep area. | $3,000 |
| Feb 14, 2011 | Completed final sign-off May 2011 | 251 Rhode Island St | remove of partitions walls & soft ceiling for clean up of space- interior office /retail space. ab-17Details
remove of partitions walls & soft ceiling for clean up of space- interior office /retail space. ab-17 | $8,500 |
| Nov 19, 2010 | Completed final sign-off May 2011 | 1501 Cortland Av | demising wall & t.i. improvement for new offices, commercial kitchen with associated plumbing & electrical work. design built for plumbing, electrical & hvacDetails
demising wall & t.i. improvement for new offices, commercial kitchen with associated plumbing & electrical work. design built for plumbing, electrical & hvac | $60,000 |
| Sep 13, 2010 | Completed final sign-off Sep 2010 | 969 Hayes St | repair of existing redwood deck. repalce of stairs at redwood deck and landings only. replacing in kind, less than 50% of deck and stairs.Details
repair of existing redwood deck. repalce of stairs at redwood deck and landings only. replacing in kind, less than 50% of deck and stairs. | $2,500 |
| Aug 31, 2010 | Completed final sign-off Feb 2011 | 530 Bush St | an optometry office into an adj. vacant tenant space. the new work to include new walls, doors, interior glazing,millwork & finishes. mep & sprinkler work to e under separate permit.Details
an optometry office into an adj. vacant tenant space. the new work to include new walls, doors, interior glazing,millwork & finishes. mep & sprinkler work to e under separate permit. | $195,000 |
| Jun 8, 2010 | Completed final sign-off Dec 2010 | 251 Rhode Island St | office ti on the 2nd fl. to include new interior partitions, doors, glazing and millwork, mep, life safety and fire sprinkler under separate permitDetails
office ti on the 2nd fl. to include new interior partitions, doors, glazing and millwork, mep, life safety and fire sprinkler under separate permit | $80,000 |
| Apr 26, 2010 | Completed final sign-off Jun 2012 | 531 Castro St | to obtain final inspection for work approved under pa 200505031487; all work is completeDetails
to obtain final inspection for work approved under pa 200505031487; all work is complete | |
| Apr 26, 2010 | Completed final sign-off Jun 2012 | 531 Castro St | to obtain final inspection for work approved under pa 200703307713; all work is completeDetails
to obtain final inspection for work approved under pa 200703307713; all work is complete | |
| Oct 19, 2009 | Completed final sign-off Feb 2010 | 814 Irving St | non-structural exterior remodel to include removal & installation of storefront windows & doors siding & stucco finish interior work to include (n) furnace installation. signage under separate permits. all accesibility concerns addressed under previous issued t.i. permit # 2009/09106486.Details
non-structural exterior remodel to include removal & installation of storefront windows & doors siding & stucco finish interior work to include (n) furnace installation. signage under separate permits. all accesibility concerns addressed under previous issued t.i. permit # 2009/09106486. | $11,500 |
| Oct 15, 2009 | Completed final sign-off Jan 2010 | 814 Irving St | revision to 200909106486: to include demolition and construction of structural columns and beam. accessibility work performed under previously issued permit. structural work onlyDetails
revision to 200909106486: to include demolition and construction of structural columns and beam. accessibility work performed under previously issued permit. structural work only | $10,000 |
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 230 California St | to obtain final inspection for work approved under pa # 200603035943. all work is complete.Details
to obtain final inspection for work approved under pa # 200603035943. all work is complete. | |
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 230 California St | to obtain final inspection for work approved under pa # 200610124886. all work is complete.Details
to obtain final inspection for work approved under pa # 200610124886. all work is complete. | |
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 230 California St | to obtain final inspection for work approved under pa # 200610054279. all work is complete.Details
to obtain final inspection for work approved under pa # 200610054279. all work is complete. | |
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 230 California St | to obtain final inspection for work approved under pa # 200609111924. all work is complete.Details
to obtain final inspection for work approved under pa # 200609111924. all work is complete. | |
| Sep 23, 2009 | Never finaled issued Sep 2009, no final | 220 California St | verify #220 california street is an add'l legal address for blk 0237 lot 008/to clarify that app #200906049752,200908255520 & 200905289301 should be referred to address 220 california street only.Details
verify #220 california street is an add'l legal address for blk 0237 lot 008/to clarify that app #200906049752,200908255520 & 200905289301 should be referred to address 220 california street only. | |
| Sep 10, 2009 | Completed final sign-off Jan 2010 | 814 Irving St | non structural interior tenant improvement to e restaurant space. construction to include non structural ceilings, partitions and finishes. installation of kitchen equipement and furniture. no change in occupancy or exiting.Details
non structural interior tenant improvement to e restaurant space. construction to include non structural ceilings, partitions and finishes. installation of kitchen equipement and furniture. no change in occupancy or exiting. | $80,000 |
| Aug 25, 2009 | Never finaled issued Aug 2009, no final | 230 California St | remodel to (e) storefront facade. scope of building interior tenant improvement under separate and approved permit #2009/0604/9752.Details
remodel to (e) storefront facade. scope of building interior tenant improvement under separate and approved permit #2009/0604/9752. | $6,500 |
| Jun 9, 2009 | Completed final sign-off Nov 2009 | 343 Powell St | minor remodel of (e) retail space. non-structural demolition & construction of partition ceilings, millwork & finishes. mep under separate permit.Details
minor remodel of (e) retail space. non-structural demolition & construction of partition ceilings, millwork & finishes. mep under separate permit. | $25,000 |
| Jun 4, 2009 | Never finaled issued Aug 2009, no final | 230 California St | (e) restaurant tenant improvement remodel of "rado's deli" for new restaurant tenant barbacco. fire alarm & sprinkler under deferred submittalDetails
(e) restaurant tenant improvement remodel of "rado's deli" for new restaurant tenant barbacco. fire alarm & sprinkler under deferred submittal | $575,000 |
| May 28, 2009 | Completed final sign-off Oct 2009 | 230 California St | demolition of (e) restaurant "rado's deli" for new restaurant tenant "barbacco" per ab-017Details
demolition of (e) restaurant "rado's deli" for new restaurant tenant "barbacco" per ab-017 | $10,000 |
| Nov 2, 2005 | Completed final sign-off Apr 2006 | 620 Folsom St | minor restroom modifications for code compliance, including partition & plumbing relocationsDetails
minor restroom modifications for code compliance, including partition & plumbing relocations | $7,200 |
| Dec 11, 2003 | Completed final sign-off Feb 2004 | 282 Valley St | repair/replace components of the stairway between the buildings that are rotted/deteriorated -repairDetails
repair/replace components of the stairway between the buildings that are rotted/deteriorated -repair | $4,500 |
| Oct 31, 2003 | Completed final sign-off Dec 2003 | 1050 North Point St | renew#200304021264 for final inspectionDetails
renew#200304021264 for final inspection | |
| Oct 31, 2002 | Never finaled issued Oct 2002, no final | 530 Bush St | alfter existing hvac duct to new office configuration on 1st floor suite 101Details
alfter existing hvac duct to new office configuration on 1st floor suite 101 | $1,800 |
| Apr 27, 2001 | Completed final sign-off Oct 2001 | 291 Geary St | oti-1 3rd floor el spDetails
oti-1 3rd floor el sp | $41,200 |