Block 3706, lot 096
780 Mission St
- City’s use
- Commercial Hotel
- Built
- 1989
- Lot
- 127,406 sq ft
- Zoning
- C3R
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2025 | Completed final sign-off Jul 2026 | 780 Mission St | Emcor Services/Mesa Energy Systems Inc | like for like replacement of 2 cooling tower and vfd on 3rd floor. 3 condensor water pumps and vfd 2nd floor.Details
like for like replacement of 2 cooling tower and vfd on 3rd floor. 3 condensor water pumps and vfd 2nd floor. | $448,000 |
| Jan 13, 2025 | In progress filed Jan 2025, not yet issued | 55 04th St | Siemens Industry, Inc. | elevator modernization project: fire alarm addtions are 11 smoke detectors, 8 heat detectors and 30 modules.Details
elevator modernization project: fire alarm addtions are 11 smoke detectors, 8 heat detectors and 30 modules. | $31,680 |
| Sep 16, 2024 | Completed final sign-off Nov 2024 | 55 04th St | Siemens Industry, Inc. | fire only work to add 2 smoke detectors and 1 module for the roll down door location on the basement 2 level; no ref pa (fa additions only)Details
fire only work to add 2 smoke detectors and 1 module for the roll down door location on the basement 2 level; no ref pa (fa additions only) | $2,045 |
| Sep 12, 2024 | In progress filed Sep 2024, not yet issued | 780 Mission St | temporary archway for event at marriott marquis. dreamforce san francisco on september 17-19 2024. engineering drawings attached.Details
temporary archway for event at marriott marquis. dreamforce san francisco on september 17-19 2024. engineering drawings attached. | $12,000 | |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 1 Yerba Buena Ln | Rago Neon Inc. | install single faced electric wall sign " one yerba buena"Details
install single faced electric wall sign " one yerba buena" | $8,000 |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 1 Yerba Buena Ln | Rago Neon Inc. | install non electric single faced wall sign "one yerba buena"Details
install non electric single faced wall sign "one yerba buena" | $1,000 |
| Mar 27, 2024 | Completed final sign-off Dec 2024 | 25 Yerba Buena Ln | Shield Fire & Safety Solutions Inc | replace one of two tanks: pcl-460 with new pcl-600. add 2 new nozzles & adjust nozzles. fire only suppression systemDetails
replace one of two tanks: pcl-460 with new pcl-600. add 2 new nozzles & adjust nozzles. fire only suppression system | $2,000 |
| Jun 14, 2023 | Completed final sign-off Mar 2024 | 99 Yerba Buena Ln | Cbs Construction Inc. | tenant improvement, no change to mep, update conuntertops & cabinets, new paint touch-up, update new floor.Details
tenant improvement, no change to mep, update conuntertops & cabinets, new paint touch-up, update new floor. | $7,000 |
| May 11, 2023 | Completed final sign-off Nov 2024 | 55 04th St | Emcor Services/Mesa Energy Systems Inc | deferred mep; work 4th flr, 9th flr, 19th flr 38th flr elevator equipment room add one new 3.5 ton condensing unit/ahu with new electrical and new conducting. 4th flr add new 3.5 ton condensing unit/ahu, 9th flr remove and replace one fan coil, 19th flr remove and replace two fan coil,Details
deferred mep; work 4th flr, 9th flr, 19th flr 38th flr elevator equipment room add one new 3.5 ton condensing unit/ahu with new electrical and new conducting. 4th flr add new 3.5 ton condensing unit/ahu, 9th flr remove and replace one fan coil, 19th flr remove and replace two fan coil, | $235,000 |
| Mar 21, 2023 | Never finaled issued Mar 2023, no final | 55 04th St | Siemens Industry, Inc. | 1/f: fire only work to add 3 leds to the (e) graphic annunciator and to program the elevator recall disable button to automatic enable return after 2 hours - per the state elevator inspector. fire alarm addition only. no ref permit app#.Details
1/f: fire only work to add 3 leds to the (e) graphic annunciator and to program the elevator recall disable button to automatic enable return after 2 hours - per the state elevator inspector. fire alarm addition only. no ref permit app#. | |
| Feb 21, 2023 | Never finaled filed Feb 2023, never issued | 55 04th St | Siemens Industry, Inc. | fire only work for the "elevator modernization projects", additions are 11 smoke detectors, 8 heat detectors and 29 relay modules, fire alarm additions only- ref permit app# 202303214026.Details
fire only work for the "elevator modernization projects", additions are 11 smoke detectors, 8 heat detectors and 29 relay modules, fire alarm additions only- ref permit app# 202303214026. | $31,080 |
| Mar 16, 2022 | Never finaled issued May 2022, no final | 780 Mission St | Premier Sign Installations | install 2 illuminated wall signs along mission st & 4th street above vehicle entrance/exit. (marriott)Details
install 2 illuminated wall signs along mission st & 4th street above vehicle entrance/exit. (marriott) | $10,000 |
| Mar 16, 2022 | Never finaled issued May 2022, no final | 780 Mission St | Premier Sign Installations | replace/reface (e) projection blade sign double faced along mission street.Details
replace/reface (e) projection blade sign double faced along mission street. | $1,500 |
| Nov 16, 2021 | Completed final sign-off Feb 2023 | 55 04th St | Ariel-10, Inc, Xclusive Wireless Resources Llc., Walker Cellular Inc | rooftop: demolition/removal of 9e) sprint wireless equipment, radios, antennas,cabinets.Details
rooftop: demolition/removal of 9e) sprint wireless equipment, radios, antennas,cabinets. | $12,000 |
| Feb 25, 2021 | Never finaled issued Mar 2021, no final | 55 04th St | Siemens Industry, Inc. | fire only work for the "elevator modernization" project on the ballroom lower leverl and the b2 level; additions are 5 heat detectors and 9 modules. no ref permit app number.Details
fire only work for the "elevator modernization" project on the ballroom lower leverl and the b2 level; additions are 5 heat detectors and 9 modules. no ref permit app number. | $8,125 |
| May 22, 2020 | Never finaled issued Oct 2020, no final | 55 04th St | R L H Fire Protection Inc | fire sprinkler elevator modernization. remove 50 fire sprinklers, pipes, hangers and bracing in elevators and machine rooms.Details
fire sprinkler elevator modernization. remove 50 fire sprinklers, pipes, hangers and bracing in elevators and machine rooms. | $26,714 |
| Jun 3, 2019 | Expired or cancelled cancelled Jan 2026 | 55 04th St | replacement of the (e) 4th & 5th floor lights nad lighting controls. lighting upgrades to meet t-24 reqs. new lighting is to be tied into emergency powerDetails
replacement of the (e) 4th & 5th floor lights nad lighting controls. lighting upgrades to meet t-24 reqs. new lighting is to be tied into emergency power | $120,000 | |
| Apr 19, 2019 | Completed final sign-off Sep 2020 | 780 Mission St | new evacuation plan signage matching hotel renovation plans by tyner houston architectureDetails
new evacuation plan signage matching hotel renovation plans by tyner houston architecture | $10,000 | |
| Apr 1, 2019 | Completed final sign-off Feb 2020 | 75 Yerba Buena Ln | Siemens Industry, Inc. | 1/f: fire alarm work for restaurant remodel on g/f. additions are: 2 duct detectors and 2 strobes. ref t.i. pa#201804186717.Details
1/f: fire alarm work for restaurant remodel on g/f. additions are: 2 duct detectors and 2 strobes. ref t.i. pa#201804186717. | $4,270 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 55 04th St | Siemens Industry, Inc. | lower basement - fire alarm work the "salons" remodel in the lower basement; additions are 12 duct detectors for fan units serving salons 1-6 and 10-15 ref pa 2018-0830-8747Details
lower basement - fire alarm work the "salons" remodel in the lower basement; additions are 12 duct detectors for fan units serving salons 1-6 and 10-15 ref pa 2018-0830-8747 | $19,020 |
| Mar 8, 2019 | Completed final sign-off May 2019 | 55 04th St | Turner Construction Co | revision to permit #201803295009. removing electrical work from scope.Details
revision to permit #201803295009. removing electrical work from scope. | |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 780 Mission St | street spaceDetails
street space | ||
| Jan 31, 2019 | Never finaled issued Jan 2019, no final | 780 Mission St | street spaceDetails
street space | ||
| Jan 31, 2019 | Never finaled filed Jan 2019, never issued | 780 Mission St | street space only.Details
street space only. | ||
| Jan 22, 2019 | Completed final sign-off Aug 2019 | 780 Mission St | Turner Construction Co | revision to bpa# 2018-0924-1133. ground floor & repalce driveway topping elements to perform waterproofing repairs for the porte cochere insf marriot, for relocation of ada parking spots and pavingsDetails
revision to bpa# 2018-0924-1133. ground floor & repalce driveway topping elements to perform waterproofing repairs for the porte cochere insf marriot, for relocation of ada parking spots and pavings | |
| Nov 30, 2018 | Completed final sign-off Sep 2019 | 55 04th St | R L H Fire Protection Inc | fire sprinkler ti on fls 8th-18th: relocate 608 sidewall heads and delete 630 heads from closets that are now occuppied by hutch. separate permit required to relocate additional side walls in king, executive and junior suites. ref pa #201803274743. n/a for maher.Details
