Block 0292, lot 001
111 Sutter St
- City’s use
- Commercial Office
- Built
- 1926
- Stories
- 24
- Building
- 286,182 sq ft
- Lot
- 16,000 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2025 | In progress issued Jan 2025 | 111 Sutter St | Rapid Fire Safety&Security Llc Dba Pafa | 9/f: fire alarm ti - adding (1) power supply, (4) smoke detectors, (2) speakers, (32) speaker-strobes and (3) relay modules to existing notifier nfs2-3030 fire alarm system. ref permit 202409130767 and 202411145009 (mech)Details
9/f: fire alarm ti - adding (1) power supply, (4) smoke detectors, (2) speakers, (32) speaker-strobes and (3) relay modules to existing notifier nfs2-3030 fire alarm system. ref permit 202409130767 and 202411145009 (mech) | $14,780 |
| Nov 14, 2024 | Completed final sign-off Apr 2025 | 111 Sutter St | Gci, Inc | 9th fl deferred mechanical & electrical for pa # 2024-0913-0767Details
9th fl deferred mechanical & electrical for pa # 2024-0913-0767 | $176,000 |
| Oct 17, 2024 | Completed final sign-off Mar 2025 | 111 Sutter St | Pioneer Fire Inc. | 9/f: relocate (57) and add (3) pendents. gc ti# 202409130767Details
9/f: relocate (57) and add (3) pendents. gc ti# 202409130767 | $15,000 |
| Sep 13, 2024 | Completed final sign-off Apr 2025 | 111 Sutter St | Gci, Inc | interior tenant improvement; selective demolition and construction of non-load bearing partitions, new office doors, ceilings, lighting, and new millwork and finishes. mep and fire/life safety under separate permit.Details
interior tenant improvement; selective demolition and construction of non-load bearing partitions, new office doors, ceilings, lighting, and new millwork and finishes. mep and fire/life safety under separate permit. | $950,000 |
| Jul 12, 2023 | Never finaled issued Jul 2023, no final | 111 Sutter St | 10/f: t.i. including new elevator lobby doors to replace existing.Details
10/f: t.i. including new elevator lobby doors to replace existing. | $4,825 | |
| Nov 15, 2022 | Completed final sign-off May 2023 | 111 Sutter St | Pyro-Comm Systems, Inc. | fire alarm ti. 5 ceiling strobes, 14 ceiling speaker/strobes, 2 duct detectors and 2 relay modules to be added to provide proper coverage ref 2022-0804-9891.Details
fire alarm ti. 5 ceiling strobes, 14 ceiling speaker/strobes, 2 duct detectors and 2 relay modules to be added to provide proper coverage ref 2022-0804-9891. | $8,000 |
| Nov 9, 2022 | Completed final sign-off Jun 2023 | 111 Sutter St | Peacock Construction | 4th fl: mech and electrical for ti. new heat pumps, duct work, exhaust grills. no new fine dampers and fds. new power and signal devices. red pa#202208049891.Details
4th fl: mech and electrical for ti. new heat pumps, duct work, exhaust grills. no new fine dampers and fds. new power and signal devices. red pa#202208049891. | $75,000 |
| Oct 7, 2022 | Completed final sign-off Oct 2022 | 111 Sutter St | Golden Gate Fire Protection Inc | 4/f: fire sprinklers, relocate 40 pendents, 37 uprights, 4 concealed pendents. ref t.i. pa 202208049891.Details
4/f: fire sprinklers, relocate 40 pendents, 37 uprights, 4 concealed pendents. ref t.i. pa 202208049891. | $42,525 |
| Aug 4, 2022 | Completed final sign-off Jun 2023 | 111 Sutter St | Peacock Construction | 4/f: demo/construction of nonload bearing partitions, new office doors, ceiling lighting & new millwork/finishes & restroom upgradescDetails
4/f: demo/construction of nonload bearing partitions, new office doors, ceiling lighting & new millwork/finishes & restroom upgradesc | $800,000 |
| Jun 13, 2022 | Never finaled issued Jun 2022, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | 10th fl: fire alarm 2-way. voluntary addition of 1 call station and 1 2-way sign to be added in elevator lobby. 2-way backbone pa# 202006128638.Details
10th fl: fire alarm 2-way. voluntary addition of 1 call station and 1 2-way sign to be added in elevator lobby. 2-way backbone pa# 202006128638. | $1,000 |
| Mar 30, 2022 | Completed final sign-off Apr 2022 | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | 10th fl: add 2 & relocate 8 fire sprinklers per t.i.. ref pa# 202201246490Details
10th fl: add 2 & relocate 8 fire sprinklers per t.i.. ref pa# 202201246490 | $16,900 |
| Jan 24, 2022 | Completed final sign-off Aug 2022 | 111 Sutter St | Gci, Inc | 10/f: non structural demo a construction of non structural partitions, doors, sidelights, ceilings, power , finishes a millwork.Details
10/f: non structural demo a construction of non structural partitions, doors, sidelights, ceilings, power , finishes a millwork. | $591,132 |
| Nov 17, 2021 | Completed final sign-off Nov 2022 | 111 Sutter St | Peacock Construction | electrical - power, lighting & signal title 24Details
electrical - power, lighting & signal title 24 | |
| Oct 26, 2021 | Never finaled issued Oct 2021, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | 7/f: fire alarm addition to (e) system: 2 new ceiling speaker strobes and 1 new call station to provide proper coverage for area of work. ref pa 202006128638.Details
7/f: fire alarm addition to (e) system: 2 new ceiling speaker strobes and 1 new call station to provide proper coverage for area of work. ref pa 202006128638. | $2,000 |
| Oct 20, 2021 | Completed final sign-off Jul 2022 | 111 Sutter St | Peacock Construction | 7th floor:lighting and power. ref app#202108166479Details
7th floor:lighting and power. ref app#202108166479 | |
| Oct 5, 2021 | Completed final sign-off Nov 2021 | 111 Sutter St | Golden Gate Fire Protection Inc | fire sprinkler's relocate 2 pendant sprinklers and add 1 upright on the 7th fl. t.i. 2021-0816-6479Details
fire sprinkler's relocate 2 pendant sprinklers and add 1 upright on the 7th fl. t.i. 2021-0816-6479 | $1,000 |
| Aug 16, 2021 | Completed final sign-off Sep 2022 | 111 Sutter St | Peacock Construction | new non structural partitions, 2 new offices, 3 new fail safe card reads and mothers room modificationsDetails
new non structural partitions, 2 new offices, 3 new fail safe card reads and mothers room modifications | $120,000 |
| Jul 21, 2021 | Completed final sign-off Nov 2022 | 111 Sutter St | Peacock Construction | floors 5/8/9: t.i. resrooms: removal of finsihes, light fixtures & restrooms, fixtures & accessories. maher n/a.Details
floors 5/8/9: t.i. resrooms: removal of finsihes, light fixtures & restrooms, fixtures & accessories. maher n/a. | $550,000 |
| May 11, 2021 | Completed final sign-off Aug 2021 | 111 Sutter St | Pribuss Engineering Inc | provide new piping to refeed sprinklers in existing storage space on 1st floor. total sprinklers in this project: 04.Details
provide new piping to refeed sprinklers in existing storage space on 1st floor. total sprinklers in this project: 04. | |
| Mar 9, 2021 | Completed final sign-off Sep 2021 | 111 Sutter St | Emcor Services/Mesa Energy Systems Inc | replace high + low domestic booster pumps located in a subbasement. replace low + high gravity fed systems with 2 packaged skid pressure booster system. electrical - reuse & extend conduit & feeder to panelboard.Details
replace high + low domestic booster pumps located in a subbasement. replace low + high gravity fed systems with 2 packaged skid pressure booster system. electrical - reuse & extend conduit & feeder to panelboard. | $350,000 |
| Oct 9, 2020 | Never finaled issued Dec 2020, no final | 111 Sutter St | Rainbow Waterproofing & Restor | re-roofing scope associated with pa 201909252682 filed at the request of dbi.Details
re-roofing scope associated with pa 201909252682 filed at the request of dbi. | |
| Sep 28, 2020 | Completed final sign-off May 2021 | 111 Sutter St | Pioneer Fire Inc. | suite 110: installation of new fire sprinkler system. (nfpa 13; 35 heads & new pipe added to existing system)Details
suite 110: installation of new fire sprinkler system. (nfpa 13; 35 heads & new pipe added to existing system) | $20,000 |
| Jun 12, 2020 | Completed final sign-off Dec 2020 | 111 Sutter St | Pyro-Comm Systems, Inc. | install (n) 2-way emergency communication system infrastructure backbone will be added. all new eleator call stations will be added under future t.i. maher n/a.Details
install (n) 2-way emergency communication system infrastructure backbone will be added. all new eleator call stations will be added under future t.i. maher n/a. | $4,000 |
| Feb 14, 2020 | Completed final sign-off Aug 2020 | 111 Sutter St | Pyro-Comm Systems, Inc. | suite 100 - fire alarm 3 wall speaker strobes, 1 ceiling speaker strobe, 1 ceiling strobe to be added to existing facu.Details
suite 100 - fire alarm 3 wall speaker strobes, 1 ceiling speaker strobe, 1 ceiling strobe to be added to existing facu. | $3,000 |
| Feb 14, 2020 | Completed final sign-off Apr 2020 | 111 Sutter St | Pyro-Comm Systems, Inc. | fire alarm on 20th & 21st fl: 1 ceiling strobe will be added on 20th floor to existing facu. relocate 1 speaker on 21.Details
fire alarm on 20th & 21st fl: 1 ceiling strobe will be added on 20th floor to existing facu. relocate 1 speaker on 21. | $1,000 |
| Feb 6, 2020 | Completed final sign-off Jul 2020 | 111 Sutter St | Peacock Construction | 1st fl - t-24 mechanical & electrical for work under pa 2019-1206-8887Details
1st fl - t-24 mechanical & electrical for work under pa 2019-1206-8887 | |
| Feb 6, 2020 | Completed final sign-off Mar 2021 | 111 Sutter St | Gci, Inc | 20th and 21st floors: title 24 electrical n/a maherDetails
20th and 21st floors: title 24 electrical n/a maher | $38,000 |
