Permit GraphShortlistSan Francisco building permits since 2000

Erin Uesugi

License
C16985
Look the license up with the state
Listed as
architect, authorized agent-others, designer
Firm
Uesugi & Associates
Based in
San Francisco
On San Francisco permits
Jul 2002 to Dec 2025

166 permits since 2000 (architect on 158 permits, designer on 7 permits, authorized agent-others on 1 permit): 142 completed, 3 in progress, 13 never finaled, 8 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 166.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 30, 2025In progress
filed Dec 2025, not yet issued
333 Market Streplace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet.
Details
Permit
202512302961
Status
filed
Filed
Dec 30, 2025
Declared cost
$600,000
Address
333 Market St

replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet.

Open the permit page

$600,000
Oct 20, 2025In progress
issued Sep 2026
555 California StSkyline Construction23rd floor: ti consisting of new office remodel with new offices, workroom, & coffee station. new led lighting and finishes throughout. mechanical work: new duct distribution, 2 new constant air volume boxes, 1 new heat pump, 2 new transforfans, 4 new smoke dampers, 4 new fire/smoke dampers.
Details
Permit
202510207671
Status
issued
Filed
Oct 20, 2025
Permit issued
Sep 21, 2026
Declared cost
$1,500,000
Address
555 California St

23rd floor: ti consisting of new office remodel with new offices, workroom, & coffee station. new led lighting and finishes throughout. mechanical work: new duct distribution, 2 new constant air volume boxes, 1 new heat pump, 2 new transforfans, 4 new smoke dampers, 4 new fire/smoke dampers.

Open the permit page

$1,500,000
Aug 11, 2025In progress
filed Aug 2025, not yet issued
333 Market StCity Building Inc.335 sqft. area of work water roofing remediation of basement wall structure due to water intrusion. remove (e) pavers/slab/soil to access and repair/replace waterproofing membrane. provide temporary shoring of during excavation. restore (e) sidwald pavers and
Details
Permit
202508112727
Status
filed
Filed
Aug 11, 2025
Declared cost
$175,000
Address
333 Market St

335 sqft. area of work water roofing remediation of basement wall structure due to water intrusion. remove (e) pavers/slab/soil to access and repair/replace waterproofing membrane. provide temporary shoring of during excavation. restore (e) sidwald pavers and

Open the permit page

$175,000
Jun 9, 2025Completed
final sign-off Oct 2025
555 California StSkyline Construction24th floor: revision to pa #202410213343 to add new 20 min. rated hold open doors, separation of hi-10 drinking fountains and relocation of semi-ambulatory stall in women's toilet room due to existing conditions. ref #202410213343 & 202504073822
Details
Permit
202506098189
Status
complete
Filed
Jun 9, 2025
Permit issued
Jul 9, 2025
Final sign-off
Oct 6, 2025
Address
555 California St

24th floor: revision to pa #202410213343 to add new 20 min. rated hold open doors, separation of hi-10 drinking fountains and relocation of semi-ambulatory stall in women's toilet room due to existing conditions. ref #202410213343 & 202504073822

Open the permit page

Jun 4, 2025Completed
final sign-off Dec 2025
333 Market StRudolph Commercial Interiors Inc, Rci8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of work.
Details
Permit
202506047877
Status
complete
Filed
Jun 4, 2025
Permit issued
Aug 27, 2025
Final sign-off
Dec 3, 2025
Declared cost
$175,000
Address
333 Market St

8th floor: office remodel to add a new large and new medium conference room and 2 huddle rooms. new furniture and finishes, convert 2 existing conference rooms into offices. associated hvac and electrical work for area of remodel. 1169 sq ft area of work.

Open the permit page

$175,000
May 28, 2025Completed
final sign-off Jan 2026
333 Market StRudolph Commercial Interiors Inc, Rcibasement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall support.
Details
Permit
202505287376
Status
complete
Filed
May 28, 2025
Permit issued
Oct 14, 2025
Final sign-off
Jan 27, 2026
Declared cost
$15,000
Address
333 Market St

basement: 10 s.f demo of existing door and partial cmu wall to install new double doors. relocate existing equipment as necessary. no mechanical/plumbing work. low voltage work for relocated card reader and electrified door. new steel angle headers for cmu wall support.

Open the permit page

$15,000
Apr 7, 2025Completed
final sign-off Sep 2025
555 California StSkyline Constructionrevision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisions
Details
Permit
202504073822
Status
complete
Filed
Apr 7, 2025
Permit issued
Apr 22, 2025
Final sign-off
Sep 3, 2025
Declared cost
$20,000
Address
555 California St

revision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisions

Open the permit page

$20,000
Oct 21, 2024Completed
final sign-off Oct 2025
555 California StSkyline Constructiont.i. consists of office remodel with new office, meeting room,work rooms, break room, and pantry. new led lighting & finises throughout. d.a. upgrades to restrooms. mechanical work, duct redistribution and addition of equipment electrical work: new led lighting & controls, new isms system.
Details
Permit
202410213343
Status
complete
Filed
Oct 21, 2024
Permit issued
Feb 28, 2025
Final sign-off
Oct 6, 2025
Declared cost
$2,500,000
Address
555 California St

t.i. consists of office remodel with new office, meeting room,work rooms, break room, and pantry. new led lighting & finises throughout. d.a. upgrades to restrooms. mechanical work, duct redistribution and addition of equipment electrical work: new led lighting & controls, new isms system.

Open the permit page

$2,500,000
Sep 25, 2024Completed
final sign-off Apr 2025
333 Market StRudolph Commercial Interiors Inc, Rci9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqft.
Details
Permit
202409251549
Status
complete
Filed
Sep 25, 2024
Permit issued
Nov 5, 2024
Final sign-off
Apr 2, 2025
Declared cost
$150,000
Address
333 Market St

9th floor. partial remodel of existing office. hvac upgrade for new remodel. upgrade to led lighting in floor. common areas and new rooms. area of work: 307 sf, aread of suite 4093 sqft. no adding sqft.

Open the permit page

$150,000
Sep 25, 2024Completed
final sign-off Jul 2025
333 Market StRudolph Commercial Interiors Inc, Rci1/fl office ti, conversion of (e) storage space to mail room, no public facing space, remodel (e) unisex toilet room, addition of drinking fountain, hvac upgrade, (n) exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room and
Details
Permit
202409251548
Status
complete
Filed
Sep 25, 2024
Permit issued
Feb 28, 2025
Final sign-off
Jul 18, 2025
Declared cost
$150,000
Address
333 Market St

1/fl office ti, conversion of (e) storage space to mail room, no public facing space, remodel (e) unisex toilet room, addition of drinking fountain, hvac upgrade, (n) exhaust fan and vav box w/reheat added, no new fsd's. lighting upgrade . remodel of existing unisex toilet and room and

Open the permit page

$150,000
Aug 26, 2024Completed
final sign-off May 2025
333 Market StSkyline Construction(at garage) providing 10 electric bike stations (future n.i.c.), 6 e-bike dual parking docks and 52 vertical standard bike racks in new wire mesh enclosure in the garage. power to electric bike charging stations as required.
Details
Permit
202408269423
Status
complete
Filed
Aug 26, 2024
Permit issued
Sep 13, 2024
Final sign-off
May 9, 2025
Declared cost
$100,000
Address
333 Market St

(at garage) providing 10 electric bike stations (future n.i.c.), 6 e-bike dual parking docks and 52 vertical standard bike racks in new wire mesh enclosure in the garage. power to electric bike charging stations as required.

Open the permit page

$100,000
Jul 15, 2024Completed
final sign-off Aug 2025
333 Market StSkyline Construction2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of work
Details
Permit
202407156457
Status
complete
Filed
Jul 15, 2024
Permit issued
Oct 9, 2024
Final sign-off
Aug 8, 2025
Declared cost
$25,000
Address
333 Market St

2nd fl - upgrade all lighting to led. millwork refresh; relocated 7 new hvac with new ceiling areas. new finishes in area of work 1268 sq ft. area of work

Open the permit page

$25,000
Jul 15, 2024Completed
final sign-off Feb 2025
333 Market StRudolph Commercial Interiors Inc, Rci9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of work.
Details
Permit
202407156458
Status
complete
Filed
Jul 15, 2024
Permit issued
Aug 15, 2024
Final sign-off
Feb 26, 2025
Declared cost
$220,000
Address
333 Market St

9th floor: new remodel consisting of new conference room, 6 offices, pantry, and a copy room, revise lighting, finishes and hvac upgrade in area of work.

