Block 0207, lot 037
505 Sansome St
- City’s use
- Commercial Office
- Built
- 1981
- Stories
- 20
- Units
- 1
- Building
- 191,142 sq ft
- Lot
- 11,413 sq ft
- Zoning
- C3O
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2025 | Completed final sign-off Aug 2026 | 505 Sansome St | Sabah International Incorporated | replace (e) honeywell xls-1000(est-3 eom facu) voice fire alarm control units with new generation edwards est-4 voice fire alarm system as per ca fire marshall info bulletin dated 9/4/2028 and interpretations (12-001) date 7/23/2012Details
replace (e) honeywell xls-1000(est-3 eom facu) voice fire alarm control units with new generation edwards est-4 voice fire alarm system as per ca fire marshall info bulletin dated 9/4/2028 and interpretations (12-001) date 7/23/2012 | $400,000 |
| Oct 24, 2024 | Completed final sign-off Nov 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | revision to pa# 202407307575, change of planter layout at south east corner of building. rev3 to original pa202202077476Details
revision to pa# 202407307575, change of planter layout at south east corner of building. rev3 to original pa202202077476 | |
| Jul 30, 2024 | Completed final sign-off Nov 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | ground fl revision to pa # 2022-0207-7476 scope of work includes planter and non structural demolition of storefront door to comply with notice of complaint # 202426441. remove demising wall to combine 2 tenant spaces into one. tenant space remains vacantDetails
ground fl revision to pa # 2022-0207-7476 scope of work includes planter and non structural demolition of storefront door to comply with notice of complaint # 202426441. remove demising wall to combine 2 tenant spaces into one. tenant space remains vacant | |
| Nov 6, 2023 | Completed final sign-off Sep 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | deferred submittal for acme sunshades bpa 202305188074Details
deferred submittal for acme sunshades bpa 202305188074 | $110,000 |
| Oct 20, 2023 | In progress issued Oct 2023 | 505 Sansome St | Hathaway Dinwiddie Co. | demolition of ste 400 at 505 sansome st 4/f. demo of walls and carpet only. existing wall power and switches to be relocated to perimeter walls.the scope does not involve any ceiling work.Details
demolition of ste 400 at 505 sansome st 4/f. demo of walls and carpet only. existing wall power and switches to be relocated to perimeter walls.the scope does not involve any ceiling work. | $100,000 |
| May 24, 2023 | Completed final sign-off Dec 2023 | 505 Sansome St | Sabah International Incorporated | provide modification of (e) f/a system associated with basement & 1/f only. ref bpa#202202077476Details
provide modification of (e) f/a system associated with basement & 1/f only. ref bpa#202202077476 | $60,875 |
| May 18, 2023 | Completed final sign-off Sep 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | revision to bpa# 202202077476. addition of anwnings and metal screen to the east and south facade of the ground level.Details
revision to bpa# 202202077476. addition of anwnings and metal screen to the east and south facade of the ground level. | $83,062 |
| May 2, 2023 | Completed final sign-off Sep 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | revision to 202302071522 for mechanical layout of the heat pumps and duct distributionDetails
revision to 202302071522 for mechanical layout of the heat pumps and duct distribution | |
| Mar 29, 2023 | Completed final sign-off Sep 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | deferred submittal for 202202077476: dura art stone and ranker amg exterior work (column covers, hoisting equip, curtain wall system, glass doors, exterior louvers)Details
deferred submittal for 202202077476: dura art stone and ranker amg exterior work (column covers, hoisting equip, curtain wall system, glass doors, exterior louvers) | |
| Feb 7, 2023 | Completed final sign-off Sep 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | deferred mep for bpa 202202077476Details
deferred mep for bpa 202202077476 | $74,538 |
| Jan 17, 2023 | Completed final sign-off Nov 2023 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | demo (e) fire sprinklers to core and shell conditons 1st & 2nd fl. add and relocate sprinklers as necessary to accordance with new elevator lobby ceiling and common area ceilingDetails
demo (e) fire sprinklers to core and shell conditons 1st & 2nd fl. add and relocate sprinklers as necessary to accordance with new elevator lobby ceiling and common area ceiling | $23,100 |
| Feb 18, 2022 | Completed final sign-off Jul 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | permit to establish temporary barricade for safe guarding construction site drawing construction. no encroachment into public right of way.Details
permit to establish temporary barricade for safe guarding construction site drawing construction. no encroachment into public right of way. | $15,000 |
| Feb 7, 2022 | Completed final sign-off Nov 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | removal of exterior building envelope and roofing, structural demolition, new curtain wall and builindg envelope; floor infill @ 2nd floor; building lobby ti and ground floor cold shell space for future retailDetails
removal of exterior building envelope and roofing, structural demolition, new curtain wall and builindg envelope; floor infill @ 2nd floor; building lobby ti and ground floor cold shell space for future retail | $745,379 |
| Jul 2, 2020 | Completed final sign-off Aug 2020 | 505 Sansome St | Skyline Construction | deferred electrical submittal. new power for lobby areas, new lighting and controls. ref#201908219430.Details
deferred electrical submittal. new power for lobby areas, new lighting and controls. ref#201908219430. | $91,000 |
| Jan 17, 2020 | Completed final sign-off Apr 2020 | 505 Sansome St | Sabah International Incorporated | 7th floor: modify extg fire alarm system. add 2 ceiling speaker/strobes, 1 wall speaker/strobe.relocate 3 ceiling speakers. remove 1 ceiling speaker. ref app#201911187550Details
7th floor: modify extg fire alarm system. add 2 ceiling speaker/strobes, 1 wall speaker/strobe.relocate 3 ceiling speakers. remove 1 ceiling speaker. ref app#201911187550 | $8,000 |
| Jan 17, 2020 | Completed final sign-off Apr 2020 | 505 Sansome St | Sabah International Incorporated | 1st floor: modify extg fire alarm system. add 1 booster power supply, 1 synchronization output module, 1 smoke detector, 5 ceiling speaker strobes, 2 wall speaker/strobes. ref app#201908219430Details
1st floor: modify extg fire alarm system. add 1 booster power supply, 1 synchronization output module, 1 smoke detector, 5 ceiling speaker strobes, 2 wall speaker/strobes. ref app#201908219430 | $11,989 |
| Dec 12, 2019 | Completed final sign-off Apr 2020 | 505 Sansome St | R L H Fire Protection Inc | ref pa# 201911187550; fire sprinkler t.i. move 1 and add 3 pendent heads (7th fl.)Details
ref pa# 201911187550; fire sprinkler t.i. move 1 and add 3 pendent heads (7th fl.) | $1,950 |
| Dec 4, 2019 | Completed final sign-off Jun 2020 | 505 Sansome St | Skyline Construction | mep for tenant improvement on the 7th fl to include redistribution of (e) ductwork for new floor layout. new power & data ref pa 2019-1118-7550 new lightingDetails
mep for tenant improvement on the 7th fl to include redistribution of (e) ductwork for new floor layout. new power & data ref pa 2019-1118-7550 new lighting | $70,000 |
| Dec 3, 2019 | Never finaled issued Dec 2019, no final | 505 Sansome St | Sabah International Incorporated | ref pa# 201906102952; add 6 speaker/strobesDetails
ref pa# 201906102952; add 6 speaker/strobes | $7,987 |
| Nov 18, 2019 | Completed final sign-off Jun 2020 | 505 Sansome St | Skyline Construction | 7th fl: ti of (e) office space, demolition of (e) non-structural partitions, lighting & finishes. construction of new accessible all gender restrooms. maher naDetails
7th fl: ti of (e) office space, demolition of (e) non-structural partitions, lighting & finishes. construction of new accessible all gender restrooms. maher na | $131,325 |
| Nov 13, 2019 | Never finaled issued Feb 2020, no final | 505 Sansome St | Husher Inc Dba Husher Construction | 2299sqft interior remodel to an existing cafe & mep. maher na.Details
2299sqft interior remodel to an existing cafe & mep. maher na. | $275,000 |
| Oct 9, 2019 | Expired or cancelled cancelled Aug 2020 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | 1st floor: relocate 20 add 1 & plug 1 sprinkler to conform with the new wall and ceiling layout of the t.i. ref app3201907024986 n.a for maherDetails
