Jin Park
- Listed as
- architect
- Firm
- Revel
- Based in
- Sf
- On San Francisco permits
- Aug 2024 to Aug 2026
35 permits since 2000 (architect on 35 permits): 23 completed, 12 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Aug 2026 | 580 California St | Skyline Construction | 13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixturesDetails
13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and life safety under seperate permits. no new plumbing fixtures | $966,322 |
| Aug 12, 2026 | In progress issued Sep 2026 | 500 Beach St | Rdl Construction, Inc. | ground floor- revision 202607024493- relocate of 2nd exit door, stair and alcove. structrual work includedDetails
ground floor- revision 202607024493- relocate of 2nd exit door, stair and alcove. structrual work included | |
| Aug 6, 2026 | In progress issued Aug 2026 | 750 Battery St | Field Construction Inc. | 4th floor:interior demo & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the commen area restrooms within the e envelope.demo/install of nw finishes & fixtures mech/electrical deferDetails
4th floor:interior demo & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the commen area restrooms within the e envelope.demo/install of nw finishes & fixtures mech/electrical defer | $2,509,029 |
| Jul 2, 2026 | In progress issued Jul 2026 | 500 Beach St | Rdl Construction, Inc. | new demising wall, new entry door & glazing w/exterior canopy, new shared exit vestbulew/new stairs exisitng stairs, ramp and railing will be upgraded to full compliance, inlcuding structrual for new header at entry doors, ceiling ramp and stair w/landing. sprinkler deferred.Details
new demising wall, new entry door & glazing w/exterior canopy, new shared exit vestbulew/new stairs exisitng stairs, ramp and railing will be upgraded to full compliance, inlcuding structrual for new header at entry doors, ceiling ramp and stair w/landing. sprinkler deferred. | $190,000 |
| Jun 25, 2026 | In progress issued Aug 2026 | 101 California St | 10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491Details
10th fl: non structual interior demolition of partitoins, doors, finishes, ceilings, lighting, mechanical and electrical outlets/switches. refer to mech/elec plans. includes restroom ada accessibility upgrades. mep deferred. ref path of travel 202303103491 | $58,220 | |
| Jun 24, 2026 | In progress issued Aug 2026 | 201 Mission St | Richlen Construction | 14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits.Details
14/f suite 1400: selective interior demo and new construction of elements including but not limited to interior partitions, doors, finishes, ceilings, open ceiling and light fixtures. mep and life safety under separate permits. | $285,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 101 California St | Source Planning And Construction Inc | 46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishesDetails
46th fl limited demo, construction of partitions, ceiling, lighting, doors & inishes to demise suite 4600 into suite 4600 & 4625. also, refreshing, common area restrooms & limited demo, new partitions, restroom dividers ceiling lights, fixtures, accessorie & finishes | $250,000 |
| Jun 17, 2026 | Completed final sign-off Jul 2026 | 201 Mission St | Richlen Construction | 23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location.Details
23/f unit 2375: selective interior demo & new construction of elements including but not limited to: interior glass partitions, finishes, & ceilings. no change to plumbing fixture count and location. | $56,543 |
| Jun 4, 2026 | Completed final sign-off Aug 2026 | 201 Mission St | Richlen Construction | 22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles.Details
22/fl- ste. 2240 -ref 202604239932- mep- electrical (n) fixtures and finishes, power signal devices/wiring. hvac (n) 2x2 supply air diffusers, supply air ducts, air grilles. | $190,288 |
| May 22, 2026 | In progress issued Jun 2026 | 750 Battery St | Field Construction Inc. | revision to pa 202602266563 drinking fountain alcove changes to accommodate (e) conditions - after exploratory demo. revision of deferred submittals, accesory specifications, rcp layout & light fixture quantitiesDetails
revision to pa 202602266563 drinking fountain alcove changes to accommodate (e) conditions - after exploratory demo. revision of deferred submittals, accesory specifications, rcp layout & light fixture quantities | |
| May 21, 2026 | Completed final sign-off Jun 2026 | 750 Battery St | Field Construction Inc. | revision to pa 202601234385 permit set consists od drinking fountation alcove changes to accomoodate existing condition after exploratory demo. revisions to deferred submittals & accessory specs. original permit 202601234385Details