Open the permit page

$220,000
Feb 12, 2024Completed
final sign-off Jul 2024
333 Market StRudolph Commercial Interiors Inc, Rci9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan.
Details
Permit
202402125689
Status
complete
Filed
Feb 12, 2024
Permit issued
Apr 19, 2024
Final sign-off
Jul 29, 2024
Declared cost
$175,000
Address
333 Market St

9th fl remodel of existing office. demo 2 offices, new led lghting in areas of construction only, paint for affected spaces, new furniture where noted. new mechanical & electrical work for affected spaces. duct distribution being modified per new space plan.

Open the permit page

$175,000
Aug 23, 2023Completed
final sign-off Jul 2024
333 Market StRudolph Commercial Interiors Inc, Rciground fl loading dock. infill existing loading dock ramp.
Details
Permit
202308235009
Status
complete
Filed
Aug 23, 2023
Permit issued
Jan 31, 2024
Final sign-off
Jul 29, 2024
Declared cost
$225,000
Address
333 Market St

ground fl loading dock. infill existing loading dock ramp.

Open the permit page

$225,000
Aug 21, 2023Completed
final sign-off Aug 2023
550 California StRudolph Commercial Interiors Inc, Rci(parking structure) consisting only of barrier removal: provide designated accessible parking spaces for new ev charging stations. ev charger installation was previously approved under separate electrical permit# ew202306232040.
Details
Permit
202308214831
Status
complete
Filed
Aug 21, 2023
Permit issued
Aug 24, 2023
Final sign-off
Aug 30, 2023
Declared cost
$5,000
Address
550 California St

(parking structure) consisting only of barrier removal: provide designated accessible parking spaces for new ev charging stations. ev charger installation was previously approved under separate electrical permit# ew202306232040.

Open the permit page

$5,000
Jun 21, 2023Completed
final sign-off Dec 2023
333 Market StRudolph Commercial Interiors Inc, Rci5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new construction
Details
Permit
202306210493
Status
complete
Filed
Jun 21, 2023
Permit issued
Aug 11, 2023
Final sign-off
Dec 14, 2023
Declared cost
$125,000
Address
333 Market St

5th fl - office remodel consisting of adding 3 (n) offices w/new furniture & finishes & copy area. new lighting & hvac associated to new construction

Open the permit page

$125,000
Jun 21, 2023Completed
final sign-off Jul 2024
333 Market StG L C Construction Company Inc1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodel
Details
Permit
202306210488
Status
complete
Filed
Jun 21, 2023
Permit issued
Sep 26, 2023
Final sign-off
Jul 17, 2024
Declared cost
$135,000
Address
333 Market St

1/f annex: new pantry area w/new finishes/lighting, new tv wall @ (e) collaboration area. hvac upgrade for new remodel

Open the permit page

$135,000
May 17, 2023Completed
final sign-off Jan 2024
333 Market StRudolph Commercial Interiors Inc, Rci9th fl. conversion of (e) training rooms to copy/print center, new led lighting in areas of construction only, new paint and carpet for new spaces new furniture where noted, mechanical scope new fsds, fan powered boxes, transfer fans,heat pupmps added
Details
Permit
202305177948
Status
complete
Filed
May 17, 2023
Permit issued
Jul 25, 2023
Final sign-off
Jan 3, 2024
Declared cost
$162,000
Address
333 Market St

9th fl. conversion of (e) training rooms to copy/print center, new led lighting in areas of construction only, new paint and carpet for new spaces new furniture where noted, mechanical scope new fsds, fan powered boxes, transfer fans,heat pupmps added

Open the permit page

$162,000
May 3, 2023Completed
final sign-off Mar 2024
333 Market StGci, Incconversion of existing copy rooms to new focus rooms. change of furniture in area of work only and workstations. relocating led lighting in area of work to fit new layout. new mech and elc. work for converted spaces
Details
Permit
202305036992
Status
complete
Filed
May 3, 2023
Permit issued
Jul 6, 2023
Final sign-off
Mar 13, 2024
Declared cost
$175,000
Address
333 Market St

conversion of existing copy rooms to new focus rooms. change of furniture in area of work only and workstations. relocating led lighting in area of work to fit new layout. new mech and elc. work for converted spaces

Open the permit page

$175,000
Oct 6, 2022Never finaled
filed Oct 2022, never issued
420 Montgomery Stinterior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of use
Details
Permit
202210063903
Status
approved
Filed
Oct 6, 2022
Declared cost
$3,120,000
Address
420 Montgomery St

interior t.i. to the 3rd fl. scope of work includes interior demo, partitions, doors, ceilings, mech, elec, plumbing, structural work (no structural demo) kitchenette for employee self use, no outside catering will be provided, no change of use

Open the permit page

$3,120,000
Sep 27, 2022Expired or cancelled
cancelled Jan 2026
420 Montgomery Stremodel of partial 1st fl conversion of e office space to new mail room, production center, and delivery area. new lighting in areas of costruction onlyl. new paint and carpet for new spaces. new mech, plumb, elec for new spaces
Details
Permit
202209273189
Status
cancelled
Filed
Sep 27, 2022
Declared cost
$550,000
Address
420 Montgomery St

remodel of partial 1st fl conversion of e office space to new mail room, production center, and delivery area. new lighting in areas of costruction onlyl. new paint and carpet for new spaces. new mech, plumb, elec for new spaces

Open the permit page

$550,000
Aug 18, 2022Completed
final sign-off Sep 2023
333 Market StRudolph Commercial Interiors Inc, Rci2/f ste 217: remodel of (e) breakroom & upgrade to new led lighting, new ceiling, new appliances - sink, power, new finishes. new exhaust fan, new vav box, no new fsd's. fire alarm/sprinklers under sep permits. maher n/a
Details
Permit
202208180787
Status
complete
Filed
Aug 18, 2022
Permit issued
Mar 16, 2023
Final sign-off
Sep 8, 2023
Declared cost
$250,000
Address
333 Market St

2/f ste 217: remodel of (e) breakroom & upgrade to new led lighting, new ceiling, new appliances - sink, power, new finishes. new exhaust fan, new vav box, no new fsd's. fire alarm/sprinklers under sep permits. maher n/a

Open the permit page

$250,000
Aug 5, 2022Never finaled
issued Nov 2022, no final
333 Market StG L C Construction Company Inc15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodel
Details
Permit
202208050009
Status
issued
Filed
Aug 5, 2022
Permit issued
Nov 7, 2022
Declared cost
$500,000
Address
333 Market St

15th flr - new recording studio 4 editing room w/ (n) lighting fixtures, ceiling, finishes. conversion of (e) offices, finishes; (n) conference, huddle rooms, and focus rooms remodel

Open the permit page

$500,000
Jul 1, 2022Expired or cancelled
withdrawn Mar 2024
333 Market St27th fl: join 2 separate suites. remove demising walls and common corridors. conversion of (e) offices/ finishes for (n) conference rooms, huddle, and activity rooms remodel. no ceiling work.
Details
Permit
202207017618
Status
withdrawn
Filed
Jul 1, 2022
Declared cost
$350,000
Address
333 Market St

27th fl: join 2 separate suites. remove demising walls and common corridors. conversion of (e) offices/ finishes for (n) conference rooms, huddle, and activity rooms remodel. no ceiling work.

Open the permit page

$350,000
May 6, 2022Completed
final sign-off Mar 2023
333 Market StRudolph Commercial Interiors Inc, Rci25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms.
Details
Permit
202205063683
Status
complete
Filed
May 6, 2022
Permit issued
Aug 9, 2022
Final sign-off
Mar 2, 2023
Declared cost
$150,000
Address
333 Market St

25th fl: conversion of existing office & finishes for new conference rooms, huddle, and focus rooms.

