Hilbers Inc.
- Based in
- Yuba City
- On San Francisco permits
- Sep 2001 to Jun 2025
- Last 24 months
- 1 permit filed
48 permits since 2000: 33 completed, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2025 | Completed final sign-off Sep 2025 | 2453 Fillmore St | removal and replacement and floor finishes and base trim. remove and replacement of selected millwork cabinetry and equipment in kitchen/prep area. new paint to match existing in front of house and restroom.Details
removal and replacement and floor finishes and base trim. remove and replacement of selected millwork cabinetry and equipment in kitchen/prep area. new paint to match existing in front of house and restroom. | $350,000 |
| Dec 20, 2017 | Completed final sign-off Nov 2018 | 345 Spear St | on 1st floor- replacement of damage ceiling tiles, broken floor tiles and locker vanity tops, restroom partition screen. remove steam rm and equipDetails
on 1st floor- replacement of damage ceiling tiles, broken floor tiles and locker vanity tops, restroom partition screen. remove steam rm and equip | $100,000 |
| Sep 14, 2017 | Completed final sign-off Apr 2018 | 2324 Chestnut St | g/f: removal/demo of (e) non-bearing interior walls to code; to open up work space.Details
g/f: removal/demo of (e) non-bearing interior walls to code; to open up work space. | $7,500 |
| Sep 14, 2017 | Completed final sign-off Feb 2018 | 1725 Union St | g/f: removal/demo of (e) non-bearing interior walls to code; to open up work space.Details
g/f: removal/demo of (e) non-bearing interior walls to code; to open up work space. | $8,500 |
| Jul 26, 2017 | Never finaled issued Sep 2017, no final | 2800 Leavenworth St | revision to 201705116355, revise restrooms, related mep itemsDetails
revision to 201705116355, revise restrooms, related mep items | |
| Jul 7, 2017 | Never finaled issued Jul 2017, no final | 300 Main St | install 2 double faced electrical signs, same size, over north and east entrances.Details
install 2 double faced electrical signs, same size, over north and east entrances. | $8,000 |
| May 11, 2017 | Completed final sign-off Jan 2018 | 2800 Leavenworth St | tenant fit out for new tenant on 1st floor - krispy kreme. no exterior changes. ** maher: n/a **Details
tenant fit out for new tenant on 1st floor - krispy kreme. no exterior changes. ** maher: n/a ** | $1,000,000 |
| Dec 2, 2016 | Completed final sign-off Aug 2017 | 300 Main St | grnd flr: demo only, demo & core drilling of existing slab for future tenant under pa 201609016605 (application under review).Details
grnd flr: demo only, demo & core drilling of existing slab for future tenant under pa 201609016605 (application under review). | $40,000 |
| Sep 20, 2016 | Never finaled issued Sep 2016, no final | 773 Market St | anchorage of fixed and/ord mobile shelving units in peet's coffee storage room. no construction or other work maher naDetails
anchorage of fixed and/ord mobile shelving units in peet's coffee storage room. no construction or other work maher na | $5,000 |
| Sep 1, 2016 | Completed final sign-off Sep 2018 | 300 Main St | (n) grocery store 9,433 sq ft on street level retail & serviceDetails
(n) grocery store 9,433 sq ft on street level retail & service | $2,250,000 |
| Apr 26, 2016 | Completed final sign-off Sep 2016 | 644 Broadway | revision to pa #201510028663 including revsion to wall type, ada counters & addition of walls in lieu of guardrails.Details
revision to pa #201510028663 including revsion to wall type, ada counters & addition of walls in lieu of guardrails. | |
| Dec 22, 2015 | Completed final sign-off Oct 2016 | 773 Market St | interior tenant improvement for new tenant (peet's coffee) with new structural mezzanine (275 sf) & interior layout & finishes, new accessible restrooms. n/a maher ordinanceDetails
interior tenant improvement for new tenant (peet's coffee) with new structural mezzanine (275 sf) & interior layout & finishes, new accessible restrooms. n/a maher ordinance | $400,000 |
| Nov 23, 2015 | Completed final sign-off Sep 2016 | 644 Broadway | electrical work for t.i. theater application #201510028663. basementDetails
electrical work for t.i. theater application #201510028663. basement | |