revision to pa 202601234385 permit set consists od drinking fountation alcove changes to accomoodate existing condition after exploratory demo. revisions to deferred submittals & accessory specs. original permit 202601234385 | |
| May 20, 2026 | Completed final sign-off Sep 2026 | 201 Mission St | Richlen Construction | 21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approvedDetails
21/f ste 2150 : shall consist of selective interior demolition and new construction of elements including but not limited to: interior partitions, door finishes & ceilings. path of travel ref drawings previously approved | $218,435 |
| Apr 23, 2026 | Completed final sign-off Aug 2026 | 201 Mission St | Richlen Construction | floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit.Details
floor 22: ste 2240 - interior demolition and new constructions of elements including but not limited to interior partitions, doors, finishes and lighting. mep sprinklers and life safety modifications undere separate permit. | $341,000 |
| Apr 23, 2026 | Completed final sign-off Jul 2026 | 595 Market St | Dome Construction Corp | 20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850Details
20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850 | |
| Apr 23, 2026 | Completed final sign-off Jul 2026 | 595 Market St | Dome Construction Corp | 22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844Details
22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844 | |
| Feb 26, 2026 | In progress issued Mar 2026 | 750 Battery St | Field Construction Inc. | 6/fl- soft demo of non sturtcrual partitions, finishes and fixtures. install (n) lighting and remodel of restrooms. ti permit will be on separte permit as well as fire and mep deffered.Details
6/fl- soft demo of non sturtcrual partitions, finishes and fixtures. install (n) lighting and remodel of restrooms. ti permit will be on separte permit as well as fire and mep deffered. | $199,000 |
| Feb 26, 2026 | Completed final sign-off Jul 2026 | 595 Market St | Dome Construction Corp | 22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawingDetails
22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing | $1,097,019 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 101 California St | Hp Build | 25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitionsDetails
25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interior ceilings, light, & finishes. new work includes construction of interior non-structural partitions | $120,000 |
| Dec 17, 2025 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | scope of work on the 7/f ste 700. shall consist of interior demo of non structural elements including but not necessary limited to interior partions, doors, finishes, ceiling, lighting, mech and elec outlets and switches. mep life, safety and sprinkler system on sep permit. no exterior work.Details
scope of work on the 7/f ste 700. shall consist of interior demo of non structural elements including but not necessary limited to interior partions, doors, finishes, ceiling, lighting, mech and elec outlets and switches. mep life, safety and sprinkler system on sep permit. no exterior work. | $1,100,000 |
| Nov 13, 2025 | Completed final sign-off Jun 2026 | 185 Berry St | Hathaway Dinwiddie Co. | 1/f: tenant suite demising wall. ste #150, resulting in creating suite #140 and #150.Details
1/f: tenant suite demising wall. ste #150, resulting in creating suite #140 and #150. | $15,000 |
| Nov 5, 2025 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | 13th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.Details
13th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit. | $834,400 |
| Nov 5, 2025 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | 12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.Details
12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit. | $347,351 |
| Nov 5, 2025 | In progress issued Jan 2026 | 450 Sansome St | M C S Construction Services | 14th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.Details
14th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit. | $426,957 |
| Oct 23, 2025 | In progress issued Jan 2026 | 450 Sansome St | M C S Construction Services | 11/f suite 1100 - demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting, mech electrical outlets and switches. restroom ada access. upgrade and new ada hi/lo drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit.Details
11/f suite 1100 - demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting, mech electrical outlets and switches. restroom ada access. upgrade and new ada hi/lo drinking fountain. mep, ls and sprinkler system modification will be submitted as a separate permit. | $1,043,000 |