| Jan 17, 2020 | Completed final sign-off Apr 2020 | 111 Sutter St | Golden Gate Fire Protection Inc | suite 100: ref pa# 201912069887; fire sprinkler, relocate 22 pendent sprinklers and 1 concealed pendent sprinnkler in suite #100 n/a maherDetails
suite 100: ref pa# 201912069887; fire sprinkler, relocate 22 pendent sprinklers and 1 concealed pendent sprinnkler in suite #100 n/a maher | $11,500 |
| Jan 17, 2020 | Completed final sign-off Mar 2021 | 111 Sutter St | Gci, Inc | ref 201910174867, title 24 electricalDetails
ref 201910174867, title 24 electrical | $50,000 |
| Dec 23, 2019 | Completed final sign-off Oct 2020 | 111 Sutter St | Gci, Inc | 20th and 21st floors: revision to app#201911268169. t.i. including new non-structural partitions. finishes to match extg. mep, fire life safety and sprinkler under separate permit.Details
20th and 21st floors: revision to app#201911268169. t.i. including new non-structural partitions. finishes to match extg. mep, fire life safety and sprinkler under separate permit. | $165,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2020 | 111 Sutter St | Peacock Construction | interior ti: non-structural interior partitions, new finishes & lighting. mep, sprinkler, life safety under separate permit. maher not reqDetails
interior ti: non-structural interior partitions, new finishes & lighting. mep, sprinkler, life safety under separate permit. maher not req | $320,000 |
| Dec 6, 2019 | Never finaled issued Dec 2019, no final | 111 Sutter St | Golden Gate Fire Protection Inc | demo. fire sprinklers. relocate 45 upright headsDetails
demo. fire sprinklers. relocate 45 upright heads | $22,500 |
| Nov 26, 2019 | Completed final sign-off Mar 2021 | 111 Sutter St | Gci, Inc | 20th and 21st fl tenant improvement including new non structural partitoins. finishes to matche e mep, fire life safety and sprinkler under sep permitDetails
20th and 21st fl tenant improvement including new non structural partitoins. finishes to matche e mep, fire life safety and sprinkler under sep permit | $165,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2020 | 111 Sutter St | Pyro-Comm Systems, Inc. | 18th fire alarm 1 ceiling speaker/strobe, 2 duct detectors to be added to (e) facu n/a maherDetails
18th fire alarm 1 ceiling speaker/strobe, 2 duct detectors to be added to (e) facu n/a maher | $2,000 |
| Oct 29, 2019 | Completed final sign-off Nov 2019 | 111 Sutter St | Golden Gate Fire Protection Inc | 18th floor: as built to app#2019091011236. delete 2 concealed pendent sprinklers in board room (room on the right side of the contract area).Details
18th floor: as built to app#2019091011236. delete 2 concealed pendent sprinklers in board room (room on the right side of the contract area). | $1,000 |
| Oct 17, 2019 | Completed final sign-off Mar 2021 | 111 Sutter St | Gci, Inc | 19th flr. removal of non-structural partitions per ab-017. no ceiling work/demo under this permit until sprinkler plans are submitted.Details
19th flr. removal of non-structural partitions per ab-017. no ceiling work/demo under this permit until sprinkler plans are submitted. | $150,000 |
| Oct 17, 2019 | Completed final sign-off Jul 2022 | 111 Sutter St | Gci, Inc | 6/f, 12/f,13/f: title 24 compliance, mech & electrical improvements. ref t.i. pa201908057897, 201908057898, 201908057899. maher n/a.Details
6/f, 12/f,13/f: title 24 compliance, mech & electrical improvements. ref t.i. pa201908057897, 201908057898, 201908057899. maher n/a. | $1,200,000 |
| Oct 16, 2019 | Completed final sign-off Dec 2019 | 111 Sutter St | Pyro-Comm Systems, Inc. | ste 1300 - fire alarm 18 ceiling speaker strobes, 1 speaker wall strobe, 4 ceiling strobes to be added to existing facu. ref pa 2019-0805-7899Details
ste 1300 - fire alarm 18 ceiling speaker strobes, 1 speaker wall strobe, 4 ceiling strobes to be added to existing facu. ref pa 2019-0805-7899 | $9,500 |
| Oct 10, 2019 | Completed final sign-off Dec 2019 | 111 Sutter St | Pyro-Comm Systems, Inc. | 12th fl, ste 1200 - 20 ceiling speaker strobes, 2 ceiling strobes to be added to existing facu. ref pa 2019-0805-7898Details
12th fl, ste 1200 - 20 ceiling speaker strobes, 2 ceiling strobes to be added to existing facu. ref pa 2019-0805-7898 | $11,000 |
| Oct 1, 2019 | Completed final sign-off Dec 2019 | 111 Sutter St | Bcci Construction Company | 18 fl. mechaninical & electrical permit to suppport architectural pemit, install new wshps, relocate (e) wshps, demo (e) distribution to remodeled rooms. ref app#201908068008Details
18 fl. mechaninical & electrical permit to suppport architectural pemit, install new wshps, relocate (e) wshps, demo (e) distribution to remodeled rooms. ref app#201908068008 | $75,000 |
| Sep 25, 2019 | Never finaled issued Dec 2020, no final | 111 Sutter St | Rainbow Waterproofing & Restor | historic facade repair & maintenance req'd to maintain/restore stable & water tight conditions of bldg enclosure, w/ intention of preserving the historic fabric of the bldg facades.Details
historic facade repair & maintenance req'd to maintain/restore stable & water tight conditions of bldg enclosure, w/ intention of preserving the historic fabric of the bldg facades. | $1,500,000 |
| Sep 13, 2019 | Never finaled issued Sep 2019, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | 6th floor-turo suite 600: 10 ceiling speaker strobes to be added to extg facu. n/a for maher. ref app#201908057897Details
6th floor-turo suite 600: 10 ceiling speaker strobes to be added to extg facu. n/a for maher. ref app#201908057897 | $6,000 |
| Sep 10, 2019 | Completed final sign-off Feb 2020 | 111 Sutter St | Golden Gate Fire Protection Inc | 8fire sprinklers relocate 8 pendent uprights, 1 upright sprinkler 18th flr ref 201908068008Details
8fire sprinklers relocate 8 pendent uprights, 1 upright sprinkler 18th flr ref 201908068008 | $4,500 |
| Sep 10, 2019 | Completed final sign-off Jul 2022 | 111 Sutter St | Gci, Inc | ste 1200 - revision to pa 2019-0805-7898 convert phone room to mother's room. adding plumbing, millwork, new hardware and finishesDetails
ste 1200 - revision to pa 2019-0805-7898 convert phone room to mother's room. adding plumbing, millwork, new hardware and finishes | $30,000 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 111 Sutter St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 9 pendents, 4 uprights on the 6th fl. relocate 37 pendents and 6 uprights on the 12th fl. relocate 40 pendents and 5 uprights on the 13th fl ref 201908057897 for the 6th fl 201908057898 for the 12 th fl, 201908057899 for the 13th flDetails
fire sprinklers, relocate 9 pendents, 4 uprights on the 6th fl. relocate 37 pendents and 6 uprights on the 12th fl. relocate 40 pendents and 5 uprights on the 13th fl ref 201908057897 for the 6th fl 201908057898 for the 12 th fl, 201908057899 for the 13th fl | $51,500 |
| Aug 6, 2019 | Completed final sign-off Dec 2019 | 111 Sutter St | Bcci Construction Company | 18th flr. demo of (e) partitions and doors. new partitions and doors for offices and conference roomsDetails
18th flr. demo of (e) partitions and doors. new partitions and doors for offices and conference rooms | $485,000 |
| Aug 5, 2019 | Completed final sign-off Jul 2022 | 111 Sutter St | Gci, Inc | #1200- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep/fire/life safety under sep permitDetails
#1200- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep/fire/life safety under sep permit | $600,000 |
| Aug 5, 2019 | Completed final sign-off Jul 2022 | 111 Sutter St | Gci, Inc | #600- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep/fire/life safety under sep permitDetails
#600- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep/fire/life safety under sep permit | $400,000 |
| Aug 5, 2019 | Completed final sign-off Jul 2022 | 111 Sutter St | Gci, Inc | #1300- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep/fire/life safety under sep permitDetails
#1300- ti- demo int partitions, doors, finishes, ceiling, lighting & mechanical. construction of new wall and glazing configuration, ceiling & lighting, power/data work, millwork and new finishes. mep/fire/life safety under sep permit | $600,000 |
| Jun 27, 2019 | Completed final sign-off Nov 2019 | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | 7th floor: add, relocate and remove fire sprinklers per t.i.: 27 add, 95 relocate and 14 remove. n/a for maher. ref app#201904248807Details
7th floor: add, relocate and remove fire sprinklers per t.i.: 27 add, 95 relocate and 14 remove. n/a for maher. ref app#201904248807 | $35,550 |
| Jun 27, 2019 | Completed final sign-off Jul 2019 | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | 3rd floor: add, relocate and remove fire sprinklers per t.i.: 16 add, 42 relocate. n/a for maher. ref app#201904248804Details
3rd floor: add, relocate and remove fire sprinklers per t.i.: 16 add, 42 relocate. n/a for maher. ref app#201904248804 | $17,850 |
| Jun 24, 2019 | Completed final sign-off Apr 2021 | 111 Sutter St | Gci, Inc | spec suite 300 on 3rd and spec suite 700 on 7th flr electrical and title 24. ref pa's 201904248804 and 201904248807Details
spec suite 300 on 3rd and spec suite 700 on 7th flr electrical and title 24. ref pa's 201904248804 and 201904248807 | |
| Jun 24, 2019 | Completed final sign-off Sep 2019 | 111 Sutter St | Pyro-Comm Systems, Inc. | 3rd flr fire alarm t.i. 12 ceiling mount speaker strobes to be added to (e) facu. ref pa 201904248804Details
3rd flr fire alarm t.i. 12 ceiling mount speaker strobes to be added to (e) facu. ref pa 201904248804 | $6,000 |