Open the permit page

$150,000
Dec 10, 2021Completed
final sign-off Mar 2022
333 Market StG L C Construction Company Inc30th floor: conversion of (e) office to (n) supply room. all (e) fixtures to remain. hvac upgrade for area of construction only.
Details
Permit
202112104150
Status
complete
Filed
Dec 10, 2021
Permit issued
Feb 4, 2022
Final sign-off
Mar 7, 2022
Declared cost
$50,000
Address
333 Market St

30th floor: conversion of (e) office to (n) supply room. all (e) fixtures to remain. hvac upgrade for area of construction only.

Open the permit page

$50,000
Dec 6, 2021Completed
final sign-off Nov 2022
333 Market StRichlen Constructioninstallation of 4 steel bollards in front of e rolling grilles for safety precautions. bollards are inside property line and does not impact public path of travel.
Details
Permit
202112063750
Status
complete
Filed
Dec 6, 2021
Permit issued
Jan 4, 2022
Final sign-off
Nov 4, 2022
Declared cost
$16,000
Address
333 Market St

installation of 4 steel bollards in front of e rolling grilles for safety precautions. bollards are inside property line and does not impact public path of travel.

Open the permit page

$16,000
Oct 22, 2021Completed
final sign-off Mar 2023
333 Market StSkyline Construction31st fl - conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel
Details
Permit
202110220996
Status
complete
Filed
Oct 22, 2021
Permit issued
Jun 13, 2022
Final sign-off
Mar 24, 2023
Declared cost
$1,530,000
Address
333 Market St

31st fl - conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle, and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel

Open the permit page

$1,530,000
Oct 1, 2021Completed
final sign-off Mar 2023
333 Market StSkyline Construction19/f: conversion of (e) offices/finishes/lighting, new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel
Details
Permit
202110019629
Status
complete
Filed
Oct 1, 2021
Permit issued
Jun 13, 2022
Final sign-off
Mar 24, 2023
Declared cost
$1,530,000
Address
333 Market St

19/f: conversion of (e) offices/finishes/lighting, new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel

Open the permit page

$1,530,000
Sep 23, 2021Completed
final sign-off Mar 2023
333 Market StSkyline Construction24/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms. remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.
Details
Permit
202109239013
Status
complete
Filed
Sep 23, 2021
Permit issued
Jun 13, 2022
Final sign-off
Mar 24, 2023
Declared cost
$1,530,000
Address
333 Market St

24/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms. remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.

Open the permit page

$1,530,000
Sep 17, 2021Completed
final sign-off Mar 2023
333 Market StSkyline Constructionconversion of (e) offices/finishes/lighting. new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. add one new heat pump. mep included. fire alarm/sprinklers under sep permits.
Details
Permit
202109178632
Status
complete
Filed
Sep 17, 2021
Permit issued
Jun 13, 2022
Final sign-off
Mar 24, 2023
Declared cost
$1,530,000
Address
333 Market St

conversion of (e) offices/finishes/lighting. new conference rooms, huddle, focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. add one new heat pump. mep included. fire alarm/sprinklers under sep permits.

Open the permit page

$1,530,000
Aug 9, 2021Completed
final sign-off Jun 2022
333 Market St17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms only.
Details
Permit
202108096055
Status
complete
Filed
Aug 9, 2021
Permit issued
Oct 27, 2021
Final sign-off
Jun 24, 2022
Declared cost
$250,000
Address
333 Market St

17/f: non structural interior office remodel. convert select offices to meeting rooms, add large breakroom. update hvac led lighting for affected rooms only.

Open the permit page

$250,000
Jul 16, 2021Completed
final sign-off Nov 2022
333 Market StRudolph Commercial Interiors Inc, Rci20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit.
Details
Permit
202107164536
Status
complete
Filed
Jul 16, 2021
Permit issued
Oct 28, 2021
Final sign-off
Nov 23, 2022
Declared cost
$1,530,000
Address
333 Market St

20/f: office remodel of new conference rooms, huddle rooms, focus rooms and break room. new furniture and finishes. upgrade all fixtures to new led lighting. hvac upgrade for new remodel. fire alarm and sprinklers under sep permit.

Open the permit page

$1,530,000
Apr 19, 2021Completed
final sign-off Jan 2022
333 Market StRudolph Commercial Interiors Inc, Rci9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction.
Details
Permit
202104198849
Status
complete
Filed
Apr 19, 2021
Permit issued
Jul 15, 2021
Final sign-off
Jan 31, 2022
Declared cost
$466,000
Address
333 Market St

9/f: conversion of (e) offices/finishes/lighting: new conference rooms, huddle, and focus rooms remodel. upgrade fixtures to new led lighting and hvac modification in areas of construction.

Open the permit page

$466,000
Dec 9, 2020Expired or cancelled
cancelled May 2021
550 California StG L C Construction Company Inc7th flr. conversion of (e) offices / finishes / lighting. (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.
Details
Permit
202012090656
Status
cancelled
Filed
Dec 9, 2020
Permit issued
Apr 7, 2021
Declared cost
$1,540,000
Address
550 California St

7th flr. conversion of (e) offices / finishes / lighting. (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.

Open the permit page

$1,540,000
Oct 17, 2020Completed
final sign-off Jul 2021
333 Market StG L C Construction Company Inc29th floor: conversion of (e) offices, finishes, lighting. (n) conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.
Details
Permit
202010176713
Status
complete
Filed
Oct 17, 2020
Permit issued
Jan 5, 2021
Final sign-off
Jul 28, 2021
Declared cost
$790,150
Address
333 Market St

29th floor: conversion of (e) offices, finishes, lighting. (n) conference rooms, huddle rooms & breakroom remodel. upgrade all fixtures to new led lighting. hvac upgrade for new remodel.

Open the permit page

$790,150
Oct 17, 2020Completed
final sign-off Jul 2022
333 Market StRichlen Construction1st floor: partail demo of (e) walls& flooring for (n) security doors. partial demo of (e) rcp at areas of demo and provide (n) led lighting. (n) power/data where required. (n) 1 hour rated exit corridor at ground floor. (n) ada door operatiors at lobby door & annex entry door.
Details
Permit
202010176782
Status
complete
Filed
Oct 17, 2020
Permit issued
Mar 31, 2021
Final sign-off
Jul 11, 2022
Declared cost
$325,000
Address
333 Market St

1st floor: partail demo of (e) walls& flooring for (n) security doors. partial demo of (e) rcp at areas of demo and provide (n) led lighting. (n) power/data where required. (n) 1 hour rated exit corridor at ground floor. (n) ada door operatiors at lobby door & annex entry door.

Open the permit page

$325,000
Oct 10, 2020Completed
final sign-off Jul 2021
333 Market StG L C Construction Company Inc28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of (e) conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodel.
Details
Permit
202010106325
Status
complete
Filed
Oct 10, 2020
Permit issued
Jan 7, 2021
Final sign-off
Jul 15, 2021
Declared cost
$780,150
Address
333 Market St

28th flr. demo 9 existing office and constructing 8 new focus rooms. remodel of (e) conference rooms, huddle rooms, break room.provide new finishes & upgrade of all fixtures t onew led lighting. upgrade hvac due to remodel.

Open the permit page

$780,150
Oct 2, 2020Completed
final sign-off Jul 2021
333 Market StG L C Construction Company Inc27/f suite b: t.i. change of (e) furniture in areas of work, covert (e) offices to (n) conference rooms. (n) mechanical & (n) electrical work in affected area of work. maher n/a.
Details
Permit
202010025749
Status
complete
Filed
Oct 2, 2020
Permit issued
Dec 2, 2020
Final sign-off
Jul 15, 2021
Declared cost
$175,000
Address
333 Market St

27/f suite b: t.i. change of (e) furniture in areas of work, covert (e) offices to (n) conference rooms. (n) mechanical & (n) electrical work in affected area of work. maher n/a.

Open the permit page

$175,000
Sep 24, 2020Completed
final sign-off Jul 2021
333 Market StG L C Construction Company Inc21/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/a.
Details
Permit
202009244919
Status
complete
Filed
Sep 24, 2020
Permit issued
Dec 2, 2020
Final sign-off
Jul 15, 2021
Declared cost
$1,530,000
Address
333 Market St

21/f: conversion of (e) offices/finishes/lighting; (n) conference rooms, huddle and focus rooms remodel. upgrade all fixtures to new led lghting. hvac upgrade for new remodel. maher n/a.