| Oct 2, 2015 | Completed final sign-off Sep 2016 | 644 Broadway | basement theater, ti- including new mecahnical platform, stairs, ramp, partitions, ceiling and associated mechanical and plumbing systemDetails
basement theater, ti- including new mecahnical platform, stairs, ramp, partitions, ceiling and associated mechanical and plumbing system | $764,000 |
| Feb 11, 2015 | Never finaled issued Mar 2015, no final | 3251 20th Av | space #158: revision to 201409166427; removed stained wood outdoor dining patio fence, replace with fiberglass planters. revise main door and adobe concrete landing ramp with handrails, extend counter to back service area.Details
space #158: revision to 201409166427; removed stained wood outdoor dining patio fence, replace with fiberglass planters. revise main door and adobe concrete landing ramp with handrails, extend counter to back service area. | $27,000 |
| Dec 2, 2014 | Completed final sign-off Jan 2015 | 100 California St | basement- remove existing ceiling and replace with new t bar. n/a ordinance #155-13Details
basement- remove existing ceiling and replace with new t bar. n/a ordinance #155-13 | $40,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 2675 Geary Bl | reviison to approved app#201410038071 not issued yet. work includes minor arch. changes and new m.e.p. installation. n/a for the maher ordinance.Details
reviison to approved app#201410038071 not issued yet. work includes minor arch. changes and new m.e.p. installation. n/a for the maher ordinance. | $125,000 |
| Oct 3, 2014 | Completed final sign-off Jan 2015 | 2675 Geary Bl | revision to 201406188750. architectural revisions in advance of mep work under separate permit. maher not req 155-13. sprinklers later under separate permit.Details
revision to 201406188750. architectural revisions in advance of mep work under separate permit. maher not req 155-13. sprinklers later under separate permit. | $150,000 |
| Sep 30, 2014 | Never finaled issued Oct 2014, no final | 100 California St | revision to appl #2014.0415.3303 - added ef-4 & sf-1 & revose ef-3, some duct work change. n/a maher ordinanceDetails
revision to appl #2014.0415.3303 - added ef-4 & sf-1 & revose ef-3, some duct work change. n/a maher ordinance | $5,000 |
| Sep 16, 2014 | Completed final sign-off Dec 2015 | 3251 20th Av | new 1900 s.f. burger restaurant with new kitchen, dining, restroom, with porposed patio modification. change of use from m to a2 including mech and elecDetails
new 1900 s.f. burger restaurant with new kitchen, dining, restroom, with porposed patio modification. change of use from m to a2 including mech and elec | $137,000 |
| Jun 18, 2014 | Completed final sign-off Jan 2015 | 2675 Geary Bl | t.i. for (n) bakery cafe, work includes (n) fixtures, finishes, mep, equipment, mill work, (n) bathrooms, no exterior work, fire protection under separate permit. maher n/a change of use from 'm' to 'a2' occupancyDetails
t.i. for (n) bakery cafe, work includes (n) fixtures, finishes, mep, equipment, mill work, (n) bathrooms, no exterior work, fire protection under separate permit. maher n/a change of use from 'm' to 'a2' occupancy | $375,000 |
| Apr 15, 2014 | Completed final sign-off Jan 2015 | 100 California St | interior remodel of portion of basemt,main & 2/f in an(e)15 story bldg. basemt:conversion of 166sf(e)office to fitness & remodel of 3266 sq ft (e)fitness space.includes hvac upgrade/lighting replacement/finishes. main floor: replace flooring. 2nd floor:add office rm/new ceiling/lighting/Details
interior remodel of portion of basemt,main & 2/f in an(e)15 story bldg. basemt:conversion of 166sf(e)office to fitness & remodel of 3266 sq ft (e)fitness space.includes hvac upgrade/lighting replacement/finishes. main floor: replace flooring. 2nd floor:add office rm/new ceiling/lighting/ | $571,000 |
| Apr 9, 2014 | Completed final sign-off Jul 2014 | 665 Market St | revision to app#201401287270. change of duct type for kitchen exhaust duct only.n/a for the maher ordinance #155-13Details
revision to app#201401287270. change of duct type for kitchen exhaust duct only.n/a for the maher ordinance #155-13 | |
| Jan 28, 2014 | Completed final sign-off Jul 2014 | 665 Market St | t.i. for new restaurant, new kitchen, adding 2 new restrooms, partitions stair case, electrical, plumbing & mechanical. sprinkler & fire alarm under separate permits. no change to exterior. compliance with ord #155-13 not required.Details
