Block 0229, lot 018
450 Sansome St
- City’s use
- Commercial Office
- Built
- 1967
- Stories
- 16
- Building
- 135,000 sq ft
- Lot
- 10,537 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | In progress issued Jun 2026 | 450 Sansome St | M C S Construction Services | def mech and elec for 202512172060. mech: selectrive demo and cap of med and low pressure ductwork. new dist for vav boxes. new hot water reheat dist piping, air balance. elec: new power and signal devices throughout space. new 2022 title 24 compliant lighting and controlsDetails
def mech and elec for 202512172060. mech: selectrive demo and cap of med and low pressure ductwork. new dist for vav boxes. new hot water reheat dist piping, air balance. elec: new power and signal devices throughout space. new 2022 title 24 compliant lighting and controls | $145,000 |
| May 15, 2026 | In progress issued May 2026 | 450 Sansome St | Martin Sign Co Inc. | the fabrication and installation of 15 acrylic evacuation mapsDetails
the fabrication and installation of 15 acrylic evacuation maps | $3,750 |
| Mar 26, 2026 | Completed final sign-off Sep 2026 | 450 Sansome St | deferred mecha and electrical permit. ref 202511058945. mech selective demo and cap of med to low pressure ductwork. new dist for vav bxes, new hot water reheat dist piping. air balance. elec new power and signal devices throughout space, new 2022 t24 compliant lighting and controlsDetails
deferred mecha and electrical permit. ref 202511058945. mech selective demo and cap of med to low pressure ductwork. new dist for vav bxes, new hot water reheat dist piping. air balance. elec new power and signal devices throughout space, new 2022 t24 compliant lighting and controls | $253,892 | |
| Mar 19, 2026 | In progress issued Mar 2026 | 450 Sansome St | M C S Construction Services | 11th fl - deferred mech & elec permit. permit ref pa 202510238040 mech selective demo & cap of med & low pressure duct work, ew dist for vav boxes, new hot water. reheat dis piping wshp & assoc ductwork & piping, air balance. elec, new power & signal devices throughout. new 2022 t24 ltg & controlsDetails
11th fl - deferred mech & elec permit. permit ref pa 202510238040 mech selective demo & cap of med & low pressure duct work, ew dist for vav boxes, new hot water. reheat dis piping wshp & assoc ductwork & piping, air balance. elec, new power & signal devices throughout. new 2022 t24 ltg & controls | $306,377 |
| Mar 19, 2026 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | 12th floor: deferred mech + elec permit. permit ref # 202511058940. mech selective demo + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping air balance. elec new power + signal devices throughout. new 2022 t24 complaint lighting + controls.Details
12th floor: deferred mech + elec permit. permit ref # 202511058940. mech selective demo + cap of med to low pressure ductwork. new distribution for vav boxes, new hot water reheat distribution piping air balance. elec new power + signal devices throughout. new 2022 t24 complaint lighting + controls. | $254,763 |
| Mar 19, 2026 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | deferred mech and elec permit. ref pa# 202511058944. mech: select demo and cap of mep to low pressured ducktwork.new dist for vav boxes, new hot water reheat distrubtion piping. air balance elec and new power and signal devices througout. new 2022 t 24 compliant lighting and controls.Details
deferred mech and elec permit. ref pa# 202511058944. mech: select demo and cap of mep to low pressured ducktwork.new dist for vav boxes, new hot water reheat distrubtion piping. air balance elec and new power and signal devices througout. new 2022 t 24 compliant lighting and controls. | $275,277 |
| Mar 18, 2026 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | ste 750: deferred mech + elec permit. ref # 202510237987. mech select demo + cap of mep to low pressure duct work. new dist for vav boxes, new hot water reheat dist piping. ohr balance. elec new power + signal devices throughout, new 2022 t24 complaint. lighting + controls.Details
ste 750: deferred mech + elec permit. ref # 202510237987. mech select demo + cap of mep to low pressure duct work. new dist for vav boxes, new hot water reheat dist piping. ohr balance. elec new power + signal devices throughout, new 2022 t24 complaint. lighting + controls. | $207,497 |
| Feb 12, 2026 | Completed final sign-off May 2026 | 450 Sansome St | Golden Gate Fire Protection Inc | 11th fl - relocate 36 pendent sprinklers ref pa 202510238040Details
11th fl - relocate 36 pendent sprinklers ref pa 202510238040 | $19,425 |
| Feb 12, 2026 | Completed final sign-off May 2026 | 450 Sansome St | Golden Gate Fire Protection Inc | 7th fl relocate 35 pendents ref pa 202510237987Details
7th fl relocate 35 pendents ref pa 202510237987 | $18,375 |
| Feb 11, 2026 | Completed final sign-off May 2026 | 450 Sansome St | Golden Gate Fire Protection Inc | relocate 4 pendents on the 12 fl; relocate 23 pendenta on the 13th fl; relocate 32 pendents and 10 uprights on the 14th fl. 12th fl - 202511058940, 13th fl 202511058944, 14th 202511058945Details
relocate 4 pendents on the 12 fl; relocate 23 pendenta on the 13th fl; relocate 32 pendents and 10 uprights on the 14th fl. 12th fl - 202511058940, 13th fl 202511058944, 14th 202511058945 | $36,225 |
| Dec 17, 2025 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | scope of work on the 7/f ste 700. shall consist of interior demo of non structural elements including but not necessary limited to interior partions, doors, finishes, ceiling, lighting, mech and elec outlets and switches. mep life, safety and sprinkler system on sep permit. no exterior work.Details
scope of work on the 7/f ste 700. shall consist of interior demo of non structural elements including but not necessary limited to interior partions, doors, finishes, ceiling, lighting, mech and elec outlets and switches. mep life, safety and sprinkler system on sep permit. no exterior work. | $1,100,000 |
| Nov 5, 2025 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | 12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.Details
12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit. | $347,351 |
| Nov 5, 2025 | In progress issued Jan 2026 | 450 Sansome St | M C S Construction Services | 14th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.Details
14th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit. | $426,957 |
| Nov 5, 2025 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | 13th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.Details
13th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit. | $834,400 |
| Oct 23, 2025 | In progress issued Jan 2026 | 450 Sansome St | M C S Construction Services | 11/f suite 1100 - demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting, mech electrical outlets and switches. restroom ada access. upgrade and new ada hi/lo drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.Details
11/f suite 1100 - demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting, mech electrical outlets and switches. restroom ada access. upgrade and new ada hi/lo drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit. | $1,043,000 |
| Oct 23, 2025 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | scope of work 7th fl (ste 750) shall consist of interior demo of non structural elements including interior partitoins, doors, finishes, ceilings, lighting,mech and elec outlets/switches. restroom ada upgrades, drinking fountains. mep life safety,sprinkler sys sep permit. no exterior work.Details
scope of work 7th fl (ste 750) shall consist of interior demo of non structural elements including interior partitoins, doors, finishes, ceilings, lighting,mech and elec outlets/switches. restroom ada upgrades, drinking fountains. mep life safety,sprinkler sys sep permit. no exterior work. | $351,066 |
| Aug 20, 2025 | In progress issued Nov 2025 | 450 Sansome St | Ramsay Signs, Inc. | install (1) non-illuminated window sign.Details
install (1) non-illuminated window sign. | $4,500 |
| Aug 20, 2025 | In progress issued Nov 2025 | 450 Sansome St | Ramsay Signs, Inc. | install (1) non-illuminated projecting sign.Details
install (1) non-illuminated projecting sign. | $7,000 |
| Jun 12, 2024 | In progress issued Jun 2024 | 450 Sansome St | Excel Signs | illuminated sign: (e) interior single face hanging lightbox. 36" x 36" - delah cafe-Details
illuminated sign: (e) interior single face hanging lightbox. 36" x 36" - delah cafe- | $1,100 |
| Jun 12, 2024 | In progress issued Jun 2024 | 450 Sansome St | Excel Signs | exterior pvc letters on glass "delah" 82" x 34"Details