1st floor: relocate 20 add 1 & plug 1 sprinkler to conform with the new wall and ceiling layout of the t.i. ref app3201907024986 n.a for maher | $5,025 |
| Sep 26, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | mechanical work for ti at suite 1700. ref arch pa #201907186245.Details
mechanical work for ti at suite 1700. ref arch pa #201907186245. | $45,000 |
| Sep 24, 2019 | Completed final sign-off Nov 2019 | 505 Sansome St | Sabah International Incorporated | suite 1700: modify existing system bldg permit 2019-0718-6245, add (1) booster power supply, (1) synchoronization output module, (10) new speaker/strobesDetails
suite 1700: modify existing system bldg permit 2019-0718-6245, add (1) booster power supply, (1) synchoronization output module, (10) new speaker/strobes | $12,714 |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 505 Sansome St | Sabah International Incorporated | f/a on 10th fl: modify existing f.a. system - add 1 booster power supply, 1 synchronization output module, 5 new speaker/strobes. ref pa #201908067983.Details
f/a on 10th fl: modify existing f.a. system - add 1 booster power supply, 1 synchronization output module, 5 new speaker/strobes. ref pa #201908067983. | $11,407 |
| Sep 4, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | suite 1700 - electrical work for ti on 17th ref 201907186245Details
suite 1700 - electrical work for ti on 17th ref 201907186245 | $20,000 |
| Aug 28, 2019 | Completed final sign-off Oct 2019 | 505 Sansome St | R L H Fire Protection Inc | 17th flr - fire sprinklers relocate 34, add 4 delete 3 ref 201907186245Details
17th flr - fire sprinklers relocate 34, add 4 delete 3 ref 201907186245 | $9,000 |
| Aug 28, 2019 | Completed final sign-off Sep 2019 | 505 Sansome St | R L H Fire Protection Inc | 10th flr - fire sprinklers relocate 14, add 2, delete 2 ref 201908067983Details
10th flr - fire sprinklers relocate 14, add 2, delete 2 ref 201908067983 | $4,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | 19th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no structDetails
19th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no struct | $300,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | 11th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no structDetails
11th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no struct | $300,000 |
| Aug 21, 2019 | Completed final sign-off Aug 2020 | 505 Sansome St | Skyline Construction | interior tenant improvement of e lobby and conference room. demo non structural finishes, flooring, lighting, new non structural partitions, glazing, doors, power data, finishes, millwork, ceiling assembly and lightingDetails
interior tenant improvement of e lobby and conference room. demo non structural finishes, flooring, lighting, new non structural partitions, glazing, doors, power data, finishes, millwork, ceiling assembly and lighting | $364,982 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 505 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler only - 11th fl - relocate 38 heads (uprights) & 19th fl (ste 1950) 24 upright relocate in suite.Details
fire sprinkler only - 11th fl - relocate 38 heads (uprights) & 19th fl (ste 1950) 24 upright relocate in suite. | $31,000 |
| Aug 19, 2019 | Completed final sign-off Oct 2019 | 505 Sansome St | Skyline Construction | 10th fl - mep to architectural pa 2019-0806-7983Details
10th fl - mep to architectural pa 2019-0806-7983 | $145,000 |
| Aug 6, 2019 | Completed final sign-off Oct 2019 | 505 Sansome St | Skyline Construction | 10th floor: demo of (e) partition and ceiling constrruction of non-structural partitions, ceiling and light fixtures. restroom improvement includes (n) stall partitions and re-install (e) plumbing fixtures to be to code compliant.Details
10th floor: demo of (e) partition and ceiling constrruction of non-structural partitions, ceiling and light fixtures. restroom improvement includes (n) stall partitions and re-install (e) plumbing fixtures to be to code compliant. | $200,000 |
| Jul 26, 2019 | Never finaled issued Sep 2019, no final | 505 Sansome St | Skyline Construction | 1/f demolish all (e) partitions, doors, millwork, ceiling grid, lighting, flooring, and equipment remove all equipment from fl. outlets & demollised walls,equipment from floor outlets and demolished loops remove mech duct work back to main loop mezzanine structural member to be demolished n/a maherDetails
1/f demolish all (e) partitions, doors, millwork, ceiling grid, lighting, flooring, and equipment remove all equipment from fl. outlets & demollised walls,equipment from floor outlets and demolished loops remove mech duct work back to main loop mezzanine structural member to be demolished n/a maher | $124,000 |
| Jul 18, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | demolition of non structural partitions, glazing, doors, finishes, millwork and lighting. new non structural partitions, glazing, doors, power/data, finishes, millwork and lighting. mep, life safty and sprinklers under seperate permit. n/a for maherDetails
demolition of non structural partitions, glazing, doors, finishes, millwork and lighting. new non structural partitions, glazing, doors, power/data, finishes, millwork and lighting. mep, life safty and sprinklers under seperate permit. n/a for maher | $328,208 |
| Jul 2, 2019 | Completed final sign-off Nov 2019 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate and remove fire sprinkler per ti. 21 relocate 1st floor 8 remove 1st floor.Details
relocate and remove fire sprinkler per ti. 21 relocate 1st floor 8 remove 1st floor. | $4,725 |
| Jun 13, 2019 | Completed final sign-off Jun 2019 | 505 Sansome St | R L H Fire Protection Inc | 20th fl, ste 2050 ti/upgrade of the existing fire sprinkler system. 1 relocate pendent sprinkler ref pa 2019-0610-2652Details
20th fl, ste 2050 ti/upgrade of the existing fire sprinkler system. 1 relocate pendent sprinkler ref pa 2019-0610-2652 | $200 |
| Jun 10, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | 20th flr. interior demo and configuration of office space to incl 2 private offices and wellness.Details
20th flr. interior demo and configuration of office space to incl 2 private offices and wellness. | $35,000 |
| Dec 18, 2018 | Completed final sign-off Feb 2019 | 505 Sansome St | R L H Fire Protection Inc | 7th floor - fire sprinkler add 1 and relocate one ref 201811276731Details
7th floor - fire sprinkler add 1 and relocate one ref 201811276731 | $1,500 |
| Dec 18, 2018 | Completed final sign-off Feb 2019 | 505 Sansome St | R L H Fire Protection Inc | fire sprinkler elevator modernization remove 13 heads and adjust 5 heads in pitDetails
fire sprinkler elevator modernization remove 13 heads and adjust 5 heads in pit | $4,950 |
| Dec 13, 2018 | Never finaled issued Jan 2019, no final | 505 Sansome St | Swinerton Builders | 2nd fl: scope of work includes restroom accessibility upgrades finishes in restroom and entry way and new lights in restrooms. no exterior work.Details
2nd fl: scope of work includes restroom accessibility upgrades finishes in restroom and entry way and new lights in restrooms. no exterior work. | $70,000 |
| Nov 27, 2018 | Completed final sign-off Feb 2019 | 505 Sansome St | Skyline Construction | 7th fl. t.i.; includes demolition, new partitions and finishes, restroom upgrades include new signage and removal of vest doorDetails
7th fl. t.i.; includes demolition, new partitions and finishes, restroom upgrades include new signage and removal of vest door | $24,000 |
| Sep 21, 2018 | Never finaled issued Sep 2018, no final | 505 Sansome St | revision to pa 201808298708. 19th flr. 2 fire sprnkler pendent location changesDetails
revision to pa 201808298708. 19th flr. 2 fire sprnkler pendent location changes | ||
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 505 Sansome St | Sabah International Incorporated | fref pa# 201807195027; add (2) new speaker/strobes & relocate (2) existing speaker/strobes. n/a for maher.Details
fref pa# 201807195027; add (2) new speaker/strobes & relocate (2) existing speaker/strobes. n/a for maher. | $10,369 |
| Sep 5, 2018 | Completed final sign-off Sep 2018 | 505 Sansome St | Sabah International Incorporated | 1st fl and basement - add 1 smoke detector on lower level & 1 smoke detector on 1st floor all associate with freight elevatorDetails
1st fl and basement - add 1 smoke detector on lower level & 1 smoke detector on 1st floor all associate with freight elevator | $400 |
| Aug 29, 2018 | Completed final sign-off Oct 2018 | 505 Sansome St | R L H Fire Protection Inc | 19th flr. fire sprinklers, relocate 15, add 5, delete 4 pendents. maher n/aDetails
19th flr. fire sprinklers, relocate 15, add 5, delete 4 pendents. maher n/a | $5,000 |