fire sprinkler ti on fls 8th-18th: relocate 608 sidewall heads and delete 630 heads from closets that are now occuppied by hutch. separate permit required to relocate additional side walls in king, executive and junior suites. ref pa #201803274743. n/a for maher. | $130,120 |
| Oct 22, 2018 | Completed final sign-off Jan 2019 | 55 04th St | Siemens Industry, Inc. | lobby - fire alarm work for the "registration area". additions and replacements are 13 smoke detectors, 5 pull, 6 speakers and 11 speaker/strobes. ref pa 2018-08-30-8747Details
lobby - fire alarm work for the "registration area". additions and replacements are 13 smoke detectors, 5 pull, 6 speakers and 11 speaker/strobes. ref pa 2018-08-30-8747 | $24,435 |
| Oct 17, 2018 | Completed final sign-off Apr 2019 | 55 04th St | R L H Fire Protection Inc | revision to fire pa 201809261405. ti upgrade of (e) fire sprinkler system. 32 relocated sprinklers, 5 delete pendent sprinklers, 1 add sprinklerDetails
revision to fire pa 201809261405. ti upgrade of (e) fire sprinkler system. 32 relocated sprinklers, 5 delete pendent sprinklers, 1 add sprinkler | $6,700 |
| Oct 9, 2018 | Never finaled issued Dec 2018, no final | 55 04th St | Turner Construction Co | revision to permit app#201808207752 to reverse swing of door 1118b n/a for maherDetails
revision to permit app#201808207752 to reverse swing of door 1118b n/a for maher | |
| Sep 26, 2018 | Never finaled issued Sep 2018, no final | 55 04th St | R L H Fire Protection Inc | lobby - ti upgrade of (e)fire sprinklers system revision to 201809109499, 17 relocat pendents. 4 delete pendent sprinklersDetails
lobby - ti upgrade of (e)fire sprinklers system revision to 201809109499, 17 relocat pendents. 4 delete pendent sprinklers | $6,800 |
| Sep 24, 2018 | Completed final sign-off Aug 2019 | 780 Mission St | Turner Construction Co | ground fl. replace the driveway topping elements and perform water proofing repair at porte cochere sf marriottDetails
ground fl. replace the driveway topping elements and perform water proofing repair at porte cochere sf marriott | $1,406,000 |
| Sep 18, 2018 | Never finaled issued Sep 2018, no final | 55 04th St | new and supplemental lighting in lobby, ref 201808308747Details
new and supplemental lighting in lobby, ref 201808308747 | $30,000 | |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 55 04th St | Turner Construction Co | title 24 energy calcs for lobby level.Details
title 24 energy calcs for lobby level. | $30,000 |
| Sep 10, 2018 | Completed final sign-off Sep 2019 | 55 04th St | R L H Fire Protection Inc | fire sprinkler guest room upgrades on 6th and 7th fl 204 adjusted relocated sidewalls, 208 deleted pendents, 8 added pendent sprinklers. ref 201803274743. n/a for maher.Details
fire sprinkler guest room upgrades on 6th and 7th fl 204 adjusted relocated sidewalls, 208 deleted pendents, 8 added pendent sprinklers. ref 201803274743. n/a for maher. | $42,690 |
| Sep 10, 2018 | Completed final sign-off Oct 2018 | 55 04th St | R L H Fire Protection Inc | ti upgrade of existing fire sprinkler system ref 201808308747 5 relocate pendent sprinklers, 2 deleted pendent sprinlklersDetails
ti upgrade of existing fire sprinkler system ref 201808308747 5 relocate pendent sprinklers, 2 deleted pendent sprinlklers | $1,000 |
| Aug 30, 2018 | Completed final sign-off Jun 2019 | 55 04th St | Turner Construction Co | the work includes renovation to the registration area and screen between the lobby and restaurant. no exterior work. maher naDetails
the work includes renovation to the registration area and screen between the lobby and restaurant. no exterior work. maher na | $210,000 |
| Aug 29, 2018 | Completed final sign-off Mar 2020 | 55 04th St | Siemens Industry, Inc. | floors 4-38. fire alarm work for the "marriott marquis hotel" to replace guest room speakrs. the work includes installations of (9) new speakers and the direct replacement of 1499 speakers on floors 4 through 38; all speaker replacements will use (e) wire and conduit.Details
floors 4-38. fire alarm work for the "marriott marquis hotel" to replace guest room speakrs. the work includes installations of (9) new speakers and the direct replacement of 1499 speakers on floors 4 through 38; all speaker replacements will use (e) wire and conduit. | $400,533 |
| Aug 23, 2018 | Completed final sign-off Sep 2018 | 55 04th St | R L H Fire Protection Inc | fire sprinklers: relocate 2 pendents, 1 sidewall, and remove 2 pendent sprinklers on the 32nd fl. ti #201806283230.Details
fire sprinklers: relocate 2 pendents, 1 sidewall, and remove 2 pendent sprinklers on the 32nd fl. ti #201806283230. | $1,000 |
| Jul 19, 2018 | Completed final sign-off Apr 2020 | 55 04th St | Hathaway Dinwiddie Co. | renovate non-accessible guestrooms on 4th & 5th fl. includes n finishes & fixtures, tub to shower conversion, n illuminated mirror, hvac & lighting e to remain. two n outlets. renovate to e corridors including new finishes only. only ffe sconces are replaced in kind. all other lighting e to remain.Details
renovate non-accessible guestrooms on 4th & 5th fl. includes n finishes & fixtures, tub to shower conversion, n illuminated mirror, hvac & lighting e to remain. two n outlets. renovate to e corridors including new finishes only. only ffe sconces are replaced in kind. all other lighting e to remain. | $825,000 |
| Jun 19, 2018 | Expired or cancelled cancelled Jan 2026 | 55 04th St | room #3230: renovation of (e) non-accessible presidential suite. work includes new finishes & fixtures, toilet & sink relocation within existing bathroom and tub to shower conversion. hvac is existing to remain. all new lighting to be led where occurs with much of the existing lighting to remain.Details
room #3230: renovation of (e) non-accessible presidential suite. work includes new finishes & fixtures, toilet & sink relocation within existing bathroom and tub to shower conversion. hvac is existing to remain. all new lighting to be led where occurs with much of the existing lighting to remain. | $50,000 | |
| Apr 18, 2018 | Never finaled issued Apr 2019, no final | 75 Yerba Buena Ln | J M E Construction Services Inc | revision to 201703201819. existing tropisueno restaurant expanding into vacant space & providing take out concept w/new cold-prep kitchen area & service counters with associted electrical, mechanical & plumbing. **maher n/a**Details
revision to 201703201819. existing tropisueno restaurant expanding into vacant space & providing take out concept w/new cold-prep kitchen area & service counters with associted electrical, mechanical & plumbing. **maher n/a** | $25,000 |
| Mar 29, 2018 | Completed final sign-off May 2019 | 55 04th St | Turner Construction Co | renovation to meeting rooms on levels b-1,b-2,2,4, & 5. work includes addition of operable partitions, new soffits, ada improvements, new lighting, some new electrical, replacement of fcu's and replacement of plumbing fixtures. n/a for maherDetails
renovation to meeting rooms on levels b-1,b-2,2,4, & 5. work includes addition of operable partitions, new soffits, ada improvements, new lighting, some new electrical, replacement of fcu's and replacement of plumbing fixtures. n/a for maher | $280,000 |
| Mar 27, 2018 | Never finaled filed Mar 2018, never issued | 55 04th St | interior renovation to public spaces of lobby area, incl lobby, registration, entry area, back of house area, administractive office, porte cochere, valet, cashier, valet storage, a new revolving door system & exit doors, lobby area and related 1st restrooms. maher n/a.Details
interior renovation to public spaces of lobby area, incl lobby, registration, entry area, back of house area, administractive office, porte cochere, valet, cashier, valet storage, a new revolving door system & exit doors, lobby area and related 1st restrooms. maher n/a. | $2,301,175 | |
| Mar 27, 2018 | Completed final sign-off Jun 2020 | 55 04th St | Hathaway Dinwiddie Co. | interior renovation of (e) non-accessible & accessible guestrooms, corridor,new finishes &fixtures, bathrms tub to shower conversions, new lighting very limited partition & rated wall const, no change to major plumbing & electrical. maher n/a.Details
interior renovation of (e) non-accessible & accessible guestrooms, corridor,new finishes &fixtures, bathrms tub to shower conversions, new lighting very limited partition & rated wall const, no change to major plumbing & electrical. maher n/a. | $2,800,000 |
| Feb 13, 2018 | Never finaled issued Feb 2018, no final | 760 Mission St | umbrella building permit compliance with high rise sprinkler ordinance #377-93. ref pa 2017-0928-9801Details
umbrella building permit compliance with high rise sprinkler ordinance #377-93. ref pa 2017-0928-9801 | ||
| Dec 7, 2017 | Never finaled filed Dec 2017, never issued | 25 Yerba Buena Ln | provide outdoor seating with windscreens, service door with landing and landscapingDetails