t.i. for new restaurant, new kitchen, adding 2 new restrooms, partitions stair case, electrical, plumbing & mechanical. sprinkler & fire alarm under separate permits. no change to exterior. compliance with ord #155-13 not required. | $500,000 |
| Dec 11, 2013 | Completed final sign-off Aug 2014 | 626 Potrero Av | underground fire sprinkler permit to installed the new 4 fire service with backflow preventer off of 12" main on 18th st.Details
underground fire sprinkler permit to installed the new 4 fire service with backflow preventer off of 12" main on 18th st. | $10,000 |
| Aug 16, 2013 | Never finaled issued Aug 2013, no final | 555 California St | work limited to removal of existing finishes in area at concourse level of spa, wet sauna, dry sauna and equipment room. work is for preparation of new water roofing nand new finishes under pa 201308053527 currently under review.Details
work limited to removal of existing finishes in area at concourse level of spa, wet sauna, dry sauna and equipment room. work is for preparation of new water roofing nand new finishes under pa 201308053527 currently under review. | $3,500 |
| Aug 5, 2013 | Never finaled issued Dec 2013, no final | 555 California St | working at ground floor. rebuild men's spa, sauna & equipment room. patch leaking drains, reset toilets & reseal fl penetrations in men's & women's shower & lavatory & spa, sauna & equipment rm. remove & replace grout in men's & women's wet area w/ laticrete spectralock pro premium grout.Details
working at ground floor. rebuild men's spa, sauna & equipment room. patch leaking drains, reset toilets & reseal fl penetrations in men's & women's shower & lavatory & spa, sauna & equipment rm. remove & replace grout in men's & women's wet area w/ laticrete spectralock pro premium grout. | $350,000 |
| Sep 11, 2012 | Completed final sign-off Aug 2014 | 2535 18th St | oshpd3 project - new interior improvements for 25 station dialysis clinic with support space. this project will require oshpd3 approval .Details
oshpd3 project - new interior improvements for 25 station dialysis clinic with support space. this project will require oshpd3 approval . | $950,000 |
| Aug 15, 2012 | Completed final sign-off Aug 2014 | 2535 18th St | shell&core improv for future dialysis clinic. landscape on & off site, remove(e)fence & replace w/ new wrought iron fence. repave parking lots. refer blk&lot 4025/002,013,014 -2012-08-15-7378.Details
shell&core improv for future dialysis clinic. landscape on & off site, remove(e)fence & replace w/ new wrought iron fence. repave parking lots. refer blk&lot 4025/002,013,014 -2012-08-15-7378. | |
| Aug 15, 2012 | Completed final sign-off Aug 2014 | 626 Potrero Av | shell&core improv for future dialysis clinic.landscape,remove(e)fence&replc w/ new wrought iron fence.replace parking lots, demo interior. add elevator tower. replace doors&windows.reroof, add roof screen. new hvac units. (blk&lot 4025/001(2012-08-15-7382) shall be referenced to this permit.)Details
shell&core improv for future dialysis clinic.landscape,remove(e)fence&replc w/ new wrought iron fence.replace parking lots, demo interior. add elevator tower. replace doors&windows.reroof, add roof screen. new hvac units. (blk&lot 4025/001(2012-08-15-7382) shall be referenced to this permit.) | $750,000 |
| Oct 21, 2010 | Completed final sign-off Dec 2010 | 100 California St | 24 hr fitness/ add employee break room in existing space on 2nd floorDetails
24 hr fitness/ add employee break room in existing space on 2nd floor | $20,000 |
| Sep 15, 2010 | Never finaled issued Oct 2010, no final | 61 New Montgomery St | demolition of extg ceiling and repair to match extg construction of new steel support beam for new fan. no disability access requirements.Details
demolition of extg ceiling and repair to match extg construction of new steel support beam for new fan. no disability access requirements. | $10,000 |
| Aug 9, 2010 | Expired or cancelled expired Apr 2012 | 1645 Bryant St | to obtain final inspection for work approved under pa#9914730. all work is complete.Details
to obtain final inspection for work approved under pa#9914730. all work is complete. | |
| Aug 9, 2010 | Expired or cancelled expired Apr 2012 | 1645 Bryant St | to obtain final inspection for work approved under pa#200707197225. all work is complete.Details