| Jul 19, 2018 | Completed final sign-off Dec 2018 | 505 Sansome St | demo of existing partitions, ceilings & millwork, new construction of partitions, ceilings light,fixtures, millwork & finishes, restroom accessibility improvement includes, stall partitions & reinstalling exising plumbing fixtures, defered: life safety, sprinklers, & fire alarmDetails
demo of existing partitions, ceilings & millwork, new construction of partitions, ceilings light,fixtures, millwork & finishes, restroom accessibility improvement includes, stall partitions & reinstalling exising plumbing fixtures, defered: life safety, sprinklers, & fire alarm | $319,000 | |
| Feb 13, 2018 | Completed final sign-off Apr 2018 | 505 Sansome St | Sabah International Incorporated | install fire alarm monitoring devices to support fire pump replacement and new balve tamper swithches in the fire pump room and connect to the existing facu on the 1st floor. ref ti #2017-1109-3554. maher naDetails
install fire alarm monitoring devices to support fire pump replacement and new balve tamper swithches in the fire pump room and connect to the existing facu on the 1st floor. ref ti #2017-1109-3554. maher na | $15,363 |
| Feb 13, 2018 | Completed final sign-off May 2018 | 505 Sansome St | Sabah International Incorporated | 17 th fl - modification of fire alarm system for 17th floor lobby t.i. add (1) duct detector, (1) high power control relay. ref t.i. #2017-1113-3796. n/a maherDetails
17 th fl - modification of fire alarm system for 17th floor lobby t.i. add (1) duct detector, (1) high power control relay. ref t.i. #2017-1113-3796. n/a maher | $10,069 |
| Jan 26, 2018 | Completed final sign-off Feb 2018 | 505 Sansome St | R L H Fire Protection Inc | 17th fl fire sprinkler ti: 4 relocate pendent sprinkler. ref pa #201711133796. maher naDetails
17th fl fire sprinkler ti: 4 relocate pendent sprinkler. ref pa #201711133796. maher na | $1,200 |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 505 Sansome St | Skyline Construction | 17th flr - ele revision to 201711133796 to reuse lighting schedule and title 24 ref 201711133796 maher naDetails
17th flr - ele revision to 201711133796 to reuse lighting schedule and title 24 ref 201711133796 maher na | |
| Nov 13, 2017 | Never finaled issued Jan 2018, no final | 505 Sansome St | Skyline Construction | 17th fl - improvements to elevator lobby and corridor. demolition of existing toilet partitions, ceilings, lights, and finishes. new toilet partitions, ceiling, light fixtures, and finishes. work also includes mep work. maher naDetails
17th fl - improvements to elevator lobby and corridor. demolition of existing toilet partitions, ceilings, lights, and finishes. new toilet partitions, ceiling, light fixtures, and finishes. work also includes mep work. maher na | $150,000 |
| Nov 9, 2017 | Completed final sign-off Mar 2018 | 505 Sansome St | R L H Fire Protection Inc | basement: remove & replace existing diesel engine fire pump amd controller, suction/supply vallies, relief line, & city bypass. n/a maher ordinanceDetails
basement: remove & replace existing diesel engine fire pump amd controller, suction/supply vallies, relief line, & city bypass. n/a maher ordinance | $250,409 |
| Oct 26, 2017 | Completed final sign-off Feb 2018 | 505 Sansome St | Skyline Construction | 7/f: rev to pa#201709279669 to reuse floor plan.Details
7/f: rev to pa#201709279669 to reuse floor plan. | |
| Oct 25, 2017 | Completed final sign-off May 2018 | 505 Sansome St | Sabah International Incorporated | add 2 photo elec smoke detectors and 3 control relays to existing system. n/a ordinance #155-13.Details
add 2 photo elec smoke detectors and 3 control relays to existing system. n/a ordinance #155-13. | $24,773 |
| Sep 27, 2017 | Completed final sign-off Feb 2018 | 505 Sansome St | Skyline Construction | demolition of non-structural partitions, millwork and finishes. new partitions, restroom upgrades. mep under separate permitDetails
demolition of non-structural partitions, millwork and finishes. new partitions, restroom upgrades. mep under separate permit | $30,000 |
| Aug 26, 2016 | Expired or cancelled cancelled Aug 2023 | 505 Sansome St | replace diesel fire pumpDetails
replace diesel fire pump | $400,000 | |
| Apr 25, 2016 | Never finaled issued Apr 2016, no final | 505 Sansome St | Terra Visual Inc | #101 - erect non-electric double faced projecting signDetails
#101 - erect non-electric double faced projecting sign | $2,500 |
| Apr 8, 2016 | Completed final sign-off Apr 2016 | 505 Sansome St | Sabah International Incorporated | 1st floor - provide modification of existing fire alarm system for "illy cafe" tenant improvement. remove & replace an existing locations (3) ada compliant wall strobes for aesthetics. ref t.i. #201511233383. n/a maher ordinanceDetails
1st floor - provide modification of existing fire alarm system for "illy cafe" tenant improvement. remove & replace an existing locations (3) ada compliant wall strobes for aesthetics. ref t.i. #201511233383. n/a maher ordinance | $4,276 |
| Feb 29, 2016 | Completed final sign-off Mar 2016 | 505 Sansome St | Pioneer Fire Inc. | relocate 3 pendents. relocate 1 uprright pendent;ref pa 2016 0105 6388; maher naDetails
relocate 3 pendents. relocate 1 uprright pendent;ref pa 2016 0105 6388; maher na | $4,885 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 505 Sansome St | Gotham Bay Construction | interior non-structural demolition in preparation for ti under separate permit. maher naDetails
interior non-structural demolition in preparation for ti under separate permit. maher na | $10,000 |
| Nov 23, 2015 | Completed final sign-off Dec 2016 | 505 Sansome St | Gotham Bay Construction | new tenant "illy cafe" -interior renovation of cafe. sprinkler & fire alarm under separate permit. n/a maher ordinanceDetails
new tenant "illy cafe" -interior renovation of cafe. sprinkler & fire alarm under separate permit. n/a maher ordinance | $165,000 |
| Aug 20, 2015 | Completed final sign-off Dec 2015 | 505 Sansome St | Field Construction Inc. | 2nd floor sute, 200 mechanical reference pa 201507070761.idf room a non-ab060/ n/a maher ord. 155-13Details
2nd floor sute, 200 mechanical reference pa 201507070761.idf room a non-ab060/ n/a maher ord. 155-13 | |
| Aug 11, 2015 | Completed final sign-off Sep 2015 | 505 Sansome St | Sabah International Incorporated | 2nd floor: provide odification of (e) fire alarm system. 1 wall mounter strobe, add 1 new smoke det, 1 new wall mounted strobe, 1 new ceiling mounted speaker and 5 nw ceilin mounted speaker/strobes. reference ti 2015.0707.0761 maher naDetails
2nd floor: provide odification of (e) fire alarm system. 1 wall mounter strobe, add 1 new smoke det, 1 new wall mounted strobe, 1 new ceiling mounted speaker and 5 nw ceilin mounted speaker/strobes. reference ti 2015.0707.0761 maher na | $8,224 |
| Aug 10, 2015 | Expired or cancelled cancelled Jan 2026 | 505 Sansome St | Field Construction Inc. | 2nd floor: reference app#201507070761. mechanical and electrical workDetails
2nd floor: reference app#201507070761. mechanical and electrical work | $50,000 |
| Jul 22, 2015 | Completed final sign-off Jul 2016 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | 2nd flr: relocate (3) sprinklers per tenant improvements; ref. 201507070761; maher n/aDetails
2nd flr: relocate (3) sprinklers per tenant improvements; ref. 201507070761; maher n/a | $1,542 |
| Jul 7, 2015 | Never finaled issued Jul 2015, no final | 505 Sansome St | Field Construction Inc. | suite 200: commercial t.i. which includes demo of casework/finishes. new work includes installation of new interior partitions, doors, casework, light fixtures. reconfigure existing restroom partitions and clearances. deferred submittal for mech and elec (design build).Details
suite 200: commercial t.i. which includes demo of casework/finishes. new work includes installation of new interior partitions, doors, casework, light fixtures. reconfigure existing restroom partitions and clearances. deferred submittal for mech and elec (design build). | $100,000 |
| Jan 27, 2015 | Completed final sign-off Feb 2015 | 505 Sansome St | Golden Gate Fire Protection Inc | 14th flr: fire sprinkler only, relocate 7 sprinkler pendants, add 1 pendant total 8 heads for suite 1450 (pyramid center) bldg permit 201512244490; maher n/aDetails
14th flr: fire sprinkler only, relocate 7 sprinkler pendants, add 1 pendant total 8 heads for suite 1450 (pyramid center) bldg permit 201512244490; maher n/a | $4,000 |
| Jan 20, 2015 | Completed final sign-off Mar 2015 | 505 Sansome St | Sabah International Incorporated | provide a modification of the extg firea alarm system for the 505 sansome bldg 14th floor t.i. project. add one new duct smoke detector, one new control relay, 4 new strobes and one new speaker/strobe. relocate 2 extg strobes. n/a for maher. t.i. #201412244490Details