| Jun 24, 2019 | Completed final sign-off Mar 2021 | 111 Sutter St | Pyro-Comm Systems, Inc. | 7th flr fire alarm t.i. 1 smoke detector and 27 ceiling mount speaker strobes to be added to (e) facu. ref pa 201904248807Details
7th flr fire alarm t.i. 1 smoke detector and 27 ceiling mount speaker strobes to be added to (e) facu. ref pa 201904248807 | $14,000 |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 111 Sutter St | Gci, Inc | 12/f: interior demo of (e) full-floor office space consisting of interior partitions, doors, finishes, lighting, plumbing & mechanical. maher n/a. no ceiling demo. ceiling demo under sep permit. currently vacantDetails
12/f: interior demo of (e) full-floor office space consisting of interior partitions, doors, finishes, lighting, plumbing & mechanical. maher n/a. no ceiling demo. ceiling demo under sep permit. currently vacant | $10,000 |
| Jun 17, 2019 | Completed final sign-off Apr 2021 | 111 Sutter St | Gci, Inc | suite 300 and 700- furnish and install two new water source heat pumps with ductwork, water supply and return condensate drains and thermostats. outside air fans, thermostatic valves on 20 steam radiators.Details
suite 300 and 700- furnish and install two new water source heat pumps with ductwork, water supply and return condensate drains and thermostats. outside air fans, thermostatic valves on 20 steam radiators. | |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 111 Sutter St | Gci, Inc | 13/f: interior demo of (e) full-floor office space consisting of interior partitions, doors, finishes, lighting, plumbing & mechanical. maher n/a. no ceiling demo. ceiling demo under sep permit.currently vacantDetails
13/f: interior demo of (e) full-floor office space consisting of interior partitions, doors, finishes, lighting, plumbing & mechanical. maher n/a. no ceiling demo. ceiling demo under sep permit.currently vacant | $10,000 |
| Apr 24, 2019 | Completed final sign-off Jan 2020 | 111 Sutter St | Gci, Inc | ste 700 - demo & construction of partitions & associated power data, finishes, lighting & millwork. tenant suite currently vacant. mep, fire safety & sprinklers modifications to be an seperate & defered permitsDetails
ste 700 - demo & construction of partitions & associated power data, finishes, lighting & millwork. tenant suite currently vacant. mep, fire safety & sprinklers modifications to be an seperate & defered permits | $600 |
| Apr 24, 2019 | Completed final sign-off Nov 2019 | 111 Sutter St | Gci, Inc | ste 300 - demo & construction of partitions & associated power data, finishes, lighting & millwork. tenant suite currently vacant. mep, fire safety & sprinklers modifications to be an seperate & defered permitsDetails
ste 300 - demo & construction of partitions & associated power data, finishes, lighting & millwork. tenant suite currently vacant. mep, fire safety & sprinklers modifications to be an seperate & defered permits | $350,000 |
| Oct 1, 2018 | Expired or cancelled cancelled Oct 2018 | 111 Sutter St | Phoenix Electric Co. | repair two 8 inch laterals (8 inch sewer) (8 inch storm drain), replace damaged pipes and wye fitting with new pipes and fitting. replace in kind at same location.Details
repair two 8 inch laterals (8 inch sewer) (8 inch storm drain), replace damaged pipes and wye fitting with new pipes and fitting. replace in kind at same location. | $10,000 |
| Sep 26, 2018 | Never finaled issued Sep 2018, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | fire alarm add a gsm dialer to fa system. n/a for maher.Details
fire alarm add a gsm dialer to fa system. n/a for maher. | |
| May 16, 2018 | Completed final sign-off Oct 2018 | 111 Sutter St | Richlen Construction | 9th fl: demising wall. ada toilet upgrades. no change in occupancy use or area. maher na; life safety, sprinklers under seperate permitDetails
9th fl: demising wall. ada toilet upgrades. no change in occupancy use or area. maher na; life safety, sprinklers under seperate permit | $1,640 |
| Jan 3, 2018 | Completed final sign-off Feb 2018 | 111 Sutter St | Pyro-Comm Systems, Inc. | 6th fl: fa ti: pyro comm will provide (1) remote power supply, (2) multi voltage relays, (11) ceiling mount speaker/strobes and (2) high candela ceiling mount speaker/strobes. maher naDetails
6th fl: fa ti: pyro comm will provide (1) remote power supply, (2) multi voltage relays, (11) ceiling mount speaker/strobes and (2) high candela ceiling mount speaker/strobes. maher na | $17,000 |
| Dec 20, 2017 | Completed final sign-off Apr 2018 | 111 Sutter St | Richlen Construction | 6th flr: mech - add 1 water source heat pump for interior cooling - transfer 1 fan to it room - balance (e) restroom exhaust. electrical - partial scope office tenant retrofit-lighting, power & signal, wiring, lighting & controls ref arch 201711083458 maher naDetails
6th flr: mech - add 1 water source heat pump for interior cooling - transfer 1 fan to it room - balance (e) restroom exhaust. electrical - partial scope office tenant retrofit-lighting, power & signal, wiring, lighting & controls ref arch 201711083458 maher na | $200,000 |
| Dec 8, 2017 | Completed final sign-off Jan 2018 | 111 Sutter St | Golden Gate Fire Protection Inc | 6/f #600- fire sprinkler only, relocate 23 pendents, add 3 pendents. t.i. pa#201711083458. n/a ordinance #155-13Details
6/f #600- fire sprinkler only, relocate 23 pendents, add 3 pendents. t.i. pa#201711083458. n/a ordinance #155-13 | $6,500 |
| Nov 10, 2017 | Never finaled issued Nov 2017, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | 18th floor: fa ti to an existing building. pyro comm will provide (42) new devices and repair (5) existing devices. n/a maherDetails
18th floor: fa ti to an existing building. pyro comm will provide (42) new devices and repair (5) existing devices. n/a maher | $15,000 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 111 Sutter St | Bcci Construction Company | 18th fl - electrical only. lighting, power & signal, wiring, lighting & controls. new subpanels & feeder. ref pa #201709158490. maher naDetails
18th fl - electrical only. lighting, power & signal, wiring, lighting & controls. new subpanels & feeder. ref pa #201709158490. maher na | $70,000 |
| Nov 8, 2017 | Completed final sign-off Apr 2018 | 111 Sutter St | Richlen Construction | tenant improvemen on the 6th fl of 22 story building. consist of demo of interior partitions, doors, finishes, ceiling, lighting, mech, and constructtion of new wall and glazing configuration, ceiling and lighting, power/datawork millwork and new finishes. mep elec sep permit and ls sprinklersDetails
tenant improvemen on the 6th fl of 22 story building. consist of demo of interior partitions, doors, finishes, ceiling, lighting, mech, and constructtion of new wall and glazing configuration, ceiling and lighting, power/datawork millwork and new finishes. mep elec sep permit and ls sprinklers | $977,340 |
| Oct 20, 2017 | Completed final sign-off Nov 2017 | 111 Sutter St | Golden Gate Fire Protection Inc | fire sprinkler only. 2017-1017-1465 relocate 13 pendent, relocate 17 uprights for veritas (18th fl)Details
fire sprinkler only. 2017-1017-1465 relocate 13 pendent, relocate 17 uprights for veritas (18th fl) | $7,500 |
| Oct 17, 2017 | Completed final sign-off Aug 2018 | 111 Sutter St | Bcci Construction Company | 18th floor: mechanical work including 4 new water source heat pumps. ref#201709158490. n/a for maherDetails
18th floor: mechanical work including 4 new water source heat pumps. ref#201709158490. n/a for maher | $10,000 |
| Sep 22, 2017 | Completed final sign-off Oct 2017 | 111 Sutter St | Pyro-Comm Systems, Inc. | 17/f- fire alarm t.i. add (2) duct detectors, (2) modules, (27) nac appliances connect to 9e) fire alarm system. t.i. pa#201708104455. n/a ordinance #155-13Details
17/f- fire alarm t.i. add (2) duct detectors, (2) modules, (27) nac appliances connect to 9e) fire alarm system. t.i. pa#201708104455. n/a ordinance #155-13 | $13,000 |
| Sep 18, 2017 | Never finaled issued Oct 2017, no final | 111 Sutter St | Famand Inc Dba Indoor Environmental Serv | 17/f- mechanical work for (e) pa#201708104455, supply (2) water source heat pumps with all duct & piping, complete with osa connection & t-24 t-stat, 1 exhaust fan for it room. n/a ordinance #155-13Details
17/f- mechanical work for (e) pa#201708104455, supply (2) water source heat pumps with all duct & piping, complete with osa connection & t-24 t-stat, 1 exhaust fan for it room. n/a ordinance #155-13 | $39,728 |
| Sep 15, 2017 | Completed final sign-off Sep 2017 | 111 Sutter St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 14 uprights & add 5 uprights (19 total). for redbubble on the 17th fl. ref #201708104455. maher naDetails
fire sprinkler only - relocate 14 uprights & add 5 uprights (19 total). for redbubble on the 17th fl. ref #201708104455. maher na | $4,750 |
| Sep 15, 2017 | Completed final sign-off Aug 2018 | 111 Sutter St | Bcci Construction Company | 18th fl - ti includes demo, new partitions, finishes & lighting. mep under separate permitDetails
18th fl - ti includes demo, new partitions, finishes & lighting. mep under separate permit | $650,000 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 111 Sutter St | Richlen Construction | 17/f: t24 electrical drawings: partial scope office t.i. retrifit: lighting, power and signal wiring, lighting & controls. ref t.i. 201708104455.Details
17/f: t24 electrical drawings: partial scope office t.i. retrifit: lighting, power and signal wiring, lighting & controls. ref t.i. 201708104455. | $210,000 |