exterior pvc letters on glass "delah" 82" x 34" | $700 |
| Jun 15, 2023 | Completed final sign-off Oct 2023 | 450 Sansome St | Gci, Inc | 16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242Details
16/f: operable partition wall ref pa 2022-1223-9077 & 2021-0728-5242 | $2,000 |
| Dec 23, 2022 | Completed final sign-off May 2023 | 450 Sansome St | Gci, Inc | mechanical only - demo existing duct & hvac equipment, install new duct & hvac equipment. ref #202107285242.Details
mechanical only - demo existing duct & hvac equipment, install new duct & hvac equipment. ref #202107285242. | $20,000 |
| Dec 23, 2022 | Completed final sign-off May 2023 | 450 Sansome St | Gci, Inc | revision to pa# 2021-0728-5242, removing operable wall from scope along w/ structural supportDetails
revision to pa# 2021-0728-5242, removing operable wall from scope along w/ structural support | |
| Jun 8, 2022 | Completed final sign-off Sep 2022 | 450 Sansome St | Siemens Industry, Inc. | fire only work for the remodel on floor 16 additions are 14 speakers/strobes, 6 strobes, and 1 module, ref permit app 202107285242Details
fire only work for the remodel on floor 16 additions are 14 speakers/strobes, 6 strobes, and 1 module, ref permit app 202107285242 | $12,675 |
| May 20, 2022 | Completed final sign-off May 2023 | 450 Sansome St | Gci, Inc | 16/f: title 24 compliance - electrical for pa202107285242. maher n/aDetails
16/f: title 24 compliance - electrical for pa202107285242. maher n/a | $389,000 |
| Jan 7, 2022 | Completed final sign-off Aug 2022 | 450 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler relocate 35 pendent sprinklers and relocate 34 uprights on the 16th fl; ref pa 2021-0728-5242Details
fire sprinkler relocate 35 pendent sprinklers and relocate 34 uprights on the 16th fl; ref pa 2021-0728-5242 | $35,000 |
| Jul 28, 2021 | Completed final sign-off May 2023 | 450 Sansome St | Gci, Inc | 16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partitionDetails
16/f: demo non-structural partitions, fixtures, millwork & finishes. construction of new non-structural partitions, fixtures, millwork & finishes. structural support (1) moveable partition | $692,514 |
| Feb 11, 2021 | Completed final sign-off Mar 2021 | 450 Sansome St | Siemens Industry, Inc. | fire only work for the "suite 1000" remodel on floor 10; 9 speaker/strobes are added and 2 existing restroom speaker/strobes are being replaced. ref. permit app # 2020 1021 7059Details
fire only work for the "suite 1000" remodel on floor 10; 9 speaker/strobes are added and 2 existing restroom speaker/strobes are being replaced. ref. permit app # 2020 1021 7059 | $6,975 |
| Jan 27, 2021 | Never finaled issued Feb 2021, no final | 450 Sansome St | Skyline Construction | Details
| $5,000 |
| Jan 21, 2021 | Completed final sign-off Apr 2021 | 450 Sansome St | Skyline Construction | 10/f: new lighting and branch circuiting to (e) panel. install new vav box. re-distribute downsteam duct work for new layout. ref pa 202010217059Details
10/f: new lighting and branch circuiting to (e) panel. install new vav box. re-distribute downsteam duct work for new layout. ref pa 202010217059 | $495 |
| Jan 21, 2021 | Completed final sign-off Mar 2021 | 450 Sansome St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 8 pendant sprinklers on the 10th floor suite 1000. t.i. ref # 2020-10-21-7059Details
fire sprinklers; relocate 8 pendant sprinklers on the 10th floor suite 1000. t.i. ref # 2020-10-21-7059 | $4,000 |
| Oct 21, 2020 | Completed final sign-off Apr 2021 | 450 Sansome St | Skyline Construction | suite 1000: demo of (e) partitions, millwork, associated power/data, floor finishes and lighting.(n) partitions, doors, power/data, lighting and finishes. all work on 10/f. maher n/a.Details
suite 1000: demo of (e) partitions, millwork, associated power/data, floor finishes and lighting.(n) partitions, doors, power/data, lighting and finishes. all work on 10/f. maher n/a. | $200,736 |
| Dec 26, 2019 | Completed final sign-off Dec 2020 | 450 Sansome St | Emcor Services/Mesa Energy Systems Inc | structural revision to pa# 2019-1011-4211. change to beam size.Details
structural revision to pa# 2019-1011-4211. change to beam size. | |
| Nov 12, 2019 | Completed final sign-off Mar 2020 | 450 Sansome St | Siemens Industry, Inc. | ref pa# 201907176094; fire alarm work for the "suite 700 mintz" remodel on floor 7; additions are 4 speaker and 16 speaker strobesDetails
ref pa# 201907176094; fire alarm work for the "suite 700 mintz" remodel on floor 7; additions are 4 speaker and 16 speaker strobes | $12,700 |
| Oct 11, 2019 | Completed final sign-off Dec 2020 | 450 Sansome St | Emcor Services/Mesa Energy Systems Inc | rooftop: remove & replace 1 chiller & 2 pumps. maher n/a.Details
rooftop: remove & replace 1 chiller & 2 pumps. maher n/a. | $198,500 |
| Aug 30, 2019 | Expired or cancelled cancelled Jan 2026 | 450 Sansome St | project consists of barrier removal, adding automatic door operator at suite 100 street entry. n/a for maherDetails
project consists of barrier removal, adding automatic door operator at suite 100 street entry. n/a for maher | $15,000 | |
| Aug 21, 2019 | Completed final sign-off Oct 2019 | 450 Sansome St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 12 penddent heads on the 7th flDetails
fire sprinklers, relocate 12 penddent heads on the 7th fl | $6,000 |
| Aug 19, 2019 | Completed final sign-off Mar 2020 | 450 Sansome St | Richlen Construction | demo of (e) partitions & assoc power/data, finishes & millwork. any alterations to mep, sprinklers. ele & life safety under sep permitDetails
demo of (e) partitions & assoc power/data, finishes & millwork. any alterations to mep, sprinklers. ele & life safety under sep permit | $72,000 |
| Jul 17, 2019 | Completed final sign-off Jan 2020 | 450 Sansome St | Richlen Construction | 7th flr. demo (e) partitions and associated power data, lighting, finishes and millwork. construc (n) partitions, pwoer data, lighting, finishes and millwork. suite is currently unoccupiedDetails
7th flr. demo (e) partitions and associated power data, lighting, finishes and millwork. construc (n) partitions, pwoer data, lighting, finishes and millwork. suite is currently unoccupied | $281,600 |
| Jan 17, 2019 | Expired or cancelled cancelled Jan 2026 | 450 Sansome St | replace millwork for new equipment for mobile order ahead service. plumbing and electrical. no structural, exterior or mechanical workDetails
replace millwork for new equipment for mobile order ahead service. plumbing and electrical. no structural, exterior or mechanical work | $30,000 | |
| Jun 29, 2018 | Completed final sign-off Jan 2019 | 450 Sansome St | Emcor Services/Mesa Energy Systems Inc | replace 3 cooling towersDetails
replace 3 cooling towers | $350,000 |
| Jan 9, 2017 | Never finaled issued Jan 2017, no final | 450 Sansome St | Bilcor Inc | 9th floor ste 900 fire alarm e.i. - as-built to pa #201608256027 - instll (2) ceiling mount strobes, relcoate (4) ceiling mount speakers strobes, remove installation of (3) ceiling mount speaker-strobes, install (3) ceiling mount speaker/strobes. n/a maher ordinanceDetails
9th floor ste 900 fire alarm e.i. - as-built to pa #201608256027 - instll (2) ceiling mount strobes, relcoate (4) ceiling mount speakers strobes, remove installation of (3) ceiling mount speaker-strobes, install (3) ceiling mount speaker/strobes. n/a maher ordinance | $2,000 |
| Dec 15, 2016 | Completed final sign-off Jun 2017 | 450 Sansome St | Peacock Construction | 9th floor - revision to pa 2016-0729-3711, selective demo of non-structural partitions, build back training room, conference room. maher naDetails
9th floor - revision to pa 2016-0729-3711, selective demo of non-structural partitions, build back training room, conference room. maher na | $135,000 |
| Sep 23, 2016 | Completed final sign-off Jun 2017 | 450 Sansome St | Peacock Construction | title-24 electrical for work done under pa 2016-0729-3711Details
title-24 electrical for work done under pa 2016-0729-3711 | $21,000 |
| Aug 31, 2016 | Never finaled issued Sep 2016, no final | 450 Sansome St | Peacock Construction | t-24 mechanical for work done under pa 201607293711; maher n/aDetails
t-24 mechanical for work done under pa 201607293711; maher n/a | $7,000 |
| Aug 26, 2016 | Never finaled issued Aug 2016, no final | 450 Sansome St | Golden Gate Fire Protection Inc | 9th floor: fire spinkler only relocate 25 pendents, add 1 for suite 900 ref pa 201607293711Details
9th floor: fire spinkler only relocate 25 pendents, add 1 for suite 900 ref pa 201607293711 | $15,225 |