provide a modification of the extg firea alarm system for the 505 sansome bldg 14th floor t.i. project. add one new duct smoke detector, one new control relay, 4 new strobes and one new speaker/strobe. relocate 2 extg strobes. n/a for maher. t.i. #201412244490 | $7,885 |
| Dec 24, 2014 | Completed final sign-off Aug 2015 | 505 Sansome St | Swinerton Builders | 14th floor suite 1450 commercial t.i. which includes demolitoin of inteiror partitoins, doors, casework, plumbing & finishes. new work includes installation of new interior partition, doors, casework & plumbing. restroom upgrades to (e) restrooms. heat pump addition. n/a maher ordinanceDetails
14th floor suite 1450 commercial t.i. which includes demolitoin of inteiror partitoins, doors, casework, plumbing & finishes. new work includes installation of new interior partition, doors, casework & plumbing. restroom upgrades to (e) restrooms. heat pump addition. n/a maher ordinance | $400,000 |
| Oct 21, 2014 | Completed final sign-off Nov 2014 | 505 Sansome St | Sabah International Incorporated | 18th floor - provide a modification of the existing fire alarm system. new devices will be tied to the existing system as shown on the drawing. add (1) new strobe & (3) new speaker/strobes. ref t.i. #2014.0911.6087. n/a maher ordinanceDetails
18th floor - provide a modification of the existing fire alarm system. new devices will be tied to the existing system as shown on the drawing. add (1) new strobe & (3) new speaker/strobes. ref t.i. #2014.0911.6087. n/a maher ordinance | $6,057 |
| Oct 16, 2014 | Completed final sign-off Oct 2014 | 505 Sansome St | Anderson, Rowe & Buckley, Inc. | 18th flr: fire sprinkler relocate one sprinkler; t.i.201409116087; maher n/aDetails
18th flr: fire sprinkler relocate one sprinkler; t.i.201409116087; maher n/a | $515 |
| Sep 11, 2014 | Completed final sign-off Nov 2014 | 505 Sansome St | Skyline Construction | 18th flr: demo (e) 5 offices to expand (e) open office area, new workstations & (n) finishes for open office area, 1 new conference room, 1 meeeting (focus) room, toilet no new fixtures; maher n/aDetails
18th flr: demo (e) 5 offices to expand (e) open office area, new workstations & (n) finishes for open office area, 1 new conference room, 1 meeeting (focus) room, toilet no new fixtures; maher n/a | $50,000 |
| Sep 4, 2014 | Completed final sign-off Oct 2014 | 505 Sansome St | R L H Fire Protection Inc | 14th floor suite 1450 fire sprinkler permit - relocate 5 and add 1 pendent t.i. pa# 201406198856. n/a ordinance #155-13Details
14th floor suite 1450 fire sprinkler permit - relocate 5 and add 1 pendent t.i. pa# 201406198856. n/a ordinance #155-13 | $3,084 |
| Aug 12, 2014 | Completed final sign-off Sep 2014 | 505 Sansome St | Sabah International Incorporated | 14th floor modification of existing fire alarm. add 1 new booster power supply. 2 new strobes, 1 new speakers and relocate 2 existing strobes. maher n/a. ref. app# 2014-0619-8856. suite 1450.Details
14th floor modification of existing fire alarm. add 1 new booster power supply. 2 new strobes, 1 new speakers and relocate 2 existing strobes. maher n/a. ref. app# 2014-0619-8856. suite 1450. | $4,700 |
| Jul 22, 2014 | Completed final sign-off Aug 2014 | 505 Sansome St | Sabah International Incorporated | 4/f: add 3 smoke detectors; add 3 mounting plates; add 1 control relay; duct detection shown on original drawings not used. corridor smoke detection used for fsd control. compliance with maher ordinance 155-13 not required.Details
4/f: add 3 smoke detectors; add 3 mounting plates; add 1 control relay; duct detection shown on original drawings not used. corridor smoke detection used for fsd control. compliance with maher ordinance 155-13 not required. | |
| Jun 19, 2014 | Completed final sign-off Sep 2014 | 505 Sansome St | Swinerton Builders | 14th floor #1450 - remove (1) existing partition at private office within vacant suite. remove all existing fluorescent light fixtures within vacant suite. install new 2'-0" x 2'-0" building standard led light fixtures. n/a maher ordinance. ab 017 in effect no tco. sprinklers/ls on separate permitsDetails
14th floor #1450 - remove (1) existing partition at private office within vacant suite. remove all existing fluorescent light fixtures within vacant suite. install new 2'-0" x 2'-0" building standard led light fixtures. n/a maher ordinance. ab 017 in effect no tco. sprinklers/ls on separate permits | $134,890 |
| Jun 18, 2014 | Completed final sign-off Aug 2014 | 505 Sansome St | Pribuss Engineering Inc | 4th flr: fire sprinkler tenant improvement: adding 3 pendant hds, relocating 11 pendant heads total 14 heads. (common area) t.i. ref 201405145729; compliance with ord 155-13 not rquiredDetails
4th flr: fire sprinkler tenant improvement: adding 3 pendant hds, relocating 11 pendant heads total 14 heads. (common area) t.i. ref 201405145729; compliance with ord 155-13 not rquired | $7,204 |
| Jun 10, 2014 | Completed final sign-off Aug 2014 | 505 Sansome St | Sabah International Incorporated | provide modification of existing f.a. system, new devices will be tied to existing system. add (1) power supply, (2) batteries, (6) smoke detectors, (6) control relays, (1) module, (5) speaker strobes. remove & replace (1) strobe, (1) speaker. t.i. pa#201405145729. n/a ordinance #155-13Details
provide modification of existing f.a. system, new devices will be tied to existing system. add (1) power supply, (2) batteries, (6) smoke detectors, (6) control relays, (1) module, (5) speaker strobes. remove & replace (1) strobe, (1) speaker. t.i. pa#201405145729. n/a ordinance #155-13 | $12,272 |
| May 14, 2014 | Completed final sign-off Aug 2014 | 505 Sansome St | Field Construction Inc. | remodelto existing elevator lobby. instlall new 2x2 led light fixtures & ceiling grid & tiles in common corridors. remodel & upgrade existing restroom to bring to code & accessiblility compliance. maher n/a.Details
remodelto existing elevator lobby. instlall new 2x2 led light fixtures & ceiling grid & tiles in common corridors. remodel & upgrade existing restroom to bring to code & accessiblility compliance. maher n/a. | $252,000 |
| Apr 15, 2014 | Completed final sign-off May 2014 | 505 Sansome St | Sabah International Incorporated | provide a modification of existing fire alarm system, 20th fl, new devices will be tied to existing system as shown on drawing, upgrade system shall include: add (2) strobes, (1) control relay, (1) duct detector and (1) smoke detector. t.i. pa#201311151988 n/a ordinance #155-13.Details
provide a modification of existing fire alarm system, 20th fl, new devices will be tied to existing system as shown on drawing, upgrade system shall include: add (2) strobes, (1) control relay, (1) duct detector and (1) smoke detector. t.i. pa#201311151988 n/a ordinance #155-13. | $5,700 |
| Dec 6, 2013 | Completed final sign-off Jan 2014 | 505 Sansome St | Sabah International Incorporated | provide a modification of existing f.a. system, new devices will be tied to existing system. add 1 new strobe, relocate 1 existing speaker. t.i. pa# 201311151988Details
provide a modification of existing f.a. system, new devices will be tied to existing system. add 1 new strobe, relocate 1 existing speaker. t.i. pa# 201311151988 | $4,844 |
| Dec 5, 2013 | Completed final sign-off Dec 2013 | 505 Sansome St | Golden Gate Fire Protection Inc | relocate 3 pendent sprinkler heads on the 20th floor, add 1 head.Details
relocate 3 pendent sprinkler heads on the 20th floor, add 1 head. | $2,060 |
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 505 Sansome St | Terra Visual Inc | install (n) evacuation maps to comply w/ current sffd evacuation map guidelines. for 20th and 6th floors- 3 on each floorDetails
install (n) evacuation maps to comply w/ current sffd evacuation map guidelines. for 20th and 6th floors- 3 on each floor | $1,500 |
| Nov 19, 2013 | Never finaled issued Nov 2013, no final | 505 Sansome St | Sabah International Incorporated | 6th floor provide modification of (e) fire alarm system, new devices will be tied to existing system. add (1) new power supple, (3) new strobes, (14) new speaker strobes. ref #2012.06.29.3794Details
6th floor provide modification of (e) fire alarm system, new devices will be tied to existing system. add (1) new power supple, (3) new strobes, (14) new speaker strobes. ref #2012.06.29.3794 | $14,309 |