Open the permit page

$1,530,000
Sep 15, 2020Completed
final sign-off Apr 2021
550 California StRudolph Commercial Interiors Inc, Rci11th flr. office remodel of new break room, change of existing furnitures in areas of work w/ new conference rooms, new focus rooms, and new finishes. new mechanical and electrical work for new spaces.
Details
Permit
202009154208
Status
complete
Filed
Sep 15, 2020
Permit issued
Oct 23, 2020
Final sign-off
Apr 22, 2021
Declared cost
$137,000
Address
550 California St

11th flr. office remodel of new break room, change of existing furnitures in areas of work w/ new conference rooms, new focus rooms, and new finishes. new mechanical and electrical work for new spaces.

Open the permit page

$137,000
Sep 15, 2020Expired or cancelled
cancelled Jan 2026
420 Montgomery Stremodel of 3rd fl: add new conference rooms, focus rooms, huddle rooms, break rooms & mother's room. new lighting in areas of construction. new paint & carpet for new open office area. new furniture where noted. new mech, plum, elec work for new spaces.
Details
Permit
202009154228
Status
cancelled
Filed
Sep 15, 2020
Address
420 Montgomery St

remodel of 3rd fl: add new conference rooms, focus rooms, huddle rooms, break rooms & mother's room. new lighting in areas of construction. new paint & carpet for new open office area. new furniture where noted. new mech, plum, elec work for new spaces.

Open the permit page

Sep 14, 2020Completed
final sign-off Feb 2021
375 Brannan StRudolph Commercial Interiors Inc, Rcibarrier removal only -ada toilet upgrade of (e) toilet rooms, partial demo of men's toilet room, janitor's room & women's toilet room. new design/build hvac, elec & plumbing s required. mep: design/build (in area of work only
Details
Permit
202009144169
Status
complete
Filed
Sep 14, 2020
Permit issued
Sep 24, 2020
Final sign-off
Feb 5, 2021
Declared cost
$137,000
Address
375 Brannan St

barrier removal only -ada toilet upgrade of (e) toilet rooms, partial demo of men's toilet room, janitor's room & women's toilet room. new design/build hvac, elec & plumbing s required. mep: design/build (in area of work only

Open the permit page

$137,000
Feb 13, 2020Expired or cancelled
cancelled Jan 2026
333 Market St2nd fl - add 3 telephone booths (furniture) & required power outlets. new gwb soffit & bracing
Details
Permit
202002134405
Status
cancelled
Filed
Feb 13, 2020
Declared cost
$10,000
Address
333 Market St

2nd fl - add 3 telephone booths (furniture) & required power outlets. new gwb soffit & bracing

Open the permit page

$10,000
Nov 26, 2019Completed
final sign-off Feb 2021
420 Montgomery StSkyline Constructionrev to pa# 201805048292; add 1 hour rated partiton at lower level storage 1 hour rated corridor
Details
Permit
201911268158
Status
complete
Filed
Nov 26, 2019
Permit issued
Jan 23, 2020
Final sign-off
Feb 2, 2021
Declared cost
$10,000
Address
420 Montgomery St

rev to pa# 201805048292; add 1 hour rated partiton at lower level storage 1 hour rated corridor

Open the permit page

$10,000
Nov 5, 2019Completed
final sign-off Jul 2020
333 Market StG L C Construction Company Inc25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.
Details
Permit
201911056451
Status
complete
Filed
Nov 5, 2019
Permit issued
Dec 20, 2019
Final sign-off
Jul 9, 2020
Declared cost
$516,115
Address
333 Market St

25th floor: total floor area 15,335 sq.ft. total effected area 4,735 sq.ft. office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.

Open the permit page

$516,115
Nov 5, 2019Completed
final sign-off Jun 2020
333 Market StRudolph Commercial Interiors Inc, Rci15th floor: office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.
Details
Permit
201911056455
Status
complete
Filed
Nov 5, 2019
Permit issued
Dec 17, 2019
Final sign-off
Jun 15, 2020
Declared cost
$715,803
Address
333 Market St

15th floor: office remodel of new huddle rooms, focus rooms & break room. new furniture & finishes. upgrade fixture to new led lighting. hvac upgrade for new remodel.

Open the permit page

$715,803
Oct 18, 2019Completed
final sign-off Sep 2023
635 Sacramento StHoneywell International, Inc6th floor: 635 sacramento town. f/a modification: add 1 strobe booster; 16 spker/strbs; 1 spkr; 7 control relay module; 10 pilot relays; 6 duct detectors; 5 monitor modules; 10 aux relays; 3 smoke detectors and 3 pull stations; demo f/a devices per sheet f7.1. ref app#201907125734
Details
Permit
201910184903
Status
complete
Filed
Oct 18, 2019
Permit issued
May 12, 2020
Final sign-off
Sep 8, 2023
Declared cost
$38,193
Address
635 Sacramento St

6th floor: 635 sacramento town. f/a modification: add 1 strobe booster; 16 spker/strbs; 1 spkr; 7 control relay module; 10 pilot relays; 6 duct detectors; 5 monitor modules; 10 aux relays; 3 smoke detectors and 3 pull stations; demo f/a devices per sheet f7.1. ref app#201907125734

Open the permit page

$38,193
Oct 2, 2019Completed
final sign-off Sep 2020
343 Sansome StParadigm General Contractors11th floor: office remodel of (n) conference rooms, huddle rooms, focus rooms, & break room, new furniture & finishes, upgrade all fixtures to new led lighting hvac upgrade for new remodel
Details
Permit
201910023276
Status
complete
Filed
Oct 2, 2019
Permit issued
Dec 5, 2019
Final sign-off
Sep 21, 2020
Declared cost
$950,000
Address
343 Sansome St

11th floor: office remodel of (n) conference rooms, huddle rooms, focus rooms, & break room, new furniture & finishes, upgrade all fixtures to new led lighting hvac upgrade for new remodel

Open the permit page

$950,000
Sep 6, 2019Completed
final sign-off Jun 2020
333 Market StRudolph Commercial Interiors Inc, Rci14th fl - area of work 14561 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mech.
Details
Permit
201909060909
Status
complete
Filed
Sep 6, 2019
Permit issued
Oct 7, 2019
Final sign-off
Jun 22, 2020
Declared cost
$850,000
Address
333 Market St

14th fl - area of work 14561 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms, breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. includes mep/mech.

Open the permit page

$850,000
Sep 6, 2019Completed
final sign-off Jun 2020
333 Market StRudolph Commercial Interiors Inc, Rci18th fl - area of work 1614 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mech.
Details
Permit
201909060908
Status
complete
Filed
Sep 6, 2019
Permit issued
Oct 7, 2019
Final sign-off
Jun 22, 2020
Declared cost
$350,000
Address
333 Market St

18th fl - area of work 1614 sf. office remodel of (n) conference rooms, huddle rooms, focus rooms & breakroom & mother's room. including new finishes. upgrade all light fixtures to new led, hvac upgrade for new remodel. incl mep/mech.

