Gotham Bay Construction
- Based in
- Emeryville
- On San Francisco permits
- Apr 2001 to Aug 2026
- Last 24 months
- 2 permits filed
83 permits since 2000: 62 completed, 2 in progress, 7 never finaled, 12 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 2165 Lombard St | repair at interior due to fire. scope includes replacement at all interior finishes, furnishings, light fixtures, kitchen equipment, plumbing fixtures. all damaged by the fire as well as structural and accessibility upgrades current codesDetails
repair at interior due to fire. scope includes replacement at all interior finishes, furnishings, light fixtures, kitchen equipment, plumbing fixtures. all damaged by the fire as well as structural and accessibility upgrades current codes | $570,000 |
| Aug 20, 2026 | In progress issued Sep 2026 | 2165 Lombard St | minor interior demo to support future tenant improvement permit. scope includes removal of existing concrete curbs/pads, non load bearing partitions and interior doors. ab-17Details
minor interior demo to support future tenant improvement permit. scope includes removal of existing concrete curbs/pads, non load bearing partitions and interior doors. ab-17 | $80,000 |
| Dec 31, 2019 | Completed final sign-off Apr 2021 | 420 Folsom St | revision to 201908128540 and orig 201905171039 new finishes, new and revised kitchen equipmentDetails
revision to 201908128540 and orig 201905171039 new finishes, new and revised kitchen equipment | |
| Sep 11, 2019 | Expired or cancelled cancelled Jan 2026 | 733 Front St | addition of an ada roll-in shower and reconfiguration of (e) commercial bathroom sinksDetails
addition of an ada roll-in shower and reconfiguration of (e) commercial bathroom sinks | $15,000 |
| Aug 12, 2019 | Completed final sign-off Apr 2021 | 420 Folsom St | revision to 201905171039 installation of i\new int partitions, finishes, furniture, millwork & equip. mep, mech will consist of a disfuser, duct installation, ele work 0 newpower/data along with lightingDetails
revision to 201905171039 installation of i\new int partitions, finishes, furniture, millwork & equip. mep, mech will consist of a disfuser, duct installation, ele work 0 newpower/data along with lighting | |
| May 17, 2019 | Completed final sign-off Apr 2021 | 420 Folsom St | interior altertation for new tenant with existing shell building, new interior partitions, finishes fixtures, furniture, millwork, equipment, mep work included, diffuser & duct install power data & lighting througout, new plumbing fixtures n/a maherDetails
interior altertation for new tenant with existing shell building, new interior partitions, finishes fixtures, furniture, millwork, equipment, mep work included, diffuser & duct install power data & lighting througout, new plumbing fixtures n/a maher | $225,000 |
| Apr 16, 2019 | Completed final sign-off Jun 2019 | 55 02nd St | revision to 201901281445 to show changes in design due to value engineeringDetails
revision to 201901281445 to show changes in design due to value engineering | |
| Mar 13, 2019 | Never finaled issued May 2019, no final | 1 California St | revision to pa 201812279246. replacement of (e) sink with (n) and addition of prep sinkDetails
revision to pa 201812279246. replacement of (e) sink with (n) and addition of prep sink | |
| Jan 28, 2019 | Completed final sign-off Jun 2019 | 55 02nd St | suite 150: interior ti to inlcude new paritions, finishes, fixtures, furniture, casework, millwork, equipment and mepDetails
suite 150: interior ti to inlcude new paritions, finishes, fixtures, furniture, casework, millwork, equipment and mep | $225,000 |
| Dec 27, 2018 | Completed final sign-off Apr 2019 | 1 California St | ti - (e) 468 sf of front of house to include- removal of (e) radiant heaters at (e) store front. new front of house lighting new millwork. fully sprinklered bldDetails
ti - (e) 468 sf of front of house to include- removal of (e) radiant heaters at (e) store front. new front of house lighting new millwork. fully sprinklered bld | $35,000 |
| Jan 19, 2018 | Completed final sign-off Oct 2018 | 329 Bryant St | title 24 for ref 201709199013 maher naDetails