| Nov 15, 2013 | Completed final sign-off Jun 2014 | 505 Sansome St | Swinerton Builders | 20/f:interior office remodel. construct nw tnt to tenant demising partitions. install new energy efficient 2x2 led light fixtures. power/ electrical work being performed to aligh with tenants new furniture requirments. 2 new 1/4" h2o lines in break room for coffee. new carpet & paint throughout tntDetails
20/f:interior office remodel. construct nw tnt to tenant demising partitions. install new energy efficient 2x2 led light fixtures. power/ electrical work being performed to aligh with tenants new furniture requirments. 2 new 1/4" h2o lines in break room for coffee. new carpet & paint throughout tnt | $195,000 |
| Nov 8, 2013 | Completed final sign-off Jun 2014 | 505 Sansome St | Terra Visual Inc | installing 3 new evacuation maps on 15th floor to comply with current sffd evacuation map guildelines.Details
installing 3 new evacuation maps on 15th floor to comply with current sffd evacuation map guildelines. | $1,200 |
| Oct 21, 2013 | Completed final sign-off Jan 2014 | 505 Sansome St | Sabah International Incorporated | 15th floor-modify extg f.a. system. add 1 single signature driver controller. one contorl relay. 5 photo detector, 7 speaker/strobes. t.i. app#201309197290Details
15th floor-modify extg f.a. system. add 1 single signature driver controller. one contorl relay. 5 photo detector, 7 speaker/strobes. t.i. app#201309197290 | $15,000 |
| Oct 16, 2013 | Expired or cancelled cancelled Jan 2026 | 505 Sansome St | replace (e) ceiling light fixtures with new light fixtures in same placeDetails
replace (e) ceiling light fixtures with new light fixtures in same place | $57,200 | |
| Sep 30, 2013 | Completed final sign-off Jan 2014 | 505 Sansome St | R L H Fire Protection Inc | 15th floor-add, relocate & remove fire sprinkler heads per tenant improvement-2 added, 14 relocated & 1 removedDetails
15th floor-add, relocate & remove fire sprinkler heads per tenant improvement-2 added, 14 relocated & 1 removed | $8,224 |
| Sep 19, 2013 | Completed final sign-off Jan 2014 | 505 Sansome St | Swinerton Builders | 15th floor-tenant improvemenmt includes new non structural partitions, restroom accessibility upgrade, plumbing fixtures, power & signal & lightingDetails
15th floor-tenant improvemenmt includes new non structural partitions, restroom accessibility upgrade, plumbing fixtures, power & signal & lighting | $295,187 |
| Sep 18, 2013 | Never finaled issued Sep 2013, no final | 505 Sansome St | street space permitDetails
street space permit | ||
| May 2, 2013 | Completed final sign-off May 2013 | 505 Sansome St | Sabah International Incorporated | 8th floor-modification of (e) fire alarm system-upgrade system shall include 1 new control relay, 1 new photoelectric duct smoke detector, 1 new ceiling speaker & 5 new ceiling speaker/strobesDetails
8th floor-modification of (e) fire alarm system-upgrade system shall include 1 new control relay, 1 new photoelectric duct smoke detector, 1 new ceiling speaker & 5 new ceiling speaker/strobes | $7,390 |
| Apr 22, 2013 | Completed final sign-off Apr 2013 | 505 Sansome St | Pribuss Engineering Inc | fire sprinkler t.i add 1 heads, relocate 4 heads, total 5 heads. t.i pa# 201304184876Details
fire sprinkler t.i add 1 heads, relocate 4 heads, total 5 heads. t.i pa# 201304184876 | $2,570 |
| Apr 18, 2013 | Completed final sign-off May 2013 | 505 Sansome St | Field Construction Inc. | 8th floor interior alterations only including demolitoin of (e) partitions, constructing of new partitions & doors, new ceilings & lighting, mechnaical, plumbing & electrical. sprinkler & fire alarm under separate permit.Details
8th floor interior alterations only including demolitoin of (e) partitions, constructing of new partitions & doors, new ceilings & lighting, mechnaical, plumbing & electrical. sprinkler & fire alarm under separate permit. | $100,000 |
| Nov 7, 2012 | Completed final sign-off Nov 2012 | 505 Sansome St | Terra Visual Inc | 8th floor-remove (e) evacuation map signage & replace with 3 new evacuation map signage to current sffd codesDetails
8th floor-remove (e) evacuation map signage & replace with 3 new evacuation map signage to current sffd codes | $1,500 |
| Sep 19, 2012 | Never finaled issued Sep 2012, no final | 505 Sansome St | Honeywell International, Inc | install 1 strobe powr supply, 18 new speaker strobes, 4 control relays, new duct smoke detectorsDetails
install 1 strobe powr supply, 18 new speaker strobes, 4 control relays, new duct smoke detectors | $12,000 |
| Aug 24, 2012 | Completed final sign-off May 2014 | 505 Sansome St | R L H Fire Protection Inc | 6th floor-fire sprinkler permit-relocate 2 & add 2 pendents. ti pa# 2012-0629-3794Details
6th floor-fire sprinkler permit-relocate 2 & add 2 pendents. ti pa# 2012-0629-3794 | $2,000 |
| Aug 21, 2012 | Never finaled issued Aug 2012, no final | 505 Sansome St | Honeywell International, Inc | add fire alarm:1)duct detector 2)control delays 3)pilot delaysDetails
add fire alarm:1)duct detector 2)control delays 3)pilot delays | $5,000 |
| Aug 10, 2012 | Never finaled issued Aug 2012, no final | 505 Sansome St | Superior Electrical Advertising Inc | erect an electric double faced projecting sign.Details
erect an electric double faced projecting sign. | $3,000 |
| Aug 2, 2012 | Never finaled issued Aug 2012, no final | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | 8th floor-tenant improvement to (e) fire sprinkler system-2 added, 78 relocated & 2 removed sprinkler, total of 80 sprinklersDetails
8th floor-tenant improvement to (e) fire sprinkler system-2 added, 78 relocated & 2 removed sprinkler, total of 80 sprinklers | $40,000 |
| Jun 29, 2012 | Completed final sign-off Dec 2012 | 505 Sansome St | Swinerton Builders | 6th fl elevator lobby alterations. interior alterations only including demo, new paritions and doors, new ceiling and lights, mep inlcudedDetails
6th fl elevator lobby alterations. interior alterations only including demo, new paritions and doors, new ceiling and lights, mep inlcuded | $60,000 |
| Jun 29, 2012 | Completed final sign-off Nov 2012 | 505 Sansome St | Field Construction Inc. | 8th floor: tenant improvement, interior alterations only including demolition, new paritions and doors, new ceiling and lights. mep inlcludedDetails
8th floor: tenant improvement, interior alterations only including demolition, new paritions and doors, new ceiling and lights. mep inlcluded | $200,000 |
| Jan 25, 2012 | Never finaled issued Jan 2012, no final | 505 Sansome St | Honeywell International, Inc | 3rd floor-fire alarm only-add 1 new strobeDetails
3rd floor-fire alarm only-add 1 new strobe | $5,000 |
| Jan 9, 2012 | Completed final sign-off Mar 2012 | 505 Sansome St | Hathaway Dinwiddie Co. | title 24 lighting & electrical for arch pa# 2011-1207-0232Details
title 24 lighting & electrical for arch pa# 2011-1207-0232 | |
| Dec 29, 2011 | Completed final sign-off Feb 2012 | 505 Sansome St | Pribuss Engineering Inc | fire sprinkler t.i. add 1 sprinkler, relocate 4 sprinklers.Details
fire sprinkler t.i. add 1 sprinkler, relocate 4 sprinklers. | $2,573 |
| Dec 16, 2011 | Completed final sign-off Dec 2011 | 505 Sansome St | Honeywell International, Inc | 3rd floor-fire alarm-6 speaker/strobesDetails
3rd floor-fire alarm-6 speaker/strobes | $7,000 |
| Dec 7, 2011 | Completed final sign-off Mar 2012 | 505 Sansome St | Hathaway Dinwiddie Co. | 3rd floor:interior alterations including demolition, new doors, new partitions, relocating lights. no change to hvac. electrical, fire alarm and sprinkler will be covered under separate permits.Details
3rd floor:interior alterations including demolition, new doors, new partitions, relocating lights. no change to hvac. electrical, fire alarm and sprinkler will be covered under separate permits. | $50,000 |
| Nov 14, 2011 | Never finaled issued Nov 2011, no final | 505 Sansome St | R L H Fire Protection Inc | fire sprinkler only. relocate 4 hd on 3rd floor(ecology and environment)Details
fire sprinkler only. relocate 4 hd on 3rd floor(ecology and environment) | $2,000 |
| Oct 28, 2011 | Completed final sign-off Mar 2012 | 505 Sansome St | Field Construction Inc. | #300- commercial ti includes modifications and demo, new non structural partitions, additoiin of light fixtures, new finishes, millworkDetails
#300- commercial ti includes modifications and demo, new non structural partitions, additoiin of light fixtures, new finishes, millwork | $30,000 |
| Oct 14, 2011 | Completed final sign-off Nov 2011 | 505 Sansome St | Honeywell International, Inc | fire alarm scope. 1 duct detector. 2 control relays, 2 pilot relaysDetails
fire alarm scope. 1 duct detector. 2 control relays, 2 pilot relays | $6,000 |
| Sep 13, 2011 | Never finaled issued Sep 2011, no final | 505 Sansome St | street spaceDetails
street space | ||
