Julie Momchilov Johnson
- License
- 21696
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, authorized agent-others
- Firm
- Jmj Studios
- On San Francisco permits
- Dec 2000 to Dec 2015
6 permits since 2000 (architect on 5 permits, authorized agent-others on 1 permit): 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bach Construction, Inc., Gillispie Construction, Handelin Inc Dba Original Construction C, Richlen Construction, The Sustainable Cbo Inc Dba Oliver Macki
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 4, 2015 | Completed final sign-off Jul 2016 | 2305 Scott St | Handelin Inc Dba Original Construction C | new rated window in new opening, fixed 45 minute fire protection rated assembly with oh-45 fire rated glazing marking.Details
new rated window in new opening, fixed 45 minute fire protection rated assembly with oh-45 fire rated glazing marking. | $2,000 |
| Jul 6, 2015 | Completed final sign-off Aug 2015 | 666 Noe St | The Sustainable Cbo Inc Dba Oliver Macki | add toilet/sink to extg closet.Details
add toilet/sink to extg closet. | $10,000 |
| Mar 5, 2015 | Completed final sign-off Mar 2016 | 45 19th Av | Gillispie Construction | kitchen renovation and replace 1 extg window.Details
kitchen renovation and replace 1 extg window. | $50,000 |
| May 1, 2012 | Completed final sign-off Dec 2012 | 637 Commercial St | Bach Construction, Inc. | demo the windows on the 2nd and 3rd fl on the north and south elevations and demo of interior furred walls at ext walls at 2nd and 3rd fl. newenergy efficient window system to be installed, insulation to be added to ext walls adjacent to new windows with new furred partitions to enclose insulationDetails
demo the windows on the 2nd and 3rd fl on the north and south elevations and demo of interior furred walls at ext walls at 2nd and 3rd fl. newenergy efficient window system to be installed, insulation to be added to ext walls adjacent to new windows with new furred partitions to enclose insulation | $140,000 |
| Jun 2, 2011 | Completed final sign-off Aug 2011 | 111 Sutter St | Richlen Construction | suite #550-suite expansion includes new offices, power/signal, lighting relocated only, doors & partitionDetails
suite #550-suite expansion includes new offices, power/signal, lighting relocated only, doors & partition | $30,000 |
| Dec 12, 2000 | Expired or cancelled expired Dec 2003 | 450 Sansome St | oti-1, 3rd floor - el, me, ls, spDetails
oti-1, 3rd floor - el, me, ls, sp | $42,000 |