Block 0240, lot 020
550 California St
- City’s use
- Commercial Office
- Built
- 1960
- Stories
- 13
- Rooms
- 38 bathrooms
- Building
- 332,672 sq ft
- Lot
- 34,993 sq ft
- Zoning
- C3O
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 550 California St | suite 240, 2nd flr. interior demo of non-structural elements. interior partitions, doors, finishes, ceilings, lighting, mech, elec. outlets and switches.Details
suite 240, 2nd flr. interior demo of non-structural elements. interior partitions, doors, finishes, ceilings, lighting, mech, elec. outlets and switches. | $250,000 | |
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 550 California St | revision to 202603318646. removeal of 1 partition. make 1 office into a meeting room and revise lighting and power as needed. provide furring near breakroom.Details
revision to 202603318646. removeal of 1 partition. make 1 office into a meeting room and revise lighting and power as needed. provide furring near breakroom. | ||
| Jun 30, 2026 | In progress issued Jul 2026 | 550 California St | ste #220 (level 2): deferred mep for pa# 202606052702.Details
ste #220 (level 2): deferred mep for pa# 202606052702. | $172,368 | |
| Jun 26, 2026 | In progress issued Jul 2026 | 550 California St | suite 430: deferred mep for 202604300443Details
suite 430: deferred mep for 202604300443 | $249,000 | |
| Jun 5, 2026 | In progress issued Jun 2026 | 550 California St | ste #220 (level 2) ti: demo and (n) non structural partitions, finishes, millwork, lighting, mep deferred. no structural or exterior work.Details
ste #220 (level 2) ti: demo and (n) non structural partitions, finishes, millwork, lighting, mep deferred. no structural or exterior work. | $324,300 | |
| Jun 4, 2026 | In progress issued Jun 2026 | 550 California St | level 4, suite 440: deferred mep for pa#202604230010Details
level 4, suite 440: deferred mep for pa#202604230010 | $289,656 | |
| May 7, 2026 | In progress issued May 2026 | 550 California St | 2/fl-ref 202603318646- mepsDetails
2/fl-ref 202603318646- meps | $190,000 | |
| Apr 30, 2026 | In progress issued May 2026 | 550 California St | 4/f suite 430: tenant improvement. demo and new non-structural partitions, millwork, finishes. no structural or exterior work. mep deferred.Details
4/f suite 430: tenant improvement. demo and new non-structural partitions, millwork, finishes. no structural or exterior work. mep deferred. | $350,000 | |
| Apr 23, 2026 | In progress issued Apr 2026 | 550 California St | 14th fl, ste 440 ti demo (e) floor finish & build; (n) non-structural partitions, finishes, millwork, lighting. no structural/exterior work mep deferredDetails
14th fl, ste 440 ti demo (e) floor finish & build; (n) non-structural partitions, finishes, millwork, lighting. no structural/exterior work mep deferred | $350,000 | |
| Mar 31, 2026 | In progress issued Apr 2026 | 550 California St | level 2, suite 210. demo e and construct new non structural partitons, finishes,millwork, ceilings. no exterior or structural work. mep deferredDetails
level 2, suite 210. demo e and construct new non structural partitons, finishes,millwork, ceilings. no exterior or structural work. mep deferred | $350,000 | |
| Mar 26, 2026 | In progress issued Mar 2026 | 550 California St | 4th fl, 450 deferred mep for bpa 202602196216Details
4th fl, 450 deferred mep for bpa 202602196216 | $126,000 | |
| Feb 26, 2026 | In progress issued Mar 2026 | 550 California St | 3rd/f: suite 340. deferred mep for t.i. 202512172011Details
3rd/f: suite 340. deferred mep for t.i. 202512172011 | $218,952 | |
| Feb 19, 2026 | In progress issued Mar 2026 | 550 California St | ste 450.scope of work on the 4/f consists of selective demo and new construction of non structural partition, doors, finishes, ceiling, lighting, mep and millwork, scope also includes path of travel upgrades of the g/fand parking garage. mep, fls, and sprinkers are to be deferred. interior work onlyDetails
ste 450.scope of work on the 4/f consists of selective demo and new construction of non structural partition, doors, finishes, ceiling, lighting, mep and millwork, scope also includes path of travel upgrades of the g/fand parking garage. mep, fls, and sprinkers are to be deferred. interior work only | $400,000 | |
| Feb 5, 2026 | In progress issued Feb 2026 | 550 California St | deferred mep for pa#2025-1222-2376Details
deferred mep for pa#2025-1222-2376 | $636,899 | |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 550 California St | Battalion One Fire Protection | 4th floor. suite 420. fire alarm tenant improvement - remove/relocation and install new notification devices. bldg permit: 202508274033 and existing fire alarm ref: 202212097979Details
4th floor. suite 420. fire alarm tenant improvement - remove/relocation and install new notification devices. bldg permit: 202508274033 and existing fire alarm ref: 202212097979 | $9,500 |
| Jan 29, 2026 | In progress issued Jan 2026 | 550 California St | Battalion One Fire Protection | 12th fl, ste 1220 fire alarm ti - remove/relocation and install new notification devices. ref bldg pa 202511038811 existing fire alarm 202212097979Details
12th fl, ste 1220 fire alarm ti - remove/relocation and install new notification devices. ref bldg pa 202511038811 existing fire alarm 202212097979 | $9,500 |
| Jan 29, 2026 | In progress issued Jan 2026 | 550 California St | Battalion One Fire Protection | 12th fl, ste 1200 fire alarm ti - remove/relocation and install new notification devices. ref bldg pa 202510217749 existing fire alarm 202212097979Details
12th fl, ste 1200 fire alarm ti - remove/relocation and install new notification devices. ref bldg pa 202510217749 existing fire alarm 202212097979 | $9,500 |
| Jan 8, 2026 | Completed final sign-off Jan 2026 | 550 California St | Battalion One Fire Protection | 3rd floor #360: fire alarm t.i. - remove/relocation and install new notification devices. bldg#: 202508112721. ref fire alarm: 202212097979.Details
3rd floor #360: fire alarm t.i. - remove/relocation and install new notification devices. bldg#: 202508112721. ref fire alarm: 202212097979. | $9,500 |
| Jan 8, 2026 | Completed final sign-off Jan 2026 | 550 California St | Battalion One Fire Protection | 2nd fl, ste 250 fire alarm ti remove/relocation and install new notification devices. building pa 202509195774; existing fire alarm pa 202212097979Details
2nd fl, ste 250 fire alarm ti remove/relocation and install new notification devices. building pa 202509195774; existing fire alarm pa 202212097979 | $9,500 |
| Jan 8, 2026 | Completed final sign-off Jan 2026 | 550 California St | Battalion One Fire Protection | 3/f suite 350: fire alarm tenant improvement - remove/relocation and install new notification devices. ref building permit 202509165430, existing fa permit 202212097979Details
3/f suite 350: fire alarm tenant improvement - remove/relocation and install new notification devices. ref building permit 202509165430, existing fa permit 202212097979 | $9,500 |
| Jan 8, 2026 | Completed final sign-off Jan 2026 | 550 California St | Battalion One Fire Protection | 2nd fl ref pa #2025-0919-5772 fire alarm tenant improvement- remove/relocation and install new notification devicesDetails
2nd fl ref pa #2025-0919-5772 fire alarm tenant improvement- remove/relocation and install new notification devices | $9,500 |
| Dec 22, 2025 | In progress issued Jan 2026 | 550 California St | 11th floor: suite #1100:shell consists of selective interior demo including non-structural partitions. new construction includes interior nonstructural partitions, doors finishes, lighting, electrical, restroom upgrade, a movable partition with structural calculations. mep, fire, sprinkler,Details
11th floor: suite #1100:shell consists of selective interior demo including non-structural partitions. new construction includes interior nonstructural partitions, doors finishes, lighting, electrical, restroom upgrade, a movable partition with structural calculations. mep, fire, sprinkler, | $350,000 | |
| Dec 17, 2025 | In progress issued Feb 2026 | 550 California St | suite 410- deferred mep ref 202511038810Details
suite 410- deferred mep ref 202511038810 | $247,752 | |
| Dec 17, 2025 | In progress issued Feb 2026 | 550 California St | suite 340- ti demo and (n) non structural partitions, finishes, millwork, lighting, no exterior work. mep deferredDetails
suite 340- ti demo and (n) non structural partitions, finishes, millwork, lighting, no exterior work. mep deferred | $350,000 | |
| Dec 2, 2025 | In progress issued Dec 2025 | 550 California St | level 9 suite 910: deferred mep 202510066834Details
level 9 suite 910: deferred mep 202510066834 | $673,128 | |
| Nov 10, 2025 | In progress issued Nov 2025 | 550 California St | 4/fl- suite 420- 202508274033- deferred mepDetails
4/fl- suite 420- 202508274033- deferred mep | $193,200 | |
| Nov 6, 2025 | In progress issued Nov 2025 | 550 California St | l 2 suite #250: deferred mep for pa #202509195774Details
l 2 suite #250: deferred mep for pa #202509195774 | $187,200 | |
| Nov 6, 2025 | In progress issued Nov 2025 | 550 California St | 2nd fl, ste 230 deferred mep for pa 202509195772Details
2nd fl, ste 230 deferred mep for pa 202509195772 | $107,064 | |
| Nov 3, 2025 | In progress issued Nov 2025 | 550 California St | 4/fl- suite 410 consist of selective interior demo of non structrural partitions, finishes, doors, ceilings, lighting, mep. (n) construction consists of (n) non structural partitions, finishes, doors, ceilings, lighting and mep. does not affect path of travel, fixture quantities or occupant loadsDetails
4/fl- suite 410 consist of selective interior demo of non structrural partitions, finishes, doors, ceilings, lighting, mep. (n) construction consists of (n) non structural partitions, finishes, doors, ceilings, lighting and mep. does not affect path of travel, fixture quantities or occupant loads | $350,000 | |
| Nov 3, 2025 | In progress issued Dec 2025 | 550 California St | 12/fl- suite 1220 - ref 202509034469 for defered mepDetails
12/fl- suite 1220 - ref 202509034469 for defered mep | $500,000 | |
| Oct 31, 2025 | Completed final sign-off Dec 2025 | 550 California St | Battalion One Fire Protection | 2nd fl, ste 260 fire alarm tenant improvement - install/relocate notification devices. ref bldg pa 202508042273 & existing fire alarm permit 202212097979Details
2nd fl, ste 260 fire alarm tenant improvement - install/relocate notification devices. ref bldg pa 202508042273 & existing fire alarm permit 202212097979 | $17,000 |