| Aug 25, 2011 | Completed final sign-off Sep 2011 | 505 Sansome St | Anderson, Rowe & Buckley, Inc. | 8th floor-(e) fire sprinkler system tenant improvements-2 relocated sprinklersDetails
8th floor-(e) fire sprinkler system tenant improvements-2 relocated sprinklers | $1,000 |
| Aug 10, 2011 | Completed final sign-off Nov 2011 | 505 Sansome St | Skyline Construction | commercial tenant improvement, including restrooms accessibility upgrade, new finishes, accessories and plumbing fixtures, new countertops, elvator lobby new finishes, new ceiling & new lighting and mep revisions. sprinkler and fire alarm revision u der separate applicationDetails
commercial tenant improvement, including restrooms accessibility upgrade, new finishes, accessories and plumbing fixtures, new countertops, elvator lobby new finishes, new ceiling & new lighting and mep revisions. sprinkler and fire alarm revision u der separate application | $105,000 |
| Mar 17, 2011 | Completed final sign-off May 2011 | 505 Sansome St | Honeywell International, Inc | 5th floor fire alarm - additoin to the existing system in the bldg. addiotn of 6 strobes, 9 speakers, 2 smoke detectors, 2 control relays to accommodte tenant space remodel.Details
5th floor fire alarm - additoin to the existing system in the bldg. addiotn of 6 strobes, 9 speakers, 2 smoke detectors, 2 control relays to accommodte tenant space remodel. | $11,000 |
| Mar 17, 2011 | Completed final sign-off Mar 2011 | 505 Sansome St | Field Construction Inc. | #510 & 550- demo extg heat pump and replace with new pump. for new idf 1 hour fire rated room, install new duct work and grilles and relocate grilles. relocate 2x4 lights. architectural pa#201102220668Details
#510 & 550- demo extg heat pump and replace with new pump. for new idf 1 hour fire rated room, install new duct work and grilles and relocate grilles. relocate 2x4 lights. architectural pa#201102220668 | $90,000 |
| Feb 25, 2011 | Completed final sign-off Mar 2011 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvmentDetails
relocate fire sprinkler heads per tenant improvment | $25,000 |
| Feb 22, 2011 | Completed final sign-off Mar 2011 | 505 Sansome St | Field Construction Inc. | 5th floor-interior t.i only including demolition & construction of new walls, doors, new finishes. hvac, electrical, fire alarm & sprinkler work to be submitted under seperate permitDetails
5th floor-interior t.i only including demolition & construction of new walls, doors, new finishes. hvac, electrical, fire alarm & sprinkler work to be submitted under seperate permit | $200,000 |
| Sep 1, 2010 | Never finaled issued Sep 2010, no final | 505 Sansome St | Honeywell International, Inc | fire alarm on 14th floor. 4 strobes, 5 speaker/strobes, 1 smoke detectorDetails
fire alarm on 14th floor. 4 strobes, 5 speaker/strobes, 1 smoke detector | $9,000 |
| Aug 23, 2010 | Never finaled issued Aug 2010, no final | 505 Sansome St | Censource Inc | remove and replace evacuation maps/signage on 5th floor in accordance to regulations by the fire dept.Details
remove and replace evacuation maps/signage on 5th floor in accordance to regulations by the fire dept. | $3,000 |
| Jul 21, 2010 | Completed final sign-off Oct 2010 | 505 Sansome St | Honeywell International, Inc | 5th floor-addition of 8 smoke detectors, 5 strobes, 4 speakers, 3 control relays & pilot relaysDetails
5th floor-addition of 8 smoke detectors, 5 strobes, 4 speakers, 3 control relays & pilot relays | $12,000 |
| Jul 15, 2010 | Completed final sign-off Oct 2010 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | 5th floor - relocate fire sprinkler heads per tenant improvements (13 relocates)Details
5th floor - relocate fire sprinkler heads per tenant improvements (13 relocates) | $2,400 |
| Jun 4, 2010 | Completed final sign-off Oct 2010 | 505 Sansome St | Field Construction Inc. | commercial tenant improvement which includes the following; non-structural partition & ceiling, mech., elec., plumbing, life safety, fire alarm, finishes & millwork. common elevator & corridor remodel. redo finishes & fixtures in (e) accessible restrooms. provide (n) hi-low dinking fountain.Details
commercial tenant improvement which includes the following; non-structural partition & ceiling, mech., elec., plumbing, life safety, fire alarm, finishes & millwork. common elevator & corridor remodel. redo finishes & fixtures in (e) accessible restrooms. provide (n) hi-low dinking fountain. | $110,000 |
| Jul 21, 2009 | Completed final sign-off Mar 2010 | 505 Sansome St | Jentek Integrated Systsm | install 2 stand alone keypads for controlled access and power supply. integrate key pads with extg electrified door locks, interface system with extg life safty systems, install emergency override for egress and interface with extg life safty systems.Details
install 2 stand alone keypads for controlled access and power supply. integrate key pads with extg electrified door locks, interface system with extg life safty systems, install emergency override for egress and interface with extg life safty systems. | $5,000 |
| May 20, 2009 | Completed final sign-off Jun 2009 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler plans per tenant improvements. 2 relocateDetails
relocate fire sprinkler plans per tenant improvements. 2 relocate | $300 |
| May 12, 2009 | Completed final sign-off Sep 2009 | 505 Sansome St | Honeywell International, Inc | addition of 13 strobes, 4 smoke detectors, 3 manual pull stations/control module and 1 power boostrer.Details
addition of 13 strobes, 4 smoke detectors, 3 manual pull stations/control module and 1 power boostrer. | $11,000 |
| Apr 22, 2009 | Completed final sign-off Sep 2009 | 505 Sansome St | Honeywell International, Inc | addition of strobe only devices and speakers to the 14 th floor. also, adding remote power supply & smoke detectors, & 2 duct detectors, 3 pull stations.Details
addition of strobe only devices and speakers to the 14 th floor. also, adding remote power supply & smoke detectors, & 2 duct detectors, 3 pull stations. | $11,000 |
| Apr 14, 2009 | Never finaled issued Apr 2009, no final | 505 Sansome St | Honeywell International, Inc | delete 5 monitors points from system software module to be removed from electrical and returned to electrical.ref pa# 2009/04/03/5564 removal of fm 200 and preaction systems.Details
delete 5 monitors points from system software module to be removed from electrical and returned to electrical.ref pa# 2009/04/03/5564 removal of fm 200 and preaction systems. | $950 |
| Apr 3, 2009 | Completed final sign-off Apr 2009 | 505 Sansome St | Anderson, Rowe & Buckley, Inc. | removed extg pre action fire sprinkler system total/pac. removed fm 200 system.connected preaction piping to extg basement wet pipe fire sprinkler system. no added or removed sprinklers. fire alarm under separte permit.Details
removed extg pre action fire sprinkler system total/pac. removed fm 200 system.connected preaction piping to extg basement wet pipe fire sprinkler system. no added or removed sprinklers. fire alarm under separte permit. | $2,000 |
| Apr 2, 2009 | Completed final sign-off Jun 2009 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | at 14th fl: relocate fire sprinkler heads per t. i. (relocate 12), (remove 1.)Details
at 14th fl: relocate fire sprinkler heads per t. i. (relocate 12), (remove 1.) | $2,200 |
| Mar 17, 2009 | Completed final sign-off Oct 2009 | 505 Sansome St | Field Construction Inc. | commercial t.i.-which includes the following; non-structural partition& clg., mech., elect., plumb., life safety, fire alarm, finishes & millwork. common elev. remodel. redo finishes in (e) accessible restrms. provide (n) hi/low dinking fountain. differ submittals if reg'd. life safety & sprinkers.Details
commercial t.i.-which includes the following; non-structural partition& clg., mech., elect., plumb., life safety, fire alarm, finishes & millwork. common elev. remodel. redo finishes in (e) accessible restrms. provide (n) hi/low dinking fountain. differ submittals if reg'd. life safety & sprinkers. | $50,000 |
| Feb 20, 2009 | Expired or cancelled cancelled Jan 2026 | 505 Sansome St | Jentek Integrated Systsm | install 2 stand alone key for controlled access and power supply. integrate key pads with extg electrified door locks, interface system with extg life safty systems, install emergency override for egress and interface with extg life safty systems.Details
install 2 stand alone key for controlled access and power supply. integrate key pads with extg electrified door locks, interface system with extg life safty systems, install emergency override for egress and interface with extg life safty systems. | $5,000 |