provide outdoor seating with windscreens, service door with landing and landscaping | $55,000 | |
| Nov 30, 2017 | Completed final sign-off Jul 2018 | 55 04th St | Hathaway Dinwiddie Co. | revision to 201709219211 scope is 1 tub to shower conversion to room 2433 maher naDetails
revision to 201709219211 scope is 1 tub to shower conversion to room 2433 maher na | $5,000 |
| Nov 8, 2017 | Completed final sign-off Nov 2017 | 55 04th St | R L H Fire Protection Inc | 17/f & 18/f rooms #1731 & 1833- fire sprinkler permit, relocate 2 sidewall sprinklers and delete 2 pendents. t.i. pa#201709219211. n/a ordinance #155-13Details
17/f & 18/f rooms #1731 & 1833- fire sprinkler permit, relocate 2 sidewall sprinklers and delete 2 pendents. t.i. pa#201709219211. n/a ordinance #155-13 | $1,000 |
| Sep 21, 2017 | Completed final sign-off Mar 2019 | 55 04th St | Hathaway Dinwiddie Co. | removate 3 extg guestrooms as "model" rooms - portion of 1 corridor, rooms 1731, 1833 and 1933. remodel includes new finishes, 1 tub to shower conversion and replacement of outlets to tamper proof outlets, replacement of thermostat. n/a for maher.Details
removate 3 extg guestrooms as "model" rooms - portion of 1 corridor, rooms 1731, 1833 and 1933. remodel includes new finishes, 1 tub to shower conversion and replacement of outlets to tamper proof outlets, replacement of thermostat. n/a for maher. | $70,000 |
| Aug 9, 2017 | Completed final sign-off Aug 2017 | 55 04th St | Siemens Industry, Inc. | fire alarm work for the "elevator upgrade" on floors 34 and 35; additions are 3 heat detectors and 3 relay modules. n/a maherDetails
fire alarm work for the "elevator upgrade" on floors 34 and 35; additions are 3 heat detectors and 3 relay modules. n/a maher | $3,360 |
| Jul 5, 2017 | Completed final sign-off Aug 2019 | 55 04th St | Turner Construction Co | repair exterior soffit facciaDetails
repair exterior soffit faccia | $30,000 |
| Jun 13, 2017 | Completed final sign-off Jun 2017 | 99 Yerba Buena Ln | Eric F Anderson Incorporated | revision to pa 2017-0314-1382 sales & seating area revisionsDetails
revision to pa 2017-0314-1382 sales & seating area revisions | |
| May 23, 2017 | Completed final sign-off Oct 2017 | 49 Yerba Buena Ln | Plant Construction Co, Lp | explore private sidewalk membrane failure to determine leak location & repair as required. non-structural work only. structure below topping slab to remain "untouched" & "undistrubed" without exception.Details
explore private sidewalk membrane failure to determine leak location & repair as required. non-structural work only. structure below topping slab to remain "untouched" & "undistrubed" without exception. | $5,000 |
| Mar 27, 2017 | Completed final sign-off Apr 2017 | 51 Yerba Buena Ln | Certified Fire And Safety | install of ul300 hood & duct fire suppression system ref 201609278943 maher naDetails
install of ul300 hood & duct fire suppression system ref 201609278943 maher na | $9,000 |
| Mar 20, 2017 | Never finaled issued Apr 2018, no final | 75 Yerba Buena Ln | J M E Construction Services Inc | extg tropisueno restaurant expanding into vacant space and providing take-out concept with new kitchen area and service counters with associated electric, mechanical and plumbing.n/a for maherDetails
extg tropisueno restaurant expanding into vacant space and providing take-out concept with new kitchen area and service counters with associated electric, mechanical and plumbing.n/a for maher | $75,000 |
| Mar 14, 2017 | Completed final sign-off Jun 2017 | 99 Yerba Buena Ln | Eric F Anderson Incorporated | interior remodel of (e) sales & retail seating area. no mech or plumbing work requiredDetails
interior remodel of (e) sales & retail seating area. no mech or plumbing work required | $110,000 |
| Feb 23, 2017 | Completed final sign-off Jun 2017 | 51 Yerba Buena Ln | Hasz Construction Inc | revision to app#201609278943. removal of structural work. no longer in scope of work. remove special inspection requirements. n/a for maher.Details
revision to app#201609278943. removal of structural work. no longer in scope of work. remove special inspection requirements. n/a for maher. | |
| Feb 1, 2017 | Completed final sign-off Apr 2017 | 51 Yerba Buena Ln | Siemens Industry, Inc. | 1st floor: fire alarm work for the "mixt greens" remodel: additions are 4 duct detectors, 5 speaker/strobes, and 2 strobes. n/a for maher. ref app#2016-0927-8943.Details
1st floor: fire alarm work for the "mixt greens" remodel: additions are 4 duct detectors, 5 speaker/strobes, and 2 strobes. n/a for maher. ref app#2016-0927-8943. | $5,950 |
| Jan 30, 2017 | Completed final sign-off Feb 2017 | 51 Yerba Buena Ln | Ayoob & Peery Plumbing Co Inc | per tenant improvement add 7, relocate 12, plug 8 fire sprinklers to conform with new wall ceiling layout pa#2016 0927 8943. n/a for maher.Details
per tenant improvement add 7, relocate 12, plug 8 fire sprinklers to conform with new wall ceiling layout pa#2016 0927 8943. n/a for maher. | $9,271 |
| Sep 27, 2016 | Completed final sign-off Jun 2017 | 51 Yerba Buena Ln | Hasz Construction Inc | t.i. of an extg retail space to a new restaurant. new interior non-structural partitions, kitchen equipment, millwork, and finishes. new mechanical, electrical and plmg. all work to remain within the interior shell of the extg bldg. no increase in square footage. life safety deferred. n/a maherDetails
t.i. of an extg retail space to a new restaurant. new interior non-structural partitions, kitchen equipment, millwork, and finishes. new mechanical, electrical and plmg. all work to remain within the interior shell of the extg bldg. no increase in square footage. life safety deferred. n/a maher | $300,000 |
| Sep 20, 2016 | Never finaled issued Sep 2016, no final | 773 Market St | Hilbers Inc. | anchorage of fixed and/ord mobile shelving units in peet's coffee storage room. no construction or other work maher naDetails
anchorage of fixed and/ord mobile shelving units in peet's coffee storage room. no construction or other work maher na | $5,000 |
| Sep 15, 2016 | Completed final sign-off Dec 2016 | 75 Yerba Buena Ln | D Kelly Construction Inc. | demilition of 18'x13' concrete bebench, patch concrete surfaceDetails
demilition of 18'x13' concrete bebench, patch concrete surface | $5,000 |
| Aug 16, 2016 | Never finaled issued Aug 2016, no final | 780 Mission St | street spaceDetails
street space | ||
| Jul 8, 2016 | Completed final sign-off Aug 2016 | 765 Market St | Pioneer Fire Inc. | relocate 3 main to clear new pvc. reattache (e) line piping 9802342-sa & 2016040 / 2016005278674 maher naDetails
relocate 3 main to clear new pvc. reattache (e) line piping 9802342-sa & 2016040 / 2016005278674 maher na | $9,800 |
| Jun 28, 2016 | Completed final sign-off Sep 2016 | 773 Market St | R L H Fire Protection Inc | 1st floor: fire sprinkler t.i. relocate 14 pendent sprinklers, add 7 pendent sprinklers(peet's coffee) n/a for maher. t.i. 201512225774Details
1st floor: fire sprinkler t.i. relocate 14 pendent sprinklers, add 7 pendent sprinklers(peet's coffee) n/a for maher. t.i. 201512225774 | $11,330 |
| Jun 21, 2016 | Completed final sign-off Sep 2016 | 773 Market St | Siemens Industry, Inc. | 1st floor "peet's coffee": fire alarm add 2 pull stations, 5 speaker/strobes and 2 strobes. ref pa 2015-1222-5774, maher naDetails
1st floor "peet's coffee": fire alarm add 2 pull stations, 5 speaker/strobes and 2 strobes. ref pa 2015-1222-5774, maher na | $4,790 |
| May 27, 2016 | Completed final sign-off Apr 2017 | 765 Market St | Plant Construction Co, Lp | 1st floor: core work future tenant space. relocate entry and prep for mechanical work. maher naDetails
1st floor: core work future tenant space. relocate entry and prep for mechanical work. maher na | $400,000 |
| Mar 16, 2016 | Expired or cancelled cancelled Aug 2023 | 780 Mission St | Emcor Services/Mesa Energy Systems Inc | revision to 2014 1208 3260: revise from fsd to fd maher naDetails
revision to 2014 1208 3260: revise from fsd to fd maher na | |
| Jan 6, 2016 | Completed final sign-off Nov 2016 | 773 Market St | Sign Of Light | install one (1) illuminated wall sign (a); electric, single faced; maher n/aDetails
install one (1) illuminated wall sign (a); electric, single faced; maher n/a | $3,000 |
| Jan 6, 2016 | Completed final sign-off Nov 2016 | 773 Market St | Sign Of Light | install one (1) illuminated projecting sign (c); double-faced; maher n/aDetails
install one (1) illuminated projecting sign (c); double-faced; maher n/a | $3,000 |
| Jan 6, 2016 | Completed final sign-off Nov 2016 | 773 Market St | Sign Of Light | install one (1) illuminated wall sign (b); electric, single faced; maher n/aDetails
install one (1) illuminated wall sign (b); electric, single faced; maher n/a | $3,000 |
| Dec 30, 2015 | Completed final sign-off Jan 2016 | 55 04th St | Pribuss Engineering Inc | 4th floor: fire sprinkler ti. ref pa 2015-1016-9906, relocate 11, add 1 (total 12). n/a maher ord. #155-13Details
4th floor: fire sprinkler ti. ref pa 2015-1016-9906, relocate 11, add 1 (total 12). n/a maher ord. #155-13 | $6,175 |