| Oct 21, 2025 | In progress issued Oct 2025 | 550 California St | 12th fl suite 1200: selective interior demolition of non structural elements that include interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets and switches. construction includes partitions, doors, finishes, lighting, millwork, mech, electrical and plumbing.Details
12th fl suite 1200: selective interior demolition of non structural elements that include interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets and switches. construction includes partitions, doors, finishes, lighting, millwork, mech, electrical and plumbing. | $498,950 | |
| Oct 6, 2025 | In progress issued Oct 2025 | 550 California St | work within suite 910, consists of selectives interior demolition of non-structural partiations, doors, finishes, lighting, and mep. new construction of non-structural partitions, doors. finishes, lighting, ceiling, millwork, and mep. mep deferred. no exterior or structural work.Details
work within suite 910, consists of selectives interior demolition of non-structural partiations, doors, finishes, lighting, and mep. new construction of non-structural partitions, doors. finishes, lighting, ceiling, millwork, and mep. mep deferred. no exterior or structural work. | $500,000 | |
| Sep 26, 2025 | In progress issued Oct 2025 | 550 California St | l3 - ste# 310: deferred mep for pa# 202508294228.Details
l3 - ste# 310: deferred mep for pa# 202508294228. | $613,152 | |
| Sep 26, 2025 | In progress issued Oct 2025 | 550 California St | Battalion One Fire Protection | 9th fl, ste 930 fire alarm tenant improvement - remove and relocation of notification devices ref pa 202212097979, 202506309809Details
9th fl, ste 930 fire alarm tenant improvement - remove and relocation of notification devices ref pa 202212097979, 202506309809 | $8,000 |
| Sep 26, 2025 | In progress issued Sep 2025 | 550 California St | Battalion One Fire Protection | 9th fl, ste 920 fire alarm tenant improvement - remove and relocation of notification devices ref pa 202212097979Details
9th fl, ste 920 fire alarm tenant improvement - remove and relocation of notification devices ref pa 202212097979 | $8,000 |
| Sep 19, 2025 | In progress issued Sep 2025 | 550 California St | 2/fl- ste 250- selected emo of non structrual partitions, finishes, doors, ceilings, lighting and mep. interior renovation consists of (n) non structural partitions, doors, finishes, ceilings, lights and mep. no change in path of travel,occupancy load. mep deferred no exterior or structrual work.Details
2/fl- ste 250- selected emo of non structrual partitions, finishes, doors, ceilings, lighting and mep. interior renovation consists of (n) non structural partitions, doors, finishes, ceilings, lights and mep. no change in path of travel,occupancy load. mep deferred no exterior or structrual work. | $350,000 | |
| Sep 19, 2025 | In progress issued Sep 2025 | 550 California St | 2/fl- ste 230- selected demo of non structrual partitions, finishes, doors, ceilings, lighting and mep. interior renovation consists of (n) non structural partitions, doors, finishes, ceilings, lights and mep. no change in path of travel,occupancy load. mep deferred no exterior or structrual work.Details
2/fl- ste 230- selected demo of non structrual partitions, finishes, doors, ceilings, lighting and mep. interior renovation consists of (n) non structural partitions, doors, finishes, ceilings, lights and mep. no change in path of travel,occupancy load. mep deferred no exterior or structrual work. | $350,000 | |
| Sep 16, 2025 | In progress issued Sep 2025 | 550 California St | suite 360, level 3 deferred mep 202508112721Details
suite 360, level 3 deferred mep 202508112721 | $246,024 | |
| Sep 16, 2025 | In progress issued Sep 2025 | 550 California St | level 3, suite 350 deferred mep for 202508042277Details
level 3, suite 350 deferred mep for 202508042277 | $144,792 | |
| Sep 3, 2025 | In progress issued Oct 2025 | 550 California St | l12m ste 1220 non-structural interior demo of partitions, finishes, ceilings, lighting and mep. new construction consists of (n) non-structural partitions, finishes, lighting, ceiling, doors, millwork and mep. renovation to (e) restrooms on 12th for ada compliance. no change in fixture quantitiesDetails
l12m ste 1220 non-structural interior demo of partitions, finishes, ceilings, lighting and mep. new construction consists of (n) non-structural partitions, finishes, lighting, ceiling, doors, millwork and mep. renovation to (e) restrooms on 12th for ada compliance. no change in fixture quantities | $450,000 | |
| Sep 2, 2025 | Completed final sign-off Sep 2025 | 550 California St | Battalion One Fire Protection | 10th floor-suite 1040: fire alarm improvement-remove and relocation of notification devices. ref pa #202212097979Details
10th floor-suite 1040: fire alarm improvement-remove and relocation of notification devices. ref pa #202212097979 | $7,000 |
| Sep 2, 2025 | Completed final sign-off Sep 2025 | 550 California St | Battalion One Fire Protection | fire alarm tenant improvement -remove and relocation of notification devices. previous permit pa#2022-1209-7979, # 202506118511Details
fire alarm tenant improvement -remove and relocation of notification devices. previous permit pa#2022-1209-7979, # 202506118511 | $8,000 |
| Aug 29, 2025 | In progress issued Sep 2025 | 550 California St | l3 suite #310 : office t.i. to demo and install of new non-structual partitions, millwork, finishes, lighting, outlets. mep deffered. no exterior or structureDetails
l3 suite #310 : office t.i. to demo and install of new non-structual partitions, millwork, finishes, lighting, outlets. mep deffered. no exterior or structure | $203,611 | |
| Aug 29, 2025 | In progress issued Sep 2025 | 550 California St | level 2: suite 260. deferred mep for ti pa#2025-0804-2273Details
level 2: suite 260. deferred mep for ti pa#2025-0804-2273 | $245,016 | |
| Aug 27, 2025 | In progress issued Oct 2025 | 550 California St | 4/f suite 420: selective interior demo of non-structural elements including interior partitions, doors, finishes, lighting, etc. new interior construction consists of non-structural partitions, doors, finishes, lighting, millwork. mep and fire life safety deferred. no exterior or structural work.Details
4/f suite 420: selective interior demo of non-structural elements including interior partitions, doors, finishes, lighting, etc. new interior construction consists of non-structural partitions, doors, finishes, lighting, millwork. mep and fire life safety deferred. no exterior or structural work. | $210,000 | |
| Aug 11, 2025 | In progress issued Aug 2025 | 550 California St | level 3, suite 360 demo and installation of non structural partitions, finishes, lighting, millwork. mep deferred. no exterior workDetails
level 3, suite 360 demo and installation of non structural partitions, finishes, lighting, millwork. mep deferred. no exterior work | $350,000 | |
| Aug 8, 2025 | In progress issued Aug 2025 | 550 California St | l9 suite 920: deffed mep for pa #202506309807Details
l9 suite 920: deffed mep for pa #202506309807 | $334,152 | |
| Aug 8, 2025 | In progress issued Aug 2025 | 550 California St | 9th fl, ste 930 deferred mep for pa 202506309809Details
9th fl, ste 930 deferred mep for pa 202506309809 | $241,488 | |
| Aug 4, 2025 | In progress issued Aug 2025 | 550 California St | l3 - ste# 350. ti- non-structural demo and (n) partitions, finsihes, millwork, lighting. mep deferred. no exterior work.Details
l3 - ste# 350. ti- non-structural demo and (n) partitions, finsihes, millwork, lighting. mep deferred. no exterior work. | $350,000 | |
| Aug 4, 2025 | In progress issued Aug 2025 | 550 California St | level 2, suite 260. t.i. non-structural demo + (n) partitions, finishes, lighting. mep deferred. no exterior work.Details
level 2, suite 260. t.i. non-structural demo + (n) partitions, finishes, lighting. mep deferred. no exterior work. | $350,000 | |
| Jul 24, 2025 | In progress issued Aug 2025 | 550 California St | 10/f - #1010: deferred mep for pa # 202506118511.Details
10/f - #1010: deferred mep for pa # 202506118511. | $338,688 | |
| Jul 24, 2025 | In progress issued Aug 2025 | 550 California St | level 10 suite 1040. deferred mep for pa #202506118512.Details
level 10 suite 1040. deferred mep for pa #202506118512. | $283,752 | |
| Jun 30, 2025 | In progress issued Jul 2025 | 550 California St | 9th fl, ste 930 - interior demo & (n) non-structural partititions, finishes, lighting, break room. no exterior. mep deferredDetails
9th fl, ste 930 - interior demo & (n) non-structural partititions, finishes, lighting, break room. no exterior. mep deferred | $350,000 | |
| Jun 30, 2025 | In progress issued Jul 2025 | 550 California St | 9th fl, ste 920 - interior demo & (n) non-structural partititions, finishes, lighting, break room. no exterior. mep deferredDetails
9th fl, ste 920 - interior demo & (n) non-structural partititions, finishes, lighting, break room. no exterior. mep deferred | $350,000 | |
| Jun 27, 2025 | In progress issued Jun 2025 | 550 California St | H C I Systems Inc | 14th fl ref pa # 2025-0509-6137 as built scope add 1 new speaker/strobeDetails
14th fl ref pa # 2025-0509-6137 as built scope add 1 new speaker/strobe | $18,043 |
| Jun 26, 2025 | In progress issued Jun 2025 | 550 California St | Battalion One Fire Protection | fire alarm tenant improvement. remove and replocation/replace of notification devices. build permit 202504245133, exist fire alarm 2022-12-09-7979Details
fire alarm tenant improvement. remove and replocation/replace of notification devices. build permit 202504245133, exist fire alarm 2022-12-09-7979 | $25,000 |
| Jun 13, 2025 | Completed final sign-off Jul 2025 | 550 California St | Battalion One Fire Protection | 10/f suite 1030: fire alarm tenant improvement - remove and relocation of notification devices. ref permits 202504305514 and 202212097979Details
10/f suite 1030: fire alarm tenant improvement - remove and relocation of notification devices. ref permits 202504305514 and 202212097979 | $9,000 |
| Jun 13, 2025 | In progress issued Jun 2025 | 550 California St | Battalion One Fire Protection | 10th fl suite 1020 ref pa # 2025-0430-5515 fire alarm tenant improvement- remove and relocation of notification devicesDetails
10th fl suite 1020 ref pa # 2025-0430-5515 fire alarm tenant improvement- remove and relocation of notification devices | $8,000 |
| Jun 11, 2025 | In progress issued Jul 2025 | 550 California St | 10th/f ste# 1040: t.i. office suite build-out, mep defferredDetails