| Aug 10, 2017 | Completed final sign-off Nov 2017 | 111 Sutter St | Richlen Construction | project consist of a ti on the 17th fl of a 22 story building. build out includes construction of new non-load bearing partitions, glazing, ceiling, power and data, millwork, new finishes. mep, life saty, and sprinkler system under separate permit. maher naDetails
project consist of a ti on the 17th fl of a 22 story building. build out includes construction of new non-load bearing partitions, glazing, ceiling, power and data, millwork, new finishes. mep, life saty, and sprinkler system under separate permit. maher na | $850,000 |
| Apr 10, 2017 | Completed final sign-off Jun 2017 | 111 Sutter St | Richlen Construction | 6/f: project consists of demo of existing partions, doors, electrical, plumbing, mill work, and finishes. tenant improvement, mechanical, electrical, life safety, and sprinkler modification under separate permit 3 2017-0327-2376. the floor is currently unoccupied per ab-017. maher ord 155-13 naDetails
6/f: project consists of demo of existing partions, doors, electrical, plumbing, mill work, and finishes. tenant improvement, mechanical, electrical, life safety, and sprinkler modification under separate permit 3 2017-0327-2376. the floor is currently unoccupied per ab-017. maher ord 155-13 na | $65,000 |
| Apr 10, 2017 | Completed final sign-off Jun 2017 | 111 Sutter St | Richlen Construction | project consists of a t.i. of suite 1900 &1925 on a multi-tenant floor. build out consists of new wall and glazing, extg ceiling and system, mounted fixture and devices to remain typical throughtout unless noted otherwise. n/a for maherDetails
project consists of a t.i. of suite 1900 &1925 on a multi-tenant floor. build out consists of new wall and glazing, extg ceiling and system, mounted fixture and devices to remain typical throughtout unless noted otherwise. n/a for maher | $161,000 |
| Mar 27, 2017 | Never finaled issued Mar 2017, no final | 111 Sutter St | Golden Gate Fire Protection Inc | fire sprinkler ti - convert 99 pendents to 99 uprights for future demo allowing removal of suspended ceilint on 6th floor - full floor. ti plans under separate permit.Details
fire sprinkler ti - convert 99 pendents to 99 uprights for future demo allowing removal of suspended ceilint on 6th floor - full floor. ti plans under separate permit. | $51,750 |
| Nov 16, 2016 | Never finaled issued Nov 2016, no final | 111 Sutter St | Mcclure Electric Inc | title 24 lighting only. ref pa 2016-0804-4180. maher n/aDetails
title 24 lighting only. ref pa 2016-0804-4180. maher n/a | $100 |
| Oct 21, 2016 | Never finaled issued Oct 2016, no final | 111 Sutter St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Sep 21, 2016 | Completed final sign-off Oct 2016 | 111 Sutter St | R L H Fire Protection Inc | 5th floor: fire sprinkler permit. add 6 pendent sprinklers.t.i.#201608044182 n/a for maherDetails
5th floor: fire sprinkler permit. add 6 pendent sprinklers.t.i.#201608044182 n/a for maher | $3,153 |
| Sep 21, 2016 | Never finaled issued Sep 2016, no final | 111 Sutter St | R L H Fire Protection Inc | 17th floor: fire sprinkler permit. relocate 7 add one, and delete 1 pendent sprinklers.t.i. app#201608044180 n/a for maherDetails
17th floor: fire sprinkler permit. relocate 7 add one, and delete 1 pendent sprinklers.t.i. app#201608044180 n/a for maher | $1,948 |
| Sep 15, 2016 | Never finaled issued Sep 2016, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | tenant improvement project to 17th floor. addition of 8 fire alarm appliances to connect to existing fire alarm system ref pa 2016-0804-4180Details
tenant improvement project to 17th floor. addition of 8 fire alarm appliances to connect to existing fire alarm system ref pa 2016-0804-4180 | $5,000 |
| Aug 4, 2016 | Completed final sign-off Jan 2017 | 111 Sutter St | 5th flr, suite 550: partial floor east side ti- new millwork, flooring, paint/finishes, power/communications outlets & sliding doors. no ceiling/lighting work, (e) to remain. no new partitions maher naDetails
5th flr, suite 550: partial floor east side ti- new millwork, flooring, paint/finishes, power/communications outlets & sliding doors. no ceiling/lighting work, (e) to remain. no new partitions maher na | $44,000 | |
| Aug 4, 2016 | Never finaled issued Aug 2016, no final | 111 Sutter St | Bevilacqua & Sons | 17th flr: ti- spec suite: new partitions, millwork, finishes. light fixtures & elec power & comm. maher na. separate ti permit incl mep required for future tenant.Details
17th flr: ti- spec suite: new partitions, millwork, finishes. light fixtures & elec power & comm. maher na. separate ti permit incl mep required for future tenant. | $150,000 |
| Aug 4, 2016 | Completed final sign-off Nov 2016 | 111 Sutter St | Bevilacqua & Sons | 19th flr, suite 1900 & 1925 partial floor demo on west side: demo of (e) flooring, floor finishes & partitions. (e) grid system, mtd fixture & devices to remain, typ suite to remain unoccupied until ti - permit is filed per ab-017 maher naDetails
19th flr, suite 1900 & 1925 partial floor demo on west side: demo of (e) flooring, floor finishes & partitions. (e) grid system, mtd fixture & devices to remain, typ suite to remain unoccupied until ti - permit is filed per ab-017 maher na | $21,771 |
| May 2, 2016 | Never finaled issued May 2016, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | 17th and 18th floors: remove extg fire alarm devices as part of a demo project. extg core and shell devices to remain. future t.i. under seperate permit. remove 9 smoke detectors. 30 strobes, 25 speakers. ref app#201603091640. n/a for maherDetails
17th and 18th floors: remove extg fire alarm devices as part of a demo project. extg core and shell devices to remain. future t.i. under seperate permit. remove 9 smoke detectors. 30 strobes, 25 speakers. ref app#201603091640. n/a for maher | $1,000 |
| May 2, 2016 | Completed final sign-off May 2016 | 111 Sutter St | R L H Fire Protection Inc | fire sprinkler permit remove (e) arm overs and drops to provide coverage at exposed deck. 17th floor: relocate 84 pendent sprinklers. 18th floor: relocate 71 pendent sprinklers. ref pa 2016-0309-1640. maher naDetails
fire sprinkler permit remove (e) arm overs and drops to provide coverage at exposed deck. 17th floor: relocate 84 pendent sprinklers. 18th floor: relocate 71 pendent sprinklers. ref pa 2016-0309-1640. maher na | $27,460 |
| Apr 27, 2016 | Never finaled issued Apr 2016, no final | 111 Sutter St | street spaceDetails
street space | ||
| Mar 9, 2016 | Completed final sign-off Nov 2016 | 111 Sutter St | Bevilacqua & Sons | 17th & 18th floors: full floor interior demo, include partitions, lighting and power, finishes, ceiling. no structural demo. per ab-017 maher naDetails
17th & 18th floors: full floor interior demo, include partitions, lighting and power, finishes, ceiling. no structural demo. per ab-017 maher na | $160,000 |
| Feb 16, 2016 | Never finaled issued Feb 2016, no final | 111 Sutter St | Garnett Signs Llc | (8) evacuation maps for floors 20-21Details
(8) evacuation maps for floors 20-21 | $2,800 |
| Jan 19, 2016 | Never finaled issued Jan 2016, no final | 111 Sutter St | Source Planning And Construction Inc | 16th floor structural for "movable wall" on permit 2015-1109-2076. maher naDetails
16th floor structural for "movable wall" on permit 2015-1109-2076. maher na | |
| Jan 15, 2016 | Never finaled issued Jan 2016, no final | 111 Sutter St | Gci, Inc | 5th floor #525 - lighting & power 7 signal, ref #2015-1125-3647. n/a maher ordinanceDetails
5th floor #525 - lighting & power 7 signal, ref #2015-1125-3647. n/a maher ordinance | $15,000 |
| Jan 11, 2016 | Never finaled issued Jan 2016, no final | 111 Sutter St | Source Planning And Construction Inc | 16th floor: structural for 201511092076. n/a for maherDetails
16th floor: structural for 201511092076. n/a for maher | $20,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 111 Sutter St | Gci, Inc | 20/21st flrs: provide structural support for moveable partition wall @20th flr as part of renovation. the moveable partition wall is suspended from supplemental steel below the 21st flr, ref. 201510210363; maher n/aDetails
20/21st flrs: provide structural support for moveable partition wall @20th flr as part of renovation. the moveable partition wall is suspended from supplemental steel below the 21st flr, ref. 201510210363; maher n/a | $40,000 |
| Jan 7, 2016 | Completed final sign-off May 2016 | 111 Sutter St | Gci, Inc | 20/21st flrs: lighting & power- connecting power to new or relocated light fixtures, power outlets & tenant equipment, reference 201510210363; maher n/aDetails
20/21st flrs: lighting & power- connecting power to new or relocated light fixtures, power outlets & tenant equipment, reference 201510210363; maher n/a | $500,000 |
| Jan 6, 2016 | Completed final sign-off Jan 2016 | 111 Sutter St | Pyro-Comm Systems, Inc. | new fire alarm devices added to ti in an (e) building to include: (3) speaker/strobes (1) strobe. ref pa 2015-1125-3647. maher naDetails
new fire alarm devices added to ti in an (e) building to include: (3) speaker/strobes (1) strobe. ref pa 2015-1125-3647. maher na | $1,500 |
| Dec 16, 2015 | Completed final sign-off Apr 2016 | 111 Sutter St | Pioneer Fire Inc. | relocate existing line relocate 4 pendents. maher naDetails
relocate existing line relocate 4 pendents. maher na | $4,222 |
| Dec 11, 2015 | Completed final sign-off Feb 2016 | 111 Sutter St | Pyro-Comm Systems, Inc. | 20th and 21st floors: new fire alarm appliances added to a ti in an (e) building to include: (8) speaker/strobes, (6) strobes,(4) speakers. ref pa 2015-1021-0363. maher naDetails