title 24 for ref 201709199013 maher na | |
| Dec 12, 2017 | Completed final sign-off Aug 2018 | 1050 Van Ness Av | interior remodel to include small bar and restroom and finishesDetails
interior remodel to include small bar and restroom and finishes | $250,000 |
| Sep 19, 2017 | Completed final sign-off Oct 2018 | 329 Bryant St | interior alterations, new finishes throughout and reconfiguration to extg space. relocate (e) restrooms. accessible parking to be relocated. entry to be re-graded. no exterior facade work proposed under this permit. n/a for maherDetails
interior alterations, new finishes throughout and reconfiguration to extg space. relocate (e) restrooms. accessible parking to be relocated. entry to be re-graded. no exterior facade work proposed under this permit. n/a for maher | $100,000 |
| Jan 10, 2017 | Completed final sign-off Aug 2017 | 220 Montgomery St | 0n 1st floor - renovation of (e) storage space to become classroom & offices for coffee making demonstration and classes. sope of area is approx 770 sq ft "no exterior scope" maher naDetails
0n 1st floor - renovation of (e) storage space to become classroom & offices for coffee making demonstration and classes. sope of area is approx 770 sq ft "no exterior scope" maher na | $100,000 |
| Dec 22, 2016 | Completed final sign-off Aug 2017 | 1 Market St | remodel of front of house of an (e) service restaurant the scope includes replacing new non bearing partitions, new finishes, replace selected kitchen equip. and replace front of house light fixtures and controls. existing hvac system to remain as is maher naDetails
remodel of front of house of an (e) service restaurant the scope includes replacing new non bearing partitions, new finishes, replace selected kitchen equip. and replace front of house light fixtures and controls. existing hvac system to remain as is maher na | $60,000 |
| Aug 9, 2016 | Completed final sign-off Nov 2016 | 2300 Polk St | demolition of extg inerior finishes, non structural partitions, selective demolition of extg electrical/lighting and plumbing fixtures. all demolition work to remain within exterior walls. no work or demolition to exterior of bldg. remain vancancy under ab-017Details
demolition of extg inerior finishes, non structural partitions, selective demolition of extg electrical/lighting and plumbing fixtures. all demolition work to remain within exterior walls. no work or demolition to exterior of bldg. remain vancancy under ab-017 | $5,000 |
| Jul 28, 2016 | Completed final sign-off Nov 2016 | 2300 Polk St | t.i. of an (e) restaurant space to a new restaurant. new int.non-structural partitions, kitchen equipment, millwork & finishes. all plumbing or mechanical work to be design/build under separate permit. all work to remain within interior shall be exisitng bldg, no exterior work, no increase in sq ft.Details
t.i. of an (e) restaurant space to a new restaurant. new int.non-structural partitions, kitchen equipment, millwork & finishes. all plumbing or mechanical work to be design/build under separate permit. all work to remain within interior shall be exisitng bldg, no exterior work, no increase in sq ft. | $170,000 |
| Dec 9, 2015 | Never finaled issued Dec 2015, no final | 505 Sansome St | interior non-structural demolition in preparation for ti under separate permit. maher naDetails
interior non-structural demolition in preparation for ti under separate permit. maher na | $10,000 |
| Dec 1, 2015 | Completed final sign-off Aug 2016 | 1 Embarcadero Center | interior non structural demo in prep for interior ti under sep permit. demo involves removal of millwork and equipDetails
interior non structural demo in prep for interior ti under sep permit. demo involves removal of millwork and equip | $10,000 |
| Nov 23, 2015 | Completed final sign-off Dec 2016 | 505 Sansome St | new tenant "illy cafe" -interior renovation of cafe. sprinkler & fire alarm under separate permit. n/a maher ordinanceDetails
new tenant "illy cafe" -interior renovation of cafe. sprinkler & fire alarm under separate permit. n/a maher ordinance | $165,000 |