10th/f ste# 1040: t.i. office suite build-out, mep defferred | $250,000 | |
| Jun 11, 2025 | In progress issued Jul 2025 | 550 California St | 10th/f ste# 1010: selective interior demo of non structural elements. new interior paritions, doors, finishes, lighting, mech/elec, outlets & switches. mep,f/lf/s & fire sprinkler dwg submitted separately. work do not affect fixtures guantities or path of traval. no exterior bldg, site, landscape,Details
10th/f ste# 1010: selective interior demo of non structural elements. new interior paritions, doors, finishes, lighting, mech/elec, outlets & switches. mep,f/lf/s & fire sprinkler dwg submitted separately. work do not affect fixtures guantities or path of traval. no exterior bldg, site, landscape, | $200,000 | |
| Jun 5, 2025 | In progress issued Aug 2025 | 550 California St | scope consists of selective demo of non structural elements including but not limited to int partitions, doors, finishes, ceilings, lighting, mech and elec outlets and switches. refer to mech and elec plans.scope also includes rr accessibility upgrades. f/l/s and fire sprinkler drawings will be submDetails
scope consists of selective demo of non structural elements including but not limited to int partitions, doors, finishes, ceilings, lighting, mech and elec outlets and switches. refer to mech and elec plans.scope also includes rr accessibility upgrades. f/l/s and fire sprinkler drawings will be subm | $210,000 | |
| Jun 5, 2025 | In progress issued Jun 2025 | 550 California St | Battalion One Fire Protection | 2nd floor. fire alarm tenant improvement - install/relocate notification devicesDetails
2nd floor. fire alarm tenant improvement - install/relocate notification devices | $19,000 |
| May 9, 2025 | In progress issued May 2025 | 550 California St | H C I Systems Inc | 14th/f: provide a modification of e) fire alarm system for the 14th fl t.i. add 1 new booster power supply w/ 2 mew 12v 2ah batteries, add 2 new ceiling strobes, add 1 new speaker/ strobes. ref to 202503273173Details
14th/f: provide a modification of e) fire alarm system for the 14th fl t.i. add 1 new booster power supply w/ 2 mew 12v 2ah batteries, add 2 new ceiling strobes, add 1 new speaker/ strobes. ref to 202503273173 | $18,043 |
| May 6, 2025 | In progress issued May 2025 | 550 California St | H C I Systems Inc | 9th fl: modification of fire alarm system for the common areas & restroom upgrades. the modification shall consist of (1) new ceiling strobe & 10 new speaker strobes ref arch 202411225540 ref fa 202212097979Details
9th fl: modification of fire alarm system for the common areas & restroom upgrades. the modification shall consist of (1) new ceiling strobe & 10 new speaker strobes ref arch 202411225540 ref fa 202212097979 | $19,799 |
| Apr 30, 2025 | In progress issued May 2025 | 550 California St | 10th fl suite 1030: selective interior demo of non structural elements. (n) interior partitions, doors, finishes, lighting, mechanical and electrical outlets & switches. refer to mech & elec plans. f/l/s and fire sprinkler drawings submitted under separate permit.Details
10th fl suite 1030: selective interior demo of non structural elements. (n) interior partitions, doors, finishes, lighting, mechanical and electrical outlets & switches. refer to mech & elec plans. f/l/s and fire sprinkler drawings submitted under separate permit. | $350,000 | |
| Apr 30, 2025 | In progress issued May 2025 | 550 California St | 10/f (ste 1020): selective interior demo of non-structural elements. (n) interior partitions, doors, finishes, lighting, mechanical, & electrical outlets and switches. refer to mech and electrical plans. fls and fire sprinkler drawings will be submitted separately. scope does not affect fixture...Details
10/f (ste 1020): selective interior demo of non-structural elements. (n) interior partitions, doors, finishes, lighting, mechanical, & electrical outlets and switches. refer to mech and electrical plans. fls and fire sprinkler drawings will be submitted separately. scope does not affect fixture... | $350,000 | |
| Apr 24, 2025 | In progress issued May 2025 | 550 California St | 3rd fl - selective int'r demo of non-struc'l elements inlcuding but not limited to interior partitions, doors, finishes, clg, lighting, mech & elec outlets & switches refer to mech & elec plans. scope includes rr accessibility upgrades. fls & fire sprinkler drwg's to be submitted separately. scopeDetails
3rd fl - selective int'r demo of non-struc'l elements inlcuding but not limited to interior partitions, doors, finishes, clg, lighting, mech & elec outlets & switches refer to mech & elec plans. scope includes rr accessibility upgrades. fls & fire sprinkler drwg's to be submitted separately. scope | $100,000 | |
| Apr 15, 2025 | In progress issued Apr 2025 | 550 California St | H C I Systems Inc | 6th fl - provide a modification of (e) fire alarm system common areas & restroom upgrades; add 1 new ceiling strobe and add 8 new speaker/strobes ref pa 202411225537Details
6th fl - provide a modification of (e) fire alarm system common areas & restroom upgrades; add 1 new ceiling strobe and add 8 new speaker/strobes ref pa 202411225537 | $25,000 |
| Apr 4, 2025 | Completed final sign-off Apr 2025 | 550 California St | H C I Systems Inc | 10th/fl: provide modification of existing fire alarm system for the 10 floor commom area restrooom upgrades. add 2 new ceiling strobes, add 8 new speaker/strobes.Details
10th/fl: provide modification of existing fire alarm system for the 10 floor commom area restrooom upgrades. add 2 new ceiling strobes, add 8 new speaker/strobes. | $19,779 |
| Mar 27, 2025 | In progress issued Mar 2025 | 550 California St | 14th/f: selective demo & minor construction of interior partitions, doors, finishes, & lighting ref to mech & electrical plans. fire/life safety & sprinkler drawings will be submitted sepratedly, scope of work does not affect fixture quantities, occupany load & calculation or path of travel.Details
14th/f: selective demo & minor construction of interior partitions, doors, finishes, & lighting ref to mech & electrical plans. fire/life safety & sprinkler drawings will be submitted sepratedly, scope of work does not affect fixture quantities, occupany load & calculation or path of travel. | $150,000 | |
| Mar 12, 2025 | Completed final sign-off Apr 2025 | 550 California St | H C I Systems Inc | 7th floor:provide a modification of the existing fire alarm system for the existing corridor. the modification shall consist of the following: add 6 new ceiling speaker strobes. no changes shall be made t0 existing sequence of operation and smoke control management.Details
7th floor:provide a modification of the existing fire alarm system for the existing corridor. the modification shall consist of the following: add 6 new ceiling speaker strobes. no changes shall be made t0 existing sequence of operation and smoke control management. | $27,290 |
| Feb 19, 2025 | In progress issued Mar 2025 | 550 California St | 2/f: selective demo of non-structural elements including but not limited to int. partitions, doors, finishes, ceilings, lighting, mech/elec outs and switches per mech/elec plans. restroom accessibility upgrades. f/l/s and fire sprinkler drawings under separate permit. scope does not affect fixtureDetails
2/f: selective demo of non-structural elements including but not limited to int. partitions, doors, finishes, ceilings, lighting, mech/elec outs and switches per mech/elec plans. restroom accessibility upgrades. f/l/s and fire sprinkler drawings under separate permit. scope does not affect fixture | $75,000 | |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 550 California St | H C I Systems Inc | 8th fl/ ste 830- ref pa # 202411255623 & t.i. 202408158724. add (1) wall speaker strobe. remove one ceiling speaker strobeDetails
8th fl/ ste 830- ref pa # 202411255623 & t.i. 202408158724. add (1) wall speaker strobe. remove one ceiling speaker strobe | $23,630 |
| Jan 23, 2025 | Completed final sign-off Apr 2025 | 550 California St | H C I Systems Inc | 7th/f, ste 710: provide a modification of e) fire alarm system per ste 710 t.i.(ref t.i. pa#202409181012): add 7 new ceiling strobes, add 10 new speaker/strobes, remove all e) a/v devices in ste 710 & safe off. these drawings are based on as-built for pa 202212097979.Details
7th/f, ste 710: provide a modification of e) fire alarm system per ste 710 t.i.(ref t.i. pa#202409181012): add 7 new ceiling strobes, add 10 new speaker/strobes, remove all e) a/v devices in ste 710 & safe off. these drawings are based on as-built for pa 202212097979. | $26,630 |
| Dec 17, 2024 | In progress issued Feb 2025 | 550 California St | ground floor- revision of 202410032227- deferred mep to retain (e) electrical closet and associated mepDetails
ground floor- revision of 202410032227- deferred mep to retain (e) electrical closet and associated mep | ||
| Nov 25, 2024 | Completed final sign-off Apr 2025 | 550 California St | H C I Systems Inc | 8th fl ref pa # 2024-0815-8724 provide a modification of the (e) fire alarm system for suite 830 tiDetails
8th fl ref pa # 2024-0815-8724 provide a modification of the (e) fire alarm system for suite 830 ti | $26,630 |
| Nov 22, 2024 | In progress issued Nov 2024 | 550 California St | 6th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scopeDetails
6th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope | $75,000 | |
| Nov 22, 2024 | In progress issued Nov 2024 | 550 California St | 9th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scopeDetails
9th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope | $75,000 | |
| Nov 22, 2024 | In progress issued Nov 2024 | 550 California St | 10th fl selective demo of non structural elements including int partitions, doors, finishes, ceiling, lighting, mech, elec outlets, switches per mech/elec plans. restroom accessibolity upgrades. flws & sprinkler drawings under sep permit. does not affect fixture quantities,occ load calcs, or pot.Details
10th fl selective demo of non structural elements including int partitions, doors, finishes, ceiling, lighting, mech, elec outlets, switches per mech/elec plans. restroom accessibolity upgrades. flws & sprinkler drawings under sep permit. does not affect fixture quantities,occ load calcs, or pot. | $75,000 | |
| Nov 22, 2024 | Completed final sign-off Jan 2025 | 550 California St | Battalion One Fire Protection | 8th floor, suite 830. raising piping in production room, turn 9 pendants upright. add line restraints as needed. ref#: 202408158724Details