| Dec 22, 2015 | Completed final sign-off Oct 2016 | 773 Market St | Hilbers Inc. | interior tenant improvement for new tenant (peet's coffee) with new structural mezzanine (275 sf) & interior layout & finishes, new accessible restrooms. n/a maher ordinanceDetails
interior tenant improvement for new tenant (peet's coffee) with new structural mezzanine (275 sf) & interior layout & finishes, new accessible restrooms. n/a maher ordinance | $400,000 |
| Nov 6, 2015 | Completed final sign-off Feb 2016 | 55 04th St | Siemens Industry, Inc. | fire alarm work for the m lounge/fitness center ti remodel on floors 2, 4, 5. additions are 5 smoke detectors, 3 speakers, 3 speaker/strobes, 7 strobes. ref. app. #'s: 2015.0708.0909 (floor 2); 2015.0708.0915 (floors 4 & 5). maher n/aDetails
fire alarm work for the m lounge/fitness center ti remodel on floors 2, 4, 5. additions are 5 smoke detectors, 3 speakers, 3 speaker/strobes, 7 strobes. ref. app. #'s: 2015.0708.0909 (floor 2); 2015.0708.0915 (floors 4 & 5). maher n/a | $9,500 |
| Sep 29, 2015 | Completed final sign-off Oct 2015 | 37 Yerba Buena Ln | Nickell Fire Protection Inc. | install ul 300 ansul fire system to protect pollution control unit installed in exhaust duct ref 201503261935; maher n/aDetails
install ul 300 ansul fire system to protect pollution control unit installed in exhaust duct ref 201503261935; maher n/a | $4,000 |
| Sep 25, 2015 | Completed final sign-off Oct 2015 | 37 Yerba Buena Ln | International Fire Equip | installation of ul 300 fire system. n/a maher ordinanceDetails
installation of ul 300 fire system. n/a maher ordinance | $3,500 |
| Sep 16, 2015 | Never finaled issued Sep 2015, no final | 55 04th St | R L H Fire Protection Inc | fire sprinkler permit, relocate 2, add 2 and delete 1 pendent sprinklers, relocate 9 and add 4 upright sprinklers. t.i. pa#201507222125. n/a ordinance #155-13Details
fire sprinkler permit, relocate 2, add 2 and delete 1 pendent sprinklers, relocate 9 and add 4 upright sprinklers. t.i. pa#201507222125. n/a ordinance #155-13 | $3,400 |
| Sep 11, 2015 | Never finaled issued Sep 2015, no final | 780 Mission St | Martinelli Environmental Graph | to erect non-electrical 2 projecting signs and one letter set. n/a for maher.Details
to erect non-electrical 2 projecting signs and one letter set. n/a for maher. | $4,000 |
| Sep 11, 2015 | Completed final sign-off Oct 2015 | 55 04th St | Siemens Industry, Inc. | 1st floor: fire alarm work for the "fleet feet sports" t.i. remodel: additions are 5 speaker/strobes and 2 strobes. ref app#201507201976. n/a for maher.Details
1st floor: fire alarm work for the "fleet feet sports" t.i. remodel: additions are 5 speaker/strobes and 2 strobes. ref app#201507201976. n/a for maher. | $3,500 |
| Aug 20, 2015 | Completed final sign-off Oct 2015 | 37 Yerba Buena Ln | Siemens Industry, Inc. | 1st floor: second permit for fire alarm work. this permit updates the actual device locations (no new devices added), original fa permit 2015 0610 8585. ref pa 2015 0326 1935 maher naDetails
1st floor: second permit for fire alarm work. this permit updates the actual device locations (no new devices added), original fa permit 2015 0610 8585. ref pa 2015 0326 1935 maher na | |
| Jul 20, 2015 | Never finaled issued Jul 2015, no final | 55 04th St | Source Planning And Construction Inc | renovation of exterior entry to new retail tenant. work includes removal of (e) non-accessible topping slab & construction of new steps & sloped walkway as well as new door actuator to allow for accessibility into retail space. n/a maher ordinanceDetails
renovation of exterior entry to new retail tenant. work includes removal of (e) non-accessible topping slab & construction of new steps & sloped walkway as well as new door actuator to allow for accessibility into retail space. n/a maher ordinance | $100,000 |
| Jul 16, 2015 | Completed final sign-off Sep 2015 | 37 Yerba Buena Ln | Ayoob & Peery Plumbing Co Inc | add 3, plug 9, relocate 17 & recut 12 sprinklers for new ceiling layout per t.i. pa#201503261935. n/a ordinance #155-13Details
add 3, plug 9, relocate 17 & recut 12 sprinklers for new ceiling layout per t.i. pa#201503261935. n/a ordinance #155-13 | $15,934 |
| Jul 8, 2015 | Expired or cancelled cancelled Jan 2026 | 55 04th St | convert existing 18th floor concierge lounge to (4) guestroom keys with guest baths including new fcu's, plumbing fixtures & lighting. n/a maher ordinanceDetails
convert existing 18th floor concierge lounge to (4) guestroom keys with guest baths including new fcu's, plumbing fixtures & lighting. n/a maher ordinance | $140,000 | |
| Jul 8, 2015 | Completed final sign-off Mar 2016 | 55 04th St | Hathaway Dinwiddie Co. | renovate existing 2nd floor concierge "m lounge" including new finishes & furnishings. n/a maher ordinanceDetails
renovate existing 2nd floor concierge "m lounge" including new finishes & furnishings. n/a maher ordinance | $95,000 |
| Jul 8, 2015 | Completed final sign-off Dec 2016 | 55 04th St | Hathaway Dinwiddie Co. | renovate (e) 4th flr fitness center & existing men's & women's locker rooms & add (4) new treatment rooms incl. new fcu's ductwrok & lighting. renovate (e) 5th flr pool deck & convert to fitness center. infill (e) pool & spa & remove (e) shower & restrm. new finishes & equip thru n/a maher ordinanceDetails
renovate (e) 4th flr fitness center & existing men's & women's locker rooms & add (4) new treatment rooms incl. new fcu's ductwrok & lighting. renovate (e) 5th flr pool deck & convert to fitness center. infill (e) pool & spa & remove (e) shower & restrm. new finishes & equip thru n/a maher ordinance | $450,000 |
| Jun 11, 2015 | Completed final sign-off Aug 2015 | 55 04th St | Pribuss Engineering Inc | ground fl: fire sprinkler t.i. under pa# 2015-0212-8184, relocate 17 heads, add 5 heads, total 22 heads. n/a ordinance #155-13. also, plugging 1 head.Details
ground fl: fire sprinkler t.i. under pa# 2015-0212-8184, relocate 17 heads, add 5 heads, total 22 heads. n/a ordinance #155-13. also, plugging 1 head. | $11,322 |
| Jun 10, 2015 | Never finaled issued Jun 2015, no final | 37 Yerba Buena Ln | Siemens Industry, Inc. | 1st floor: fire alarm work on "delarosa". t.i. project. additions are 1 duct detector, 1 module, 6 speaker/strobes, and 1 strobe. ref. app#2015-0326-1935.Details
1st floor: fire alarm work on "delarosa". t.i. project. additions are 1 duct detector, 1 module, 6 speaker/strobes, and 1 strobe. ref. app#2015-0326-1935. | $4,500 |
| Jun 2, 2015 | Completed final sign-off Feb 2017 | 55 04th St | Siemens Industry, Inc. | fire alarm work for floor 1 marketplace remodel ti addition of 1 speaker strobe and relocate 2 monitor modulesDetails
fire alarm work for floor 1 marketplace remodel ti addition of 1 speaker strobe and relocate 2 monitor modules | $900 |
| May 14, 2015 | Expired or cancelled cancelled Jan 2026 | 780 Mission St | installation for co-location of verizon equip on to (e) indoor distributed antenna system consisting of: dc power plant, new packs to replace (e) bts cabinets, gps antenna mounted to a new pipe & associated wiring. maher naDetails
installation for co-location of verizon equip on to (e) indoor distributed antenna system consisting of: dc power plant, new packs to replace (e) bts cabinets, gps antenna mounted to a new pipe & associated wiring. maher na | $30,000 | |
| Mar 26, 2015 | Completed final sign-off Jan 2016 | 37 Yerba Buena Ln | Hasz Construction Inc | remodel of (e) space- interior work only- to delarosa pizza restaurant w/associated electrical, plumbing & mechanical. maher - not req'd. awning & signage under seperate permit.Details
remodel of (e) space- interior work only- to delarosa pizza restaurant w/associated electrical, plumbing & mechanical. maher - not req'd. awning & signage under seperate permit. | $298,000 |
| Feb 12, 2015 | Completed final sign-off Mar 2016 | 55 04th St | Hathaway Dinwiddie Co. | remove extg lobby level starbucks and convert to grab "n" go market. n/a for the maher. including furnishings and fixtures, equipment (no hood), ceiling reconfiguration and new walkin cooler. fire alarm and sprinkler on separate permits.Details
remove extg lobby level starbucks and convert to grab "n" go market. n/a for the maher. including furnishings and fixtures, equipment (no hood), ceiling reconfiguration and new walkin cooler. fire alarm and sprinkler on separate permits. | $125,000 |
| Feb 11, 2015 | Completed final sign-off Feb 2016 | 37 Yerba Buena Ln | Plant Construction Co, Lp | ground floor - installation of pollution control unit, grease-exhaust ductwork, heat pump & piping. space currently vacant. n/a maher ordinanceDetails
ground floor - installation of pollution control unit, grease-exhaust ductwork, heat pump & piping. space currently vacant. n/a maher ordinance | $30,000 |
| Dec 8, 2014 | Never finaled issued Dec 2014, no final | 780 Mission St | Emcor Services/Mesa Energy Systems Inc | provide a lint filtration system to remove lint from the laundry chute room. n/a for the maher ordinance.Details