Open the permit page

$350,000
Aug 2, 2019Completed
final sign-off Jun 2020
550 California StRudolph Commercial Interiors Inc, Rciremodel of (e) video library: (n) audio control rm. & (n) audio suite upgrade all light fixture in suite to new led lighting, hvac upgrade for (n) remodel
Details
Permit
201908027718
Status
complete
Filed
Aug 2, 2019
Permit issued
Nov 12, 2019
Final sign-off
Jun 5, 2020
Declared cost
$25,000
Address
550 California St

remodel of (e) video library: (n) audio control rm. & (n) audio suite upgrade all light fixture in suite to new led lighting, hvac upgrade for (n) remodel

Open the permit page

$25,000
Jul 12, 2019Completed
final sign-off Jun 2020
635 Sacramento StRudolph Commercial Interiors Inc, Rciretail remodel of (e) office on 6th flr in 3 suites add demisinf wall btw suite 625 & 650. upgrade pantry /copy rm in suite 625m 650 & 675. new offices, new pantry, new meeting rooms. new mech & new ele work for new spaces. min work in (e) toilet rm. no change in plm fix count
Details
Permit
201907125734
Status
complete
Filed
Jul 12, 2019
Permit issued
Jul 17, 2019
Final sign-off
Jun 18, 2020
Declared cost
$250,000
Address
635 Sacramento St

retail remodel of (e) office on 6th flr in 3 suites add demisinf wall btw suite 625 & 650. upgrade pantry /copy rm in suite 625m 650 & 675. new offices, new pantry, new meeting rooms. new mech & new ele work for new spaces. min work in (e) toilet rm. no change in plm fix count

Open the permit page

$250,000
Jul 12, 2019Completed
final sign-off Jun 2020
635 Sacramento StRudolph Commercial Interiors Inc, Rci1st floor: 4,119 sq ft area of work. remodel of extg office space on 1st floor with new meeting room, breakroom/finishes/lighting. new exit door to exterior. new mep work. minimal work in extg toilet rooms for ada and finishes upgrade. n/a for maher
Details
Permit
201907125763
Status
complete
Filed
Jul 12, 2019
Permit issued
Jul 17, 2019
Final sign-off
Jun 17, 2020
Declared cost
$450,000
Address
635 Sacramento St

1st floor: 4,119 sq ft area of work. remodel of extg office space on 1st floor with new meeting room, breakroom/finishes/lighting. new exit door to exterior. new mep work. minimal work in extg toilet rooms for ada and finishes upgrade. n/a for maher

Open the permit page

$450,000
Jun 5, 2019Never finaled
issued Jun 2019, no final
333 Market StG L C Construction Company Inc33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/a.
Details
Permit
201906052530
Status
issued
Filed
Jun 5, 2019
Permit issued
Jun 14, 2019
Declared cost
$1,962,000
Address
333 Market St

33/f: office remodel of new conf rm, huddle rm, focus rm, break rm, new furniture & finishes. upgrade all fixture to new led lighting. hvac upgrade for new remodel. maher n/a.

Open the permit page

$1,962,000
Apr 5, 2019Completed
final sign-off Jun 2020
550 California StRudolph Commercial Interiors Inc, Rci3/f: remodel of (e) office space on 3rd fl with (n) conference rooms, (n) focus rooms, (n) breakroom, (n) finishes and (n) led lighting in affected areas. mep included. maher na.
Details
Permit
201904057249
Status
complete
Filed
Apr 5, 2019
Permit issued
Sep 17, 2019
Final sign-off
Jun 19, 2020
Declared cost
$1,500,000
Address
550 California St

3/f: remodel of (e) office space on 3rd fl with (n) conference rooms, (n) focus rooms, (n) breakroom, (n) finishes and (n) led lighting in affected areas. mep included. maher na.

Open the permit page

$1,500,000
Oct 17, 2018Completed
final sign-off Feb 2020
601 Market StEric F Anderson Incorporatedminor permit to alter. exterior work to include replace entry doors & hardware, remove 2nd fl mechanical louvers on market st & replace with glazing to match adjacent. replace inside new louvers on 2nd street elevation
Details
Permit
201810173452
Status
complete
Filed
Oct 17, 2018
Permit issued
Jul 30, 2019
Final sign-off
Feb 10, 2020
Declared cost
$75,000
Address
601 Market St

minor permit to alter. exterior work to include replace entry doors & hardware, remove 2nd fl mechanical louvers on market st & replace with glazing to match adjacent. replace inside new louvers on 2nd street elevation

Open the permit page

$75,000
May 4, 2018Completed
final sign-off Nov 2018
333 Market StSwinerton Buildersremodel of 3rd flr - add conference room, huddle room, focus room, remodel break room, new funiture & finishes, upgrage all lighting to led, upgrade mech & ele of space
Details
Permit
201805048254
Status
complete
Filed
May 4, 2018
Permit issued
Jun 1, 2018
Final sign-off
Nov 28, 2018
Declared cost
$250,000
Address
333 Market St

remodel of 3rd flr - add conference room, huddle room, focus room, remodel break room, new funiture & finishes, upgrage all lighting to led, upgrade mech & ele of space

Open the permit page

$250,000
May 4, 2018Completed
final sign-off Oct 2018
635 Sacramento StRudolph Commercial Interiors Inc, Rci8th fl: partial remodel 430 sq ft of 8th fl amep: focus room, open office, breakroom. upgrade mechanical and elec of space maher not req, fire under separate permit(s). no new fsds
Details
Permit
201805048195
Status
complete
Filed
May 4, 2018
Permit issued
May 31, 2018
Final sign-off
Oct 4, 2018
Declared cost
$50,000
Address
635 Sacramento St

8th fl: partial remodel 430 sq ft of 8th fl amep: focus room, open office, breakroom. upgrade mechanical and elec of space maher not req, fire under separate permit(s). no new fsds

Open the permit page

$50,000
May 3, 2018Completed
final sign-off Nov 2018
420 Montgomery StRudolph Commercial Interiors Inc, Rciremodel of 6th floor: huddle room, focus room, upgrade mechanical and electrical of space. n/a for maher
Details
Permit
201805038111
Status
complete
Filed
May 3, 2018
Permit issued
May 31, 2018
Final sign-off
Nov 28, 2018
Declared cost
$50,000
Address
420 Montgomery St

remodel of 6th floor: huddle room, focus room, upgrade mechanical and electrical of space. n/a for maher

Open the permit page

$50,000
Mar 8, 2018Completed
final sign-off Jan 2019
550 California StG L C Construction Company Inc5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areas
Details
Permit
201803083150
Status
complete
Filed
Mar 8, 2018
Permit issued
Apr 6, 2018
Final sign-off
Jan 10, 2019
Declared cost
$1,550,000
Address
550 California St

5th floor: remodel of (e) office space: (n) conference rooms, copy areas, mother's room & new studio. new finishes and new led lighting in affected areas

Open the permit page

$1,550,000
Oct 11, 2017Completed
final sign-off Nov 2018
333 Market StSwinerton Builderspartial remodel of 10th fl add small converence room, huddle and focus rooms. remodel breakroom. new furniture and finishes. upgrade all lighting to led new mech and elec work for new space maher na
Details
Permit
201710110873
Status
complete
Filed
Oct 11, 2017
Permit issued
May 8, 2018
Final sign-off
Nov 28, 2018
Declared cost
$140,000
Address
333 Market St

partial remodel of 10th fl add small converence room, huddle and focus rooms. remodel breakroom. new furniture and finishes. upgrade all lighting to led new mech and elec work for new space maher na

Open the permit page

$140,000
Aug 22, 2017Never finaled
issued Oct 2017, no final
333 Market StSkyline Construction7/f- two (n) focus rooms, (n) finishes, upgrade of lighting to led, (n) mechanical and electrical work for new spaces. n/a ordinance #155-13
Details
Permit
201708225486
Status
issued
Filed
Aug 22, 2017
Permit issued
Oct 12, 2017
Declared cost
$225,000
Address
333 Market St

7/f- two (n) focus rooms, (n) finishes, upgrade of lighting to led, (n) mechanical and electrical work for new spaces. n/a ordinance #155-13

Open the permit page

$225,000
Aug 2, 2017Completed
final sign-off Mar 2019
333 Market StG L C Construction Company Incremodel of 22nd floor - 3 (n) focus rooms, 1 (n) huddle room, (n) small conference room, (n) copy room, (n) furniture/finishes. upgrade all lights to led (n) mechanical & electrical for new spaces.
Details
Permit
201708023619
Status
complete
Filed
Aug 2, 2017
Permit issued
Sep 15, 2017
Final sign-off
Mar 25, 2019
Declared cost
$275,000
Address
333 Market St

remodel of 22nd floor - 3 (n) focus rooms, 1 (n) huddle room, (n) small conference room, (n) copy room, (n) furniture/finishes. upgrade all lights to led (n) mechanical & electrical for new spaces.