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 450 Sansome St | Bilcor Inc | 9th floor - fire alarm ti. install (12) ceiling mount speaker-strobes, install (1) wall mount speaker-strobe. ref ti #2016-0729-3711.Details
9th floor - fire alarm ti. install (12) ceiling mount speaker-strobes, install (1) wall mount speaker-strobe. ref ti #2016-0729-3711. | $5,200 |
| Jul 29, 2016 | Completed final sign-off Jun 2017 | 450 Sansome St | Peacock Construction | 9th floor: remodel (e) suite for ti - includes the demo of (e) walls, construction of new walls, lighting upgrades and upgrades to finishes maher naDetails
9th floor: remodel (e) suite for ti - includes the demo of (e) walls, construction of new walls, lighting upgrades and upgrades to finishes maher na | $375,000 |
| Sep 22, 2015 | Completed final sign-off Jun 2017 | 450 Sansome St | Peacock Construction | title 24 electrical for work done under pa #201506249846. n/a maher ordinanceDetails
title 24 electrical for work done under pa #201506249846. n/a maher ordinance | $90,000 |
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 450 Sansome St | Peacock Construction | mechanical t24 for work done under 201506249846. maher not reqDetails
mechanical t24 for work done under 201506249846. maher not req | $22,000 |
| Jul 23, 2015 | Completed final sign-off Aug 2015 | 450 Sansome St | Bilcor Inc | 4th floor: fire alarm t.i. to install 7 ceiling mount speaker strobes. ref app#201506249846. n/a for the maher.Details
4th floor: fire alarm t.i. to install 7 ceiling mount speaker strobes. ref app#201506249846. n/a for the maher. | $2,800 |
| Jul 17, 2015 | Never finaled issued Jul 2015, no final | 450 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler relocate 54 pendent sprinkler heads on the 4th fl. t.i. # 201506249846/ maher ord. 155-3 n/aDetails
fire sprinkler relocate 54 pendent sprinkler heads on the 4th fl. t.i. # 201506249846/ maher ord. 155-3 n/a | $27,810 |
| Jun 24, 2015 | Completed final sign-off Jan 2016 | 450 Sansome St | Peacock Construction | 4/f -approx 8500 sq ft of remodel in existing space. compliance with maher ordinance no 155-13 not required.Details
4/f -approx 8500 sq ft of remodel in existing space. compliance with maher ordinance no 155-13 not required. | $458,000 |
| Apr 16, 2015 | Completed final sign-off May 2015 | 450 Sansome St | Bilcor Inc | fire alarm ti. install 5 ceiling mount speaker-strobes, install 1 ceiling mount speaker , relocate 1 wall mount strobe, relocate 2 ceiling mount spaker, remove 1 wall mount strobe, remove 1 ceiling mount speakerDetails
fire alarm ti. install 5 ceiling mount speaker-strobes, install 1 ceiling mount speaker , relocate 1 wall mount strobe, relocate 2 ceiling mount spaker, remove 1 wall mount strobe, remove 1 ceiling mount speaker | $4,400 |
| Apr 16, 2015 | Never finaled issued Apr 2015, no final | 450 Sansome St | Source Planning And Construction Inc | 2nd flr: install 1 (n) vav box, 1 (n) exhaust fan, (n) duct work ref pa 2015 03 27 2019 maher - not req'dDetails
2nd flr: install 1 (n) vav box, 1 (n) exhaust fan, (n) duct work ref pa 2015 03 27 2019 maher - not req'd | $30,000 |
| Apr 14, 2015 | Completed final sign-off May 2015 | 450 Sansome St | Golden Gate Fire Protection Inc | sprinkler ti-relocate 3 pendent heads on the 2nd flDetails
sprinkler ti-relocate 3 pendent heads on the 2nd fl | $1,545 |
| Mar 27, 2015 | Completed final sign-off May 2015 | 450 Sansome St | Source Planning And Construction Inc | 2nd fl ti. interior improvements. removal of portiton of e partitions, full glazing partitions, casework, el outlets, limited light fixtures. new non structural full and ceiling height partitons, limited lighting, doors and hardware.Details
2nd fl ti. interior improvements. removal of portiton of e partitions, full glazing partitions, casework, el outlets, limited light fixtures. new non structural full and ceiling height partitons, limited lighting, doors and hardware. | $240,000 |
| Mar 20, 2015 | Never finaled issued Mar 2015, no final | 450 Sansome St | Source Planning And Construction Inc | 2nd floor: demo only. un-occupied space(ab-017). n/a for the maherDetails
2nd floor: demo only. un-occupied space(ab-017). n/a for the maher | |
| Jan 30, 2015 | Completed final sign-off Feb 2015 | 450 Sansome St | Golden Gate Fire Protection Inc | 16th flr: fire sprinkler only, relocate 2 pendants, add 2 pendants (total 4 hds) for axis reinsurance 16th flr, bldg 201501206141; maher n/aDetails
16th flr: fire sprinkler only, relocate 2 pendants, add 2 pendants (total 4 hds) for axis reinsurance 16th flr, bldg 201501206141; maher n/a | $2,000 |
| Jan 28, 2015 | Completed final sign-off Mar 2015 | 450 Sansome St | Bilcor Inc | 16th flr: fire alarm tenant improvement, relocate (1) wall mount strobe, t.i. #201501206141; maher n/aDetails
16th flr: fire alarm tenant improvement, relocate (1) wall mount strobe, t.i. #201501206141; maher n/a | $500 |
| Jan 20, 2015 | Completed final sign-off Mar 2015 | 450 Sansome St | Peacock Construction | 16th floor: t.i. 700 s.f. of remodel in existing space included t-24. sprinkler, life safety, mechanical under separate permit. maher n/a.Details
16th floor: t.i. 700 s.f. of remodel in existing space included t-24. sprinkler, life safety, mechanical under separate permit. maher n/a. | $45,000 |
| Aug 18, 2014 | Completed final sign-off Aug 2014 | 450 Sansome St | Bilcor Inc | install 10 ceiling mount speaker-strobes, remove 1 wall mount speaker-strobe, remove 1 wall mount strobe. t.i.pa#201406259497. n/a ordinance #155-13Details
install 10 ceiling mount speaker-strobes, remove 1 wall mount speaker-strobe, remove 1 wall mount strobe. t.i.pa#201406259497. n/a ordinance #155-13 | $4,800 |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 450 Sansome St | Golden Gate Fire Protection Inc | relocate 10 pendent sprinkler heads on the 2nd floor : ref app#201406168506. relocate 19 pendent sprinkler heads on the 3rd floor: ref app#201406259497. n/a for the maher ordinance #155-13Details
relocate 10 pendent sprinkler heads on the 2nd floor : ref app#201406168506. relocate 19 pendent sprinkler heads on the 3rd floor: ref app#201406259497. n/a for the maher ordinance #155-13 | $14,935 |
| Aug 4, 2014 | Never finaled issued Aug 2014, no final | 450 Sansome St | street spaceDetails
street space | ||
| Jun 30, 2014 | Never finaled issued Jul 2014, no final | 450 Sansome St | Peacock Construction | title-24 for work under pa 2014/0616/8506.Details
title-24 for work under pa 2014/0616/8506. | $1,500 |
| Jun 27, 2014 | Completed final sign-off Dec 2014 | 450 Sansome St | Peacock Construction Inc | title 24 electrical for 201406259497Details
title 24 electrical for 201406259497 | $20,000 |
| Jun 25, 2014 | Completed final sign-off Sep 2014 | 450 Sansome St | Peacock Construction Inc | demo selected non structural partitions, construct new non structural partitions, new millwork. sprinkler, lifesafety, mep under separate permit maher n/aDetails
demo selected non structural partitions, construct new non structural partitions, new millwork. sprinkler, lifesafety, mep under separate permit maher n/a | $168,000 |
| Jun 16, 2014 | Completed final sign-off Sep 2014 | 450 Sansome St | Peacock Construction Inc | demo of selected non-structural partitions, millwork, ceiling tile. new compliant millwork, ceiling tile, lights and carpet. mep, fire sprinkler and life safety - under separate permit. n/a ordinance #155-13.Details
demo of selected non-structural partitions, millwork, ceiling tile. new compliant millwork, ceiling tile, lights and carpet. mep, fire sprinkler and life safety - under separate permit. n/a ordinance #155-13. | $173,000 |
| Jun 5, 2014 | Completed final sign-off Jul 2014 | 450 Sansome St | Golden Gate Fire Protection Inc | relocate 12 pendant sprinkler heads on the 4th flr, add 2 upright sprinklers, ref. ti 201404223843; compliance with ord 155-13 not requiredDetails
relocate 12 pendant sprinkler heads on the 4th flr, add 2 upright sprinklers, ref. ti 201404223843; compliance with ord 155-13 not required | $7,210 |
| May 29, 2014 | Completed final sign-off Nov 2014 | 450 Sansome St | Peacock Construction Inc | mechanical for permit # 201404223843, provide air distribution for spec. suite space. n/a maherDetails
mechanical for permit # 201404223843, provide air distribution for spec. suite space. n/a maher | $61,500 |
| May 15, 2014 | Completed final sign-off Jul 2014 | 450 Sansome St | Bilcor Inc | fire alarm ti: install 9 ceiling mount speakers strobes. maher n/a. appl. ref. 201404223843.Details
fire alarm ti: install 9 ceiling mount speakers strobes. maher n/a. appl. ref. 201404223843. | $3,600 |