| Nov 23, 2015 | Completed final sign-off Aug 2016 | 1 Embarcadero Center | interior renovation of front of house cafe space (customer area). n/a maher ordinanceDetails
interior renovation of front of house cafe space (customer area). n/a maher ordinance | $49,830 |
| Jul 9, 2015 | Completed final sign-off Sep 2015 | 275 Battery St | replace casework, new non bearing interior partitions, new wall finishes, paint, tile, replace selected equipment. compliance with maher ordinance no 155-13 not required.Details
replace casework, new non bearing interior partitions, new wall finishes, paint, tile, replace selected equipment. compliance with maher ordinance no 155-13 not required. | $100,000 |
| Apr 27, 2015 | Completed final sign-off Nov 2015 | 221 Montgomery St | ground floor: replacing casework at service counter. new no-bearing interior partitiona, new finishes (paint, tile), new equipment, new accessible dining counter, and replaceing light fixtures. maher naDetails
ground floor: replacing casework at service counter. new no-bearing interior partitiona, new finishes (paint, tile), new equipment, new accessible dining counter, and replaceing light fixtures. maher na | $80,000 |
| Mar 17, 2015 | Completed final sign-off Mar 2015 | 2700 Geary Bl | to renew application #201312234828 for final only. all work completed.Details
to renew application #201312234828 for final only. all work completed. | |
| Oct 1, 2014 | Completed final sign-off Feb 2015 | 2700 Geary Bl | revision to app#201312234812. mech and ducting and revised ceiling changes only, shown as delta 7 on plans.Details
revision to app#201312234812. mech and ducting and revised ceiling changes only, shown as delta 7 on plans. | |
| Sep 22, 2014 | Completed final sign-off Feb 2015 | 2700 Geary Bl | lighting revisions for approved permit #201312234812Details
lighting revisions for approved permit #201312234812 | |
| Sep 3, 2014 | Completed final sign-off Aug 2015 | 560 Mission St | ti of gr level food service space. new interior non structural walls and finishes, lighting, millwork, kitchen equipment, apcu and associated plumbing, mech, elec. ul 300, fire sprinkler, fire alarm, water to ul 300 sep permit. restroom upgrade under pa # 2014-1120-2160Details
ti of gr level food service space. new interior non structural walls and finishes, lighting, millwork, kitchen equipment, apcu and associated plumbing, mech, elec. ul 300, fire sprinkler, fire alarm, water to ul 300 sep permit. restroom upgrade under pa # 2014-1120-2160 | $261,362 |
| Jun 5, 2014 | Completed final sign-off Feb 2015 | 2700 Geary Bl | revision to app#201311121687. revise plans due to unforeseen loading on truss bottom chord at gridline e at 6 and 7. improve all connections of truss at g.l. e.. revise framing due to changes in mech. equipment layout on roof. revisions to details on sheet s3 to better reflect site conditions.Details
revision to app#201311121687. revise plans due to unforeseen loading on truss bottom chord at gridline e at 6 and 7. improve all connections of truss at g.l. e.. revise framing due to changes in mech. equipment layout on roof. revisions to details on sheet s3 to better reflect site conditions. | $30,000 |
| Jun 2, 2014 | Completed final sign-off Feb 2015 | 2700 Geary Bl | revision to app#201312234812. mechanical ducting changes triggered from shell modifications on 2 hour fire rated assembly. revised occupant load and moved rated wallsDetails
revision to app#201312234812. mechanical ducting changes triggered from shell modifications on 2 hour fire rated assembly. revised occupant load and moved rated walls | |
| May 30, 2014 | Completed final sign-off Feb 2015 | 2700 Geary Bl | work includes extending existing fire sprinkler system to upper level, demolition of existing pendant fire sprinkler heads in the lower level for future tenant improvementDetails
work includes extending existing fire sprinkler system to upper level, demolition of existing pendant fire sprinkler heads in the lower level for future tenant improvement | $17,000 |
| May 20, 2014 | Never finaled issued Jun 2014, no final | 4 Embarcadero Center | lobby level suite #1:finish work and equipment changes to extg restaurant.n/a for the maher ordinance #155-13Details