20th and 21st floors: new fire alarm appliances added to a ti in an (e) building to include: (8) speaker/strobes, (6) strobes,(4) speakers. ref pa 2015-1021-0363. maher na | $9,500 |
| Dec 11, 2015 | Completed final sign-off Jan 2016 | 111 Sutter St | Pyro-Comm Systems, Inc. | 16th floor: new fire alarm appliances added to a ti in an (e) building to include: (16) speaker/strobes, (2) strobes. ref pa 2015-1109-2076. maher naDetails
16th floor: new fire alarm appliances added to a ti in an (e) building to include: (16) speaker/strobes, (2) strobes. ref pa 2015-1109-2076. maher na | $6,430 |
| Dec 4, 2015 | Completed final sign-off Jan 2016 | 111 Sutter St | R L H Fire Protection Inc | fire sprinkler ti delete 4 pendent sprinklers, delete 5 upright sprinklers, add 4 upright sprinklers. add 11 pendents. ref ti 2015-1109-2076Details
fire sprinkler ti delete 4 pendent sprinklers, delete 5 upright sprinklers, add 4 upright sprinklers. add 11 pendents. ref ti 2015-1109-2076 | $17,620 |
| Dec 4, 2015 | Never finaled issued Dec 2015, no final | 111 Sutter St | Source Planning And Construction Inc | mechanical/electrical for pa 2015-1109-2076. maher naDetails
mechanical/electrical for pa 2015-1109-2076. maher na | $441,868 |
| Nov 25, 2015 | Completed final sign-off Feb 2016 | 111 Sutter St | Gci, Inc | suite 525: interior ti includes demolition and new construction, new demising wall, electrical and plumbing mep and life safety/sprinkler under separate permit. maher n/aDetails
suite 525: interior ti includes demolition and new construction, new demising wall, electrical and plumbing mep and life safety/sprinkler under separate permit. maher n/a | $133,000 |
| Nov 9, 2015 | Completed final sign-off Jul 2016 | 111 Sutter St | Source Planning And Construction Inc | 16/f -ti selective demo. build non-load bearing partitions etc: mep under separate permit (telocom room in a non-ab060 room); separate structural permit for movable partiton & fin/ceiling wall. previous demo pa 2015-1016-9896.Details
16/f -ti selective demo. build non-load bearing partitions etc: mep under separate permit (telocom room in a non-ab060 room); separate structural permit for movable partiton & fin/ceiling wall. previous demo pa 2015-1016-9896. | $79,125 |
| Oct 23, 2015 | Completed final sign-off Nov 2015 | 111 Sutter St | Pyro-Comm Systems, Inc. | 22nd floor new fire alarm devices for a t.i, in an existing bldg to include: (2) speaker/strobe. ref pa #201509237750. n/a maher ordinanceDetails
22nd floor new fire alarm devices for a t.i, in an existing bldg to include: (2) speaker/strobe. ref pa #201509237750. n/a maher ordinance | $1,000 |
| Oct 21, 2015 | Completed final sign-off May 2016 | 111 Sutter St | Gci, Inc | new non-structural partitions, moified gyp bd ceilings and soffits, and new finishes throughout. note: mep, fire srpinkler, life-safety, and evac signage on deferred permitsDetails
new non-structural partitions, moified gyp bd ceilings and soffits, and new finishes throughout. note: mep, fire srpinkler, life-safety, and evac signage on deferred permits | $2,096,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 111 Sutter St | Source Planning And Construction Inc | 16th floor - selective demo of non-load bearing partitions, millwork, light fixtures (e) ceiling grid & tile, doors, frames & side lights. ab-017. maher na. architectural and life safety deferred.Details
16th floor - selective demo of non-load bearing partitions, millwork, light fixtures (e) ceiling grid & tile, doors, frames & side lights. ab-017. maher na. architectural and life safety deferred. | $51,380 |
| Sep 23, 2015 | Completed final sign-off Nov 2015 | 111 Sutter St | Field Construction Inc. | ti includes the demo of non-structural partitions.Details
ti includes the demo of non-structural partitions. | $130,000 |
| Jul 14, 2015 | Never finaled issued Jul 2015, no final | 111 Sutter St | Source Planning And Construction Inc | suite #850- revision to pa# 2015-0522-6971 architectural drawings only, relocate lights. life safety deferred, if required.Details
suite #850- revision to pa# 2015-0522-6971 architectural drawings only, relocate lights. life safety deferred, if required. | |
| Jul 14, 2015 | Completed final sign-off Jul 2015 | 111 Sutter St | Pyro-Comm Systems, Inc. | 8th floor: new fire alarm devices added to t.i. in an extg bldg to include 4 speaker/strobes and relocate one strobe. ref app#2015-0522-6971. n/a for the maher.Details
8th floor: new fire alarm devices added to t.i. in an extg bldg to include 4 speaker/strobes and relocate one strobe. ref app#2015-0522-6971. n/a for the maher. | $3,000 |
| Jul 10, 2015 | Completed final sign-off Jul 2015 | 111 Sutter St | R L H Fire Protection Inc | 8th floor: fire sprinkler t.i. add 5 fire sprinklers. ref app#201505226971 n/a for maherDetails
8th floor: fire sprinkler t.i. add 5 fire sprinklers. ref app#201505226971 n/a for maher | $4,557 |
| Jul 7, 2015 | Never finaled issued Jul 2015, no final | 111 Sutter St | Source Planning And Construction Inc | mechanical drawings for project 2015056226971, 8th flDetails
mechanical drawings for project 2015056226971, 8th fl | $20,000 |
| Jun 25, 2015 | Completed final sign-off Sep 2015 | 111 Sutter St | Field Construction Inc. | suite 975: mechanical and elec work. life safety and fire sprinkler sep permit ref arch 2015-0518-6545. maher not reqDetails
suite 975: mechanical and elec work. life safety and fire sprinkler sep permit ref arch 2015-0518-6545. maher not req | $35,000 |
| Jun 24, 2015 | Never finaled issued Jun 2015, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | 9th flr: ste 975- new fir alarm appliances for tenant improvement in an existing building to include 2 speaker/strobes, 3 speakers, 1 strobe, pa 201505186545; maher n/aDetails
9th flr: ste 975- new fir alarm appliances for tenant improvement in an existing building to include 2 speaker/strobes, 3 speakers, 1 strobe, pa 201505186545; maher n/a | $3,430 |
| Jun 10, 2015 | Completed final sign-off Jul 2015 | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | suite #975: relocate 2 fire sprinklers per t.i. ref. aapl.# 2015.0518.6545. maher n/a.Details
suite #975: relocate 2 fire sprinklers per t.i. ref. aapl.# 2015.0518.6545. maher n/a. | $1,028 |
| May 22, 2015 | Completed final sign-off Jan 2016 | 111 Sutter St | Source Planning And Construction Inc | 8th flr/suite 850: ti- selective demo & construction of non load bearing partitions, new breakroom, millwork, reuse & minor relocation of (e) light fixtures, selective new office doors & frames, salvage & reuse of (e) selected materials if practicable & new finishes. maher naDetails
8th flr/suite 850: ti- selective demo & construction of non load bearing partitions, new breakroom, millwork, reuse & minor relocation of (e) light fixtures, selective new office doors & frames, salvage & reuse of (e) selected materials if practicable & new finishes. maher na | $258,320 |
| May 18, 2015 | Completed final sign-off Sep 2015 | 111 Sutter St | Field Construction Inc. | suite #975: interior tenant improvement including new conference room, office and finishes. mep, fire/life safety under separate permit. n/a for the maher.Details
suite #975: interior tenant improvement including new conference room, office and finishes. mep, fire/life safety under separate permit. n/a for the maher. | $60,000 |
| Sep 23, 2014 | Completed final sign-off Nov 2014 | 111 Sutter St | Pyro-Comm Systems, Inc. | new fire alarm devices added to tenant improvement to include(2) speaker/strobes. 9th floor. ref ti pa#2013-1202-3138. n/a maher ordinance.Details
new fire alarm devices added to tenant improvement to include(2) speaker/strobes. 9th floor. ref ti pa#2013-1202-3138. n/a maher ordinance. | $2,000 |
| Sep 3, 2014 | Never finaled issued Sep 2014, no final | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | suite 900: relocate 4 fire sprinklers for t.i. ref. appl 2014.0514.5738. maher n/a.Details
suite 900: relocate 4 fire sprinklers for t.i. ref. appl 2014.0514.5738. maher n/a. | $2,056 |
| Aug 22, 2014 | Completed final sign-off Jul 2016 | 111 Sutter St | Specialized Graphics Inc | evacuation maps - 11th flr (4), 10th flr (4); maher n/aDetails
evacuation maps - 11th flr (4), 10th flr (4); maher n/a | $2,400 |
| Jul 14, 2014 | Completed final sign-off Aug 2014 | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | suite #350- add & relocate fire sprinklers per t.i. (1) add, (1) relocate. t.i. pa#201406279739. n/a to ordinance #155-13Details
suite #350- add & relocate fire sprinklers per t.i. (1) add, (1) relocate. t.i. pa#201406279739. n/a to ordinance #155-13 | $1,028 |
| Jun 27, 2014 | Completed final sign-off Aug 2014 | 111 Sutter St | Greene Builders Inc | suite #350: add new demising partition to divide office into 2 suites. add new door to hall from suite 2. mep work to be submitted seperately. n/a for the maher ordinance #155-13Details
suite #350: add new demising partition to divide office into 2 suites. add new door to hall from suite 2. mep work to be submitted seperately. n/a for the maher ordinance #155-13 | $16,800 |
| Jun 25, 2014 | Never finaled issued Jun 2014, no final | 111 Sutter St | Gci, Inc | electrical for tenant improvement ref 201312023138Details
electrical for tenant improvement ref 201312023138 | $6,000 |
| Jun 16, 2014 | Completed final sign-off Oct 2014 | 111 Sutter St | Gci, Inc | 11th floor: mechanical and electrical work for t.i. ref app#201405145738. compliance with ord 155-13 not requiredDetails