| May 13, 2014 | Never finaled issued May 2014, no final | 450 Sansome St | Peacock Construction Inc | 4th floor: electrical t-24 for app#201404223843. n/a for the maher ordinance #155-13Details
4th floor: electrical t-24 for app#201404223843. n/a for the maher ordinance #155-13 | $48,000 |
| May 6, 2014 | Completed final sign-off Jun 2014 | 450 Sansome St | Peacock Construction Inc | demo selected non structural partitions, construct new non structural partitons, new door and frame, patch finishes effected by demo. mep sprinklers under sep permit. n/a for maker.Details
demo selected non structural partitions, construct new non structural partitons, new door and frame, patch finishes effected by demo. mep sprinklers under sep permit. n/a for maker. | $32,000 |
| Apr 28, 2014 | Never finaled issued Apr 2014, no final | 450 Sansome St | R L H Fire Protection Inc | fire sprinkler permit. remove all sprinklers in the elevator machine room and from the top of the elevator hoistways. elevator shall compy with preapp (approved by capt jones) and 2013 cbc 3006.4.1 et. al.Details
fire sprinkler permit. remove all sprinklers in the elevator machine room and from the top of the elevator hoistways. elevator shall compy with preapp (approved by capt jones) and 2013 cbc 3006.4.1 et. al. | $5,000 |
| Apr 22, 2014 | Never finaled issued Apr 2014, no final | 450 Sansome St | Peacock Construction Inc | 4th floor: new non-structural partitions, new accoustical ceilings, new millworks and sign. mep, sprinkler, life safety under separate permitDetails
4th floor: new non-structural partitions, new accoustical ceilings, new millworks and sign. mep, sprinkler, life safety under separate permit | $119,500 |
| Feb 11, 2014 | Completed final sign-off Jun 2017 | 450 Sansome St | Peacock Construction Inc | remodel of selected area of (e) ground floor lobby to perform cosmetic upgrades. complinace with ordinance no.155-13 not required. excavation <50 cu yd. fire/mec/elect/under separate permitDetails
remodel of selected area of (e) ground floor lobby to perform cosmetic upgrades. complinace with ordinance no.155-13 not required. excavation <50 cu yd. fire/mec/elect/under separate permit | $185,000 |
| Jan 29, 2014 | Completed final sign-off Feb 2014 | 450 Sansome St | Bilcor Inc | remove (2) wall mount speaker strobes, install (1) ceiling mount speaker strobe, install (3) wall mount speaker strobes. compliance with ordinance #155-13 not required.Details
remove (2) wall mount speaker strobes, install (1) ceiling mount speaker strobe, install (3) wall mount speaker strobes. compliance with ordinance #155-13 not required. | $2,400 |
| Jan 10, 2014 | Completed final sign-off Mar 2016 | 450 Sansome St | Peacock Construction Inc | compliance with ordinance no. 15-133 not required. excation less than 50 cu yard or no excavation: demo of non structural partitions, ceilings, lighting to remain. build new non structural wall, relocate doors and frames, new electrical. f/a and sprinklers under separate permit.Details
compliance with ordinance no. 15-133 not required. excation less than 50 cu yard or no excavation: demo of non structural partitions, ceilings, lighting to remain. build new non structural wall, relocate doors and frames, new electrical. f/a and sprinklers under separate permit. | $105,000 |
| Dec 10, 2013 | Completed final sign-off Jan 2014 | 450 Sansome St | Siemens Industry, Inc. | addition of 1 duct detector, 1 smoke detector, 11 speakers, and 11 speker/strobes for the "umpqua bank" remodel on floor 13. all new devices connect onto the fire alarm system. ref pa# 201311051181Details
addition of 1 duct detector, 1 smoke detector, 11 speakers, and 11 speker/strobes for the "umpqua bank" remodel on floor 13. all new devices connect onto the fire alarm system. ref pa# 201311051181 | $12,600 |
| Nov 27, 2013 | Completed final sign-off Jan 2014 | 450 Sansome St | R L H Fire Protection Inc | 13th floor fire sprinkler permit - relocate 55 pendents & 1 upright, add 4 pendents & 1 upright, delete 8 pendents & 13 uprights, ref t.i. #2013.11.05.1181Details
13th floor fire sprinkler permit - relocate 55 pendents & 1 upright, add 4 pendents & 1 upright, delete 8 pendents & 13 uprights, ref t.i. #2013.11.05.1181 | $31,354 |
| Nov 5, 2013 | Completed final sign-off Feb 2014 | 450 Sansome St | Peacock Construction Inc | 13th floor tenant improvement for umqua bank offices including new partitions, new doors & finish upgrades. sprinkler and f/a under seperate permit.Details
13th floor tenant improvement for umqua bank offices including new partitions, new doors & finish upgrades. sprinkler and f/a under seperate permit. | $400,000 |
| Jun 5, 2013 | Completed final sign-off Feb 2014 | 450 Sansome St | Thomas Swan Sign Co Inc | erect a non-electric single faced wall signDetails
erect a non-electric single faced wall sign | $2,000 |
| May 9, 2013 | Completed final sign-off Jul 2014 | 450 Sansome St | suite #750-revision to pa# 2012-1004-1352-change in header detail for glass wall, change from tube steel to metal stud headerDetails
suite #750-revision to pa# 2012-1004-1352-change in header detail for glass wall, change from tube steel to metal stud header | ||
| May 9, 2013 | Completed final sign-off Aug 2013 | 450 Sansome St | Siemens Industry, Inc. | addition of 6 duct, 9 speaker/strobes, and 2 strobes for the "umpqua" remodel on floor 1. all devices connect onto the life safety system; pa 201212276901Details
addition of 6 duct, 9 speaker/strobes, and 2 strobes for the "umpqua" remodel on floor 1. all devices connect onto the life safety system; pa 201212276901 | $9,100 |
| May 8, 2013 | Completed final sign-off Aug 2013 | 450 Sansome St | Pioneer Fire Inc. | relocate (31) pendents, add (14) upright and pendednts, (2) remove and replace with upright sprinkler to accomodate new build out.Details
relocate (31) pendents, add (14) upright and pendednts, (2) remove and replace with upright sprinkler to accomodate new build out. | $14,261 |
| May 8, 2013 | Never finaled issued Jun 2013, no final | 450 Sansome St | Skyline Construction | #120 - revision to appl #2012.12.27.6901: remove existing accessible lift.Details
#120 - revision to appl #2012.12.27.6901: remove existing accessible lift. | |
| May 1, 2013 | Completed final sign-off Feb 2014 | 450 Sansome St | Thomas Swan Sign Co Inc | #120 - erect an electric double faced projecting sign.Details
#120 - erect an electric double faced projecting sign. | $5,000 |
| Apr 3, 2013 | Expired or cancelled cancelled Jan 2026 | 450 Sansome St | 1st floor suite 120 -revision to appl #2012.12.27.6901: revised workroom layout, all gyp board ceilings, revised to act system, lighting & hvac system.Details
1st floor suite 120 -revision to appl #2012.12.27.6901: revised workroom layout, all gyp board ceilings, revised to act system, lighting & hvac system. | ||
| Jan 25, 2013 | Completed final sign-off Jan 2013 | 450 Sansome St | Siemens Industry, Inc. | addition of 1 speaker/strobe for the hallway remodel on floor 1. connects onto fire alarm systemDetails
addition of 1 speaker/strobe for the hallway remodel on floor 1. connects onto fire alarm system | $500 |
| Jan 25, 2013 | Completed final sign-off Feb 2013 | 450 Sansome St | Siemens Industry, Inc. | addition of 3 speaker/strobes, 8 speakers, 4 strobes for the suite 700 remodel on floor 7. devices connect onto fire alarm systemDetails
addition of 3 speaker/strobes, 8 speakers, 4 strobes for the suite 700 remodel on floor 7. devices connect onto fire alarm system | $7,500 |
| Jan 18, 2013 | Never finaled issued Jan 2013, no final | 450 Sansome St | Ayoob & Peery Plumbing Co Inc | 7th floor: relocate 1 fire sprinkler head per t.i. ref app#201212045397Details
7th floor: relocate 1 fire sprinkler head per t.i. ref app#201212045397 | $514 |
| Jan 18, 2013 | Never finaled issued Jan 2013, no final | 450 Sansome St | Ayoob & Peery Plumbing Co Inc | 1st floor: add 2 fire sprinkler head per t.i. ref app#201208238133Details
1st floor: add 2 fire sprinkler head per t.i. ref app#201208238133 | $1,028 |
| Dec 27, 2012 | Completed final sign-off Mar 2014 | 450 Sansome St | Skyline Construction | t.i to a landlord provided empty shell space. includes non bearing partition walls, a portion of raised floor with structural foam w/conc top. new floor finishes. new paint, new casework & furniture. elect,mech & plumb, work on ste 120Details
t.i to a landlord provided empty shell space. includes non bearing partition walls, a portion of raised floor with structural foam w/conc top. new floor finishes. new paint, new casework & furniture. elect,mech & plumb, work on ste 120 | $325,000 |