8th floor, suite 830. raising piping in production room, turn 9 pendants upright. add line restraints as needed. ref#: 202408158724 | $47,969 |
| Nov 20, 2024 | Completed final sign-off Sep 2025 | 550 California St | Battalion One Fire Protection | relocate 79 sprinklers. associated with building permit #202410032227.Details
relocate 79 sprinklers. associated with building permit #202410032227. | $47,969 |
| Oct 31, 2024 | In progress issued Oct 2024 | 550 California St | Battalion One Fire Protection | tenant improvement on 1st floor gym: insatll new power supply, smoke, monitor module and notification with in new t.i. space.Details
tenant improvement on 1st floor gym: insatll new power supply, smoke, monitor module and notification with in new t.i. space. | $31,000 |
| Oct 21, 2024 | Completed final sign-off Feb 2025 | 550 California St | Battalion One Fire Protection | tenant improvement 8th floor - install six new notification devices within new t.i. spaces. ref 202406204850Details
tenant improvement 8th floor - install six new notification devices within new t.i. spaces. ref 202406204850 | $19,000 |
| Oct 3, 2024 | In progress issued Nov 2024 | 550 California St | ground floor- ti to build out amenities spaces. no change of occupancy. change of use froim open office to b-office accessory space for non retail office fitness amenitiesDetails
ground floor- ti to build out amenities spaces. no change of occupancy. change of use froim open office to b-office accessory space for non retail office fitness amenities | $736,132 | |
| Sep 20, 2024 | Completed final sign-off Feb 2026 | 550 California St | Mastec Network Solutions Inc | t-mobile remove (e) antennas from (e) sign and all equipment in the basement; install 6(n) antennas behind (n) screening; install (n) platform on rooftop w/equipment; install (n) 200 a panel; install 12(n) batteriesDetails
t-mobile remove (e) antennas from (e) sign and all equipment in the basement; install 6(n) antennas behind (n) screening; install (n) platform on rooftop w/equipment; install (n) 200 a panel; install 12(n) batteries | $150,000 |
| Sep 18, 2024 | In progress issued Oct 2024 | 550 California St | 8th fl - revision to pa 202405152215 includes revising elevator lobby as (e) to remain and documenting (n) 2x4 light fixtures. scope also includes classification on wall types based off of field inspections.Details
8th fl - revision to pa 202405152215 includes revising elevator lobby as (e) to remain and documenting (n) 2x4 light fixtures. scope also includes classification on wall types based off of field inspections. | ||
| Sep 18, 2024 | In progress issued Oct 2024 | 550 California St | ste 710 - selective interior demo of non-struc'l elements. (n) interior partitions, door, finishes, lighting, mech & elec outlets & switches. lfs and fire sprinkler submitted as separate permit. scope does not affect fixture quantities, occupant load, calcs or path of travel. no exterior change toDetails
ste 710 - selective interior demo of non-struc'l elements. (n) interior partitions, door, finishes, lighting, mech & elec outlets & switches. lfs and fire sprinkler submitted as separate permit. scope does not affect fixture quantities, occupant load, calcs or path of travel. no exterior change to | $100,000 | |
| Sep 18, 2024 | In progress issued Oct 2024 | 550 California St | 8th/f: revsion to 202405152215: revising elevator lobby ceiling as e) to remain & documenting new 2x4 light fixtures in lieu of linear fixtures scope. clarification on wall types based off of field conditionsDetails
8th/f: revsion to 202405152215: revising elevator lobby ceiling as e) to remain & documenting new 2x4 light fixtures in lieu of linear fixtures scope. clarification on wall types based off of field conditions | ||
| Aug 15, 2024 | In progress issued Aug 2024 | 550 California St | 8th fl-interior ti demo & (n) construction of elements including but not limitied to interior partitions,doors,finishes, ceiling, lighting, (n) studio pipe grid, mech & elec outlets & switches. ref to mep & structural drawings. scope does not affect fixture quantities, occ load or path of travel.Details
8th fl-interior ti demo & (n) construction of elements including but not limitied to interior partitions,doors,finishes, ceiling, lighting, (n) studio pipe grid, mech & elec outlets & switches. ref to mep & structural drawings. scope does not affect fixture quantities, occ load or path of travel. | $60,000 | |
| Aug 13, 2024 | In progress issued Aug 2024 | 550 California St | 7th fl- interior demo of non structural elements including (not limited) to int partitions,doors, finishes, ceilings, lighting,mech & elec outlets & switches. ref to mech & elec plans. restroom accessibility upgrades. fire l/s & sprinkler dwgs under separate permit.Details
7th fl- interior demo of non structural elements including (not limited) to int partitions,doors, finishes, ceilings, lighting,mech & elec outlets & switches. ref to mech & elec plans. restroom accessibility upgrades. fire l/s & sprinkler dwgs under separate permit. | $70,000 | |
| Jun 20, 2024 | In progress issued Oct 2024 | 550 California St | rev 202405152157- 8th floor- duct distruction is being modified per (n) space plan. 2 vav boxes are being added. no (n) fsds are being addedDetails
rev 202405152157- 8th floor- duct distruction is being modified per (n) space plan. 2 vav boxes are being added. no (n) fsds are being added | ||
| Jun 20, 2024 | In progress filed Jun 2024, not yet issued | 550 California St | 8/f: duct distribution is being modified per (n) space plan. (4) vav boxes are being added. no (n) fsds are ebing added. (ref arch permit# 202405152215)Details
8/f: duct distribution is being modified per (n) space plan. (4) vav boxes are being added. no (n) fsds are ebing added. (ref arch permit# 202405152215) | ||
| May 15, 2024 | In progress issued May 2024 | 550 California St | 8th flr: selective int. demo of non-structural elements including int. partitions, doors, finishes, ceilings, lighting, mech, & elec. outlets & switches. refer to mech & elec plans. scope includes restroom ada upgrades. scope of work does not affect fixture quantities, occupant load calcs or pathDetails
8th flr: selective int. demo of non-structural elements including int. partitions, doors, finishes, ceilings, lighting, mech, & elec. outlets & switches. refer to mech & elec plans. scope includes restroom ada upgrades. scope of work does not affect fixture quantities, occupant load calcs or path | $70,000 | |
| May 15, 2024 | In progress issued May 2024 | 550 California St | 8th fl - selective interior demo of non-structural elements including int partitions, doors, finishes, ceilings, lighting, mech & elec outlets and switches. refer to mech & elec plans. scope also includes rr ada accessibility upgrades. scope of work does not affect fixture quantities, occ load calcsDetails
8th fl - selective interior demo of non-structural elements including int partitions, doors, finishes, ceilings, lighting, mech & elec outlets and switches. refer to mech & elec plans. scope also includes rr ada accessibility upgrades. scope of work does not affect fixture quantities, occ load calcs | $70,000 | |
| Apr 18, 2024 | In progress issued May 2024 | 550 California St | path of travel set for 550 california st, documenting full accessibility compliance, including primary entrance to building, parking, ev charging spaces, and elevator accessibility.Details
path of travel set for 550 california st, documenting full accessibility compliance, including primary entrance to building, parking, ev charging spaces, and elevator accessibility. | $5,000 | |
| Aug 21, 2023 | Completed final sign-off Aug 2023 | 550 California St | Rudolph Commercial Interiors Inc, Rci | (parking structure) consisting only of barrier removal: provide designated accessible parking spaces for new ev charging stations. ev charger installation was previously approved under separate electrical permit# ew202306232040.Details
(parking structure) consisting only of barrier removal: provide designated accessible parking spaces for new ev charging stations. ev charger installation was previously approved under separate electrical permit# ew202306232040. | $5,000 |
| Dec 9, 2022 | Completed final sign-off Sep 2023 | 550 California St | Honeywell International, Inc | replace the old audio pukane amplifier system to new honeywell xls3000 w/ digital voice command (dvc) audio system with new amplifiers (daa system). all existing speakers & speaker/strobes shall remain.Details
replace the old audio pukane amplifier system to new honeywell xls3000 w/ digital voice command (dvc) audio system with new amplifiers (daa system). all existing speakers & speaker/strobes shall remain. | $30,000 |
| Feb 11, 2022 | Completed final sign-off Oct 2022 | 550 California St | G L C Construction Company Inc | to comply w/nov #202286616. repairs to sub-sidewalk basement roof slabDetails
to comply w/nov #202286616. repairs to sub-sidewalk basement roof slab | $200,000 |
| Aug 6, 2021 | Completed final sign-off Sep 2023 | 635 Sacramento St | Rudolph Commercial Interiors Inc, Rci | assembly permit only to establish assembly area on the first floor in the meeting room of the approved permit pa#201907125763. ref pages t-1,a-2 & t-3 that required the a-3 stamp establishing the occupancy load by sffd. no work under this permit. maher n/a.Details
assembly permit only to establish assembly area on the first floor in the meeting room of the approved permit pa#201907125763. ref pages t-1,a-2 & t-3 that required the a-3 stamp establishing the occupancy load by sffd. no work under this permit. maher n/a. | |
| Feb 18, 2021 | Completed final sign-off Apr 2021 | 550 California St | Sotello Graphic Associates | install 3 evacuation maps, 11th floorDetails
install 3 evacuation maps, 11th floor | $2,700 |
| Dec 10, 2020 | Completed final sign-off Oct 2022 | 550 California St | Ayoob & Peery Plumbing Co Inc | 11th floor: add two (2) and relocate three (3) sprinklers to conform with the wall/ceiling layout of the tenant improvement. ref. # 2018-0915-4205.Details
11th floor: add two (2) and relocate three (3) sprinklers to conform with the wall/ceiling layout of the tenant improvement. ref. # 2018-0915-4205. | $1,725 |
| Dec 10, 2020 | Completed final sign-off Mar 2021 | 550 California St | Honeywell International, Inc | ref. p/a 2020-0915-4208. 11th floor fpa electrification: add (1) strobe power supply; (32) spkr/strobes; (3) spkrs; (2) strobes; (7) control relays; (4) pilot relays; (1) control module; (4) duct detectors; (12) dual monitor modules; (6) aux relays; (15) smoke detectors; (3) pull stations; (1) 2-wayDetails