| Jul 1, 2008 | Completed final sign-off Feb 2009 | 505 Sansome St | Honeywell International, Inc | add to life safety system: 13 speakers, 11 strobes, 3 smoke detectors, 7 duct smoke detectors, 1 slc loop cardDetails
add to life safety system: 13 speakers, 11 strobes, 3 smoke detectors, 7 duct smoke detectors, 1 slc loop card | $15,925 |
| Jun 19, 2008 | Completed final sign-off Feb 2009 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements. total 23 relocates, 1 removal.Details
relocate fire sprinkler heads per tenant improvements. total 23 relocates, 1 removal. | $4,000 |
| May 14, 2008 | Completed final sign-off Feb 2009 | 505 Sansome St | Field Construction Inc. | commercial tenant improvement which includes the following: non-structural partition & ceiling, mechanical, electrical, finishes & millwork. differed submittals, if required for life safety, fire sprinklers and fire alarm.Details
commercial tenant improvement which includes the following: non-structural partition & ceiling, mechanical, electrical, finishes & millwork. differed submittals, if required for life safety, fire sprinklers and fire alarm. | $144,000 |
| Mar 10, 2008 | Completed final sign-off Jul 2008 | 505 Sansome St | Skyline Construction | replacement of cooling towers and pumpsDetails
replacement of cooling towers and pumps | $300,000 |
| Feb 12, 2008 | Completed final sign-off Jun 2008 | 505 Sansome St | Honeywell International, Inc | 11th floor-fire alarm addition-20 speakers, 24 strobes, 11 duct smoke detectors, 2 smoke detectors, 1 slc loop cardDetails
11th floor-fire alarm addition-20 speakers, 24 strobes, 11 duct smoke detectors, 2 smoke detectors, 1 slc loop card | $11,625 |
| Feb 12, 2008 | Completed final sign-off May 2008 | 505 Sansome St | Field Construction Inc. | 10th, 11th, 19th floor: upgrade existing life safety - 17 strobes, 10 speakers, 7 manual pull, 22 smoke detectors, 11 duct smoke det. 4 control modules, 6 pilot relays, 3 control module, 3 remove power supple.Details
10th, 11th, 19th floor: upgrade existing life safety - 17 strobes, 10 speakers, 7 manual pull, 22 smoke detectors, 11 duct smoke det. 4 control modules, 6 pilot relays, 3 control module, 3 remove power supple. | $66,452 |
| Feb 6, 2008 | Completed final sign-off Jun 2008 | 505 Sansome St | Ayoob & Peery Plumbing Co Inc | 11th floor-relocate fire sprinkler per tenant improvements-total 75 heads, 18 removed headsDetails
11th floor-relocate fire sprinkler per tenant improvements-total 75 heads, 18 removed heads | $14,000 |
| Jan 14, 2008 | Completed final sign-off May 2008 | 505 Sansome St | revision to 200708078956. remove fsd and add occupancy sensors and controls. mech and elecDetails
revision to 200708078956. remove fsd and add occupancy sensors and controls. mech and elec | ||
| Jan 14, 2008 | Completed final sign-off May 2008 | 505 Sansome St | Field Construction Inc. | revision to application #200708078958 mech. elect. remove fsd and add occupance sensors & controls.Details
revision to application #200708078958 mech. elect. remove fsd and add occupance sensors & controls. | |
| Jan 14, 2008 | Completed final sign-off May 2008 | 505 Sansome St | Field Construction Inc. | revision to 200708078960. request plan check per 2007 code. lower non rated partition to above ceiling and corridor. remove fsd and add controls on electrical and mech. addition of occupancy sensors. delete upgrading existing hall/nonrated corridor to rated corridor from scope of work.Details
revision to 200708078960. request plan check per 2007 code. lower non rated partition to above ceiling and corridor. remove fsd and add controls on electrical and mech. addition of occupancy sensors. delete upgrading existing hall/nonrated corridor to rated corridor from scope of work. | |
| Dec 28, 2007 | Completed final sign-off Jun 2008 | 505 Sansome St | Field Construction Inc. | office tenant improvement elect.life safety electical mech under this permitDetails
office tenant improvement elect.life safety electical mech under this permit | $650,000 |
| Dec 11, 2007 | Completed final sign-off Feb 2008 | 505 Sansome St | Hathaway Dinwiddie Co. | 20th fl. - addition of the following items to the (e) life safety system: (12) strobe lights, (11) speakers, (1) remote power supply w/ batteries, (1) control module/nac, (1) pilot relays, (3) smoke detectors, (6) duct smoke detectors. (barrington investment ti)Details
20th fl. - addition of the following items to the (e) life safety system: (12) strobe lights, (11) speakers, (1) remote power supply w/ batteries, (1) control module/nac, (1) pilot relays, (3) smoke detectors, (6) duct smoke detectors. (barrington investment ti) | $15,000 |
| Dec 11, 2007 | Completed final sign-off Feb 2008 | 505 Sansome St | Hathaway Dinwiddie Co. | 20th floor - work on (e) life safety system. (6) strobe lights, (7) speakers, (8) smoke detectors, (1) dust smoke detector, (3) manual stac pull station.Details
20th floor - work on (e) life safety system. (6) strobe lights, (7) speakers, (8) smoke detectors, (1) dust smoke detector, (3) manual stac pull station. | $15,000 |
| Dec 6, 2007 | Completed final sign-off Feb 2008 | 505 Sansome St | Anderson, Rowe & Buckley, Inc. | 20th floor: tenant improvement for existing fire sprinkler system, 12 new sprinklers, 26 relocated sprinklers.Details
20th floor: tenant improvement for existing fire sprinkler system, 12 new sprinklers, 26 relocated sprinklers. | $7,000 |
| Nov 20, 2007 | Completed final sign-off May 2008 | 505 Sansome St | Anderson, Rowe & Buckley, Inc. | t. i. to existing fire sprinkler system. work to be performed on 10th, 11th, & 19th floor. 10th/fl (3) new, (10) relocated. 11th/fl (1) new, (2) relocated. 19th/fl (1) bewm (12) relocated.Details
t. i. to existing fire sprinkler system. work to be performed on 10th, 11th, & 19th floor. 10th/fl (3) new, (10) relocated. 11th/fl (1) new, (2) relocated. 19th/fl (1) bewm (12) relocated. | $5,800 |
| Nov 2, 2007 | Completed final sign-off Feb 2008 | 505 Sansome St | Hathaway Dinwiddie Co. | 20th floor: commercial tenant improvement which includes : non structural & ceiling, mech, elec, plbg, life safety, fire alarm, finishes & mill work.Details
20th floor: commercial tenant improvement which includes : non structural & ceiling, mech, elec, plbg, life safety, fire alarm, finishes & mill work. | $85,500 |
| Nov 2, 2007 | Completed final sign-off Feb 2008 | 505 Sansome St | Hathaway Dinwiddie Co. | t/i 20th floor-create multi-tenant floor, new partitions, millwork,finishes, new corridors. sprinkler and fire alarm under separate application.Details
t/i 20th floor-create multi-tenant floor, new partitions, millwork,finishes, new corridors. sprinkler and fire alarm under separate application. | $60,000 |
| Aug 7, 2007 | Completed final sign-off May 2008 | 505 Sansome St | non structural partition. electrical & mechanical. life safety defferredDetails
non structural partition. electrical & mechanical. life safety defferred | $135,000 | |
| Aug 7, 2007 | Completed final sign-off Oct 2008 | 505 Sansome St | revision to approved appl. 2007 0719 7229: non structural partition, heat pump addition on 19/f, change 1 hr. rated wall to 1 hr. const.Details
revision to approved appl. 2007 0719 7229: non structural partition, heat pump addition on 19/f, change 1 hr. rated wall to 1 hr. const. | ||
| Aug 7, 2007 | Completed final sign-off May 2008 | 505 Sansome St | non structural, mechanical & electrical improvement. bringing men's and women's restrooms to title 24 compliant condition. life safety differed.Details
non structural, mechanical & electrical improvement. bringing men's and women's restrooms to title 24 compliant condition. life safety differed. | $114,100 | |
| Aug 7, 2007 | Completed final sign-off May 2008 | 505 Sansome St | 10th floor: interior improvements at the elevator lobby and corridorsDetails
10th floor: interior improvements at the elevator lobby and corridors | $170,000 | |
| Jul 24, 2007 | Never finaled issued Sep 2007, no final | 505 Sansome St | Honeywell International, Inc | replace fire control panel with 3 new panels - all field devices to remain.Details
replace fire control panel with 3 new panels - all field devices to remain. | $89,125 |
| Jul 19, 2007 | Completed final sign-off Oct 2008 | 505 Sansome St | non-structural partition, addition of new heat pump on 19th floorDetails
non-structural partition, addition of new heat pump on 19th floor | $41,000 | |
| Mar 27, 2007 | Completed final sign-off Jul 2007 | 505 Sansome St | Skyline Construction | oti-2, 7th floor, spDetails
oti-2, 7th floor, sp | $2,000 |