| Dec 4, 2012 | Completed final sign-off Feb 2013 | 450 Sansome St | Dettaglio Construction Inc Dba Dci Const | 7th floor: minor wall demo and construction of 2 walls and 2 doors. new finishes and light fixtures throughout suite is currently unoccupied. mep, life safety and sprinkler modification are under seperate permit.Details
7th floor: minor wall demo and construction of 2 walls and 2 doors. new finishes and light fixtures throughout suite is currently unoccupied. mep, life safety and sprinkler modification are under seperate permit. | $25,000 |
| Nov 29, 2012 | Never finaled issued Dec 2012, no final | 450 Sansome St | Skyline Construction | exterior windows & doors to part of the lower level of a non-historical downtown high rise bldg. note: (e) window system requires upgrades due to weathering & (e) damaged condition. one window bay will house an atm & night drop fora proposed bank. interior t.i. under separate permit.ext.Details
exterior windows & doors to part of the lower level of a non-historical downtown high rise bldg. note: (e) window system requires upgrades due to weathering & (e) damaged condition. one window bay will house an atm & night drop fora proposed bank. interior t.i. under separate permit.ext. | $30,000 |
| Nov 13, 2012 | Never finaled issued Nov 2012, no final | 450 Sansome St | Siemens Industry, Inc. | addition of 8 speakers, 11 speaker/strobes, 3 strobes and a strobe synchronzation module for the "world pay" remodel on floor 14. all devices connect onto the life safety system.Details
addition of 8 speakers, 11 speaker/strobes, 3 strobes and a strobe synchronzation module for the "world pay" remodel on floor 14. all devices connect onto the life safety system. | $11,000 |
| Nov 7, 2012 | Completed final sign-off Nov 2012 | 450 Sansome St | Golden Gate Fire Protection Inc | 14th floor-fire sprinkler system upgrade-relocate 9 pendent sprinkler heads to uprights & relocate 1 pendent sprinkler. ti pa# 2012-1017-2268Details
14th floor-fire sprinkler system upgrade-relocate 9 pendent sprinkler heads to uprights & relocate 1 pendent sprinkler. ti pa# 2012-1017-2268 | $5,150 |
| Oct 17, 2012 | Never finaled issued Oct 2012, no final | 450 Sansome St | Jones Lang La Salle Construction Company | 14th floor - mech/electrical for ti work to demo, install/relocate equipment. pls refer to pa# 201207104441 for ti.Details
14th floor - mech/electrical for ti work to demo, install/relocate equipment. pls refer to pa# 201207104441 for ti. | $122,807 |
| Oct 4, 2012 | Completed final sign-off Nov 2013 | 450 Sansome St | removal of existing partial height wall in reception area. install full height gyp. board wall in its olace. full height glass wall at new office. installing new hardwood floors and carpet.Details
removal of existing partial height wall in reception area. install full height gyp. board wall in its olace. full height glass wall at new office. installing new hardwood floors and carpet. | $6,000 | |
| Aug 23, 2012 | Never finaled issued Jan 2013, no final | 450 Sansome St | Dettaglio Construction Inc Dba Dci Const | create a hallway across the rear of a vacant tenant space to allow landlords access to elevator equipment; close off a stairway that is not needed by code.Details
create a hallway across the rear of a vacant tenant space to allow landlords access to elevator equipment; close off a stairway that is not needed by code. | $10,000 |
| Aug 10, 2012 | Never finaled issued Aug 2012, no final | 450 Sansome St | Siemens Industry, Inc. | 4th floor core "as built" permit obtained due to the additon of 3 pull stations & 6 smoke detectors. all new devices were tested & approved by the sffd inspector, inspector requested this permit be acquired prior to job card sign-off. the original installation was performed under pa #2012.0427.9348.Details
4th floor core "as built" permit obtained due to the additon of 3 pull stations & 6 smoke detectors. all new devices were tested & approved by the sffd inspector, inspector requested this permit be acquired prior to job card sign-off. the original installation was performed under pa #2012.0427.9348. | $4,500 |
| Jul 10, 2012 | Never finaled issued Sep 2012, no final | 450 Sansome St | Jones Lang La Salle Construction Company | (14th floor) t.i. demolising non structural partitions and building new non structural partitions. all new or revised hvac, electrial, plumbing, sprinkler and life safety work, design build and submitted separately.Details
(14th floor) t.i. demolising non structural partitions and building new non structural partitions. all new or revised hvac, electrial, plumbing, sprinkler and life safety work, design build and submitted separately. | $155,000 |
| Jun 5, 2012 | Completed final sign-off Oct 2012 | 450 Sansome St | Ward Alan Emery Construction Inc. | 4th floor-demo (e) hvac air handler & associated duct, install new air handler. t.i pa# 2012-0222-4598; install 2 new fsd'sDetails
4th floor-demo (e) hvac air handler & associated duct, install new air handler. t.i pa# 2012-0222-4598; install 2 new fsd's | $82,000 |
| Apr 27, 2012 | Completed final sign-off Sep 2012 | 450 Sansome St | Siemens Industry, Inc. | addition of 1 smoke detector, 2 duct detectors, and 5 speaker/strobes for the "core area". remodel on floor 4. all devices connect onto the fire alarm system.Details
addition of 1 smoke detector, 2 duct detectors, and 5 speaker/strobes for the "core area". remodel on floor 4. all devices connect onto the fire alarm system. | $4,000 |
| Apr 24, 2012 | Never finaled issued Apr 2012, no final | 450 Sansome St | Golden Gate Fire Protection Inc | 4th floor-fire sprinkler system upgrades-add 75 upright sprinkler heads, hydro calculations included, new earthquake bracing & branch line restraints.Details
4th floor-fire sprinkler system upgrades-add 75 upright sprinkler heads, hydro calculations included, new earthquake bracing & branch line restraints. | $38,625 |
| Feb 22, 2012 | Completed final sign-off Oct 2012 | 450 Sansome St | Ward Alan Emery Construction Inc. | 4th fl: ti includes demo of non structural partitons. building new non structural partitons. all new or revised hvac, electerical, plumbing, life safety will be design build under separate permit. building not sprinklered. restroom work in mens and womens restroom.Details
4th fl: ti includes demo of non structural partitons. building new non structural partitons. all new or revised hvac, electerical, plumbing, life safety will be design build under separate permit. building not sprinklered. restroom work in mens and womens restroom. | $400,000 |
| Aug 25, 2011 | Completed final sign-off May 2012 | 450 Sansome St | Ayoob & Peery Plumbing Co Inc | basement level-add/relocate fire sprinkler heads per t.i.-1 added, 1 relocatedDetails
basement level-add/relocate fire sprinkler heads per t.i.-1 added, 1 relocated | $1,500 |
| Jul 13, 2011 | Completed final sign-off Aug 2011 | 450 Sansome St | C B F Inc | life safty system modification 450 sansome 16th floor. add 1 multi - can dela speaker/strobes wall mount. add 3 speakers ceiling mount.Details
life safty system modification 450 sansome 16th floor. add 1 multi - can dela speaker/strobes wall mount. add 3 speakers ceiling mount. | $2,000 |
| Jun 27, 2011 | Completed final sign-off Aug 2011 | 450 Sansome St | Anderson, Rowe & Buckley, Inc. | tenant improvements; arch. appl.# 201106168282. (e) fire sprinkler system, 4-added sprinkler, 1-relocated sprinkler @ 16th. flr.Details
tenant improvements; arch. appl.# 201106168282. (e) fire sprinkler system, 4-added sprinkler, 1-relocated sprinkler @ 16th. flr. | $2,000 |
| Jun 16, 2011 | Completed final sign-off Aug 2011 | 450 Sansome St | Principal Builders Inc. | 16th floor: t.i. demo of non structural partitions. all new or revised hvac and electrical included. plmg, sprinkler and life safety work will be design- build and submitted under seperate permit.Details
16th floor: t.i. demo of non structural partitions. all new or revised hvac and electrical included. plmg, sprinkler and life safety work will be design- build and submitted under seperate permit. | $195,000 |
| Jun 14, 2011 | Completed final sign-off Aug 2011 | 450 Sansome St | Siemens Industry, Inc. | addition of 1 smoke detector and 1 strobe, as well as the relocation of existing pull station, for service entrace on floor 1. new and relocated devices connect onto existing fire alarm system.Details
addition of 1 smoke detector and 1 strobe, as well as the relocation of existing pull station, for service entrace on floor 1. new and relocated devices connect onto existing fire alarm system. | $1,200 |