ref. p/a 2020-0915-4208. 11th floor fpa electrification: add (1) strobe power supply; (32) spkr/strobes; (3) spkrs; (2) strobes; (7) control relays; (4) pilot relays; (1) control module; (4) duct detectors; (12) dual monitor modules; (6) aux relays; (15) smoke detectors; (3) pull stations; (1) 2-way | $48,060 |
| Dec 9, 2020 | Expired or cancelled cancelled May 2021 | 550 California St | G L C Construction Company Inc | 7th flr. conversion of (e) offices / finishes / lighting. (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.Details
7th flr. conversion of (e) offices / finishes / lighting. (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. | $1,540,000 |
| Oct 3, 2020 | Completed final sign-off Jan 2021 | 550 California St | City Building Inc. | rooftop: furnish & install stell catwalk on top of (e) steel structure on the roof.Details
rooftop: furnish & install stell catwalk on top of (e) steel structure on the roof. | $60,000 |
| Sep 15, 2020 | Completed final sign-off Apr 2021 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 11th flr. office remodel of new break room, change of existing furnitures in areas of work w/ new conference rooms, new focus rooms, and new finishes. new mechanical and electrical work for new spaces.Details
11th flr. office remodel of new break room, change of existing furnitures in areas of work w/ new conference rooms, new focus rooms, and new finishes. new mechanical and electrical work for new spaces. | $137,000 |
| Mar 12, 2020 | Completed final sign-off Aug 2020 | 550 California St | Pribuss Engineering Inc | replace extg fire pump with new like for like fire pump model 8100 6x4x9, ul & fm approved, horizontal split case type mounted to a common fabricated steel base with a 460 jolt. 50 hp, 3550 rpm, odr motor. pump to be placed on extg pad.Details
replace extg fire pump with new like for like fire pump model 8100 6x4x9, ul & fm approved, horizontal split case type mounted to a common fabricated steel base with a 460 jolt. 50 hp, 3550 rpm, odr motor. pump to be placed on extg pad. | $40,000 |
| Feb 19, 2020 | Completed final sign-off Sep 2023 | 550 California St | Honeywell International, Inc | fire as built 201909242464 as built changes as follows update location of 1 smoke detector, 1 duct detector, 1 2 way call station, replace 2 pendant mount smoke det w 1 duct detectorDetails
fire as built 201909242464 as built changes as follows update location of 1 smoke detector, 1 duct detector, 1 2 way call station, replace 2 pendant mount smoke det w 1 duct detector | |
| Feb 12, 2020 | Completed final sign-off Aug 2020 | 550 California St | Sotello Graphic Associates | make and install 3 evacuation signsDetails
make and install 3 evacuation signs | $1,500 |
| Feb 12, 2020 | Completed final sign-off Aug 2023 | 635 Sacramento St | Sotello Graphic Associates | make and install 3 evacuation mapsDetails
make and install 3 evacuation maps | $1,500 |
| Feb 7, 2020 | Completed final sign-off Sep 2023 | 550 California St | Honeywell International, Inc | f/a addition on 1st fl. install 2 speaker/strobes. ref pa #201908027718Details
f/a addition on 1st fl. install 2 speaker/strobes. ref pa #201908027718 | $1,280 |
| Nov 22, 2019 | Completed final sign-off Feb 2020 | 550 California St | Anderson, Rowe & Buckley, Inc. | ground fl - existing fire sprinkler system ti - 3 relocated sprinklers. ref pa 201908027718Details
ground fl - existing fire sprinkler system ti - 3 relocated sprinklers. ref pa 201908027718 | $1,500 |
| Oct 18, 2019 | Completed final sign-off Sep 2023 | 635 Sacramento St | Honeywell International, Inc | 6th floor: 635 sacramento town. f/a modification: add 1 strobe booster; 16 spker/strbs; 1 spkr; 7 control relay module; 10 pilot relays; 6 duct detectors; 5 monitor modules; 10 aux relays; 3 smoke detectors and 3 pull stations; demo f/a devices per sheet f7.1. ref app#201907125734Details
6th floor: 635 sacramento town. f/a modification: add 1 strobe booster; 16 spker/strbs; 1 spkr; 7 control relay module; 10 pilot relays; 6 duct detectors; 5 monitor modules; 10 aux relays; 3 smoke detectors and 3 pull stations; demo f/a devices per sheet f7.1. ref app#201907125734 | $38,193 |
| Oct 17, 2019 | Completed final sign-off Mar 2020 | 550 California St | Anderson, Rowe & Buckley, Inc. | 3rd fl - fire sprinkler only - relocate 42 pendents & add 3 pendents (45 total) for wells fargo officeDetails
3rd fl - fire sprinkler only - relocate 42 pendents & add 3 pendents (45 total) for wells fargo office | $24,000 |
| Oct 11, 2019 | Never finaled issued Oct 2019, no final | 635 Sacramento St | Honeywell International, Inc | 1st fl 635 sac tower, fa modification: demo devices as shown on sheet f7.24d. add 1 strobe power supply; 12 speaker/strobesl 1 speaker; 4 control modules; 8 pilot relays; 6 duct detectors; 4 dual monitor modules; 6 aux relays; 2 smoke detectors; 2 pull stations. ref pa #201907125763. maher naDetails
1st fl 635 sac tower, fa modification: demo devices as shown on sheet f7.24d. add 1 strobe power supply; 12 speaker/strobesl 1 speaker; 4 control modules; 8 pilot relays; 6 duct detectors; 4 dual monitor modules; 6 aux relays; 2 smoke detectors; 2 pull stations. ref pa #201907125763. maher na | $30,100 |
| Sep 27, 2019 | Completed final sign-off Nov 2019 | 550 California St | Honeywell International, Inc | 4th fl:fire alarm modification. add slc card,1 rps, 34 sprkn/strobes, (1)spkr, 3 strobes, 27 duct detectors,26 dual monitor modules,46 aux relays, (1) 2 way call station,replace with new 3 mps,10 smoke detectors, nac module, 3 monitor modules,1 control relays, demo fa devies as shown on sheet f7.41Details
4th fl:fire alarm modification. add slc card,1 rps, 34 sprkn/strobes, (1)spkr, 3 strobes, 27 duct detectors,26 dual monitor modules,46 aux relays, (1) 2 way call station,replace with new 3 mps,10 smoke detectors, nac module, 3 monitor modules,1 control relays, demo fa devies as shown on sheet f7.41 | $110,680 |
| Sep 24, 2019 | Never finaled issued Oct 2019, no final | 550 California St | Honeywell International, Inc | 3rd floor, fa modification - ref pa #2019/0405/7249 add 1 slc card, 1 rps, 32 sprinklers/strobes; 8 sprinklers, (1) 2-way comm call box; (11) control relays; 21 pilot relays; 9 duct detectors;16 dual monitor modules; 30 aux relays; 15 smoke detectors; demo devices per sheet f7.41Details
3rd floor, fa modification - ref pa #2019/0405/7249 add 1 slc card, 1 rps, 32 sprinklers/strobes; 8 sprinklers, (1) 2-way comm call box; (11) control relays; 21 pilot relays; 9 duct detectors;16 dual monitor modules; 30 aux relays; 15 smoke detectors; demo devices per sheet f7.41 | $85,560 |
| Sep 6, 2019 | Completed final sign-off Mar 2020 | 635 Sacramento St | Pribuss Engineering Inc | 6th flr, fire sprinkler t.i. relocated 11 pendents, plugged 2, add 1 pendent, total (e) sprinklers =31. 43 total heads.Details
6th flr, fire sprinkler t.i. relocated 11 pendents, plugged 2, add 1 pendent, total (e) sprinklers =31. 43 total heads. | $22,102 |
| Aug 21, 2019 | Completed final sign-off Feb 2020 | 550 California St | Sotello Graphic Associates | 2nd, 4th and 6th floors - 9 evacuation maps, 3 each floorsDetails
2nd, 4th and 6th floors - 9 evacuation maps, 3 each floors | $6,000 |
| Aug 14, 2019 | Completed final sign-off Mar 2020 | 635 Sacramento St | Pribuss Engineering Inc | 1st fl - fire sprinkler, ref pa 2019-0712-5763. total relocated upright 6, 1 added upright, existing relocated and changed 9, 11 added pendent.Details
1st fl - fire sprinkler, ref pa 2019-0712-5763. total relocated upright 6, 1 added upright, existing relocated and changed 9, 11 added pendent. | $14,392 |
| Aug 8, 2019 | Completed final sign-off Aug 2019 | 550 California St | Honeywell International, Inc | 2nd fl - combined as built for fire alarm pa 2019-0118-0674 and 2019-0523-1477. no added parts. plans corrected per inspection commentsDetails
2nd fl - combined as built for fire alarm pa 2019-0118-0674 and 2019-0523-1477. no added parts. plans corrected per inspection comments | |
| Aug 2, 2019 | Completed final sign-off Jun 2020 | 550 California St | Rudolph Commercial Interiors Inc, Rci | remodel of (e) video library: (n) audio control rm. & (n) audio suite upgrade all light fixture in suite to new led lighting, hvac upgrade for (n) remodelDetails
remodel of (e) video library: (n) audio control rm. & (n) audio suite upgrade all light fixture in suite to new led lighting, hvac upgrade for (n) remodel | $25,000 |
| Jul 12, 2019 | Completed final sign-off Jun 2020 | 635 Sacramento St | Rudolph Commercial Interiors Inc, Rci | 1st floor: 4,119 sq ft area of work. remodel of extg office space on 1st floor with new meeting room, breakroom/finishes/lighting. new exit door to exterior. new mep work. minimal work in extg toilet rooms for ada and finishes upgrade. n/a for maherDetails
1st floor: 4,119 sq ft area of work. remodel of extg office space on 1st floor with new meeting room, breakroom/finishes/lighting. new exit door to exterior. new mep work. minimal work in extg toilet rooms for ada and finishes upgrade. n/a for maher | $450,000 |
| Jul 12, 2019 | Completed final sign-off Jun 2020 | 635 Sacramento St | Rudolph Commercial Interiors Inc, Rci | retail remodel of (e) office on 6th flr in 3 suites add demisinf wall btw suite 625 & 650. upgrade pantry /copy rm in suite 625m 650 & 675. new offices, new pantry, new meeting rooms. new mech & new ele work for new spaces. min work in (e) toilet rm. no change in plm fix countDetails
retail remodel of (e) office on 6th flr in 3 suites add demisinf wall btw suite 625 & 650. upgrade pantry /copy rm in suite 625m 650 & 675. new offices, new pantry, new meeting rooms. new mech & new ele work for new spaces. min work in (e) toilet rm. no change in plm fix count | $250,000 |
| May 23, 2019 | Completed final sign-off Aug 2019 | 550 California St | Honeywell International, Inc | ref 201812177954 revision to 201901180674 coh 1 scope of work - add 2 rib relays, 1 control relay, 1 duct det, 1 smk det, 2 dual monitor modulesDetails
ref 201812177954 revision to 201901180674 coh 1 scope of work - add 2 rib relays, 1 control relay, 1 duct det, 1 smk det, 2 dual monitor modules | $3,900 |
| May 6, 2019 | Completed final sign-off Jun 2019 | 550 California St | Honeywell International, Inc | install 2-way communication system backbone on every floor of the california and sacramento towers. install 1 main control unit & 1 remote control unit on level 2. install 2 call box on leve 2, california tower.Details