provide a lint filtration system to remove lint from the laundry chute room. n/a for the maher ordinance. | $75,000 |
| Nov 5, 2014 | Completed final sign-off Mar 2015 | 780 Mission St | Hathaway Dinwiddie Co. | evacuation signage installation, total signs: 2 on the 39th floor maher/n/aDetails
evacuation signage installation, total signs: 2 on the 39th floor maher/n/a | $3,600 |
| Sep 29, 2014 | Completed final sign-off Nov 2015 | 55 04th St | Triton Tower Inc | sprint reloc 3 nv 800/1900 antennas.1@sector a,b,c.add 3 2.5 panel antennas.1@sectors a,b,c.add 3 2.5 rrh 1@sector a,b,c.add(n)2.5 equip inside(e)mmbs cabinet.(n)2.5 batteries inside(e)bbu 4th.add(n)coax jumper lines fr rrh to(n)antennas.re-use(e)hybrid cable or install(n)as needed.add stealth enclDetails
sprint reloc 3 nv 800/1900 antennas.1@sector a,b,c.add 3 2.5 panel antennas.1@sectors a,b,c.add 3 2.5 rrh 1@sector a,b,c.add(n)2.5 equip inside(e)mmbs cabinet.(n)2.5 batteries inside(e)bbu 4th.add(n)coax jumper lines fr rrh to(n)antennas.re-use(e)hybrid cable or install(n)as needed.add stealth encl | $20,000 |
| Jun 17, 2014 | Completed final sign-off Feb 2015 | 780 Mission St | Hathaway Dinwiddie Co. | remodel of extg bar including new lighting, electrical, plumbing, new finishes and millwork and barrier removal. n/a for the maher ordinance #155-13Details
remodel of extg bar including new lighting, electrical, plumbing, new finishes and millwork and barrier removal. n/a for the maher ordinance #155-13 | $497,570 |
| Apr 30, 2013 | Never finaled issued Apr 2013, no final | 780 Mission St | to add 2nd address for marriott marquis hotel at block 3706, lot 096.Details
to add 2nd address for marriott marquis hotel at block 3706, lot 096. | ||
| Jan 4, 2013 | Completed final sign-off Dec 2013 | 55 04th St | Cw Horton General Contractor | revision to app#201209270830. new added scope is to install new disabled access pool lifts(2) to extg indoor pool and spa located on 5th level of hotel.Details
revision to app#201209270830. new added scope is to install new disabled access pool lifts(2) to extg indoor pool and spa located on 5th level of hotel. | $8,000 |
| Dec 10, 2012 | Completed final sign-off Jun 2013 | 55 04th St | Siemens Industry, Inc. | addition of 20 strobe power supplies, 101 control modules, 20 relay modules, 110 smoke detectors, 2 speaker / strobes & 117 strobes for "ada room upgrades" on various floors. all devices connect onto the fire alarm system.Details
addition of 20 strobe power supplies, 101 control modules, 20 relay modules, 110 smoke detectors, 2 speaker / strobes & 117 strobes for "ada room upgrades" on various floors. all devices connect onto the fire alarm system. | $185,000 |
| Sep 27, 2012 | Completed final sign-off Jan 2014 | 55 04th St | Cw Horton General Contractor | disabled access voluntary upgrades to public spaces of hotelDetails
disabled access voluntary upgrades to public spaces of hotel | $95,000 |
| May 24, 2012 | Never finaled issued Jun 2012, no final | 55 04th St | Thomas Swan Sign Co Inc | installation of one electric illuminated projecting double faced sign.Details
installation of one electric illuminated projecting double faced sign. | $5,000 |
| Feb 23, 2012 | Completed final sign-off Jul 2013 | 55 04th St | Cw Horton General Contractor | 40 guestroom ada modifications; remodel to conciege lounge & pantry guestroom bathroom backlit mirrors (electrical work - 1500 rooms).Details
40 guestroom ada modifications; remodel to conciege lounge & pantry guestroom bathroom backlit mirrors (electrical work - 1500 rooms). | $650,000 |
| Oct 13, 2011 | Completed final sign-off Jul 2015 | 55 04th St | Overland Contracting Inc, Progress Wireless | modify wireless facility:this proj involves 2(e)panal antennas to be removed & replace with 3 new panel antennas to be mounted to (e)tri-pods on the 4/fl. 1 (e) equip cabinet to be removed& replaced w/1 new equip cabinet.new coax transmission lines to be run & (e) 200 amp service to remain.Details
modify wireless facility:this proj involves 2(e)panal antennas to be removed & replace with 3 new panel antennas to be mounted to (e)tri-pods on the 4/fl. 1 (e) equip cabinet to be removed& replaced w/1 new equip cabinet.new coax transmission lines to be run & (e) 200 amp service to remain. | $45,000 |
| Jul 13, 2011 | Completed final sign-off Nov 2011 | 765 Market St | Aaa Restaurant Fire Control/Dba Aaa Fire | 29th floor-relocate 4 sprinklers, add 4 sprinklersDetails
29th floor-relocate 4 sprinklers, add 4 sprinklers | $5,200 |
| Jun 21, 2011 | Completed final sign-off Jul 2011 | 1 Yerba Buena Ln | Terra Nova Industries | confirmation of occupant loads for sffd assembly permit regarding approved pa #2008-12-03-7676. no construction - only sffd occupant verifigation.Details
confirmation of occupant loads for sffd assembly permit regarding approved pa #2008-12-03-7676. no construction - only sffd occupant verifigation. | |
| Jun 7, 2011 | Completed final sign-off Jul 2011 | 1 Yerba Buena Ln | install sign "brasserie" & "bluestem". see drawingslDetails
install sign "brasserie" & "bluestem". see drawingsl | $10,000 | |
| May 26, 2011 | Completed final sign-off Aug 2011 | 1 Yerba Buena Ln | Certified Fire & Safety Co | 2nd flr kitchen - hook up & test of kitchen hood fire system. install polluation controll unit for exhaust duct. connect sprinklers in controll unit to sprinkler system. provide sprinklers in duct from pcu to ext.of bldg. showing proper listing & model number of pcu shown wrong on 201102049647Details
2nd flr kitchen - hook up & test of kitchen hood fire system. install polluation controll unit for exhaust duct. connect sprinklers in controll unit to sprinkler system. provide sprinklers in duct from pcu to ext.of bldg. showing proper listing & model number of pcu shown wrong on 201102049647 | $3,000 |
| Apr 27, 2011 | Never finaled issued May 2011, no final | 25 Yerba Buena Ln | Martinelli Environmental Graph | erect double faced electric signDetails
erect double faced electric sign | $1,000 |
| Apr 27, 2011 | Completed final sign-off Nov 2011 | 25 Yerba Buena Ln | Martinelli Environmental Graph | erect electric wall signDetails
erect electric wall sign | $1,000 |
| Apr 25, 2011 | Completed final sign-off Dec 2011 | 99 Yerba Buena Ln | to erect electric wall signDetails
to erect electric wall sign | $1,000 | |
| Apr 25, 2011 | Completed final sign-off Dec 2011 | 99 Yerba Buena Ln | Martinelli Environmental Graph | to erect electric wall signDetails
to erect electric wall sign | $1,000 |
| Mar 1, 2011 | Completed final sign-off Jul 2011 | 55 04th St | Captive Fuel | revision to pa# 2008-1203-7676 to revise the light fixture schedule, drawing e0.4- to generator for back up from batteriesDetails
revision to pa# 2008-1203-7676 to revise the light fixture schedule, drawing e0.4- to generator for back up from batteries | |
| Feb 4, 2011 | Completed final sign-off Jul 2011 | 1 Yerba Buena Ln | Integrity Mechanical Systems Corporation | mechanical revision to approved plans per app#200812037676. replace specified pcu with with new unit due to specified unit not being avalableDetails
mechanical revision to approved plans per app#200812037676. replace specified pcu with with new unit due to specified unit not being avalable | |
| Dec 8, 2010 | Completed final sign-off Sep 2011 | 1 Yerba Buena Ln | Siemens Industry, Inc. | addition of 1 smoke detector, 3 duct detectors, 14 speaker/strobes, 5 modules, 1 strobe power supply for "blue stem restaurant". remodel on floors 1 and 2. all new devices connect onto the existing life safety systemDetails
addition of 1 smoke detector, 3 duct detectors, 14 speaker/strobes, 5 modules, 1 strobe power supply for "blue stem restaurant". remodel on floors 1 and 2. all new devices connect onto the existing life safety system | $9,000 |
| Dec 8, 2010 | Never finaled issued Dec 2010, no final | 55 04th St | Acco Engineered Systems Inc. Dba Acco En | 4th floor-replace 2 fan coils at weight room & added 1 exhaust fan for the same roomDetails
4th floor-replace 2 fan coils at weight room & added 1 exhaust fan for the same room | $5,000 |
| Nov 10, 2010 | Never finaled issued Nov 2010, no final | 1 Yerba Buena Ln | add 13 new sprinklers and 53 relocates for ti to existing shell bldg system. pa# 2008.12.03.7676 for referenceDetails
add 13 new sprinklers and 53 relocates for ti to existing shell bldg system. pa# 2008.12.03.7676 for reference | $15,500 | |
| Nov 3, 2010 | Never finaled issued Nov 2010, no final | 55 04th St | Thomas Swan Sign Co Inc | erect a non electric wall single faced direct new signDetails
erect a non electric wall single faced direct new sign | $2,000 |
| Jul 14, 2010 | Completed final sign-off Feb 2011 | 55 04th St | Hathaway Dinwiddie Co. | marriott hotel. pa# 2009.07.13.2508 for reference. install 4 new hanging points to ballroom ceiling.Details
marriott hotel. pa# 2009.07.13.2508 for reference. install 4 new hanging points to ballroom ceiling. | $1,500 |
| Feb 4, 2010 | Completed final sign-off Jun 2010 | 55 04th St | Hathaway Dinwiddie Co. | remodel of hotel business center with new partitions an finishes (fed-ex office). disable access path of travel under pa.#2009/0713/2508.Details