| May 11, 2011 | Completed final sign-off Nov 2011 | 450 Sansome St | Bcci Construction Company | revision to pa# 2007-1003-4450-structural changes to details on sheet s-2.0Details
revision to pa# 2007-1003-4450-structural changes to details on sheet s-2.0 | $500 |
| Jun 5, 2009 | Completed final sign-off Nov 2011 | 450 Sansome St | Dpr Construction Inc | convert existing side entrance to be a service entrance with delivery lift to complete work and obtain final inspection for work under pa 200710034450Details
convert existing side entrance to be a service entrance with delivery lift to complete work and obtain final inspection for work under pa 200710034450 | $50,000 |
| May 13, 2009 | Completed final sign-off Jun 2009 | 450 Sansome St | R.M.R. Construction Company | to obtain final inspection for work approved under app #200707136706. all work is complete.Details
to obtain final inspection for work approved under app #200707136706. all work is complete. | |
| May 13, 2009 | Completed final sign-off Jun 2009 | 450 Sansome St | R.M.R. Construction Company | to obtain final inspection for work approved under app #200707116456. all work is complete.Details
to obtain final inspection for work approved under app #200707116456. all work is complete. | |
| May 13, 2009 | Completed final sign-off Jun 2009 | 450 Sansome St | R.M.R. Construction Company | to obtain final inspection for work approved under app #200707116452. all work is complete.Details
to obtain final inspection for work approved under app #200707116452. all work is complete. | |
| May 13, 2009 | Completed final sign-off Jun 2009 | 450 Sansome St | R.M.R. Construction Company | to obtain final inspection for work approved under app #200707136705. all work is complete.Details
to obtain final inspection for work approved under app #200707136705. all work is complete. | |
| Nov 14, 2008 | Never finaled issued Nov 2008, no final | 450 Sansome St | scope of work is to verify the location of the public accessible restrooms per the district inspector's request during t i work under app #200804210265. no work under this permit, clarification only.Details
scope of work is to verify the location of the public accessible restrooms per the district inspector's request during t i work under app #200804210265. no work under this permit, clarification only. | ||
| Aug 15, 2008 | Never finaled issued Aug 2008, no final | 450 Sansome St | Morton Smith Electrical Inc | t.i. on ground floor add 2 speakers/strobe ceiling mnt. & 2 add 2 speakers/strobe wall mnt.Details
t.i. on ground floor add 2 speakers/strobe ceiling mnt. & 2 add 2 speakers/strobe wall mnt. | $1,600 |
| Aug 1, 2008 | Never finaled issued Aug 2008, no final | 450 Sansome St | street spaceDetails
street space | ||
| Jul 22, 2008 | Never finaled issued Jul 2008, no final | 450 Sansome St | Geo M Robinson & Co | 1st floor-relocate 14 sprinkler heads due to new wall and ceiling configuration for peet's coffee & teaDetails
1st floor-relocate 14 sprinkler heads due to new wall and ceiling configuration for peet's coffee & tea | $2,150 |
| Jun 17, 2008 | Completed final sign-off Jul 2008 | 450 Sansome St | J. M. Maita Construction Inc. | demolition of jamba juice improvements back to demising walls for turn over to landlord. demo shelves, counters, partition walls, sinks, floor finishes, ceiling finishes and every fixed equipement. ab17 applies.Details
demolition of jamba juice improvements back to demising walls for turn over to landlord. demo shelves, counters, partition walls, sinks, floor finishes, ceiling finishes and every fixed equipement. ab17 applies. | $10,000 |
| May 22, 2008 | Completed final sign-off May 2008 | 450 Sansome St | Dpr Construction Inc | renew appl#200707136709 for final inspection.Details
renew appl#200707136709 for final inspection. | |
| May 22, 2008 | Completed final sign-off May 2008 | 450 Sansome St | Dpr Construction Inc | renew appl#200710054671, 200705171532, 200708099296 for final inspection.Details
renew appl#200710054671, 200705171532, 200708099296 for final inspection. | |
| Apr 21, 2008 | Completed final sign-off Dec 2008 | 450 Sansome St | ti for coffee cafe on g/f, work includes (n) partitions, (n) equipment, fixtures, finishes, (n) m.e.p., no exterior work, fire protection under separate permit.Details
ti for coffee cafe on g/f, work includes (n) partitions, (n) equipment, fixtures, finishes, (n) m.e.p., no exterior work, fire protection under separate permit. | $225,000 | |
| Jan 25, 2008 | Completed final sign-off May 2008 | 450 Sansome St | Dpr Construction Inc | revision to pa# 2005/08/03/9280 to relocate handrails adjacent to handicap lift. revise ada drinking fountainDetails
revision to pa# 2005/08/03/9280 to relocate handrails adjacent to handicap lift. revise ada drinking fountain | $2,000 |
| Oct 5, 2007 | Expired or cancelled expired May 2008 | 450 Sansome St | Anderson, Rowe & Buckley, Inc. | 1st floor-tenant improvement to ex. fire sprinkler system on the 1st floor. add 3 sprinkler heads as a revision to pa# 2007/06/17/1532 to create as-built plan.Details
1st floor-tenant improvement to ex. fire sprinkler system on the 1st floor. add 3 sprinkler heads as a revision to pa# 2007/06/17/1532 to create as-built plan. | $600 |
| Oct 3, 2007 | Expired or cancelled expired May 2009 | 450 Sansome St | Dpr Construction Inc | t/i @ street level to reconfigure existing side entrance to provide new service entrance and lift.Details
t/i @ street level to reconfigure existing side entrance to provide new service entrance and lift. | $95,000 |
| Sep 28, 2007 | Never finaled issued Sep 2007, no final | 450 Sansome St | street space permitDetails
street space permit | ||
| Sep 24, 2007 | Completed final sign-off Jun 2009 | 450 Sansome St | t-24 for 11th floor tenant improvement. ref pa# 2007/05/18/1686 and 2007/05/18/1691Details
t-24 for 11th floor tenant improvement. ref pa# 2007/05/18/1686 and 2007/05/18/1691 | $25,800 | |
| Sep 12, 2007 | Completed final sign-off May 2008 | 450 Sansome St | Dpr Construction Inc | construct of new floating drywall ceiling & revised lobby lighting & construction of n ew handicap lift machine room. no exterior work. additionto appl#200508039280Details
construct of new floating drywall ceiling & revised lobby lighting & construction of n ew handicap lift machine room. no exterior work. additionto appl#200508039280 | $35,000 |
| Aug 9, 2007 | Expired or cancelled expired May 2008 | 450 Sansome St | Dpr Construction Inc | revision to pa# 200705171532-change canopy description to awning and not that non fire rated plywood to be installed breath canopy metal deck. approved plans: 200705171532. no change to design or dimensions or details from the approved plans #200705171532Details
revision to pa# 200705171532-change canopy description to awning and not that non fire rated plywood to be installed breath canopy metal deck. approved plans: 200705171532. no change to design or dimensions or details from the approved plans #200705171532 | |
| Jul 13, 2007 | Expired or cancelled expired May 2009 | 450 Sansome St | life safety system modifications @ 450 sansome st, 11th floor, sr travel. furnish & install 1 dual sync module, 3 strobe lights, 4 speaker/strobes.Details
life safety system modifications @ 450 sansome st, 11th floor, sr travel. furnish & install 1 dual sync module, 3 strobe lights, 4 speaker/strobes. | $8,000 | |
| Jul 13, 2007 | Expired or cancelled expired May 2009 | 450 Sansome St | C B F Inc | 11th floor, spec suite - life safety system modifications @ 450 sansome st, 11th floor. spec suite - furnish & install 1 dual sync module, 2 strobe lights & 2 speaker/strobes.Details
11th floor, spec suite - life safety system modifications @ 450 sansome st, 11th floor. spec suite - furnish & install 1 dual sync module, 2 strobe lights & 2 speaker/strobes. | $5,000 |
| Jul 13, 2007 | Expired or cancelled expired May 2008 | 450 Sansome St | C B F Inc | life safety system modifications @ 450 sansome 1st floor/ground floor. 1 new dual sync module, 2 new strobe lights, 2 new speaker strobe lights, 3 new manual pull stations.Details
life safety system modifications @ 450 sansome 1st floor/ground floor. 1 new dual sync module, 2 new strobe lights, 2 new speaker strobe lights, 3 new manual pull stations. | $8,000 |
| Jul 11, 2007 | Expired or cancelled expired May 2009 | 450 Sansome St | R L H Fire Protection Inc | t.i. upgrades of fire sprinkler, 11th floor, spec. suites office. relocate 22 sprinkler heads.Details
t.i. upgrades of fire sprinkler, 11th floor, spec. suites office. relocate 22 sprinkler heads. | $6,485 |