11th floor: mechanical and electrical work for t.i. ref app#201405145738. compliance with ord 155-13 not required | $25,000 |
| Jun 12, 2014 | Completed final sign-off Sep 2014 | 111 Sutter St | Pioneer Fire Inc. | 11th flr: remodel all outlined areas, consisting of 52 relocated pendants, 3 added pendants and 1 removed pendant, ti. 201405145738 ; compliance with ord 155-13 not requiredDetails
11th flr: remodel all outlined areas, consisting of 52 relocated pendants, 3 added pendants and 1 removed pendant, ti. 201405145738 ; compliance with ord 155-13 not required | $13,199 |
| Jun 11, 2014 | Completed final sign-off Oct 2014 | 111 Sutter St | Gci, Inc | (11th floor) revision to 2014-0514-5738 / ceiling detail. compliance with ordinance no 155-13 not required.Details
(11th floor) revision to 2014-0514-5738 / ceiling detail. compliance with ordinance no 155-13 not required. | |
| Jun 10, 2014 | Completed final sign-off Sep 2014 | 111 Sutter St | Pyro-Comm Systems, Inc. | 11th floor: new fire alarm devices added to tenant build out to include 4 modules, 4 pull station, 8 smoke detectors, 3 duct detectors, 17 speaker/strobes, 2 speakers, 2 strobes. ref app# 201405145738. compliance with ordinance no 155-13 not required.Details
11th floor: new fire alarm devices added to tenant build out to include 4 modules, 4 pull station, 8 smoke detectors, 3 duct detectors, 17 speaker/strobes, 2 speakers, 2 strobes. ref app# 201405145738. compliance with ordinance no 155-13 not required. | $8,600 |
| May 15, 2014 | Completed final sign-off Oct 2014 | 111 Sutter St | Gci, Inc | 11th floor: interior demo only. t.i. will be under app#201405145738 per ab-017 space will remain unoccupied and disabled access will be review & approved under t.i. permit.Details
11th floor: interior demo only. t.i. will be under app#201405145738 per ab-017 space will remain unoccupied and disabled access will be review & approved under t.i. permit. | $10,000 |
| May 14, 2014 | Completed final sign-off Oct 2014 | 111 Sutter St | Gci, Inc | t.i. includes the demo of non-structural partitions & building new non-structural partitions, all new or revised hvac, electrical, plumbing & life safety. work will be design-build and submitted seperately. building fully sprinklered.Details
t.i. includes the demo of non-structural partitions & building new non-structural partitions, all new or revised hvac, electrical, plumbing & life safety. work will be design-build and submitted seperately. building fully sprinklered. | $899,028 |
| Apr 25, 2014 | Completed final sign-off May 2014 | 111 Sutter St | Pyro-Comm Systems, Inc. | as built revisions indicating removal of (3) duct detectors, previous app# 201401297315Details
as built revisions indicating removal of (3) duct detectors, previous app# 201401297315 | |
| Apr 14, 2014 | Never finaled issued Apr 2014, no final | 111 Sutter St | Gci, Inc | 10th floor:installation of railing for movable partition. partition not in scope of work, separate permit required. ref app#201312023137 for t.i. work. n/a for the maher ordinance #155-13Details
10th floor:installation of railing for movable partition. partition not in scope of work, separate permit required. ref app#201312023137 for t.i. work. n/a for the maher ordinance #155-13 | $12,330 |
| Jan 29, 2014 | Completed final sign-off May 2014 | 111 Sutter St | Pyro-Comm Systems, Inc. | new fire alarm devices added to protected premises. (7) relay modules, (8) duct smoke detectors, (17) speaker/strobes, (2)strobes. t.i. pa#2013-12-02-3137. compliance with ordinance #155-13 not required.Details
new fire alarm devices added to protected premises. (7) relay modules, (8) duct smoke detectors, (17) speaker/strobes, (2)strobes. t.i. pa#2013-12-02-3137. compliance with ordinance #155-13 not required. | $8,000 |
| Jan 24, 2014 | Completed final sign-off Apr 2014 | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | 10th floor: add, relocate , and remove fire spirnkler heads per t.i. 74 add, 10 relocate, and 1 eremoved. ref app#201312023137. n/a for maher ordinance #155-13Details
10th floor: add, relocate , and remove fire spirnkler heads per t.i. 74 add, 10 relocate, and 1 eremoved. ref app#201312023137. n/a for maher ordinance #155-13 | $43,176 |
| Dec 2, 2013 | Completed final sign-off Apr 2015 | 111 Sutter St | Gci, Inc | tenant improvement on 9th floor to demo non-load bearing partitions and build non-load bearing partitions, glazing and finishes. mep & fire protection on seperate permit.Details
tenant improvement on 9th floor to demo non-load bearing partitions and build non-load bearing partitions, glazing and finishes. mep & fire protection on seperate permit. | $67,500 |
| Dec 2, 2013 | Completed final sign-off Oct 2014 | 111 Sutter St | Gci, Inc | tenant improvement on 10th floor to build new non-load bearing partitions, ceilings, doors, frames, finishes and mep. all life safety and fire sprinklers on seperate permit.Details
tenant improvement on 10th floor to build new non-load bearing partitions, ceilings, doors, frames, finishes and mep. all life safety and fire sprinklers on seperate permit. | $2,135,000 |
| Nov 19, 2013 | Never finaled issued Nov 2013, no final | 111 Sutter St | Gci, Inc | 10th floor:demolition of non-structural partitions, doors millwork carpet, finishes on 10th floor. space to remain vacant under ab017 and all ada requirment will be addressed under future t.i. permit. life safety shall be maintained.Details
10th floor:demolition of non-structural partitions, doors millwork carpet, finishes on 10th floor. space to remain vacant under ab017 and all ada requirment will be addressed under future t.i. permit. life safety shall be maintained. | $56,000 |
| Oct 23, 2013 | Completed final sign-off Nov 2013 | 111 Sutter St | Peacock Construction Inc | revision and addendum to 201307031066: modification of existing tenant improvements to include new electrical scope and ceiling work.Details
revision and addendum to 201307031066: modification of existing tenant improvements to include new electrical scope and ceiling work. | $20,000 |
| Aug 23, 2013 | Never finaled issued Aug 2013, no final | 111 Sutter St | street spaceDetails
street space | ||
| Aug 14, 2013 | Never finaled issued Aug 2013, no final | 111 Sutter St | Golden Gate Fire Protection Inc | 14th & 15th floor fire sprinkler - relocate 7 pendent sprinkler heads on the 14th floor. relcoate 1 pendent sprinkler head on the 15th floor. ref pa #2013.07.03.1064 & #2013.07.03.1066Details
14th & 15th floor fire sprinkler - relocate 7 pendent sprinkler heads on the 14th floor. relcoate 1 pendent sprinkler head on the 15th floor. ref pa #2013.07.03.1064 & #2013.07.03.1066 | $4,120 |
| Aug 12, 2013 | Completed final sign-off Aug 2013 | 111 Sutter St | Pyro-Comm Systems, Inc. | add new devices to new tenant build out on the 14th and 15th floor. ceiling speaker/strobes 11 wall strobe one. t.i. 15th floor app#201307031066 and 14th floor app#201307031064Details
add new devices to new tenant build out on the 14th and 15th floor. ceiling speaker/strobes 11 wall strobe one. t.i. 15th floor app#201307031066 and 14th floor app#201307031064 | $9,000 |
| Jul 3, 2013 | Completed final sign-off Feb 2014 | 111 Sutter St | Peacock Construction Inc | #1500 -modify of (e) t.i. to include selective demolition & construction of non-load bearing partitions, relocate & new light fixtures including re-switching, new office doors & frames, salvage & reuse of (e) selected materials if practical & new finishes, no new mechanical workDetails
#1500 -modify of (e) t.i. to include selective demolition & construction of non-load bearing partitions, relocate & new light fixtures including re-switching, new office doors & frames, salvage & reuse of (e) selected materials if practical & new finishes, no new mechanical work | $125,240 |
| Jul 3, 2013 | Completed final sign-off Aug 2013 | 111 Sutter St | Peacock Construction Inc | 1400: modification of exist tenant improvements to include selective demo and construction of non load bearing paritions, light fixture relocation and new including reswitching, new office door and frames,salvage and reuse existing selected materials if practical and new finishes. no new mechanicalDetails
1400: modification of exist tenant improvements to include selective demo and construction of non load bearing paritions, light fixture relocation and new including reswitching, new office door and frames,salvage and reuse existing selected materials if practical and new finishes. no new mechanical | $105,590 |
| Dec 17, 2012 | Completed final sign-off Apr 2013 | 111 Sutter St | Pyro-Comm Systems, Inc. | fire alarm panel upgradeDetails
fire alarm panel upgrade | $25,000 |
| Dec 3, 2012 | Completed final sign-off Dec 2012 | 111 Sutter St | Pyro-Comm Systems, Inc. | add new speaker/strobes to conference rooms, 8 total. bldg pa# 201208318725Details
add new speaker/strobes to conference rooms, 8 total. bldg pa# 201208318725 | $6,000 |
| Nov 15, 2012 | Completed final sign-off Jan 2015 | 111 Sutter St | Peacock Construction Inc | interior demolition of existing tenant partitions, ceilings, finishes. removal of existing mezzanine & stair approx. 2,120 sq.ft. safing off, capping/ removal of electrical & plumbing complying with ab-17Details
interior demolition of existing tenant partitions, ceilings, finishes. removal of existing mezzanine & stair approx. 2,120 sq.ft. safing off, capping/ removal of electrical & plumbing complying with ab-17 | $27,600 |