remodel of hotel business center with new partitions an finishes (fed-ex office). disable access path of travel under pa.#2009/0713/2508. | $53,000 |
| Dec 21, 2009 | Completed final sign-off Mar 2010 | 55 04th St | R L H Fire Protection Inc | golden gate ballroom: as-built to permit #2009/09307975. revise existing head locations.Details
golden gate ballroom: as-built to permit #2009/09307975. revise existing head locations. | $1,000 |
| Dec 21, 2009 | Completed final sign-off Mar 2010 | 55 04th St | R L H Fire Protection Inc | yerba buena ballroom: as built to permit #200909307978. revise 30 sprinkler heads from (e) permit, add 6" pipe in hallway.Details
yerba buena ballroom: as built to permit #200909307978. revise 30 sprinkler heads from (e) permit, add 6" pipe in hallway. | $1,000 |
| Nov 4, 2009 | Completed final sign-off Apr 2010 | 55 04th St | Siemens Industry, Inc. | to obtain final inspection for work approved under 200 . all work is complete.Details
to obtain final inspection for work approved under 200 . all work is complete. | |
| Nov 4, 2009 | Completed final sign-off Apr 2010 | 55 04th St | Siemens Industry, Inc. | to obtain final inspection for work approved under 200807076052. all work is complete.Details
to obtain final inspection for work approved under 200807076052. all work is complete. | |
| Oct 2, 2009 | Completed final sign-off Mar 2010 | 55 04th St | Siemens Industry, Inc. | fire alarm renovation for ballroom levels: 85-smoke detectors, 1-strobe, 12-speaker strobes, 1-speaker.Details
fire alarm renovation for ballroom levels: 85-smoke detectors, 1-strobe, 12-speaker strobes, 1-speaker. | $27,500 |
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | renewal of application 200803126932 to obtain final completion. all work is completed.Details
renewal of application 200803126932 to obtain final completion. all work is completed. | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | to obtain final inspection 200803278119. all work is completeDetails
to obtain final inspection 200803278119. all work is complete | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | renewal of application 200711158265 to obtain final completion. all work is completed.Details
renewal of application 200711158265 to obtain final completion. all work is completed. | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | renewal of application 200808219746 to obtain final completion. all work is completed.Details
renewal of application 200808219746 to obtain final completion. all work is completed. | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | to obtain final inspection 200712200927. all work is completeDetails
to obtain final inspection 200712200927. all work is complete | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | to obtain final inspection 200802134760. all work is completeDetails
to obtain final inspection 200802134760. all work is complete | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | to obtain final inspection 200610104469. all work is completeDetails
to obtain final inspection 200610104469. all work is complete | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | to obtain final inspection 200807086202. all work is completeDetails
to obtain final inspection 200807086202. all work is complete | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | to obtain final inspection 200804109388. all work is completeDetails
to obtain final inspection 200804109388. all work is complete | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | renewal of application 200807166819 to obtain final completion. all work is completed.Details
renewal of application 200807166819 to obtain final completion. all work is completed. | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | renewal of application 200807166830 to obtain final completion. all work is completed.Details
renewal of application 200807166830 to obtain final completion. all work is completed. | ||
| Sep 30, 2009 | Completed final sign-off Oct 2009 | 55 04th St | to obtain final inspection 200609283574. all work is completeDetails
to obtain final inspection 200609283574. all work is complete | ||
| Sep 30, 2009 | Completed final sign-off Mar 2010 | 55 04th St | R L H Fire Protection Inc | relocate 286 pendent sprinkler heads & add 72 upright heads in the golden gate exhibit hall of the marriott, delete 5 headsDetails
relocate 286 pendent sprinkler heads & add 72 upright heads in the golden gate exhibit hall of the marriott, delete 5 heads | $67,200 |
| Sep 30, 2009 | Completed final sign-off Mar 2010 | 55 04th St | R L H Fire Protection Inc | relocate 286 pendent sprinkler heads & add 72 upright heads in the golden gate exhibit hall of the marriott, delete 5 headsDetails
relocate 286 pendent sprinkler heads & add 72 upright heads in the golden gate exhibit hall of the marriott, delete 5 heads | $72,500 |
| Sep 10, 2009 | Completed final sign-off Apr 2010 | 55 04th St | International Fire Equip | to obtain final inspection for work approved under pa#200806053757. all work is complete.Details
to obtain final inspection for work approved under pa#200806053757. all work is complete. | |
| Sep 10, 2009 | Completed final sign-off Sep 2009 | 55 04th St | International Fire Equip | to obtain final inspection for work approved under pa#200803046285. all work is complete.Details
to obtain final inspection for work approved under pa#200803046285. all work is complete. | |
| Aug 21, 2009 | Never finaled issued Aug 2009, no final | 55 04th St | to obtain final inspection for work approved under pa # 200708270991. all work is complete.Details
to obtain final inspection for work approved under pa # 200708270991. all work is complete. | ||
| Jul 13, 2009 | Completed final sign-off Mar 2010 | 55 04th St | Hathaway Dinwiddie Co. | renovation of (e) ballrooms/coference rooms on basement levels. no exterior work. fire alarm and sprinkler under separate permitDetails
renovation of (e) ballrooms/coference rooms on basement levels. no exterior work. fire alarm and sprinkler under separate permit | $13,118,065 |
| Jun 12, 2009 | Never finaled issued Jun 2009, no final | 1 Yerba Buena Ln | Sierra Electric Co | as built for pa# 2008-1121-7158-we added an additional 2 smoke detectors, 1 heat detector, 2 relay modules & 2 monitor modulesDetails
as built for pa# 2008-1121-7158-we added an additional 2 smoke detectors, 1 heat detector, 2 relay modules & 2 monitor modules | $5,000 |
| Mar 11, 2009 | Completed final sign-off Apr 2009 | 55 04th St | Pribuss Engineering Inc | fire sprinkler as built as requested by insp. glen alston. original app #200810275162Details
fire sprinkler as built as requested by insp. glen alston. original app #200810275162 | |
| Jan 6, 2009 | Completed final sign-off Apr 2009 | 1 Yerba Buena Ln | revisions to approved pa # 200809111317 to delete stair, relocate elevator machine room and associated architectural and structural details. new 5" topping slab, modify mechanical platform and ladder & modify steel beam @elevator shaft. mep, sprinkler & fire alarm under separate permit.Details
revisions to approved pa # 200809111317 to delete stair, relocate elevator machine room and associated architectural and structural details. new 5" topping slab, modify mechanical platform and ladder & modify steel beam @elevator shaft. mep, sprinkler & fire alarm under separate permit. | $10,000 | |
| Dec 3, 2008 | Completed final sign-off Jun 2011 | 1 Yerba Buena Ln | Terra Nova Industries | tenant improvement of ground floor restaurant space with new finishes, structural and m.e.p. sprinkler and fire alarm under seperate permitDetails
tenant improvement of ground floor restaurant space with new finishes, structural and m.e.p. sprinkler and fire alarm under seperate permit | $1,200,000 |
| Nov 21, 2008 | Never finaled issued Dec 2008, no final | 1 Yerba Buena Ln | Sierra Electric Co | adding 3 smoke detectors, 1 heat detector, 3 relay modules.Details
adding 3 smoke detectors, 1 heat detector, 3 relay modules. | $3,000 |
| Nov 4, 2008 | Completed final sign-off Dec 2008 | 75 Yerba Buena Ln | Certified Fire & Safety Co | installation of ansul fire suppression system, 1 hood and duct system, 1 pollution control unit systemDetails
installation of ansul fire suppression system, 1 hood and duct system, 1 pollution control unit system | $1,000 |
| Oct 31, 2008 | Completed final sign-off Sep 2009 | 55 04th St | International Fire Equip | as built plans to show additional head in hood, revision to pa# 2008-0917-1884Details
as built plans to show additional head in hood, revision to pa# 2008-0917-1884 | $10 |
| Oct 27, 2008 | Completed final sign-off Apr 2009 | 55 04th St | Pribuss Engineering Inc | fire sprinkler t.i., 74 new sprinklers.Details
fire sprinkler t.i., 74 new sprinklers. | $18,500 |
| Sep 17, 2008 | Completed final sign-off Sep 2009 | 55 04th St | International Fire Equip | hood up ansul piranha system in omelet kitchen. mezzanine level. original permit #200806053757Details