| Jul 11, 2007 | Expired or cancelled expired May 2009 | 450 Sansome St | R L H Fire Protection Inc | t/i upgrade of fire sprinklers, 11th floor sr travel office. relocate 36 fire sprinklers.Details
t/i upgrade of fire sprinklers, 11th floor sr travel office. relocate 36 fire sprinklers. | $7,515 |
| Jun 27, 2007 | Never finaled issued Jun 2007, no final | 450 Sansome St | oti-1 mezzanine demolish wall and door/frame, install new wall and new doors/frames. mechical and electrical on seperate permitDetails
oti-1 mezzanine demolish wall and door/frame, install new wall and new doors/frames. mechical and electrical on seperate permit | $8,000 | |
| May 18, 2007 | Completed final sign-off Jun 2009 | 450 Sansome St | swig equity llc, oti-1 11th floor, el, me, ls, spDetails
swig equity llc, oti-1 11th floor, el, me, ls, sp | $67,318 | |
| May 18, 2007 | Completed final sign-off Jun 2009 | 450 Sansome St | sr travel service, oti-1 11th floor, el, me, ls, spDetails
sr travel service, oti-1 11th floor, el, me, ls, sp | $135,000 | |
| May 17, 2007 | Completed final sign-off May 2007 | 450 Sansome St | 15th floor-renew pa# 200603106462, 200603237350 for finalDetails
15th floor-renew pa# 200603106462, 200603237350 for final | ||
| May 17, 2007 | Expired or cancelled expired May 2008 | 450 Sansome St | Anderson, Rowe & Buckley, Inc. | expansion of ixisting fire sprinkler system at 1st floor, 24 new hdsDetails
expansion of ixisting fire sprinkler system at 1st floor, 24 new hds | $5,000 |
| Apr 26, 2007 | Completed final sign-off May 2007 | 450 Sansome St | renew pa#200603166774,#200601273198,#200602214964 for final inspection.Details
renew pa#200603166774,#200601273198,#200602214964 for final inspection. | ||
| Apr 26, 2007 | Completed final sign-off May 2007 | 450 Sansome St | renew pa#200603166771,#200512069638,#200601242899 for final inspection.Details
renew pa#200603166771,#200512069638,#200601242899 for final inspection. | ||
| Apr 26, 2007 | Completed final sign-off May 2007 | 450 Sansome St | renew pa#200602164736,#200604048218 for final inspection.Details
renew pa#200602164736,#200604048218 for final inspection. | ||
| Jan 8, 2007 | Completed final sign-off Apr 2007 | 450 Sansome St | oti-2, 12th floor, el, meDetails
oti-2, 12th floor, el, me | $93,938 | |
| Dec 19, 2006 | Completed final sign-off Apr 2007 | 450 Sansome St | oti-2 15th floor el, me, spDetails
oti-2 15th floor el, me, sp | $85,000 | |
| Dec 19, 2006 | Completed final sign-off Apr 2007 | 450 Sansome St | C B F Inc | life safety modification - total 8 strobes, speakers, smoke detectors.Details
life safety modification - total 8 strobes, speakers, smoke detectors. | $5,000 |
| Dec 18, 2006 | Completed final sign-off Apr 2007 | 450 Sansome St | R L H Fire Protection Inc | t.i.upgrade on fire sprinkler system, 12th floor, stratgen office (#3340). relocate 34 heads, 33 add, delete 1 head, total 37 heads.Details
t.i.upgrade on fire sprinkler system, 12th floor, stratgen office (#3340). relocate 34 heads, 33 add, delete 1 head, total 37 heads. | $7,400 |
| Nov 15, 2006 | Expired or cancelled cancelled May 2009 | 450 Sansome St | R L H Fire Protection Inc | t i upgrade of pipe sprinkler system, relocate 34 sprklr headsDetails
t i upgrade of pipe sprinkler system, relocate 34 sprklr heads | $7,900 |
| Nov 7, 2006 | Completed final sign-off Mar 2007 | 450 Sansome St | 1st floor-barrier removal: removal of exterior door closing the opening (ramp leading to door cannot be corrected).Details
1st floor-barrier removal: removal of exterior door closing the opening (ramp leading to door cannot be corrected). | $5,000 | |
| Nov 7, 2006 | Completed final sign-off Apr 2007 | 450 Sansome St | C B F Inc | fire alarm, life safety system modifications, 15th floor installing approximately 14 devicesDetails
fire alarm, life safety system modifications, 15th floor installing approximately 14 devices | $7,500 |
| Oct 26, 2006 | Completed final sign-off Apr 2007 | 450 Sansome St | oti-1, 12th floor, el, ls, spDetails
oti-1, 12th floor, el, ls, sp | $185,000 | |
| Oct 24, 2006 | Completed final sign-off Apr 2007 | 450 Sansome St | oti-1 rev. 15th floorDetails
oti-1 rev. 15th floor | ||
| Oct 13, 2006 | Completed final sign-off Apr 2007 | 450 Sansome St | oti-1, 15th floor, el, me, ls, sp.Details
oti-1, 15th floor, el, me, ls, sp. | $85,000 | |
| Aug 15, 2006 | Completed final sign-off Jan 2007 | 450 Sansome St | soft demolition, vacant space, disabled access exception ab-17.Details
soft demolition, vacant space, disabled access exception ab-17. | $31,000 | |
| Jun 26, 2006 | Completed final sign-off May 2007 | 450 Sansome St | oti-2 11th floor meDetails
oti-2 11th floor me | $27,000 | |
| Jun 26, 2006 | Completed final sign-off May 2007 | 450 Sansome St | oti-2 15th floor me oti-2 for hvac, oti-1 appl#200512069638Details
oti-2 15th floor me oti-2 for hvac, oti-1 appl#200512069638 | $27,000 | |
| Apr 4, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | amend to pa 200512069638 at 15th fl, add ceiling lighting fixture at elevator lobby.Details
amend to pa 200512069638 at 15th fl, add ceiling lighting fixture at elevator lobby. | ||
| Mar 27, 2006 | Completed final sign-off Apr 2006 | 450 Sansome St | R.M.R. Construction Company | to renew for final only. pa# 2005/06/09/4713.Details
to renew for final only. pa# 2005/06/09/4713. | |
| Mar 23, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | oti-2 15th fl el, meDetails
oti-2 15th fl el, me | $65,000 | |
| Mar 16, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | C B F Inc | life safety system modifacations @ 450 sansome street. 11th fllor. 7 smoke detectors, 3 duct detectors, 3 speaker / strobes, 2 wall strobes & 1 speaker.Details
life safety system modifacations @ 450 sansome street. 11th fllor. 7 smoke detectors, 3 duct detectors, 3 speaker / strobes, 2 wall strobes & 1 speaker. | $18,000 |
| Mar 16, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | C B F Inc | life safety system modifications, 1st floor. sarnoff 8 ceiling mounted speaker strobes and 1 strobeDetails
life safety system modifications, 1st floor. sarnoff 8 ceiling mounted speaker strobes and 1 strobe | $9,000 |
| Mar 10, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | R L H Fire Protection Inc | t/i upgrade reloc 29 heads/add 4 hd 33 hd on 15th floorDetails
t/i upgrade reloc 29 heads/add 4 hd 33 hd on 15th floor | $4,800 |
| Feb 21, 2006 | Completed final sign-off May 2006 | 450 Sansome St | C B F Inc | life safety system modifications. 450 sansome 6th fl-6 wall strobe lights and 4 ceiling mounted speakersDetails
life safety system modifications. 450 sansome 6th fl-6 wall strobe lights and 4 ceiling mounted speakers | $5,000 |
| Feb 21, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | C B F Inc | life safety system modifications. 450 sansome, 15 th flr, 7 smoke detectors, 3 duct detectors,3 speaker strobes, 2 wall strobes, 1 speakerDetails
life safety system modifications. 450 sansome, 15 th flr, 7 smoke detectors, 3 duct detectors,3 speaker strobes, 2 wall strobes, 1 speaker | $8,000 |
| Feb 16, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system base bldng build back 198 spkers, no increase in sizeDetails
fire sprinkler system base bldng build back 198 spkers, no increase in size | $40,000 |
| Jan 27, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | floor 11 - demolition/asbestos abatement of entire floor, build back of corridor & toilet rooms, non-structural/abatement / mep under separate permitDetails
floor 11 - demolition/asbestos abatement of entire floor, build back of corridor & toilet rooms, non-structural/abatement / mep under separate permit | $60,000 | |
| Jan 24, 2006 | Expired or cancelled expired May 2007 | 450 Sansome St | oti-1 15th floor, me, el, lsDetails
oti-1 15th floor, me, el, ls | $45,000 | |
| Jan 19, 2006 | Completed final sign-off May 2006 | 450 Sansome St | R L H Fire Protection Inc | t/i for spec suite on 6th floor of 450 sansome st 24 relocates/4 adds 28 headsDetails
t/i for spec suite on 6th floor of 450 sansome st 24 relocates/4 adds 28 heads | $4,000 |
| Jan 17, 2006 | Completed final sign-off Feb 2006 | 450 Sansome St | renew appl#200506165235,200506165233 for finalDetails
renew appl#200506165235,200506165233 for final | ||
| Jan 10, 2006 | Completed final sign-off Apr 2006 | 450 Sansome St | C B F Inc | revision to pa# 2005/08/25/1200. add 1 fsd & 1 control module.Details
revision to pa# 2005/08/25/1200. add 1 fsd & 1 control module. | |
| Dec 22, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | oti-1, 6th floor, el, me, ls, spDetails
oti-1, 6th floor, el, me, ls, sp | $70,000 | |