install 2-way communication system backbone on every floor of the california and sacramento towers. install 1 main control unit & 1 remote control unit on level 2. install 2 call box on leve 2, california tower. | $2,000 |
| Apr 5, 2019 | Completed final sign-off Jun 2020 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 3/f: remodel of (e) office space on 3rd fl with (n) conference rooms, (n) focus rooms, (n) breakroom, (n) finishes and (n) led lighting in affected areas. mep included. maher na.Details
3/f: remodel of (e) office space on 3rd fl with (n) conference rooms, (n) focus rooms, (n) breakroom, (n) finishes and (n) led lighting in affected areas. mep included. maher na. | $1,500,000 |
| Apr 1, 2019 | Completed final sign-off Jun 2019 | 550 California St | Anderson, Rowe & Buckley, Inc. | 2nd flr. fire sprinkler t.i. relocated 24, removed 22. ref pa 201812117954Details
2nd flr. fire sprinkler t.i. relocated 24, removed 22. ref pa 201812117954 | $12,000 |
| Mar 13, 2019 | Completed final sign-off Sep 2019 | 550 California St | Pribuss Engineering Inc | fire sprinklers 4th flr - relocate 28 heads add 4 heads ref 201812117953Details
fire sprinklers 4th flr - relocate 28 heads add 4 heads ref 201812117953 | $16,448 |
| Feb 12, 2019 | Completed final sign-off Mar 2019 | 635 Sacramento St | Pribuss Engineering Inc | ref pa#20181217950; remove & plug (e) sprinkler drops and provde "shell" sprinker coverage with upright sprinklers. total heads 24Details
ref pa#20181217950; remove & plug (e) sprinkler drops and provde "shell" sprinker coverage with upright sprinklers. total heads 24 | $12,350 |
| Feb 12, 2019 | Completed final sign-off Aug 2019 | 550 California St | Pribuss Engineering Inc | fire sprinkler t.i. on 6th fl. relocated sprinkler = (130), added sprinkler= (13), total (143). maher n/a.Details
fire sprinkler t.i. on 6th fl. relocated sprinkler = (130), added sprinkler= (13), total (143). maher n/a. | $73,502 |
| Feb 6, 2019 | Completed final sign-off Aug 2019 | 550 California St | Acco Engineered Systems Inc. Dba Acco En | remove and replace outside air dampersDetails
remove and replace outside air dampers | $150,000 |
| Jan 18, 2019 | Completed final sign-off Jul 2019 | 550 California St | Honeywell International, Inc | fire alarm modification 6th fl add 37 spkr strobes, 5 speakers, 9 control relays, 19 duct det, 25 rb relays, 16 dual monitor modules, 30 pam 1 relays, replace 9 smoke det, 1 nac control module, 3 pull staions, 1 monitor module ref 201901180676Details
fire alarm modification 6th fl add 37 spkr strobes, 5 speakers, 9 control relays, 19 duct det, 25 rb relays, 16 dual monitor modules, 30 pam 1 relays, replace 9 smoke det, 1 nac control module, 3 pull staions, 1 monitor module ref 201901180676 | $15,000 |
| Jan 18, 2019 | Completed final sign-off Aug 2019 | 550 California St | Honeywell International, Inc | fire alarm modification 2nd fl add 1 slc cand, 4 spker strobes, 2 spkers, 2 strobes, 10 control relays, 15 duct det, 19 rib relays, 14 monitor modules, 26 pam relays, nac module, battery cabinetDetails
fire alarm modification 2nd fl add 1 slc cand, 4 spker strobes, 2 spkers, 2 strobes, 10 control relays, 15 duct det, 19 rib relays, 14 monitor modules, 26 pam relays, nac module, battery cabinet | $49,300 |
| Dec 11, 2018 | Completed final sign-off Jan 2020 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 2nd floor: remodel of an extg space for new conference rooms, new focus rooms, new finishes and new led lighting in affected areas. n/a for maherDetails
2nd floor: remodel of an extg space for new conference rooms, new focus rooms, new finishes and new led lighting in affected areas. n/a for maher | $250,000 |
| Dec 11, 2018 | Completed final sign-off Jan 2020 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 4th floor: remodel of extg office space with new conference rooms. new focus rooms. new break room, new finishes, and led lighting in affected areas. n/a for maherDetails
4th floor: remodel of extg office space with new conference rooms. new focus rooms. new break room, new finishes, and led lighting in affected areas. n/a for maher | $1,500,000 |
| Dec 11, 2018 | Completed final sign-off Mar 2019 | 635 Sacramento St | Rudolph Commercial Interiors Inc, Rci | 1st floor: selective demolition of extg walls, ceiling, finishes, lighting work. n/a for maherDetails
1st floor: selective demolition of extg walls, ceiling, finishes, lighting work. n/a for maher | $50,000 |
| Sep 18, 2018 | Completed final sign-off Oct 2018 | 550 California St | Honeywell International, Inc | 9th flr - as built for 201809109503 & 201804277568 additional scope is to correct previously approved as built #2018-0910-9503 to correct the heat pump/transfer fans matrix. maher naDetails
9th flr - as built for 201809109503 & 201804277568 additional scope is to correct previously approved as built #2018-0910-9503 to correct the heat pump/transfer fans matrix. maher na | |
| Sep 14, 2018 | Completed final sign-off Oct 2018 | 550 California St | Honeywell International, Inc | 5th floor:as-built-l1)5 duct detect replaced with pendant mount smoke det. 2)1 dect det. replaced with new. 3) 3 monitor modules replace with new. 4) 6 pull station replaced with new. 5)1 nac module replaced with new . 6) add 4 pam relays, 1 moniter modules & 12 control relays. ref app#201805310552Details
5th floor:as-built-l1)5 duct detect replaced with pendant mount smoke det. 2)1 dect det. replaced with new. 3) 3 monitor modules replace with new. 4) 6 pull station replaced with new. 5)1 nac module replaced with new . 6) add 4 pam relays, 1 moniter modules & 12 control relays. ref app#201805310552 | $5,000 |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 550 California St | Honeywell International, Inc | 9th flr. as-builts for approved f/a 201804277568 for t.i pa 201803083147. add'l scope - add 2 speakers strobesDetails
9th flr. as-builts for approved f/a 201804277568 for t.i pa 201803083147. add'l scope - add 2 speakers strobes | $1,200 |
| Aug 28, 2018 | Completed final sign-off Aug 2018 | 635 Sacramento St | Honeywell International, Inc | 8/f:as built for approved fa pa 2018-0724-5325 (550 california); no additional scope of work; to correct ref pa (ti) to 2018-0504-8195 (635 sacramento)Details
8/f:as built for approved fa pa 2018-0724-5325 (550 california); no additional scope of work; to correct ref pa (ti) to 2018-0504-8195 (635 sacramento) | |
| Aug 13, 2018 | Never finaled issued Aug 2018, no final | 550 California St | street spaceDetails
street space | ||
| Aug 2, 2018 | Completed final sign-off Aug 2023 | 550 California St | Pribuss Engineering Inc | 5/f: fire sprinkler t.i. on 5th fl. total sprinklers (55) ($514.00)Details
5/f: fire sprinkler t.i. on 5th fl. total sprinklers (55) ($514.00) | $28,270 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 550 California St | Honeywell International, Inc | 8th flr, fire alarm modification. add 7 speakers, 3 strobes, 1 rib relay, 1 control relay. remove 1 wall strobe and 1 speaker. n/a for maher.Details
8th flr, fire alarm modification. add 7 speakers, 3 strobes, 1 rib relay, 1 control relay. remove 1 wall strobe and 1 speaker. n/a for maher. | $7,040 |
| Jun 27, 2018 | Completed final sign-off Sep 2018 | 550 California St | G L C Construction Company Inc | install bi - fold door. reference 201803083150. n/a for maher.Details
install bi - fold door. reference 201803083150. n/a for maher. | $50,000 |
| Jun 21, 2018 | Completed final sign-off Aug 2018 | 635 Sacramento St | Pribuss Engineering Inc | 8th floor - fire sprinkler tenant improvement. relocate 3 sprinklers, add 1 sprinkler. total 4. n/a for maher.Details
8th floor - fire sprinkler tenant improvement. relocate 3 sprinklers, add 1 sprinkler. total 4. n/a for maher. | $2,056 |
| Jun 13, 2018 | Completed final sign-off Jan 2020 | 550 California St | Rudolph Commercial Interiors Inc, Rci | remodel of (e) office space (n) conference rm, focus, break rm, finishes, and led lights in affected are. n/a maherDetails
remodel of (e) office space (n) conference rm, focus, break rm, finishes, and led lights in affected are. n/a maher | $1,500,000 |
| May 31, 2018 | Never finaled issued May 2018, no final | 550 California St | Honeywell International, Inc | 5th fl - f/a modification on california & sacramento ref pa 2018-0308-3150 add 46 spkr/strobes; 8 spkr; 2 smoke det; 26 duct det; 32 rib relays; 16 control relays; 20 dual monitor modules; 40 pam-1 relays; 1 aadc1 slc card. replace 21 smoke det w/new; 20 spkr/strobes w/new; 2 strobe power supply.Details
5th fl - f/a modification on california & sacramento ref pa 2018-0308-3150 add 46 spkr/strobes; 8 spkr; 2 smoke det; 26 duct det; 32 rib relays; 16 control relays; 20 dual monitor modules; 40 pam-1 relays; 1 aadc1 slc card. replace 21 smoke det w/new; 20 spkr/strobes w/new; 2 strobe power supply. | $102,196 |
| May 4, 2018 | Completed final sign-off Oct 2018 | 635 Sacramento St | Rudolph Commercial Interiors Inc, Rci | 8th fl: partial remodel 430 sq ft of 8th fl amep: focus room, open office, breakroom. upgrade mechanical and elec of space maher not req, fire under separate permit(s). no new fsdsDetails
8th fl: partial remodel 430 sq ft of 8th fl amep: focus room, open office, breakroom. upgrade mechanical and elec of space maher not req, fire under separate permit(s). no new fsds | $50,000 |
| Apr 27, 2018 | Completed final sign-off Oct 2018 | 550 California St | Honeywell International, Inc | 9th fl fire alarm modification. 19 spkr strb, 8 spkrs, 16 duct det, 9 control relays, 20 rib relays, 12 dual monitor modules, 24 pam relays, 1 analog sic board, battery cabinet with batteries, replace 15 speaker strobes with new; n/a maher; ref pa t.i. 201803083147Details
9th fl fire alarm modification. 19 spkr strb, 8 spkrs, 16 duct det, 9 control relays, 20 rib relays, 12 dual monitor modules, 24 pam relays, 1 analog sic board, battery cabinet with batteries, replace 15 speaker strobes with new; n/a maher; ref pa t.i. 201803083147 | |
| Apr 26, 2018 | Completed final sign-off Aug 2018 | 550 California St | Pribuss Engineering Inc | 5th flr- fire sprinkler relocate 68, added 4 maher naDetails
5th flr- fire sprinkler relocate 68, added 4 maher na | $8,738 |
| Apr 12, 2018 | Completed final sign-off Jun 2018 | 550 California St | Pribuss Engineering Inc | 9th floor: fire sprinkler t.i. total relocated sprinklers = 11 at and added sprinkler = 6. total 17 at 514.00. ref app#201802070611. n/a for maherDetails
9th floor: fire sprinkler t.i. total relocated sprinklers = 11 at and added sprinkler = 6. total 17 at 514.00. ref app#201802070611. n/a for maher | $8,738 |