hood up ansul piranha system in omelet kitchen. mezzanine level. original permit #200806053757 | $1,500 |
| Sep 11, 2008 | Completed final sign-off Apr 2009 | 1 Yerba Buena Ln | revision to appl #200805212587 - minor architectural & structural revision & new stair added to scope of work.Details
revision to appl #200805212587 - minor architectural & structural revision & new stair added to scope of work. | $200,000 | |
| Aug 21, 2008 | Expired or cancelled expired Oct 2009 | 55 04th St | Graycor Constructio Company Inc | add 42"low wall @ restaurant for egress passageway. revise occupancy load per actual as-built areas. revision to applications 200802134760 & 200704128682.Details
add 42"low wall @ restaurant for egress passageway. revise occupancy load per actual as-built areas. revision to applications 200802134760 & 200704128682. | $2,000 |
| Jul 28, 2008 | Completed final sign-off Dec 2008 | 75 Yerba Buena Ln | Acco Engineered Systems Inc. Dba Acco En | adding a new grease exhaust scrubber and fan to pa# 2007-1218-0791 (revision)Details
adding a new grease exhaust scrubber and fan to pa# 2007-1218-0791 (revision) | $100,000 |
| Jul 16, 2008 | Completed final sign-off Dec 2008 | 75 Yerba Buena Ln | Rcm Fire Protection Inc. | relocate approx 36 sprinkler heads and plug off about 8 sprinklers.Details
relocate approx 36 sprinkler heads and plug off about 8 sprinklers. | $8,000 |
| Jul 16, 2008 | Expired or cancelled expired Oct 2009 | 55 04th St | Anderson, Rowe & Buckley, Inc. | at 1st fl. tenant improvements to the existing fire sprinkler system, 5 added sprinklers, 7 removed sprinklers.Details
at 1st fl. tenant improvements to the existing fire sprinkler system, 5 added sprinklers, 7 removed sprinklers. | $2,000 |
| Jul 16, 2008 | Completed final sign-off Dec 2008 | 75 Yerba Buena Ln | Morton Smith Electrical Inc | tenant improvement on the ground flr-speaker in tenant, tie into (e) speaker circuit (s1b), visual circuit tie into (e) booster panel, slc devices tie into (e) loop 35. adding 2 pull stations, 1 duct detector, 1 monitor module, 2 strobes ceiling mount, 7 speaker/strobes.Details
tenant improvement on the ground flr-speaker in tenant, tie into (e) speaker circuit (s1b), visual circuit tie into (e) booster panel, slc devices tie into (e) loop 35. adding 2 pull stations, 1 duct detector, 1 monitor module, 2 strobes ceiling mount, 7 speaker/strobes. | $6,000 |
| Jul 16, 2008 | Expired or cancelled expired Oct 2009 | 55 04th St | Graycor Constructio Company Inc | refer to pa #200802134760 to eliminate corridor at meeting rooms on 2nd floor. added occupancy sheets a0.8, a0.8c per fire inpsector and added additional exit signs (6) on 2nd floor (sheets a6.6 & a6.7).Details
refer to pa #200802134760 to eliminate corridor at meeting rooms on 2nd floor. added occupancy sheets a0.8, a0.8c per fire inpsector and added additional exit signs (6) on 2nd floor (sheets a6.6 & a6.7). | |
| Jul 8, 2008 | Never finaled issued Oct 2008, no final | 55 04th St | Siemens Industry, Inc. | smoke control portion of the life safety system replacement @the marriott hotel. this is phrase 4 of the work valued under original application @2006-0629-5400. these drawings indicate the wiring diagrams, sequence of operation & the firefighter's override control panel for the smoke management addiDetails
smoke control portion of the life safety system replacement @the marriott hotel. this is phrase 4 of the work valued under original application @2006-0629-5400. these drawings indicate the wiring diagrams, sequence of operation & the firefighter's override control panel for the smoke management addi | $15,000 |
| Jul 8, 2008 | Expired or cancelled expired Oct 2009 | 55 04th St | Anderson, Rowe & Buckley, Inc. | tenant improvements to (e) fire spinkler system. 87 new pendents, 14 relocated (lowered) pendentss 1st floor and 2nd floor.Details
tenant improvements to (e) fire spinkler system. 87 new pendents, 14 relocated (lowered) pendentss 1st floor and 2nd floor. | $18,000 |
| Jul 7, 2008 | Completed final sign-off Apr 2010 | 55 04th St | Siemens Industry, Inc. | 2nd renewal of existing app#200606295400 which ha expired. the sffd field inspector has requested that this permit be renewed again as more testing is needed prior to final approval.Details
2nd renewal of existing app#200606295400 which ha expired. the sffd field inspector has requested that this permit be renewed again as more testing is needed prior to final approval. | |
| Jul 3, 2008 | Completed final sign-off Sep 2008 | 13 Yerba Buena Ln | revision to pa #2008/02/15/4929, delete ovtdoor seating areas from scope of work.Details
revision to pa #2008/02/15/4929, delete ovtdoor seating areas from scope of work. | ||
| Jun 5, 2008 | Expired or cancelled expired Apr 2010 | 55 04th St | International Fire Equip | 3rd floor-install ansul piranha system into (e) hoods on 3rd floor kitchens and banquet kitchens in basement. total 6 systems.Details
3rd floor-install ansul piranha system into (e) hoods on 3rd floor kitchens and banquet kitchens in basement. total 6 systems. | $26,050 |
| Jun 4, 2008 | Expired or cancelled expired Aug 2010 | 765 Market St | Wedge Woodworks | unit h: relocate 4 fire alarm speakers.Details
unit h: relocate 4 fire alarm speakers. | $4,000 |
| May 30, 2008 | Completed final sign-off Jun 2008 | 13 Yerba Buena Ln | Ok Fire System | install a fire system in a kitchen hoodDetails
install a fire system in a kitchen hood | $3,800 |
| May 21, 2008 | Completed final sign-off Apr 2009 | 1 Yerba Buena Ln | core and shell upgrade of restaurant tenant space. tenant improvement under separate permit. no occupancy until tenant improvement permit approved.Details
core and shell upgrade of restaurant tenant space. tenant improvement under separate permit. no occupancy until tenant improvement permit approved. | $200,000 | |
| Apr 10, 2008 | Expired or cancelled expired Oct 2009 | 55 04th St | Anderson, Rowe & Buckley, Inc. | removal of grease duct fire sprinkler valve assembly and piping on the 1st & 2nd floorsDetails
removal of grease duct fire sprinkler valve assembly and piping on the 1st & 2nd floors | $1,000 |
| Apr 3, 2008 | Completed final sign-off Dec 2008 | 75 Yerba Buena Ln | interior tenant improvement for a new restaurant at ground floor including partitions, fixtures, finishes and 2 ada restrooms on ground floor for restaurant.Details
interior tenant improvement for a new restaurant at ground floor including partitions, fixtures, finishes and 2 ada restrooms on ground floor for restaurant. | $180,000 | |
| Apr 1, 2008 | Never finaled issued Apr 2008, no final | 25 Yerba Buena Ln | Sign & Sign Again | new restaurant sign facing market st.Details
new restaurant sign facing market st. | |
| Apr 1, 2008 | Never finaled issued Apr 2008, no final | 25 Yerba Buena Ln | Sign & Sign Again | new restaurant sign facing yerba buena ln.Details
new restaurant sign facing yerba buena ln. | |
| Apr 1, 2008 | Never finaled issued Apr 2008, no final | 25 Yerba Buena Ln | Sign & Sign Again | new restaurant sign facing yerba buena ln.Details
new restaurant sign facing yerba buena ln. | |
| Mar 12, 2008 | Expired or cancelled expired Oct 2009 | 55 04th St | Anderson, Rowe & Buckley, Inc. | remove 21 sidewall sprinklers. all work on the 2nd floor.Details
remove 21 sidewall sprinklers. all work on the 2nd floor. | $2,100 |
| Mar 4, 2008 | Expired or cancelled expired Sep 2009 | 55 04th St | International Fire Equip | install ansul pirahna sysem in existing hood at ground/street level. remove sprinkler heads. use 1" fire sprinkler for water supply to system cabinet.Details
install ansul pirahna sysem in existing hood at ground/street level. remove sprinkler heads. use 1" fire sprinkler for water supply to system cabinet. | $5,000 |
| Feb 15, 2008 | Completed final sign-off Sep 2008 | 13 Yerba Buena Ln | revisions to approved pa# 200702063484-as built plans to include new patio seating at 2 locations and details for mechanical equipment platform (one being equrvalent accessible outdoor seating)Details
revisions to approved pa# 200702063484-as built plans to include new patio seating at 2 locations and details for mechanical equipment platform (one being equrvalent accessible outdoor seating) | $55,000 | |
| Feb 14, 2008 | Expired or cancelled expired Jun 2010 | 765 Market St | Pribuss Engineering Inc | penthouse 3a- fire sprinkler ti at the penthouse 3a. add 7 sprinkler heads and relocate 13 heads.Details
penthouse 3a- fire sprinkler ti at the penthouse 3a. add 7 sprinkler heads and relocate 13 heads. | $4,350 |
| Feb 13, 2008 | Expired or cancelled expired Oct 2009 | 55 04th St | Graycor Constructio Company Inc | revision to 200704129682. revision to atrium . remodel of permitted corridor.Details
revision to 200704129682. revision to atrium . remodel of permitted corridor. | |
| Feb 4, 2008 | Never finaled issued Feb 2008, no final | 13 Yerba Buena Ln | street space permit only.Details
street space permit only. | ||
| Jan 24, 2008 | Completed final sign-off Sep 2008 | 13 Yerba Buena Ln | comply with nov 200840168, mezzanine floor poured prior to permit, remove fire proofing to verify bolting & welding.Details