| Dec 6, 2005 | Expired or cancelled expired May 2007 | 450 Sansome St | demolition of tenant area and toilet rooms on 15th flr. build back of toilet rooms. gypcrete flooring for lowering of floorDetails
demolition of tenant area and toilet rooms on 15th flr. build back of toilet rooms. gypcrete flooring for lowering of floor | $80,000 | |
| Nov 15, 2005 | Completed final sign-off Feb 2006 | 450 Sansome St | correct application 2005102666618 to 450 sansome from the incorrect address of 450 sutterDetails
correct application 2005102666618 to 450 sansome from the incorrect address of 450 sutter | ||
| Oct 18, 2005 | Completed final sign-off Feb 2006 | 450 Sansome St | C B F Inc | life safety system modifications @ 450 sansome st. 5th fl, paradigm-install speaker/strober, strobe light & smoke detector.Details
life safety system modifications @ 450 sansome st. 5th fl, paradigm-install speaker/strober, strobe light & smoke detector. | $10,000 |
| Oct 12, 2005 | Completed final sign-off Feb 2006 | 450 Sansome St | Anderson, Rowe & Buckley, Inc. | extg fire sprinkler sytem expansion/no increase in size/63 sprinklr/14 spnklr/77 relocatedDetails
extg fire sprinkler sytem expansion/no increase in size/63 sprinklr/14 spnklr/77 relocated | $7,800 |
| Sep 15, 2005 | Completed final sign-off Feb 2006 | 450 Sansome St | oti-1,5th floor, el, me, ls, spDetails
oti-1,5th floor, el, me, ls, sp | $275,000 | |
| Sep 13, 2005 | Completed final sign-off Sep 2005 | 450 Sansome St | C B F Inc | life safety system modifications @ 450 sansome street. 6th floor. exit certified.Details
life safety system modifications @ 450 sansome street. 6th floor. exit certified. | $15,000 |
| Sep 2, 2005 | Completed final sign-off Sep 2005 | 450 Sansome St | Skyline Construction | oti-2 6/fl el, me, spDetails
oti-2 6/fl el, me, sp | $65,000 |
| Aug 25, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | C B F Inc | life safety system modifications @ 450 sansome st. 10th fl.american tech. research. 8 strobes, 6Details
life safety system modifications @ 450 sansome st. 10th fl.american tech. research. 8 strobes, 6 | $14,000 |
| Aug 25, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | C B F Inc | life safety system modifications @ 450 sansome st, 10th fl spec suite devices. speaker strobes.Details
life safety system modifications @ 450 sansome st, 10th fl spec suite devices. speaker strobes. | $10,000 |
| Aug 22, 2005 | Completed final sign-off Jan 2006 | 450 Sansome St | C B F Inc | life safety system modification @ 450 sansome st. 16th/fl-add (2) smoke detectors & (2) fire smokeDetails
life safety system modification @ 450 sansome st. 16th/fl-add (2) smoke detectors & (2) fire smoke | $1,800 |
| Aug 11, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | Pribuss Engineering Inc | fire sprinkler t.i. relocate 23, add 2Details
fire sprinkler t.i. relocate 23, add 2 | $2,750 |
| Aug 11, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | Pribuss Engineering Inc | fire sprinkler t.i. relocate 36, add 7Details
fire sprinkler t.i. relocate 36, add 7 | $5,200 |
| Aug 10, 2005 | Completed final sign-off Jan 2006 | 450 Sansome St | oti-2, 16th/fl-el,me.Details
oti-2, 16th/fl-el,me. | $63,600 | |
| Aug 5, 2005 | Completed final sign-off Sep 2005 | 450 Sansome St | interior,no structural work, new partitions/walls & doors.electrical,mech,life safety & srpinklersDetails
interior,no structural work, new partitions/walls & doors.electrical,mech,life safety & srpinklers | $71,200 | |
| Aug 3, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | City Building Inc. | new power, lighting & hvac.Details
new power, lighting & hvac. | $53,000 |
| Aug 3, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | City Building Inc. | new hvac, lighting & power. spec suites.Details
new hvac, lighting & power. spec suites. | $34,000 |
| Aug 3, 2005 | Completed final sign-off May 2008 | 450 Sansome St | Dpr Construction Inc | removal of (e) stairs & ramps which currently take up most of the front plaze of the bldg, construct of a new single story extension of approx 1500 sf set at street level. the new space will be used to extend the existing retail spaces & lobby.Details
removal of (e) stairs & ramps which currently take up most of the front plaze of the bldg, construct of a new single story extension of approx 1500 sf set at street level. the new space will be used to extend the existing retail spaces & lobby. | $1,000,000 |
| Aug 2, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | oti-1, 10th floor, el, me, ls, sp.Details
oti-1, 10th floor, el, me, ls, sp. | $71,200 | |
| Aug 2, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | oti-1, 10th floor, el, me, ls, sp.Details
oti-1, 10th floor, el, me, ls, sp. | $54,000 | |
| Jun 16, 2005 | Expired or cancelled expired Feb 2006 | 450 Sansome St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system,67 sprinklers, 14 changouts, 8000 s.f.,no increase in sizeDetails
fire sprinkler system,67 sprinklers, 14 changouts, 8000 s.f.,no increase in size | $24,000 |
| Jun 16, 2005 | Completed final sign-off Jan 2006 | 450 Sansome St | Anderson, Rowe & Buckley, Inc. | t.i.(e)fire sprinkler system,relocate 89 (change outs), 9000 s.f.,no increase in sizeDetails
t.i.(e)fire sprinkler system,relocate 89 (change outs), 9000 s.f.,no increase in size | $27,000 |
| Jun 16, 2005 | Expired or cancelled expired Feb 2006 | 450 Sansome St | Anderson, Rowe & Buckley, Inc. | sprinkler system,67 new sprinklers,14 changeout sprinklers 8000 s.f.,no increase in sizeDetails
sprinkler system,67 new sprinklers,14 changeout sprinklers 8000 s.f.,no increase in size | $24,000 |
| Jun 15, 2005 | Completed final sign-off Jan 2006 | 450 Sansome St | oti-1, 16th floor, el, me, ls. sp.Details
oti-1, 16th floor, el, me, ls. sp. | $130,000 | |
| Jun 9, 2005 | Completed final sign-off Feb 2006 | 450 Sansome St | C B F Inc | fire alarm/life safety system modifications @ 450 sansome 12th/fl. 1-dual sync. module, speaker/Details
fire alarm/life safety system modifications @ 450 sansome 12th/fl. 1-dual sync. module, speaker/ | $8,300 |
| Jun 9, 2005 | Expired or cancelled expired Apr 2006 | 450 Sansome St | C B F Inc | life safety system modification@ 450 sansom st, 10th/fl. dual sysc. module speakers/strobes, smokeDetails
life safety system modification@ 450 sansom st, 10th/fl. dual sysc. module speakers/strobes, smoke | $8,300 |
| Jun 9, 2005 | Completed final sign-off Jan 2006 | 450 Sansome St | C B F Inc | life safety sytem modifications@ 450 sansome st 16thfl-dual sync. module, strobe lights, & speakers.Details
life safety sytem modifications@ 450 sansome st 16thfl-dual sync. module, strobe lights, & speakers. | $14,000 |
| Apr 18, 2005 | Completed final sign-off Apr 2006 | 450 Sansome St | demolition permit -non structural work- floors 10 & floors 12.Details
demolition permit -non structural work- floors 10 & floors 12. | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C B F Inc (18), Golden Gate Fire Protection Inc (14), M C S Construction Services (11), Siemens Industry, Inc. (11), Peacock Construction Inc (10), Peacock Construction (9), Anderson, Rowe & Buckley, Inc. (8), Bilcor Inc (8), Dpr Construction Inc (8), R L H Fire Protection Inc (8), Skyline Construction (7), Gci, Inc (5), R.M.R. Construction Company (5), Ayoob & Peery Plumbing Co Inc (3), Emcor Services/Mesa Energy Systems Inc (3), Source Planning And Construction Inc (3), City Building Inc. (2), Dettaglio Construction Inc Dba Dci Const (2), Excel Signs (2), Jones Lang La Salle Construction Company (2), Pribuss Engineering Inc (2), Ramsay Signs, Inc. (2), Richlen Construction (2), Thomas Swan Sign Co Inc (2), Ward Alan Emery Construction Inc. (2), Bcci Construction Company, Geo M Robinson & Co, J. M. Maita Construction Inc., Martin Sign Co Inc., Morton Smith Electrical Inc, Pioneer Fire Inc., Principal Builders Inc.
- Architects
- Hooks Design Hooks Design (10), Yong Jin Park (6), James Stephen Sunseri (5), Melissa Pesci (4), Douglas Tom (3), Michael John Mccall (3), William Loftis (3), Mark Dziewulski, Arch (2), Scott E Clement (2), Heidi Liebes, Louis Almgren, Richman Neumann
- Engineers
- Hersert Evans (7), Sherry Chaumpluke (6), Stephen Shaffer (5), Jesus B Cabellon Jr (4), Amit Wadhwa (2), Donald Dammen (2), Edward Rivera (2), Alexander Joseph Pacheco, Arb, Edward Rivera, Farshad Khodayari, Fazol Zarrabi, Michael Mccall, Randy Collins, Rudolfo P Bustos Iii, Zhen Chao Xiong
- Designers
- James Sunseri, Karl Theodore Korth, Martin Wall, Ronald Demartini
- Pmt consultant/expediters
- Pat Buscovich (3), David Penney
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.