Open the permit page

$275,000
Jun 23, 2017Completed
final sign-off May 2019
333 Market StT C B Builders Inc3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits.
Details
Permit
201706230196
Status
complete
Filed
Jun 23, 2017
Permit issued
Aug 23, 2017
Final sign-off
May 31, 2019
Declared cost
$1,500,000
Address
333 Market St

3/f- amep plans - work to remodel existing offices, add training facilities and meeting rooms for business training purposes. connect core areas with corridor to access toilets and exit stairs. n/a ordinance #155-13, fire under separate permits.

Open the permit page

$1,500,000
Jun 22, 2017Completed
final sign-off Mar 2019
333 Market StG L C Construction Company Inc(tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work.
Details
Permit
201706220068
Status
complete
Filed
Jun 22, 2017
Permit issued
Jul 31, 2017
Final sign-off
Mar 25, 2019
Declared cost
$195,000
Address
333 Market St

(tower) 11th fl remodel: add (2) new focus rms, 4(n) small conf. rooms, enlarge existing breakroom, (n) furniture and (n) finishes. add 1 (n) drinking fountain. upgrade existing lighting to (n) led lighting. provide (n) electrical, mechanical and plumbing in areas of work.

Open the permit page

$195,000
Apr 28, 2017Completed
final sign-off Jan 2019
420 Montgomery StT C B Builders Incremodel 9th fl, add new offices, new led lighging, finsihes for new offices area, offices, conference rooms, copy rooms, breakroom, restrooms no new plumbing fixtures added, elevator lobby. new mech plumbing, elec work new spaces. fire alarm/ls and fire sprinkelr under sep permit maher not req
Details
Permit
201704285136
Status
complete
Filed
Apr 28, 2017
Permit issued
Mar 6, 2018
Final sign-off
Jan 10, 2019
Declared cost
$575,300
Address
420 Montgomery St

remodel 9th fl, add new offices, new led lighging, finsihes for new offices area, offices, conference rooms, copy rooms, breakroom, restrooms no new plumbing fixtures added, elevator lobby. new mech plumbing, elec work new spaces. fire alarm/ls and fire sprinkelr under sep permit maher not req

Open the permit page

$575,300
Mar 29, 2017Never finaled
issued Jun 2017, no final
333 Market StSkyline Construction16th flr: add 22 new offices, 5 new focus rooms, 1 new huddle room, new conference room and new copy area. upgrade all lighting to led. new mech work and electrical work for new spaces. maher na
Details
Permit
201703292641
Status
issued
Filed
Mar 29, 2017
Permit issued
Jun 29, 2017
Declared cost
$484,750
Address
333 Market St

16th flr: add 22 new offices, 5 new focus rooms, 1 new huddle room, new conference room and new copy area. upgrade all lighting to led. new mech work and electrical work for new spaces. maher na

Open the permit page

$484,750
Aug 9, 2016Completed
final sign-off Jan 2017
420 Montgomery StT C B Builders Incinstall new granite clad concrete planter within property line and landscaping upgrade, replace existing sidewalk planters with new granite clad precast concrete planters, planters not attached to sidewalk. total area of work: 45 sq.ft. n/a ordinance #155-13
Details
Permit
201608094537
Status
complete
Filed
Aug 9, 2016
Permit issued
Aug 23, 2016
Final sign-off
Jan 12, 2017
Declared cost
$20,000
Address
420 Montgomery St

install new granite clad concrete planter within property line and landscaping upgrade, replace existing sidewalk planters with new granite clad precast concrete planters, planters not attached to sidewalk. total area of work: 45 sq.ft. n/a ordinance #155-13

Open the permit page

$20,000
Jun 22, 2016Completed
final sign-off Dec 2016
333 Market StG L C Construction Company Incremodel 4th floor - add (5) new focus rooms, (2) new conference rooms, (1) new break room. new furniture, finishes & led lighting upgrade. new mep and lighting work for new spaces. no new toilets. fire alarm/life safety under separate permit.
Details
Permit
201606220649
Status
complete
Filed
Jun 22, 2016
Permit issued
Jul 27, 2016
Final sign-off
Dec 23, 2016
Declared cost
$245,000
Address
333 Market St

remodel 4th floor - add (5) new focus rooms, (2) new conference rooms, (1) new break room. new furniture, finishes & led lighting upgrade. new mep and lighting work for new spaces. no new toilets. fire alarm/life safety under separate permit.

Open the permit page

$245,000
Jun 8, 2016Completed
final sign-off Aug 2017
333 Market StParadigm General Contractorsopen collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevator
Details
Permit
201606089401
Status
complete
Filed
Jun 8, 2016
Permit issued
Dec 2, 2016
Final sign-off
Aug 21, 2017
Declared cost
$500,000
Address
333 Market St

open collaboration meeting space for existing retail bank. pantry, meeting rooms at gr and existing mezzanine. revise e stair, provide ada upgrades to restrooms and elevator

Open the permit page

$500,000
Jun 2, 2016Completed
final sign-off Dec 2016
333 Market StG L C Construction Company Incground floor: remodel of (e) office tenant imporvement with new finishes/power/lighting/hvac ref pa 2014 0521 6369
Details
Permit
201606028985
Status
complete
Filed
Jun 2, 2016
Permit issued
Jun 27, 2016
Final sign-off
Dec 12, 2016
Declared cost
$148,000
Address
333 Market St

ground floor: remodel of (e) office tenant imporvement with new finishes/power/lighting/hvac ref pa 2014 0521 6369

Open the permit page

$148,000
Apr 13, 2016Completed
final sign-off Mar 2017
420 Montgomery StSkyline Constructionprovide the existing life safety fire pump with emergency power. extend power from existing generator to feed existing fire pump. expand existing fire pump room to accomodate new controller with ats.
Details
Permit
201604134637
Status
complete
Filed
Apr 13, 2016
Permit issued
Sep 15, 2016
Final sign-off
Mar 27, 2017
Declared cost
$300,000
Address
420 Montgomery St

provide the existing life safety fire pump with emergency power. extend power from existing generator to feed existing fire pump. expand existing fire pump room to accomodate new controller with ats.

Open the permit page

$300,000
Mar 24, 2016Completed
final sign-off Jul 2016
420 Montgomery StT C B Builders Incinstallation of new turnstiles on ground floor. minor relocation of existing lighting/museum displays. maher na
Details
Permit
201603242984
Status
complete
Filed
Mar 24, 2016
Permit issued
Jun 2, 2016
Final sign-off
Jul 20, 2016
Declared cost
$50,000
Address
420 Montgomery St

installation of new turnstiles on ground floor. minor relocation of existing lighting/museum displays. maher na

Open the permit page

$50,000
Mar 24, 2016Completed
final sign-off Mar 2017
550 California StRudolph Commercial Interiors Inc, Rci8th fl: remodel of existing 18,345 sq ft of office space. new conference rooms, new open office, finishes. new lighting in affected areas. upgrade toilet rooms. no change in # of toilet fixtures. maher na. life safety deferred.
Details
Permit
201603242988
Status
complete
Filed
Mar 24, 2016
Permit issued
May 18, 2016
Final sign-off
Mar 1, 2017
Declared cost
$400,000
Address
550 California St

8th fl: remodel of existing 18,345 sq ft of office space. new conference rooms, new open office, finishes. new lighting in affected areas. upgrade toilet rooms. no change in # of toilet fixtures. maher na. life safety deferred.

Open the permit page

$400,000
Jan 15, 2016Completed
final sign-off Nov 2017
45 Fremont StRudolph Commercial Interiors Inc, Rciremodel of 8th fl. add 4 new offices, 3 new conference rooms/focus rooms, 1 new 1df room and 1 new breakroom. new furniture, paint. new mech, plumb, elec for new space. no new toilets. n/a for maher.
Details
Permit
201601157201
Status
complete
Filed
Jan 15, 2016
Permit issued
Jan 27, 2016
Final sign-off
Nov 2, 2017
Declared cost
$175,000
Address
45 Fremont St

remodel of 8th fl. add 4 new offices, 3 new conference rooms/focus rooms, 1 new 1df room and 1 new breakroom. new furniture, paint. new mech, plumb, elec for new space. no new toilets. n/a for maher.