lobby level suite #1:finish work and equipment changes to extg restaurant.n/a for the maher ordinance #155-13 | $25,000 |
| Apr 8, 2014 | Never finaled issued Apr 2014, no final | 411 Valencia St | mechanical & electrical /lighting for pa#2014-0307-0199Details
mechanical & electrical /lighting for pa#2014-0307-0199 | $2,000 |
| Mar 7, 2014 | Completed final sign-off May 2014 | 411 Valencia St | tenant improvement new cafe at ground fl. for new cafe. storefront changes, counters, cabinets, sinks, lighting, food service equipment of (e) five story bldg. the second thru fifth story r-1 occupancy is not in scope. new cafe, storefront changes, counters, cabinets, sinks, lighting, food serviceDetails
tenant improvement new cafe at ground fl. for new cafe. storefront changes, counters, cabinets, sinks, lighting, food service equipment of (e) five story bldg. the second thru fifth story r-1 occupancy is not in scope. new cafe, storefront changes, counters, cabinets, sinks, lighting, food service | $50,000 |
| Dec 23, 2013 | Never finaled issued Dec 2013, no final | 2700 Geary Bl | non-structural interior demolition. all other under seperate permit. ab 0017Details
non-structural interior demolition. all other under seperate permit. ab 0017 | $7,500 |
| Dec 23, 2013 | Completed final sign-off Feb 2015 | 2700 Geary Bl | change of use from senior daycare to dialysis clinic (f-3 to i-2.1). ti for outpatient licensed dialysis clinic on gr fl. work includes (n) walls, ceiling, flooring, mep ac units, exhaust fans on roof, 24 dialysis stations. no visible exterior work. fire protection under separate permitDetails
change of use from senior daycare to dialysis clinic (f-3 to i-2.1). ti for outpatient licensed dialysis clinic on gr fl. work includes (n) walls, ceiling, flooring, mep ac units, exhaust fans on roof, 24 dialysis stations. no visible exterior work. fire protection under separate permit | $750,000 |
| Nov 14, 2013 | Completed final sign-off May 2014 | 411 Valencia St | install ada restroom, mezzanine storage area. convert extg fixed transoms to operable awning windows, new flooring.Details
install ada restroom, mezzanine storage area. convert extg fixed transoms to operable awning windows, new flooring. | $10,000 |
| Nov 12, 2013 | Completed final sign-off Jul 2015 | 2700 Geary Bl | improv't to existing bldg for future lower level use intended to be outpatient renal dialysis clinic. project consists of upgrades to achieve designated fire rating, expanded fire suppression system to the upper fl & centain accessibility upgrade. it is an oshpo project. fire alarm & sprinkler sep.Details
improv't to existing bldg for future lower level use intended to be outpatient renal dialysis clinic. project consists of upgrades to achieve designated fire rating, expanded fire suppression system to the upper fl & centain accessibility upgrade. it is an oshpo project. fire alarm & sprinkler sep. | $300,000 |
| Nov 7, 2013 | Completed final sign-off May 2014 | 411 Valencia St | for 311 notice for new cafe @ vacant retail space. no change of use or occupancy, ti under separate permit. no construction under this permit.Details
for 311 notice for new cafe @ vacant retail space. no change of use or occupancy, ti under separate permit. no construction under this permit. | |
| Oct 3, 2013 | Completed final sign-off Nov 2014 | 2055 Union St | change of use from (e) retail, fitness club to limited use restaurant (coffee cafe). (n) demising walls, ceiling & flooring. (n) kitchen eqpm, casework, finishes. mep & fire protection under separate permits. accessibility approved under pa#2013-0417-4785.Details
change of use from (e) retail, fitness club to limited use restaurant (coffee cafe). (n) demising walls, ceiling & flooring. (n) kitchen eqpm, casework, finishes. mep & fire protection under separate permits. accessibility approved under pa#2013-0417-4785. | |
| Jun 26, 2013 | Completed final sign-off Oct 2013 | 100 California St | 1st floor- t.i of an (e) ground level (vacant) cafe space-new interior non structural partitions, finishes, lighting, millwork & kitchen equipment. plumbing, mechanical, electrical, fire sprinkler are design build & under seperate permitsDetails