| Oct 11, 2012 | Expired or cancelled cancelled Jan 2026 | 111 Sutter St | Pyro-Comm Systems, Inc. | 1st floor-changing the (e) head end equipment as well as annunciator. all field devices to remainDetails
1st floor-changing the (e) head end equipment as well as annunciator. all field devices to remain | $20,000 |
| Oct 10, 2012 | Never finaled issued Oct 2012, no final | 111 Sutter St | Details
| ||
| Aug 31, 2012 | Completed final sign-off Jan 2013 | 111 Sutter St | Peacock Construction Inc | t.i. to extg office. new partitions, electrical and relocate extg lighting for the conversion of an extg conference room into 3 new offices.Details
t.i. to extg office. new partitions, electrical and relocate extg lighting for the conversion of an extg conference room into 3 new offices. | $5,000 |
| Aug 23, 2012 | Completed final sign-off Sep 2012 | 111 Sutter St | Peacock Construction Inc | 19th floor:selective demolition. addition of new partitions and associated finishes. minor modifications in toilet rooms to meet current codes. addition of new sliding door and hardware to match extgDetails
19th floor:selective demolition. addition of new partitions and associated finishes. minor modifications in toilet rooms to meet current codes. addition of new sliding door and hardware to match extg | $3,000 |
| Apr 25, 2012 | Never finaled issued Apr 2012, no final | 111 Sutter St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade. relocate sprinkler heads on the 12th floor.Details
fire sprinkler system upgrade. relocate sprinkler heads on the 12th floor. | $1,545 |
| Apr 19, 2012 | Never finaled issued Apr 2012, no final | 111 Sutter St | Pyro-Comm Systems, Inc. | 12th floor: add 2 speaker/strobes to conference rooms, 2 strobes and 5 additional speakers to extg conference rooms.Details
12th floor: add 2 speaker/strobes to conference rooms, 2 strobes and 5 additional speakers to extg conference rooms. | $6,000 |
| Apr 12, 2012 | Completed final sign-off Aug 2012 | 111 Sutter St | Skyline Construction | modification of (e) tenant space and shall include selective demolition and construction of non-load bearing partitions, new light fixtures, new office doors & frames, salvage & reuse of existing interior glass as practicable and new finishes.Details
modification of (e) tenant space and shall include selective demolition and construction of non-load bearing partitions, new light fixtures, new office doors & frames, salvage & reuse of existing interior glass as practicable and new finishes. | $52,560 |
| Dec 28, 2011 | Completed final sign-off Mar 2012 | 111 Sutter St | Golden Gate Fire Protection Inc | 4th floor-fire sprinkler system upgrade-relocate 43 upright sprinkler heads & relocate 10 pendent sprinkler headsDetails
4th floor-fire sprinkler system upgrade-relocate 43 upright sprinkler heads & relocate 10 pendent sprinkler heads | $28,840 |
| Dec 8, 2011 | Completed final sign-off Dec 2011 | 111 Sutter St | Pyro-Comm Systems, Inc. | 15th floor - add new speaker/strobe to new conference room. relocate (1) speaker/strobe to opposite wall.Details
15th floor - add new speaker/strobe to new conference room. relocate (1) speaker/strobe to opposite wall. | $4,000 |
| Nov 9, 2011 | Completed final sign-off Feb 2012 | 111 Sutter St | Peacock Construction Inc | 4th floor:speculative tenant improvement. remove cieling in open area. patch and repair gyp bd partions adjacent to open areas. reverse accessible stall door swing at men's and women's restrooms. mep under seperate permit.Details
4th floor:speculative tenant improvement. remove cieling in open area. patch and repair gyp bd partions adjacent to open areas. reverse accessible stall door swing at men's and women's restrooms. mep under seperate permit. | $75,000 |
| Nov 1, 2011 | Completed final sign-off Nov 2011 | 111 Sutter St | Pyro-Comm Systems, Inc. | 13th floor - add two new speaker/strobes to enw conference rooms, add one new strobe for open office area.Details
13th floor - add two new speaker/strobes to enw conference rooms, add one new strobe for open office area. | $4,000 |
| Oct 28, 2011 | Completed final sign-off Sep 2012 | 111 Sutter St | Peacock Construction Inc | remodel grd fl main entr to provide core compaint access entry. wk incl demo (e) storefront to install new accessible entrance door & corridor access to (e) accessible elevator lobby. assoc elec,lighting&power per scope.Details
remodel grd fl main entr to provide core compaint access entry. wk incl demo (e) storefront to install new accessible entrance door & corridor access to (e) accessible elevator lobby. assoc elec,lighting&power per scope. | $45,000 |
| Oct 25, 2011 | Completed final sign-off Nov 2011 | 111 Sutter St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade, relocate 4 upright heads on the 13th floor. upgrade branch line restraints.Details
fire sprinkler system upgrade, relocate 4 upright heads on the 13th floor. upgrade branch line restraints. | $3,000 |
| Oct 13, 2011 | Completed final sign-off Nov 2011 | 111 Sutter St | Skyline Construction | 13th floor-t.i. selective demolition & construction of non-load bearing walls, new light fixtures & electrical outletsDetails
13th floor-t.i. selective demolition & construction of non-load bearing walls, new light fixtures & electrical outlets | $52,560 |
| Sep 16, 2011 | Never finaled issued Sep 2011, no final | 41 Montgomery St | Tracy Sign Inc | erect new sign: electric, wall, single faced.Details
erect new sign: electric, wall, single faced. | $700 |
| Jul 13, 2011 | Never finaled issued Jul 2011, no final | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | 5th floor-relocate & remove fire sprinkler heads per t.i-add 1, relocate 3, remove 1Details
5th floor-relocate & remove fire sprinkler heads per t.i-add 1, relocate 3, remove 1 | $2,000 |
| Jul 11, 2011 | Completed final sign-off Jul 2011 | 111 Sutter St | Pribuss Engineering Inc | fire sprinkler t.i. 1 relocate. spec suite 5th floor.Details
fire sprinkler t.i. 1 relocate. spec suite 5th floor. | $515 |
| Jun 20, 2011 | Completed final sign-off Dec 2011 | 111 Sutter St | Bevilacqua & Sons | 15th floor - convert 1 large office to 2 small offices: new door, patcj, repair finishes, new floor core, recircuit (e) lighting.Details
15th floor - convert 1 large office to 2 small offices: new door, patcj, repair finishes, new floor core, recircuit (e) lighting. | $25,000 |
| Jun 13, 2011 | Completed final sign-off Oct 2011 | 111 Sutter St | Pyro-Comm Systems, Inc. | add 2 speakers/strobes tpo new corridor on the 10th floor. add relay module for access control overrideDetails
add 2 speakers/strobes tpo new corridor on the 10th floor. add relay module for access control override | $3,500 |
| Jun 6, 2011 | Expired or cancelled cancelled Jan 2020 | 41 Montgomery St | Peacock Construction Inc | rev.to pa# 2011.03.23.2661 and 2011.06.01.7187 (corrct address from 45 to 41). revise celining syst(combine exposed clg w suspended clg. revise elec plans n locs of equipments. install type 2 mech.hood and water heater.Details
rev.to pa# 2011.03.23.2661 and 2011.06.01.7187 (corrct address from 45 to 41). revise celining syst(combine exposed clg w suspended clg. revise elec plans n locs of equipments. install type 2 mech.hood and water heater. | |
| Jun 6, 2011 | Completed final sign-off Oct 2011 | 111 Sutter St | Anderson, Rowe & Buckley, Inc. | tenant improvements existing fire sprinkler system, 3 add sprkr, 1 removed sprkr, 11 relocated sprkr, 10th flrDetails
tenant improvements existing fire sprinkler system, 3 add sprkr, 1 removed sprkr, 11 relocated sprkr, 10th flr | $2,800 |
| Jun 2, 2011 | Completed final sign-off Aug 2011 | 111 Sutter St | Richlen Construction | suite #550-suite expansion includes new offices, power/signal, lighting relocated only, doors & partitionDetails
suite #550-suite expansion includes new offices, power/signal, lighting relocated only, doors & partition | $30,000 |
| Jun 2, 2011 | Completed final sign-off Jul 2011 | 111 Sutter St | Bevilacqua & Sons | suite #525-add small breakeroom, counter with sink & upper/lower cabinets, convert 2 small office to 1 larger office. relocate 1 lightDetails
suite #525-add small breakeroom, counter with sink & upper/lower cabinets, convert 2 small office to 1 larger office. relocate 1 light | $25,000 |
| Jun 1, 2011 | Completed final sign-off Jul 2011 | 41 Montgomery St | Peacock Construction Inc | to correct the address for pa#201103232661. the address should be 41 montgomery street. for administrative & documentation purpose only.Details
to correct the address for pa#201103232661. the address should be 41 montgomery street. for administrative & documentation purpose only. | |
| May 24, 2011 | Completed final sign-off Aug 2011 | 111 Sutter St | Pyro-Comm Systems, Inc. | 1st floor - replace existing strobe with new strobes & speaker/stribe coverage in prep area & open area. add smoke detedtor above existing power supply. t.i. pa #201103232661.Details
1st floor - replace existing strobe with new strobes & speaker/stribe coverage in prep area & open area. add smoke detedtor above existing power supply. t.i. pa #201103232661. | $6,000 |
| May 12, 2011 | Never finaled issued May 2011, no final | 111 Sutter St | Golden Gate Fire Protection Inc | ground floor fire sprinkler system upgrade - relocate 15 pendent sprinkler heads, relocate 10 uprights.Details
ground floor fire sprinkler system upgrade - relocate 15 pendent sprinkler heads, relocate 10 uprights. | $12,500 |