Open the permit page

$175,000
Oct 13, 2015Completed
final sign-off Nov 2016
635 Sacramento StW. Bradley Electricinstalling securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher na
Details
Permit
201510139465
Status
complete
Filed
Oct 13, 2015
Permit issued
Oct 23, 2015
Final sign-off
Nov 4, 2016
Declared cost
$50,000
Address
635 Sacramento St

installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher na

Open the permit page

$50,000
Oct 13, 2015Completed
final sign-off Nov 2016
550 California StW. Bradley Electricinstalling securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher na
Details
Permit
201510139464
Status
complete
Filed
Oct 13, 2015
Permit issued
Oct 23, 2015
Final sign-off
Nov 4, 2016
Declared cost
$60,000
Address
550 California St

installing securtiy devices, exit signage, smoke detectors o all floor as reqd due to installation of new card readers. maher na

Open the permit page

$60,000
Jul 14, 2015Never finaled
issued Sep 2015, no final
1 Montgomery StC C I Commercial Construction & Improvgrnd/mez:hvac mech remodel incl new duct distribtuion 3 new fan coil units,2new roof top condensing units,&new mechanical room on mezzanine level, elec lighting revisions are included due to ceiling drop for new duct distributions & new mech rm,structural support included for mech unit support.
Details
Permit
201507141413
Status
issued
Filed
Jul 14, 2015
Permit issued
Sep 1, 2015
Declared cost
$140,000
Address
1 Montgomery St

grnd/mez:hvac mech remodel incl new duct distribtuion 3 new fan coil units,2new roof top condensing units,&new mechanical room on mezzanine level, elec lighting revisions are included due to ceiling drop for new duct distributions & new mech rm,structural support included for mech unit support.

Open the permit page

$140,000
Jun 5, 2015Completed
final sign-off Sep 2015
333 Market StAyoob & Peery Plumbing Co Inc1st floor sprinkler t.i.:add and relocate fire sprinklers. add 6, relo 19 ref. app. # 2015.0305.0022. compliance with maher ordinance no. 155-13 not required.
Details
Permit
201506058292
Status
complete
Filed
Jun 5, 2015
Permit issued
Jun 5, 2015
Final sign-off
Sep 11, 2015
Declared cost
$12,850
Address
333 Market St

1st floor sprinkler t.i.:add and relocate fire sprinklers. add 6, relo 19 ref. app. # 2015.0305.0022. compliance with maher ordinance no. 155-13 not required.

Open the permit page

$12,850
May 19, 2015Completed
final sign-off Oct 2015
333 Market StG L C Construction Company Increlocation of existing ducts and grills. add (1) ac condensing unit (4 tons). add (4) vav boxes. add (1) exhaust fan. for t.i. appl. 2015.0305.0022 mechancial work. revision to pa# 201503050022, electrical and structural. n/a maher ord # 155-13
Details
Permit
201505196673
Status
complete
Filed
May 19, 2015
Permit issued
Jun 24, 2015
Final sign-off
Oct 15, 2015
Declared cost
$50,000
Address
333 Market St

relocation of existing ducts and grills. add (1) ac condensing unit (4 tons). add (4) vav boxes. add (1) exhaust fan. for t.i. appl. 2015.0305.0022 mechancial work. revision to pa# 201503050022, electrical and structural. n/a maher ord # 155-13

Open the permit page

$50,000
Apr 1, 2015Completed
final sign-off Oct 2015
420 Montgomery StRestec Contractors Inc10th flr: partial demo - (e) walls, floor and ceiling of tenant space. plumb fixtures to be removed/salvaged for bld. cap plumb for new future plumb in demo area. ref pa# 2015 03330 2232
Details
Permit
201504012502
Status
complete
Filed
Apr 1, 2015
Permit issued
Aug 25, 2015
Final sign-off
Oct 14, 2015
Declared cost
$130,000
Address
420 Montgomery St

10th flr: partial demo - (e) walls, floor and ceiling of tenant space. plumb fixtures to be removed/salvaged for bld. cap plumb for new future plumb in demo area. ref pa# 2015 03330 2232

Open the permit page

$130,000
Mar 30, 2015Completed
final sign-off Feb 2016
420 Montgomery StT C B Builders Inc10th floor: total area of work is 10140 sq ft. remodel of extg office space. including new lighting, finishes for new open office area, offices, conference rooms, copy room, breakroom elevator lobby. new toilet rms without addn' fixtures. new mep work. n/a for maher. demo permit # 2015-0401-2502
Details
Permit
201503302232
Status
complete
Filed
Mar 30, 2015
Permit issued
Aug 19, 2015
Final sign-off
Feb 23, 2016
Declared cost
$320,000
Address
420 Montgomery St

10th floor: total area of work is 10140 sq ft. remodel of extg office space. including new lighting, finishes for new open office area, offices, conference rooms, copy room, breakroom elevator lobby. new toilet rms without addn' fixtures. new mep work. n/a for maher. demo permit # 2015-0401-2502

Open the permit page

$320,000
Mar 5, 2015Completed
final sign-off Oct 2015
333 Market StG L C Construction Company Inc2065 sq.ft. of remodel of existing tenant improvement space- partial 1st floor for new retail bank financial services facility; maher n/a
Details
Permit
201503050022
Status
complete
Filed
Mar 5, 2015
Permit issued
May 19, 2015
Final sign-off
Oct 15, 2015
Declared cost
$218,000
Address
333 Market St

2065 sq.ft. of remodel of existing tenant improvement space- partial 1st floor for new retail bank financial services facility; maher n/a

Open the permit page

$218,000
Jan 15, 2015Completed
final sign-off Oct 2015
550 California StRudolph Commercial Interiors Inc, Rci4th floor - 568 sq ft rear of work - remodel (e) office space, (n) conf. room, huddle room, open office space, new finishes/lighting in affected areas. upgrade toilet rooms. n/a maher ordinance
Details
Permit
201501155844
Status
complete
Filed
Jan 15, 2015
Permit issued
Feb 10, 2015
Final sign-off
Oct 16, 2015
Declared cost
$85,000
Address
550 California St

4th floor - 568 sq ft rear of work - remodel (e) office space, (n) conf. room, huddle room, open office space, new finishes/lighting in affected areas. upgrade toilet rooms. n/a maher ordinance

Open the permit page

$85,000
Nov 17, 2014Completed
final sign-off Dec 2014
550 California StParadigm General Contractorsreconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #20140627969. compliance with maher ordinance no. 155-13 not required.
Details
Permit
201411171689
Status
complete
Filed
Nov 17, 2014
Permit issued
Nov 18, 2014
Final sign-off
Dec 8, 2014
Address
550 California St

reconfigure womens toilet room due to non-compliant ada stall. remove 1 stall & relocate ada stall, reconfigure standard stalls. remove urinal in mens toilet room. plan revision to permit #20140627969. compliance with maher ordinance no. 155-13 not required.

Open the permit page

Nov 10, 2014Completed
final sign-off Oct 2015
550 California StRudolph Commercial Interiors Inc, Rci2nd floor - remodel of (e) office space: (n) conf. room & (n) open office area, new furniture, new finishes, (n) lighting in affected areas, upgrade toilet rooms. no change in # of fixtures. n/a maher ordinance
Details
Permit
201411101109
Status
complete
Filed
Nov 10, 2014
Permit issued
Feb 10, 2015
Final sign-off
Oct 16, 2015
Declared cost
$250,000
Address
550 California St

2nd floor - remodel of (e) office space: (n) conf. room & (n) open office area, new furniture, new finishes, (n) lighting in affected areas, upgrade toilet rooms. no change in # of fixtures. n/a maher ordinance

Open the permit page

$250,000
Oct 3, 2014Completed
final sign-off Aug 2015
45 Fremont StG L C Construction Company Inc9th flr: remodel of existing offices on 9th flr, add 2 new offices, new tread mill rm, relocate breakroom & 2 (n) conference rooms, new finishes & new lighting at affected areas; maher n/a
Details
Permit
201410038014
Status
complete
Filed
Oct 3, 2014
Permit issued
Nov 20, 2014
Final sign-off
Aug 19, 2015
Declared cost
$140,000
Address
45 Fremont St

9th flr: remodel of existing offices on 9th flr, add 2 new offices, new tread mill rm, relocate breakroom & 2 (n) conference rooms, new finishes & new lighting at affected areas; maher n/a