| Oct 23, 2025 | Completed final sign-off Sep 2026 | 450 Sansome St | M C S Construction Services | scope of work 7th fl (ste 750) shall consist of interior demo of non structural elements including interior partitoins, doors, finishes, ceilings, lighting,mech and elec outlets/switches. restroom ada upgrades, drinking fountains. mep life safety,sprinkler sys sep permit. no exterior work.Details
scope of work 7th fl (ste 750) shall consist of interior demo of non structural elements including interior partitoins, doors, finishes, ceilings, lighting,mech and elec outlets/switches. restroom ada upgrades, drinking fountains. mep life safety,sprinkler sys sep permit. no exterior work. | $351,066 |
| Sep 5, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | Hathaway Dinwiddie Co. | 17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.Details
17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit. | $800,000 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 222 02nd St | Novo Construction Inc | 13/f -revision to pa #202502130273. revision to smoke control narrative only.Details
13/f -revision to pa #202502130273. revision to smoke control narrative only. | |
| Aug 14, 2025 | Completed final sign-off Oct 2025 | 88 Stevenson St | scope of work on 3rd floor shall consist of limited interior construction of non structural elements including but not neccasary limited to partitions, doors finishes, and electrical outlets.Details
scope of work on 3rd floor shall consist of limited interior construction of non structural elements including but not neccasary limited to partitions, doors finishes, and electrical outlets. | $82,705 | |
| Aug 13, 2025 | Completed final sign-off Oct 2025 | 88 Stevenson St | suite 200 -minor interior demo and construction of non structural elements including but not limited to partitions finishes, electrial outletsDetails
suite 200 -minor interior demo and construction of non structural elements including but not limited to partitions finishes, electrial outlets | $79,745 | |
| Jul 18, 2025 | Completed final sign-off Oct 2025 | 1455 Market St | Bcci Construction Company | 8th/fl:shall consist of demolition of finishes, and minimal new millwork, plumbing, power data receptacles, paint and flooring finish. no change to ceiling, lighting, life safety scope of work does not affect the path of travel.Details
8th/fl:shall consist of demolition of finishes, and minimal new millwork, plumbing, power data receptacles, paint and flooring finish. no change to ceiling, lighting, life safety scope of work does not affect the path of travel. | $106,000 |
| Apr 3, 2025 | Completed final sign-off Apr 2026 | 222 02nd St | Novo Construction Inc | 13th fl revision to pa 2025-0213-0273: demo of (e) rated elevator lobby doors to be replaced with new rated doors and associated finishes. 5 sheetsDetails
13th fl revision to pa 2025-0213-0273: demo of (e) rated elevator lobby doors to be replaced with new rated doors and associated finishes. 5 sheets | |
| Feb 13, 2025 | Completed final sign-off Apr 2026 | 222 02nd St | Novo Construction Inc | 13/fl- -ti work includes (n) interior partitions, doors, finishes, ceilings and associated mepDetails
13/fl- -ti work includes (n) interior partitions, doors, finishes, ceilings and associated mep | $5,000,000 |
| Jan 27, 2025 | Completed final sign-off May 2025 | 747 Front St | San Francisco Commercial Builders Inc | revision 202408057928- changing the pass thru window within the same openingDetails
revision 202408057928- changing the pass thru window within the same opening | $1,000 |
| Jan 17, 2025 | Completed final sign-off Apr 2026 | 222 02nd St | Novo Construction Inc | interior demolition on 13th floor:demolition scope includes but not limitted to interior partitions, doors, ceiling, lighting and finishes. no structural, site, building exterior, landscape, parking change are proposed.Details
interior demolition on 13th floor:demolition scope includes but not limitted to interior partitions, doors, ceiling, lighting and finishes. no structural, site, building exterior, landscape, parking change are proposed. | $184,172 |
| Aug 15, 2024 | In progress issued Aug 2024 | 550 California St | 8th fl-interior ti demo & (n) construction of elements including but not limitied to interior partitions,doors,finishes, ceiling, lighting, (n) studio pipe grid, mech & elec outlets & switches. ref to mep & structural drawings. scope does not affect fixture quantities, occ load or path of travel.Details
8th fl-interior ti demo & (n) construction of elements including but not limitied to interior partitions,doors,finishes, ceiling, lighting, (n) studio pipe grid, mech & elec outlets & switches. ref to mep & structural drawings. scope does not affect fixture quantities, occ load or path of travel. | $60,000 |