| Mar 8, 2018 | Completed final sign-off Oct 2018 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 9th floor: remodel of (e) office space: (n) conference rooms, break room, (n) finishes & (n) led lighting in affected areasDetails
9th floor: remodel of (e) office space: (n) conference rooms, break room, (n) finishes & (n) led lighting in affected areas | $1,000,000 |
| Mar 8, 2018 | Completed final sign-off Jan 2019 | 550 California St | G L C Construction Company Inc | 5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areasDetails
5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areas | $1,550,000 |
| Feb 7, 2018 | Completed final sign-off Apr 2018 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 9th flr - selective demo of (e) walls, finishes, lighting maher naDetails
9th flr - selective demo of (e) walls, finishes, lighting maher na | $50,000 |
| Jun 1, 2017 | Completed final sign-off Jul 2017 | 550 California St | Honeywell International, Inc | basement, 5th, 8th, 12th floors - as built drawing for fire alarm under pa #201605248188. n/a maher ordinanceDetails
basement, 5th, 8th, 12th floors - as built drawing for fire alarm under pa #201605248188. n/a maher ordinance | |
| May 23, 2017 | Completed final sign-off Jul 2017 | 550 California St | W. Bradley Electric | as builts for replacement of electrical riser - revision m drawings. ref #2014-1114-1483. removed 4th fl hvac from scope of work. maher naDetails
as builts for replacement of electrical riser - revision m drawings. ref #2014-1114-1483. removed 4th fl hvac from scope of work. maher na | |
| May 1, 2017 | Completed final sign-off Mar 2019 | 550 California St | Swinerton Builders | remove existing external fire escape assembly on spring street to comply with complaint 201642721Details
remove existing external fire escape assembly on spring street to comply with complaint 201642721 | $30,000 |
| Nov 14, 2016 | Completed final sign-off Nov 2016 | 550 California St | Honeywell International, Inc | as built for pa 2016-0607-9269. re-numbered heat pump id's. maher naDetails
as built for pa 2016-0607-9269. re-numbered heat pump id's. maher na | |
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 550 California St | Pribuss Engineering Inc | 8th flr: fire sprinkler ti 201312063546, relocated 61, add 21; total 82Details
8th flr: fire sprinkler ti 201312063546, relocated 61, add 21; total 82 | $42,010 |
| Jun 7, 2016 | Completed final sign-off Nov 2016 | 550 California St | Honeywell International, Inc | fire alarm system addition to 8th fl. add 7 ceiling speaker strobes, 4 ceiling speakers, 1 control relay for heat pump, 4 rib relay, 3 duct detectors at heat pump, 20 pam 1 relays. replace 18 ceiling speaker strobes, replace 3 wall strobes with combo wall speaker strobes, upgrade (e) (1)strobe powerDetails
fire alarm system addition to 8th fl. add 7 ceiling speaker strobes, 4 ceiling speakers, 1 control relay for heat pump, 4 rib relay, 3 duct detectors at heat pump, 20 pam 1 relays. replace 18 ceiling speaker strobes, replace 3 wall strobes with combo wall speaker strobes, upgrade (e) (1)strobe power | $20,280 |
| May 24, 2016 | Completed final sign-off Jul 2017 | 550 California St | Honeywell International, Inc | ti pa 2014-1114-1483. fire alarm modification to install (7) smoke detectors, (1) duct detector for heat pump, (3) duct detectors for tsd and (1) strobe. n/a for maher.Details
ti pa 2014-1114-1483. fire alarm modification to install (7) smoke detectors, (1) duct detector for heat pump, (3) duct detectors for tsd and (1) strobe. n/a for maher. | $7,100 |
| May 4, 2016 | Completed final sign-off Mar 2017 | 550 California St | Skyline Construction | 4th floor: extg server room expansion with new hvac, ups and power distribution. n/a for maherDetails
4th floor: extg server room expansion with new hvac, ups and power distribution. n/a for maher | $350,000 |
| Apr 1, 2016 | Completed final sign-off Jun 2016 | 550 California St | Honeywell International, Inc | fire alarm system additn to accomodate fire pump replacement, 3 rewire dual point monitor modules for new fire pump controllers, one new dual point monitors module for fire pump controllers,2 nw sngle point monitor modules at ats, 1 reprogram & re-label facp, 1 nw single point mont. modules at genrDetails
fire alarm system additn to accomodate fire pump replacement, 3 rewire dual point monitor modules for new fire pump controllers, one new dual point monitors module for fire pump controllers,2 nw sngle point monitor modules at ats, 1 reprogram & re-label facp, 1 nw single point mont. modules at genr | $1,028 |
| Mar 24, 2016 | Completed final sign-off Mar 2017 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 8th fl: remodel of existing 18,345 sq ft of office space. new conference rooms, new open office, finishes. new lighting in affected areas. upgrade toilet rooms. no change in # of toilet fixtures. maher na. life safety deferred.Details
8th fl: remodel of existing 18,345 sq ft of office space. new conference rooms, new open office, finishes. new lighting in affected areas. upgrade toilet rooms. no change in # of toilet fixtures. maher na. life safety deferred. | $400,000 |
| Dec 18, 2015 | Completed final sign-off Oct 2017 | 550 California St | Potter Fire Protection | sprinklers ti on 2 basements, flors 2,5,6,12- relocate 8 fire sprinklers. offset 21 sections of pipe under electrical conduit. ref app# 201411141483. n/a for maherDetails
sprinklers ti on 2 basements, flors 2,5,6,12- relocate 8 fire sprinklers. offset 21 sections of pipe under electrical conduit. ref app# 201411141483. n/a for maher | $9,500 |
| Oct 13, 2015 | Completed final sign-off Nov 2016 | 550 California St | W. Bradley Electric | installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher naDetails
installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher na | $60,000 |
| Oct 13, 2015 | Completed final sign-off Nov 2016 | 635 Sacramento St | W. Bradley Electric | installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher naDetails
installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher na | $50,000 |
| Aug 12, 2015 | Completed final sign-off Apr 2016 | 550 California St | Honeywell International, Inc | fire alarm addition for the security override project: install (16) smoke detectors, install (8) ocntrol relays & (36) energency door release. (in california tower, install yellow dodor rel. pull station in sacramento tower : basement, install (1) monitor modules. n/a maher ordinanceDetails
fire alarm addition for the security override project: install (16) smoke detectors, install (8) ocntrol relays & (36) energency door release. (in california tower, install yellow dodor rel. pull station in sacramento tower : basement, install (1) monitor modules. n/a maher ordinance | $17,500 |
| Jul 17, 2015 | Never finaled issued Jan 2016, no final | 550 California St | Skyline Construction | replace existing diesel fire pump with a new electric fire pump fed from a life safety generator (like for like replacement rated 500 gpm @100 psi); maher n/aDetails
replace existing diesel fire pump with a new electric fire pump fed from a life safety generator (like for like replacement rated 500 gpm @100 psi); maher n/a | $215,000 |
| Jun 26, 2015 | Completed final sign-off Jul 2015 | 550 California St | Honeywell International, Inc | penthouse: f.a. t.i. 4 replace duct smoke detectors, 6 monitor modules, 4 mother boards, 12 relocate modules to accommodate the demo and replacement of the supply and return fans. n/a for maher. ref app#201504304990Details
penthouse: f.a. t.i. 4 replace duct smoke detectors, 6 monitor modules, 4 mother boards, 12 relocate modules to accommodate the demo and replacement of the supply and return fans. n/a for maher. ref app#201504304990 | $13,364 |
| Apr 30, 2015 | Completed final sign-off Aug 2015 | 550 California St | Skyline Construction | fan replacementDetails
fan replacement | $400,000 |
| Mar 23, 2015 | Never finaled issued Mar 2015, no final | 550 California St | Honeywell International, Inc | 2nd flr: install 4 speaker/strobes, 1 rib relay, 1 control relay, 18 pam-1 relay. replace 24 ceiling speaker/strobes with new; replace 1 strobe w/new. replace 2 ceiling speaker/strobes with wall speaker/strobes demo 1 speaker/strobe. maher - not req'dDetails
2nd flr: install 4 speaker/strobes, 1 rib relay, 1 control relay, 18 pam-1 relay. replace 24 ceiling speaker/strobes with new; replace 1 strobe w/new. replace 2 ceiling speaker/strobes with wall speaker/strobes demo 1 speaker/strobe. maher - not req'd | $18,000 |
| Mar 23, 2015 | Never finaled issued Mar 2015, no final | 550 California St | Honeywell International, Inc | 4th flr: add 5 strobes, 5 speakers, replac 2 strobes inside restroom maher - not req'dDetails
4th flr: add 5 strobes, 5 speakers, replac 2 strobes inside restroom maher - not req'd | $6,200 |
| Mar 19, 2015 | Never finaled issued Mar 2015, no final | 550 California St | Pribuss Engineering Inc | 2nd floor: fire sprinkler plan for ti : relocate/change 17 heads add 2 head. ref pa # 2014 1110 1109. compliance with maher ordinance no 155-13 not required.Details
2nd floor: fire sprinkler plan for ti : relocate/change 17 heads add 2 head. ref pa # 2014 1110 1109. compliance with maher ordinance no 155-13 not required. | $9,264 |
| Mar 13, 2015 | Completed final sign-off Mar 2015 | 635 Sacramento St | Pribuss Engineering Inc | 4th floor fire sprinkler t.i. - relocate 4, add 1 , total 5 heads. t.i. #2015.0115.5844 (550 california). n/a maher ordinanceDetails
4th floor fire sprinkler t.i. - relocate 4, add 1 , total 5 heads. t.i. #2015.0115.5844 (550 california). n/a maher ordinance | $2,573 |
| Jan 15, 2015 | Completed final sign-off Oct 2015 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 4th floor - 568 sq ft rear of work - remodel (e) office space, (n) conf. room, huddle room, open office space, new finishes/lighting in affected areas. upgrade toilet rooms. n/a maher ordinanceDetails
4th floor - 568 sq ft rear of work - remodel (e) office space, (n) conf. room, huddle room, open office space, new finishes/lighting in affected areas. upgrade toilet rooms. n/a maher ordinance | $85,000 |
| Nov 17, 2014 | Completed final sign-off Dec 2014 | 550 California St | Paradigm General Contractors | reconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #20140627969. compliance with maher ordinance no. 155-13 not required.Details
reconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #20140627969. compliance with maher ordinance no. 155-13 not required. | |
| Nov 14, 2014 | Completed final sign-off Jul 2017 | 550 California St | W. Bradley Electric | replacement of(e) 480v bus duct riser distribution system which includes removal of (e) service switchboard 3 cables iwth new 480v calbe riser distriburion and switcher. maher/naDetails
replacement of(e) 480v bus duct riser distribution system which includes removal of (e) service switchboard 3 cables iwth new 480v calbe riser distriburion and switcher. maher/na | $3,000,000 |
| Nov 10, 2014 | Completed final sign-off Oct 2015 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 2nd floor - remodel of (e) office space: (n) conf. room & (n) open office area, new furniture, new finishes, (n) lighting in affected areas, upgrade toilet rooms. no change in # of fixtures. n/a maher ordinanceDetails
2nd floor - remodel of (e) office space: (n) conf. room & (n) open office area, new furniture, new finishes, (n) lighting in affected areas, upgrade toilet rooms. no change in # of fixtures. n/a maher ordinance | $250,000 |
| Oct 3, 2014 | Completed final sign-off Nov 2014 | 550 California St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti on 10th fl. relocate 11 heads, add 1, total 12 (and plug 7). ref 2014 0627 9669.Details
fire sprinkler ti on 10th fl. relocate 11 heads, add 1, total 12 (and plug 7). ref 2014 0627 9669. | $6,200 |
| Sep 23, 2014 | Completed final sign-off Dec 2014 | 550 California St | Honeywell International, Inc | 10th flr: tenant improvement for 10th flr: 25 existing/replace ceiling spaker/strobes; 6 new ceiling strobes, 2 remove replace wall strobes, 17 pilot relays; maher n/aDetails
10th flr: tenant improvement for 10th flr: 25 existing/replace ceiling spaker/strobes; 6 new ceiling strobes, 2 remove replace wall strobes, 17 pilot relays; maher n/a | $29,000 |
| Jun 27, 2014 | Completed final sign-off Dec 2014 | 550 California St | Paradigm General Contractors | remodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fixtures added. maher 155-13 not reqDetails
remodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fixtures added. maher 155-13 not req | $250,000 |
| Jun 17, 2014 | Completed final sign-off Sep 2014 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 1st flr: renovation of existing office break/lunchroom on 1st flr of building, demo and replacement of metal stud walls; (new) couner and cabinets, existing suspended ceiling and lights to remain (no new lights added); compliance with ord 155-13 not requiredDetails
1st flr: renovation of existing office break/lunchroom on 1st flr of building, demo and replacement of metal stud walls; (new) couner and cabinets, existing suspended ceiling and lights to remain (no new lights added); compliance with ord 155-13 not required | $35,000 |
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 550 California St | Thomas Swan Sign Co Inc | 2 evacuation plan map for the 7th floor:n/a for the maher ordinance #155-13Details
2 evacuation plan map for the 7th floor:n/a for the maher ordinance #155-13 | $600 |
| Mar 12, 2014 | Completed final sign-off Jul 2014 | 550 California St | Honeywell International, Inc | 14th floor: install 24 spkr/strobes,1 strobe,7 speaker, 3 smoke detectors, 5 duct det,1 strobe power supply,1 control modules, 6 control relay, 18 rib multi purpose relay,2 door holders, 5 mntrs modules,1 pull st.replace 5 pull st. & rplc 5 smks.n/a for maher ordinance #155-13 t.i. app#201312063549.Details
14th floor: install 24 spkr/strobes,1 strobe,7 speaker, 3 smoke detectors, 5 duct det,1 strobe power supply,1 control modules, 6 control relay, 18 rib multi purpose relay,2 door holders, 5 mntrs modules,1 pull st.replace 5 pull st. & rplc 5 smks.n/a for maher ordinance #155-13 t.i. app#201312063549. | $20,000 |
| Mar 12, 2014 | Completed final sign-off Apr 2014 | 550 California St | Honeywell International, Inc | 7th floor: install 2 smoke detector, 1 control relay, 1 rib relay. n/a for the maher ordinance #155-13 t.i. app#201308144261Details
7th floor: install 2 smoke detector, 1 control relay, 1 rib relay. n/a for the maher ordinance #155-13 t.i. app#201308144261 | $2,200 |
| Mar 12, 2014 | Completed final sign-off Jul 2014 | 550 California St | Honeywell International, Inc | 12th floor: install 22 spkr/strbs,1 wall strobe, 11 speakers, 3 smk det.,1 heat det, 5 duct det, 1 storbe power supply, 1 contrl modules, 6 contrl relay, 18 rib multiprps relay, 2 door holders, 5 dual monitor modules, 1 pull stn, replace 5 smk det, replace 5 pull stations.Details
12th floor: install 22 spkr/strbs,1 wall strobe, 11 speakers, 3 smk det.,1 heat det, 5 duct det, 1 storbe power supply, 1 contrl modules, 6 contrl relay, 18 rib multiprps relay, 2 door holders, 5 dual monitor modules, 1 pull stn, replace 5 smk det, replace 5 pull stations. | $20,000 |
| Mar 7, 2014 | Completed final sign-off Mar 2014 | 550 California St | Pribuss Engineering Inc | fire sprinkler ti on 12th and 14th floors. relocate 141,add 12, total 153. per nfpa 13. 12th flr (201312063546), 14th flr (201312063549)Details
fire sprinkler ti on 12th and 14th floors. relocate 141,add 12, total 153. per nfpa 13. 12th flr (201312063546), 14th flr (201312063549) | $78,734 |
| Feb 12, 2014 | Completed final sign-off Aug 2014 | 550 California St | Thomas Swan Sign Co Inc | installation of 1 evacuation plan for 7th floor. n/a for the maher ordinance #155-13Details
installation of 1 evacuation plan for 7th floor. n/a for the maher ordinance #155-13 | $500 |
| Dec 6, 2013 | Completed final sign-off Jul 2014 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 12th floor:remodel of extg office space:new lighting and finishes for new open office area, offices, conference rooms, copy room and elevator lobby. redo toilet rooms. no new fixtures. no new # of fixtures. compliance with ordinance no. 155-13 not reuqired.Details
12th floor:remodel of extg office space:new lighting and finishes for new open office area, offices, conference rooms, copy room and elevator lobby. redo toilet rooms. no new fixtures. no new # of fixtures. compliance with ordinance no. 155-13 not reuqired. | $743,800 |
| Dec 6, 2013 | Completed final sign-off Jul 2014 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 14th floor:remodel of extg office space:new lighting and finishes for new open office area, offices, conference rooms, copy room and elevator lobby. redo toilet rooms. no new fixtures. compliance with ordinance no. 155-13 not required.Details
14th floor:remodel of extg office space:new lighting and finishes for new open office area, offices, conference rooms, copy room and elevator lobby. redo toilet rooms. no new fixtures. compliance with ordinance no. 155-13 not required. | $747,480 |
| Nov 18, 2013 | Completed final sign-off Jan 2014 | 550 California St | Honeywell International, Inc | 7th flr sac twr fire alarmr-add 14 speaker/strobes, 5 wall strobes, 12 speakers, 8 smoke det, 11 duct detectors, 1 strobe power supply, 1 control module, 1 control relay, 4 door holders, 10 dual monitor modules, 2 pull stations, 2 emergency rel push button, 1 security module. ref#2013.0814.4261.Details
7th flr sac twr fire alarmr-add 14 speaker/strobes, 5 wall strobes, 12 speakers, 8 smoke det, 11 duct detectors, 1 strobe power supply, 1 control module, 1 control relay, 4 door holders, 10 dual monitor modules, 2 pull stations, 2 emergency rel push button, 1 security module. ref#2013.0814.4261. | $16,060 |
| Nov 13, 2013 | Completed final sign-off Aug 2014 | 550 California St | Pioneer Fire Inc. | 7th floor: relocate 63 pendents. ref app#201308144261Details
7th floor: relocate 63 pendents. ref app#201308144261 | $14,657 |
| Aug 30, 2013 | Completed final sign-off Dec 2013 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 12/f- demolition of (e) walls, floor & ceiling of proposed tenant space per ab-17Details
12/f- demolition of (e) walls, floor & ceiling of proposed tenant space per ab-17 | $80,000 |
| Aug 30, 2013 | Completed final sign-off Dec 2013 | 550 California St | Rudolph Commercial Interiors Inc, Rci | 14/f- demolition of (e) walls, floor & ceiling of proposed tenant space per ab-17Details
14/f- demolition of (e) walls, floor & ceiling of proposed tenant space per ab-17 | $80,000 |
| Aug 14, 2013 | Completed final sign-off Feb 2015 | 550 California St | Richlen Construction | 7th floor (sacramento tower) full floor t.i. including partitions, ceilings, restroom upgrades, electrical, hvac, plumbing. life safety separate permits.Details
7th floor (sacramento tower) full floor t.i. including partitions, ceilings, restroom upgrades, electrical, hvac, plumbing. life safety separate permits. | $625,000 |
| Aug 1, 2013 | Completed final sign-off Nov 2013 | 635 Sacramento St | Honeywell International, Inc | 7th floor-fire alarm-relocate 6 devices & remove 1Details
7th floor-fire alarm-relocate 6 devices & remove 1 | $5,000 |
| Jul 30, 2013 | Never finaled issued Jul 2013, no final | 550 California St | Restec Contractors Inc | 7th floor - interior non structural demolition per ab017Details
7th floor - interior non structural demolition per ab017 | $136,219 |
| May 23, 2013 | Never finaled issued Jun 2013, no final | 550 California St | Mina-Tree Signs, Inc | to erect non-electrical sign:install one non-illuminated wall plaque for wells fargo home mortgage.Details
to erect non-electrical sign:install one non-illuminated wall plaque for wells fargo home mortgage. | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Honeywell International, Inc (35), Rudolph Commercial Interiors Inc, Rci (22), Battalion One Fire Protection (20), Pribuss Engineering Inc (14), H C I Systems Inc (9), Anderson, Rowe & Buckley, Inc. (4), G L C Construction Company Inc (4), Sotello Graphic Associates (4), W. Bradley Electric (4), Skyline Construction (3), Paradigm General Contractors (2), Thomas Swan Sign Co Inc (2), Acco Engineered Systems Inc. Dba Acco En, Ayoob & Peery Plumbing Co Inc, City Building Inc., Mastec Network Solutions Inc, Mina-Tree Signs, Inc, Pioneer Fire Inc., Potter Fire Protection, Restec Contractors Inc, Richlen Construction, Swinerton Builders
- Architects
- Sashikala Murthy (41), Erin K Uesugi (18), Amit Wadhwa (2), Alan Johansen, Honeywell Int'l Inc., Jin Park, Wesley Herr
- Engineers
- Amit Wadhwa (30), Levi G. Abarte (17), Bradley Hollub (2), Alan Burr, Christopher Lloyd, Jacob Proctor, James Spore, Jon Yukio Yokoyama, Vahid Sattary
- Designers
- Mike Herbert (8), Edward Sotello (2), Erin Uesugi (2), Hci Systems Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.