| Mar 27, 2007 | Completed final sign-off Jul 2007 | 505 Sansome St | Metropolitan Electrical Construction | upgrade extg life safety speakers and strobes on the 7th floor. add 6 strobes, add 2 speakers, add 1 booster panel, r&r 12 stobesDetails
upgrade extg life safety speakers and strobes on the 7th floor. add 6 strobes, add 2 speakers, add 1 booster panel, r&r 12 stobes | $30,000 |
| Mar 12, 2007 | Never finaled issued Mar 2007, no final | 505 Sansome St | demo of non-structural walls. electrical deffered- separate permit.Details
demo of non-structural walls. electrical deffered- separate permit. | $16,000 | |
| Mar 6, 2007 | Completed final sign-off Jul 2007 | 505 Sansome St | C B F Inc | life safety system modifidcations, 505 sansome st. 3dr floor gia kidder mathaws, install 5 spakers, 6 stobes, 1 suct smoke sensor, 1 control module/ remote power supply w/ battries, q control module/nac & 3 polot relaysDetails
life safety system modifidcations, 505 sansome st. 3dr floor gia kidder mathaws, install 5 spakers, 6 stobes, 1 suct smoke sensor, 1 control module/ remote power supply w/ battries, q control module/nac & 3 polot relays | $87,010 |
| Feb 28, 2007 | Completed final sign-off Jul 2007 | 505 Sansome St | oti-2 3rd/ fl,el,me.Details
oti-2 3rd/ fl,el,me. | $62,000 | |
| Feb 28, 2007 | Completed final sign-off Jul 2007 | 505 Sansome St | Skyline Construction | allison partners - oti-1 7th floor, el, me, ls, spDetails
allison partners - oti-1 7th floor, el, me, ls, sp | $50,000 |
| Feb 14, 2007 | Completed final sign-off Jul 2007 | 505 Sansome St | Potter Fire Protection | relocate (5) fire sprinklers on the 3rd floor only.Details
relocate (5) fire sprinklers on the 3rd floor only. | $1,250 |
| Feb 12, 2007 | Completed final sign-off Jul 2007 | 505 Sansome St | cushman & wakefield- oti-1 3rd floor el, me, ls, spDetails
cushman & wakefield- oti-1 3rd floor el, me, ls, sp | $68,000 | |
| Nov 15, 2005 | Never finaled issued Nov 2005, no final | 505 Sansome St | Hathaway Dinwiddie Co. | as built life safety drawnings per request of the field inspector. 18th fl. revision#200509092479.Details
as built life safety drawnings per request of the field inspector. 18th fl. revision#200509092479. | |
| Sep 21, 2005 | Completed final sign-off Dec 2005 | 505 Sansome St | Hathaway Dinwiddie Co. | tenant improvement full floor restroom work, signage, visual alarmDetails
tenant improvement full floor restroom work, signage, visual alarm | $350,000 |
| Sep 9, 2005 | Expired or cancelled expired Jul 2008 | 505 Sansome St | Hathaway Dinwiddie Co. | fire alarm work for 18th/fl for t.i.Details
fire alarm work for 18th/fl for t.i. | $19,685 |
| Sep 1, 2005 | Never finaled issued Sep 2005, no final | 505 Sansome St | Pribuss Engineering Inc | fire sprinkler t/i - 127 sprinkler headsDetails
fire sprinkler t/i - 127 sprinkler heads | $11,650 |
| Aug 29, 2005 | Completed final sign-off Nov 2005 | 505 Sansome St | Field Construction Inc. | oti-4 12th floor spDetails
oti-4 12th floor sp | $11,000 |
| Aug 22, 2005 | Completed final sign-off Nov 2005 | 505 Sansome St | Field Construction Inc. | oti-3, 12th floor, el, me.Details
oti-3, 12th floor, el, me. | $10,000 |
| Aug 17, 2005 | Never finaled issued Oct 2005, no final | 505 Sansome St | addition of 1 steel beam under floor to strengthen existing floor under new file cabinets ref.......Details
addition of 1 steel beam under floor to strengthen existing floor under new file cabinets ref....... | $25,000 | |
| Jul 22, 2005 | Completed final sign-off Nov 2005 | 505 Sansome St | oti-1 12/f, el, me, ls, spDetails
oti-1 12/f, el, me, ls, sp | $225,000 | |
| Jul 22, 2005 | Completed final sign-off Nov 2005 | 505 Sansome St | Field Construction Inc. | oti-2 12/fl, el, me, ls, sp.Details
oti-2 12/fl, el, me, ls, sp. | $250,000 |
| Jul 21, 2005 | Never finaled issued Jul 2005, no final | 505 Sansome St | Hathaway Dinwiddie Co. | interior demolition non bearing walls and interiorfinishes, floor 18 - non structural onlyDetails
interior demolition non bearing walls and interiorfinishes, floor 18 - non structural only | $10,000 |
| Jul 6, 2005 | Completed final sign-off Dec 2005 | 505 Sansome St | commercial/tenant improvement - demo all, partition build back, server roomDetails
commercial/tenant improvement - demo all, partition build back, server room | $685,000 | |
| Sep 5, 2003 | Completed final sign-off Oct 2003 | 505 Sansome St | Field Construction Inc. | oti-3, 5th fl,lsDetails
oti-3, 5th fl,ls | $5,000 |
| Aug 28, 2003 | Completed final sign-off Oct 2003 | 505 Sansome St | Field Construction Inc. | oti-4 5th floor spDetails
oti-4 5th floor sp | $25,000 |
| Jul 17, 2003 | Completed final sign-off Oct 2003 | 505 Sansome St | Field Construction Inc. | oti-2 5th floor el me .Details
oti-2 5th floor el me . | $80,000 |
| Jun 10, 2003 | Completed final sign-off Oct 2003 | 505 Sansome St | Field Construction Inc. | oti-1 5th floor mech/ l/s sprklr (5th fl.)Details
oti-1 5th floor mech/ l/s sprklr (5th fl.) | $90,000 |
| Mar 13, 2003 | Expired or cancelled cancelled May 2005 | 505 Sansome St | replace two cooling towers 2 pumps @ roof top install one condensing unit @ 2nd floorDetails
replace two cooling towers 2 pumps @ roof top install one condensing unit @ 2nd floor | $300,000 | |
| Jan 2, 2003 | Never finaled issued Jan 2003, no final | 505 Sansome St | sidewalkDetails
sidewalk | ||
| Apr 3, 2002 | Completed final sign-off May 2002 | 505 Sansome St | lifesafety for 17th fl lobby, corridors & tenant. 12 new horn strobesDetails
lifesafety for 17th fl lobby, corridors & tenant. 12 new horn strobes | $8,800 | |
| Jan 23, 2002 | Completed final sign-off Jul 2002 | 505 Sansome St | oti-1, 17th floor, ltg, mech, ls, sprDetails
oti-1, 17th floor, ltg, mech, ls, spr | $52,500 | |
| Jan 22, 2002 | Completed final sign-off May 2002 | 505 Sansome St | oti-2,17th flr, ltg, mechDetails
oti-2,17th flr, ltg, mech | $48,500 | |
| Dec 20, 2001 | Completed final sign-off May 2002 | 505 Sansome St | oti-1 17th floor lsDetails
oti-1 17th floor ls | $42,000 | |
| Dec 20, 2001 | Completed final sign-off Jun 2002 | 505 Sansome St | oti-1 17th floor el me ls spDetails
oti-1 17th floor el me ls sp | $140,000 | |
| Oct 9, 2001 | Completed final sign-off Nov 2001 | 505 Sansome St | Field Construction Inc. | 4th floor, ot1-2, me & sp onlyDetails
4th floor, ot1-2, me & sp only | $5,000 |
| Sep 28, 2001 | Completed final sign-off Nov 2001 | 505 Sansome St | Field Construction Inc. | 4th floor, oti-1 rev., ltg., mech, ls, spr.rDetails
4th floor, oti-1 rev., ltg., mech, ls, spr.r | $22,000 |
| Sep 14, 2001 | Expired or cancelled expired Jan 2002 | 505 Sansome St | Columbia Mechanical Contractors | relocate 2 sprinkler headsDetails
relocate 2 sprinkler heads | $500 |
| Aug 23, 2001 | Completed final sign-off Nov 2001 | 505 Sansome St | Field Construction Inc. | oti-1 4th floor, ltg, mech, ls, sprDetails
oti-1 4th floor, ltg, mech, ls, spr | $72,000 |
| May 11, 2001 | Completed final sign-off Jun 2001 | 505 Sansome St | Bcci Construction Company | remove and replace mechanical equipment on the 10/fDetails
remove and replace mechanical equipment on the 10/f | $14,000 |
| Dec 22, 2000 | Expired or cancelled expired Dec 2001 | 505 Sansome St | Bcci Construction Company | minor interior alterations on the 10th flDetails
minor interior alterations on the 10th fl | $30,000 |
| Dec 5, 2000 | Expired or cancelled expired Jun 2001 | 505 Sansome St | demolish non-structural wall, install cabinets & wall in confer rmDetails
demolish non-structural wall, install cabinets & wall in confer rm | $9,000 | |
| Oct 30, 2000 | Completed final sign-off Feb 2001 | 505 Sansome St | tenant improvement adding one smoke door at elevator lobby at 6th flrDetails
tenant improvement adding one smoke door at elevator lobby at 6th flr | $7,000 | |
| Apr 17, 2000 | Expired or cancelled expired Apr 2001 | 505 Sansome St | street spaceDetails
street space | ||
| Apr 13, 2000 | Expired or cancelled expired May 2001 | 505 Sansome St | Rudolph Commercial Interiors Inc, Rci | oti 2 el me l/s sp 20th floorDetails
oti 2 el me l/s sp 20th floor | $80,000 |
| Mar 16, 2000 | Expired or cancelled expired Jul 2000 | 505 Sansome St | revision to application 99161209Details
revision to application 99161209 | ||
| Mar 14, 2000 | Expired or cancelled withdrawn Dec 2001 | 505 Sansome St | one-stop, install 2 hydraulic retractable bollardsDetails
one-stop, install 2 hydraulic retractable bollards | $80,000 | |
| Feb 2, 2000 | Expired or cancelled expired Feb 2001 | 505 Sansome St | oti 1 5th floor, el, me, sp & lsDetails
oti 1 5th floor, el, me, sp & ls | $90,000 | |
| Feb 2, 2000 | Expired or cancelled expired Feb 2001 | 505 Sansome St | oti 2 5th floor, el, me & spDetails
oti 2 5th floor, el, me & sp | $39,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.