comply with nov 200840168, mezzanine floor poured prior to permit, remove fire proofing to verify bolting & welding. | $40,000 | |
| Jan 17, 2008 | Never finaled issued Feb 2008, no final | 75 Yerba Buena Ln | remove existing non bearing wall underneath existing stair case on ground floor. provide 2hr rated enclosure underneath stairs via approved permit application 2007 0827 0991Details
remove existing non bearing wall underneath existing stair case on ground floor. provide 2hr rated enclosure underneath stairs via approved permit application 2007 0827 0991 | $5,000 | |
| Jan 10, 2008 | Completed final sign-off Jun 2008 | 25 Yerba Buena Ln | Pribuss Engineering Inc | ground floor fire sprinkeler t.i. - add 118 sprinkler heads for fire sprinkler tenant improvementDetails
ground floor fire sprinkeler t.i. - add 118 sprinkler heads for fire sprinkler tenant improvement | $29,500 |
| Dec 20, 2007 | Expired or cancelled expired Oct 2009 | 55 04th St | Anderson, Rowe & Buckley, Inc. | 1st floor: tenant improvement to the existing fire sprinkler system. added 4 sprinklers. no work on r-1 portion.Details
1st floor: tenant improvement to the existing fire sprinkler system. added 4 sprinklers. no work on r-1 portion. | $800 |
| Dec 18, 2007 | Expired or cancelled expired Sep 2010 | 75 Yerba Buena Ln | Acco Engineered Systems Inc. Dba Acco En | relocate an existing fan to install a new make-up air unit. another piece of equipment is being shown for reference only. this equipment will be installed under a separate permit in the future.Details
relocate an existing fan to install a new make-up air unit. another piece of equipment is being shown for reference only. this equipment will be installed under a separate permit in the future. | $100,000 |
| Nov 15, 2007 | Expired or cancelled cancelled Jan 2026 | 55 04th St | "luili gongfang" is a tenant that is moving into the ground floor of the (e) base building of the "marriott" hotel. the new devices are connecting into the circuit running thru the floor. new devices: pull station (2), duct detectors (2), strpbes (1) and speaker/strobes (5).Details
"luili gongfang" is a tenant that is moving into the ground floor of the (e) base building of the "marriott" hotel. the new devices are connecting into the circuit running thru the floor. new devices: pull station (2), duct detectors (2), strpbes (1) and speaker/strobes (5). | $8,000 | |
| Nov 15, 2007 | Never finaled issued Nov 2007, no final | 55 04th St | Siemens Industry, Inc. | 1st & 2nd fl lobby -add of (6) smoke detectors, (8) speaker/strobes, (3) strobes due to arch. modif. at both the ground and second leveles of the hotel's lobby area. these new devices will connect onto (e) life safety. some (e) devices relocated due to arch. changes. *no work on residential units.Details
1st & 2nd fl lobby -add of (6) smoke detectors, (8) speaker/strobes, (3) strobes due to arch. modif. at both the ground and second leveles of the hotel's lobby area. these new devices will connect onto (e) life safety. some (e) devices relocated due to arch. changes. *no work on residential units. | $8,800 |
| Nov 9, 2007 | Completed final sign-off Feb 2009 | 37 Yerba Buena Ln | Ayoob & Peery Plumbing Co Inc | relocate 16 fire sprinkler heads per tenant improvement, add 4 and remove 4 heads.Details
relocate 16 fire sprinkler heads per tenant improvement, add 4 and remove 4 heads. | $7,000 |
| Oct 30, 2007 | Never finaled issued Nov 2007, no final | 765 Market St | 38 Degress North Latitude Builders Inc. | install platform for future generator on roof. generator separate permit.Details
install platform for future generator on roof. generator separate permit. | $10,000 |
| Oct 30, 2007 | Never finaled issued Oct 2007, no final | 55 04th St | Siemens Industry, Inc. | renewal of pa#2006/06/29/5400 for final inspectionDetails
renewal of pa#2006/06/29/5400 for final inspection | |
| Oct 24, 2007 | Completed final sign-off Apr 2009 | 87 Yerba Buena Ln | C B F Inc | fire alarm alteration at ground floor of existing base building including installation of 4 speaker/stobes and (1) pull station.Details
fire alarm alteration at ground floor of existing base building including installation of 4 speaker/stobes and (1) pull station. | $10,000 |
| Oct 24, 2007 | Completed final sign-off Jun 2008 | 37 Yerba Buena Ln | Morton Smith Electrical Inc | a cooper wheelock power supply is being added for strobes and speakers are tieing to the speaker circuit that is dedicated to the tenants on 1st floor. adding (1 power supply, 5- duct detectors, 1- pullstation, 2-dual monitor module 1-monitor module 18 speakers/strobes.Details
a cooper wheelock power supply is being added for strobes and speakers are tieing to the speaker circuit that is dedicated to the tenants on 1st floor. adding (1 power supply, 5- duct detectors, 1- pullstation, 2-dual monitor module 1-monitor module 18 speakers/strobes. | $5,000 |
| Oct 4, 2007 | Completed final sign-off Feb 2009 | 37 Yerba Buena Ln | minor revision to ap #200706194448 to relocate bathroom & remove additional level landing ( not an exit requirement)Details
minor revision to ap #200706194448 to relocate bathroom & remove additional level landing ( not an exit requirement) | $2,000 | |
| Oct 4, 2007 | Never finaled issued Oct 2007, no final | 55 04th St | street spaceDetails
street space | ||
| Sep 25, 2007 | Completed final sign-off Apr 2009 | 87 Yerba Buena Ln | Principal Builders Inc. | ground floor, 1st time tenant for unit #retail 7 - built out walls, new restroom, new lift. mechancial, electrical, fire sprinkler and fire alarm.counter for cash register to be under seperate permitDetails
ground floor, 1st time tenant for unit #retail 7 - built out walls, new restroom, new lift. mechancial, electrical, fire sprinkler and fire alarm.counter for cash register to be under seperate permit | $50,000 |
| Aug 27, 2007 | Expired or cancelled cancelled Oct 2009 | 55 04th St | new 2 hrs. fire rated storage room and new access door open to yerba buena lane (ground floor).Details
new 2 hrs. fire rated storage room and new access door open to yerba buena lane (ground floor). | $25,000 | |
| Aug 14, 2007 | Never finaled issued Aug 2007, no final | 55 04th St | supplemental demo permit - main permit applic. 32007/04/12/8682. demo not to conflict with main permit. see main permit 3200704/12/8682 for disabled access compliance.Details
supplemental demo permit - main permit applic. 32007/04/12/8682. demo not to conflict with main permit. see main permit 3200704/12/8682 for disabled access compliance. | $250,000 | |
| Jul 18, 2007 | Completed final sign-off Jan 2008 | 55 04th St | Anderson, Rowe & Buckley, Inc. | 1st floor-tenant improvements to (e) fire sprinkler system-33 relocates, 1 new, 1 removedDetails
1st floor-tenant improvements to (e) fire sprinkler system-33 relocates, 1 new, 1 removed | $6,500 |
| Jun 21, 2007 | Completed final sign-off Jan 2008 | 55 04th St | Turner Construction Co | renovation and expansion of hotel's fitness center. non structural improvements to (e) space. no structural workDetails
renovation and expansion of hotel's fitness center. non structural improvements to (e) space. no structural work | $95,000 |
| Jun 19, 2007 | Completed final sign-off Feb 2009 | 37 Yerba Buena Ln | All Applied Construction Inc | t.i. for a retail shop in a vacant ground floor space. put in walls, bath, electrical, lights, hvac.Details
t.i. for a retail shop in a vacant ground floor space. put in walls, bath, electrical, lights, hvac. | $120,000 |
| Apr 12, 2007 | Completed final sign-off Sep 2009 | 55 04th St | Graycor Constructio Company Inc | 1st and 2nd level hotel lobby to be renovated including offices, mtg rooms, public space, bar, restrooms, porte coachere and 4th street entry, and 4th street deli. kitchen exhaust duct work only.Details
1st and 2nd level hotel lobby to be renovated including offices, mtg rooms, public space, bar, restrooms, porte coachere and 4th street entry, and 4th street deli. kitchen exhaust duct work only. | $2,500,000 |
| Apr 10, 2007 | Expired or cancelled expired Sep 2010 | 51 Yerba Buena Ln | Sierra Electric Co | replace recently installed simplex devices with new siemens devices to match new marriott system. 4 addressable pull station, single action, 1 addressable smk detecto, 3 addressable duct smoke detector housing with control relay, 11 speaker/strobe, white synchronized for the coffee bean, craft art,Details
replace recently installed simplex devices with new siemens devices to match new marriott system. 4 addressable pull station, single action, 1 addressable smk detecto, 3 addressable duct smoke detector housing with control relay, 11 speaker/strobe, white synchronized for the coffee bean, craft art, | $12,000 |
| Feb 6, 2007 | Completed final sign-off Sep 2008 | 13 Yerba Buena Ln | tenant improvement for new restaurant (amber india) on ground floor.Details
tenant improvement for new restaurant (amber india) on ground floor. | $900,000 |