| May 5, 2011 | Completed final sign-off Oct 2011 | 111 Sutter St | Peacock Construction Inc | 10th floor-new doors at corridor, 3 new offices & associated power/data, replacement of casework where shown, new ceiling elements. sprinklers under separate permits- above and below corridor ceiling and in new offices. mep under separate permit.Details
10th floor-new doors at corridor, 3 new offices & associated power/data, replacement of casework where shown, new ceiling elements. sprinklers under separate permits- above and below corridor ceiling and in new offices. mep under separate permit. | $92,500 |
| Apr 14, 2011 | Completed final sign-off May 2011 | 111 Sutter St | Skyline Construction | divide 1 large office into 2 offices, relocate existing electrical outlets, demolish 1 light fixtureDetails
divide 1 large office into 2 offices, relocate existing electrical outlets, demolish 1 light fixture | $5,000 |
| Mar 23, 2011 | Completed final sign-off Jul 2011 | 45 Montgomery St | Peacock Construction Inc | tenant improvement for new restaurant(no cooking)re-condition extg electrical, mechanical,& plmg for new restaurant. construct new walls 34"high min. 48" high maxDetails
tenant improvement for new restaurant(no cooking)re-condition extg electrical, mechanical,& plmg for new restaurant. construct new walls 34"high min. 48" high max | $180,000 |
| Mar 18, 2011 | Never finaled issued Apr 2011, no final | 111 Sutter St | Bevilacqua & Sons | office ti on 15th fl. demolition of (e) gyp bd partition and glass doors. patch and repair and paint demo scars .Details
office ti on 15th fl. demolition of (e) gyp bd partition and glass doors. patch and repair and paint demo scars . | $5,000 |
| Feb 9, 2011 | Completed final sign-off Jul 2011 | 111 Sutter St | Diversified Fire Products | fire alarm ti on 11th floor. 2 strobes, 15 candella, 1 storbe, 30 cdfl and 3 ceiling speakersDetails
fire alarm ti on 11th floor. 2 strobes, 15 candella, 1 storbe, 30 cdfl and 3 ceiling speakers | $6,800 |
| Jan 18, 2011 | Completed final sign-off Feb 2011 | 111 Sutter St | Ayoob & Peery Plumbing Co Inc | 11th floor - raise 2-sprinkler line, relocate 2-head, plug 2-heads & add 2-heads.Details
11th floor - raise 2-sprinkler line, relocate 2-head, plug 2-heads & add 2-heads. | $1,993 |
| Dec 27, 2010 | Completed final sign-off Jun 2011 | 111 Sutter St | Turner Construction Co | office ti on 11th floor. interior alterations and new finishes. mep and ls under separate permitDetails
office ti on 11th floor. interior alterations and new finishes. mep and ls under separate permit | $200,000 |
| Dec 17, 2010 | Never finaled issued Dec 2010, no final | 111 Sutter St | Bevilacqua & Sons | demolition of ground floor space . no occupants!, no structural, per ab-017.Details
demolition of ground floor space . no occupants!, no structural, per ab-017. | $22,000 |
| Dec 2, 2010 | Never finaled issued Dec 2010, no final | 111 Sutter St | Capitol Electric Const | provide (4) new lighting fixture & relocate (5) lighting fixture for a 1,432 square feet. 14th floor office space.Details
provide (4) new lighting fixture & relocate (5) lighting fixture for a 1,432 square feet. 14th floor office space. | $5,000 |
| Dec 1, 2010 | Completed final sign-off Oct 2011 | 111 Sutter St | Tri-Signal Integration Inc. | add 3 speaker strobes and 2 strobes to existing fire alarm systemDetails
add 3 speaker strobes and 2 strobes to existing fire alarm system | $1,900 |
| Nov 30, 2010 | Completed final sign-off Oct 2011 | 111 Sutter St | Bevilacqua & Sons | 14th floor-tenant improvement includes minor demolition & build back on new meeting rooms (2) & folding partitions- sprinkler and fire alarm, electrical/lighting separate permit. meeting rooms b occupanciesDetails
14th floor-tenant improvement includes minor demolition & build back on new meeting rooms (2) & folding partitions- sprinkler and fire alarm, electrical/lighting separate permit. meeting rooms b occupancies | $70,000 |
| Jul 22, 2010 | Completed final sign-off Aug 2010 | 111 Sutter St | Bevilacqua & Sons | 8th floor- construct one work room by building one wall w/entry door. no mechanical or plumbing work. electrical permit to be filed separately.Details
8th floor- construct one work room by building one wall w/entry door. no mechanical or plumbing work. electrical permit to be filed separately. | $10,000 |
| Jul 22, 2010 | Completed final sign-off Aug 2010 | 111 Sutter St | Bevilacqua & Sons | 15th floor - demolition of one wall in open office space. patch and finish.Details
15th floor - demolition of one wall in open office space. patch and finish. | $5,000 |
| May 20, 2010 | Completed final sign-off Aug 2010 | 111 Sutter St | Pribuss Engineering Inc | fire sprinkler t.i.; total relocates-8, total relocate & changeout-2, total heads-10.Details
fire sprinkler t.i.; total relocates-8, total relocate & changeout-2, total heads-10. | $2,000 |
| May 18, 2010 | Completed final sign-off Sep 2010 | 111 Sutter St | Tri-Signal Integration Inc. | 16th floor - add 1-speak/strobe & 3-strobes to (e) fire alarm system. relocate 7-(e) devices.Details
16th floor - add 1-speak/strobe & 3-strobes to (e) fire alarm system. relocate 7-(e) devices. | $2,100 |
| Mar 30, 2010 | Completed final sign-off Aug 2010 | 111 Sutter St | Howard S. Wright Constructors Lp | minor interior tenant improvement. new interior partitions, millwork & minor electrical, mechanical is (e). demolition of (e) walls.Details
minor interior tenant improvement. new interior partitions, millwork & minor electrical, mechanical is (e). demolition of (e) walls. | $95,000 |
| Mar 23, 2010 | Completed final sign-off May 2010 | 111 Sutter St | Horizon Retail Construction Inc | 13th floor tenant improvement - restore to previous floor plan to build partition walls, electrical outlets, switches & lights, no plumbing work. srpinkler & fire alarm revisions under separate appl.Details
13th floor tenant improvement - restore to previous floor plan to build partition walls, electrical outlets, switches & lights, no plumbing work. srpinkler & fire alarm revisions under separate appl. | $50,000 |
| Mar 19, 2010 | Completed final sign-off Apr 2010 | 111 Sutter St | Horizon Retail Construction Inc | 13th floor. demolition only. tenant improvements under separate permit. ab-017.Details
13th floor. demolition only. tenant improvements under separate permit. ab-017. | $10,000 |
| May 18, 2009 | Never finaled issued May 2009, no final | 111 Sutter St | Mc Millan Electric | to obtain final inspection for work approved under app #200708078971. all work is complete.Details
to obtain final inspection for work approved under app #200708078971. all work is complete. | |
| Oct 8, 2008 | Completed final sign-off Dec 2008 | 111 Sutter St | Pribuss Engineering Inc | fire sprinkler t.i., relocated heads-9, added heads-4, total heads-13Details
fire sprinkler t.i., relocated heads-9, added heads-4, total heads-13 | $2,800 |
| Oct 3, 2008 | Completed final sign-off Dec 2008 | 111 Sutter St | Capitol Electric Const | 9th floor install (6) new 6x4 & 2 x4 light fixtures; relcoate (6) existing 2x4; install power to server room, install base feed power to t.i.Details
9th floor install (6) new 6x4 & 2 x4 light fixtures; relcoate (6) existing 2x4; install power to server room, install base feed power to t.i. | $1,200 |
| Sep 25, 2008 | Completed final sign-off Dec 2008 | 111 Sutter St | Tri-Signal Integration Inc. | add 6 speakers and 7 strobes to existing fire alarm systemDetails
add 6 speakers and 7 strobes to existing fire alarm system | $3,750 |
| Aug 21, 2008 | Completed final sign-off Dec 2008 | 111 Sutter St | Bevilacqua & Sons | at 9th fl: t.i. minor wall demolition, new paint, new carpet, relocate some lighting, new low partion walls per plan. work at 9th floor level only.Details
at 9th fl: t.i. minor wall demolition, new paint, new carpet, relocate some lighting, new low partion walls per plan. work at 9th floor level only. | $100,000 |
| Jul 3, 2008 | Never finaled issued Jul 2008, no final | 111 Sutter St | street spaceDetails
street space | ||
| Mar 25, 2008 | Completed final sign-off Apr 2008 | 111 Sutter St | Tri-Signal Integration Inc. | add 1 smoke detector to existing fire alarm system.Details
add 1 smoke detector to existing fire alarm system. | $2,100 |
| Feb 13, 2008 | Completed final sign-off Apr 2008 | 111 Sutter St | Bcci Construction Company | 3rd floor: tenant improvements - build new equipment and wiring closet. add supplemental elec. and voice data foropen office workstations.Details
3rd floor: tenant improvements - build new equipment and wiring closet. add supplemental elec. and voice data foropen office workstations. | $22,000 |
| Dec 28, 2007 | Completed final sign-off Feb 2008 | 111 Sutter St | Pribuss Engineering Inc | sprinkler work to be done on stairwell from ground floor, basement, ground , 23rd and 24th floors and only. relocate 1 sprikler on the ground floor and 1 on the 23rd floor. add 14 spriklers on the ground floor, 5 on the 23rd floor, 13 on 24th and 1 at roof.Details
sprinkler work to be done on stairwell from ground floor, basement, ground , 23rd and 24th floors and only. relocate 1 sprikler on the ground floor and 1 on the 23rd floor. add 14 spriklers on the ground floor, 5 on the 23rd floor, 13 on 24th and 1 at roof. | $36,000 |
| Oct 9, 2007 | Completed final sign-off Feb 2008 | 111 Sutter St | Tri-Signal Integration Inc. | 1st and ground - add two dual monitor mofules for new sprinkler risers monitoring.Details
1st and ground - add two dual monitor mofules for new sprinkler risers monitoring. | $3,200 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.