Open the permit page

$140,000
Sep 11, 2014Completed
final sign-off Nov 2014
505 Sansome StSkyline Construction18th flr: demo (e) 5 offices to expand (e) open office area, new workstations & (n) finishes for open office area, 1 new conference room, 1 meeeting (focus) room, toilet no new fixtures; maher n/a
Details
Permit
201409116087
Status
complete
Filed
Sep 11, 2014
Permit issued
Sep 19, 2014
Final sign-off
Nov 25, 2014
Declared cost
$50,000
Address
505 Sansome St

18th flr: demo (e) 5 offices to expand (e) open office area, new workstations & (n) finishes for open office area, 1 new conference room, 1 meeeting (focus) room, toilet no new fixtures; maher n/a

Open the permit page

$50,000
Aug 8, 2014Never finaled
issued Aug 2014, no final
420 Montgomery StT C B Builders Increvision to 201404294415. area of work 120 sq ft. relocation of proposed electrical room 653 a. provide fire/smoke dampers. 1 hr rated walls and 20 min door/frame. 2 relocated light fixtures. revise millwork at copy room 653. revision to closet door 6008. maher not req
Details
Permit
201408083432
Status
issued
Filed
Aug 8, 2014
Permit issued
Aug 11, 2014
Declared cost
$2,000
Address
420 Montgomery St

revision to 201404294415. area of work 120 sq ft. relocation of proposed electrical room 653 a. provide fire/smoke dampers. 1 hr rated walls and 20 min door/frame. 2 relocated light fixtures. revise millwork at copy room 653. revision to closet door 6008. maher not req

Open the permit page

$2,000
Jul 30, 2014Completed
final sign-off Apr 2016
1 Montgomery StC C I Commercial Construction & Improvbasement floor - ada toilet upgrade to full compliance; remodel of (e) toilet rooms, demolitoin of (e) men's & women's toilet rooms. new hvac, elec & plumbing as required. remodle break room, finishes millwork & lighting.
Details
Permit
201407302508
Status
complete
Filed
Jul 30, 2014
Permit issued
Sep 30, 2014
Final sign-off
Apr 29, 2016
Declared cost
$160,000
Address
1 Montgomery St

basement floor - ada toilet upgrade to full compliance; remodel of (e) toilet rooms, demolitoin of (e) men's & women's toilet rooms. new hvac, elec & plumbing as required. remodle break room, finishes millwork & lighting.

Open the permit page

$160,000
Jun 27, 2014Completed
final sign-off Dec 2014
550 California StParadigm General Contractorsremodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fixtures added. maher 155-13 not req
Details
Permit
201406279669
Status
complete
Filed
Jun 27, 2014
Permit issued
Sep 4, 2014
Final sign-off
Dec 16, 2014
Declared cost
$250,000
Address
550 California St

remodel of e office space. new offices, huddle rooms, collaboration of space and copy room. new furniture, finishes, lighting in new offices. mech and elec work, remodel toilet rooms, no addition fixtures added. maher 155-13 not req

Open the permit page

$250,000
Jun 18, 2014Completed
final sign-off Dec 2014
333 Market StSkyline Constructionremodel of existing office 14,140 s.f. new offices, new conference room, new copy room, new finishes/furniture. alter hvac/lighting to accomodeate remodelled area. relocate existing light fixtures to new rooms. fire alarm, life safety and sprinkler under separate permit. maher n/a.
Details
Permit
201406188753
Status
complete
Filed
Jun 18, 2014
Permit issued
Jul 23, 2014
Final sign-off
Dec 8, 2014
Declared cost
$650,000
Address
333 Market St

remodel of existing office 14,140 s.f. new offices, new conference room, new copy room, new finishes/furniture. alter hvac/lighting to accomodeate remodelled area. relocate existing light fixtures to new rooms. fire alarm, life safety and sprinkler under separate permit. maher n/a.

Open the permit page

$650,000
Jun 18, 2014Completed
final sign-off Dec 2014
333 Market StSkyline Constructionremodel of existing office 14,435 sq. ft. new offices, new conference rooms, new finishes. alternation of hvac/electrical to accomodate remodelled areas. relocate (e) light fixtures and add new fixtures to new rooms. maher n/a.
Details
Permit
201406188751
Status
complete
Filed
Jun 18, 2014
Permit issued
Jul 23, 2014
Final sign-off
Dec 8, 2014
Declared cost
$550,000
Address
333 Market St

remodel of existing office 14,435 sq. ft. new offices, new conference rooms, new finishes. alternation of hvac/electrical to accomodate remodelled areas. relocate (e) light fixtures and add new fixtures to new rooms. maher n/a.

Open the permit page

$550,000
Jun 17, 2014Completed
final sign-off Sep 2014
550 California StRudolph Commercial Interiors Inc, Rci1st flr: renovation of existing office break/lunchroom on 1st flr of building, demo and replacement of metal stud walls; (new) couner and cabinets, existing suspended ceiling and lights to remain (no new lights added); compliance with ord 155-13 not required
Details
Permit
201406178607
Status
complete
Filed
Jun 17, 2014
Permit issued
Jul 10, 2014
Final sign-off
Sep 24, 2014
Declared cost
$35,000
Address
550 California St

1st flr: renovation of existing office break/lunchroom on 1st flr of building, demo and replacement of metal stud walls; (new) couner and cabinets, existing suspended ceiling and lights to remain (no new lights added); compliance with ord 155-13 not required

Open the permit page

$35,000
Apr 29, 2014Completed
final sign-off Nov 2014
420 Montgomery StT C B Builders Incremodel (e) full floor office space, new lighting, & finishes for new open office area, offices, conference rooms, copy room, break room, & elevator looby, new mechanical, plumbing & electrical, work for new spaces, new toilet rooms with no additional fixtures. compliance with ord #155-13 not req.
Details
Permit
201404294415
Status
complete
Filed
Apr 29, 2014
Permit issued
May 6, 2014
Final sign-off
Nov 21, 2014
Declared cost
$2,404,000
Address
420 Montgomery St

remodel (e) full floor office space, new lighting, & finishes for new open office area, offices, conference rooms, copy room, break room, & elevator looby, new mechanical, plumbing & electrical, work for new spaces, new toilet rooms with no additional fixtures. compliance with ord #155-13 not req.

Open the permit page

$2,404,000
Apr 29, 2014Completed
final sign-off Jun 2014
343 Sansome StG L C Construction Company Inc3 floor ti - remodel of existing offices. 4 new offices, new furniture and finishes for open office area. new lighting. no toilet work. fire alarm and sprinkler under separate permit.
Details
Permit
201404294416
Status
complete
Filed
Apr 29, 2014
Permit issued
May 16, 2014
Final sign-off
Jun 27, 2014
Declared cost
$45,000
Address
343 Sansome St

3 floor ti - remodel of existing offices. 4 new offices, new furniture and finishes for open office area. new lighting. no toilet work. fire alarm and sprinkler under separate permit.

Open the permit page

$45,000
Apr 2, 2014Completed
final sign-off Dec 2014
45 Fremont StRudolph Commercial Interiors Inc, Rciremodel of existing office, restroom, lighting, elevator lobby upgrade. n/a ordinance #155-13
Details
Permit
201404022274
Status
complete
Filed
Apr 2, 2014
Permit issued
Apr 9, 2014
Final sign-off
Dec 24, 2014
Declared cost
$350,000
Address
45 Fremont St

remodel of existing office, restroom, lighting, elevator lobby upgrade. n/a ordinance #155-13

Open the permit page

$350,000
Apr 2, 2014Completed
final sign-off Dec 2014
45 Fremont StRudolph Commercial Interiors Inc, Rci8/f: restroom ada upgrade, lighting upgrade, elevator lobby upgrade. 13/f: elevator lobby upgrade. n/a ordinance #155-13.
Details
Permit
201404022272
Status
complete
Filed
Apr 2, 2014
Permit issued
Apr 9, 2014
Final sign-off
Dec 24, 2014
Declared cost
$125,000
Address
45 Fremont St

8/f: restroom ada upgrade, lighting upgrade, elevator lobby upgrade. 13/f: elevator lobby upgrade. n/a ordinance #155-13.

Open the permit page

$125,000