to obtain final inspection for work approved under pa#200707197225. all work is complete. | |
| Aug 9, 2010 | Expired or cancelled expired Apr 2012 | 1645 Bryant St | to obtain final inspection for work approved under pa#200502034699. all work is complete.Details
to obtain final inspection for work approved under pa#200502034699. all work is complete. | |
| Aug 9, 2010 | Expired or cancelled expired Apr 2012 | 1645 Bryant St | to obtain final inspection for work approved under pa#9703448. all work is complete.Details
to obtain final inspection for work approved under pa#9703448. all work is complete. | |
| Apr 22, 2009 | Completed final sign-off Sep 2009 | 2324 Chestnut St | remove & replace light fixtures, demo old yoga studio, paint, flooring, to comply w/ nov #200672993. install 42" high metal picket railing.Details
remove & replace light fixtures, demo old yoga studio, paint, flooring, to comply w/ nov #200672993. install 42" high metal picket railing. | $75,000 |
| Feb 9, 2009 | Completed final sign-off Jun 2009 | 609 Market St | interior remodel for installation of new beverage equipment with low walls (casework) in the customer and service area. new handsinkDetails
interior remodel for installation of new beverage equipment with low walls (casework) in the customer and service area. new handsink | $15,000 |
| Nov 10, 2008 | Completed final sign-off Jun 2009 | 350 Bay St | remove and rplace ceramic tile at men's and women's showers only at 2nd floorDetails
remove and rplace ceramic tile at men's and women's showers only at 2nd floor | $75,000 |
| Sep 29, 2008 | Completed final sign-off Jun 2009 | 1850 Ocean Av | remove (e) tile & underlayment & replacing with new tile & under layment in steam room on 1st floor. as a;;pwed imder sec 1134b.2.1 ex #4 2007 cbc.Details
remove (e) tile & underlayment & replacing with new tile & under layment in steam room on 1st floor. as a;;pwed imder sec 1134b.2.1 ex #4 2007 cbc. | $55,000 |
| Apr 3, 2006 | Never finaled issued Apr 2006, no final | 1200 Van Ness Av | repair esising plumbing in mens and womans shwer areas, replace damage wall & floor tiles, instll new shower partitions & install non disabled access shower stalls in the mmens/womaens showers.Details
repair esising plumbing in mens and womans shwer areas, replace damage wall & floor tiles, instll new shower partitions & install non disabled access shower stalls in the mmens/womaens showers. | $74,250 |
| Jul 15, 2005 | Completed final sign-off Sep 2005 | 45 Montgomery St | original t.i.under appl#200405143992.install (n)fire alarm panel,equipment & devices for 24 hr.fitneDetails
original t.i.under appl#200405143992.install (n)fire alarm panel,equipment & devices for 24 hr.fitne | $30,000 |
| Feb 3, 2005 | Expired or cancelled expired Mar 2007 | 1645 Bryant St | remove pool deck. replace floor drain per health inspectors request. repoor concrete deck. (toppingDetails
remove pool deck. replace floor drain per health inspectors request. repoor concrete deck. (topping | $100,000 |
| Nov 18, 2003 | Completed final sign-off Mar 2004 | 685 Beach St | revise: 200307099126 - address forjob siteto 655 beach street aka 2750 hyde streetDetails
revise: 200307099126 - address forjob siteto 655 beach street aka 2750 hyde street | |
| Oct 15, 2003 | Completed final sign-off Nov 2003 | 855 Harrison St | interior demo of existing bldg; non structrual interior demo onlyDetails
interior demo of existing bldg; non structrual interior demo only | $15,000 |
| Aug 21, 2003 | Completed final sign-off Mar 2004 | 855 Harrison St | interior remodel incl new fixtures, floor & wall covering, misc doors & walls & minor elec/lighting,Details
interior remodel incl new fixtures, floor & wall covering, misc doors & walls & minor elec/lighting, | $425,000 |
| Apr 12, 2002 | Completed final sign-off Apr 2004 | 685 Beach St | for record only to abate das nov200121548 ada&t-24 access. corr work under 200307099126.Details
for record only to abate das nov200121548 ada&t-24 access. corr work under 200307099126. | $1,700 |
| Sep 5, 2001 | Completed final sign-off Jan 2002 | 815 Van Ness Av | modify restrooms for handicapp accessibilityDetails
modify restrooms for handicapp accessibility | $55,000 |