1st floor- t.i of an (e) ground level (vacant) cafe space-new interior non structural partitions, finishes, lighting, millwork & kitchen equipment. plumbing, mechanical, electrical, fire sprinkler are design build & under seperate permits | $60,000 |
| Nov 27, 2012 | Completed final sign-off Sep 2013 | 30 Fremont St | tenant improvement project of an (e) restaurant of a single store commercial bldg above underground parking garage. space is adjacent to a shared courtyard.Details
tenant improvement project of an (e) restaurant of a single store commercial bldg above underground parking garage. space is adjacent to a shared courtyard. | $120,000 |
| Nov 20, 2012 | Expired or cancelled cancelled Mar 2020 | 417 Stockton St | replace 13 windows in existing locations on east stockton street elevations - all windows to be single hung. same for same replacement.Details
replace 13 windows in existing locations on east stockton street elevations - all windows to be single hung. same for same replacement. | $12,000 |
| Nov 20, 2012 | Expired or cancelled cancelled Jul 2018 | 417 Stockton St | replace 2 windows in existing locations on east side stockton street elevations - all windows to be single hung. same for same replacement.Details
replace 2 windows in existing locations on east side stockton street elevations - all windows to be single hung. same for same replacement. | $2,000 |
| Nov 20, 2012 | Expired or cancelled cancelled Jul 2018 | 417 Stockton St | replace 13 windows in existing locations on east stockton street elevations - all windows to be single hung. same for .Details
replace 13 windows in existing locations on east stockton street elevations - all windows to be single hung. same for . | $12,000 |
| Nov 20, 2012 | Expired or cancelled cancelled Mar 2020 | 417 Stockton St | replace 13 windows in existing locations on east stockton street elevations - all windows to be single hung. same for same replacement.Details
replace 13 windows in existing locations on east stockton street elevations - all windows to be single hung. same for same replacement. | $12,000 |
| Nov 20, 2012 | Expired or cancelled cancelled Jul 2018 | 417 Stockton St | replace 13 windows in existing locations on east stockton street elevations - all windows to be single hung. same for same.Details
replace 13 windows in existing locations on east stockton street elevations - all windows to be single hung. same for same. | $12,000 |
| Jun 29, 2012 | Completed final sign-off Dec 2012 | 417 Stockton St | install non-electric, double-faced, non-illuminated, new sign banner to face of building (28' x 3')Details
install non-electric, double-faced, non-illuminated, new sign banner to face of building (28' x 3') | $5,700 |
| Jun 29, 2012 | Completed final sign-off Dec 2012 | 417 Stockton St | install (n) non-electric, single-faced, non-illuminated sign on (n) awning adjacent to entry door.Details
install (n) non-electric, single-faced, non-illuminated sign on (n) awning adjacent to entry door. | $1,200 |
| May 18, 2012 | Completed final sign-off Jun 2013 | 417 Stockton St | remodel 19 hotel rooms including baths, janitors, storage on 1st fl, side door 1st floor.Details
remodel 19 hotel rooms including baths, janitors, storage on 1st fl, side door 1st floor. | $150,000 |
| May 16, 2012 | Completed final sign-off Aug 2012 | 233 Geary St | space #104 - convert (e) stock room 564 sf to retail area, remove (e) millwork piece in mens shoes & open wall for access to (e) stockroom. provide new drywall & backlit ceilings & lighting, new linear diffuser branched from (e) hvac system, & new millwork merchandise pieces.Details
space #104 - convert (e) stock room 564 sf to retail area, remove (e) millwork piece in mens shoes & open wall for access to (e) stockroom. provide new drywall & backlit ceilings & lighting, new linear diffuser branched from (e) hvac system, & new millwork merchandise pieces. | $30,000 |
| Apr 19, 2012 | Completed final sign-off Sep 2012 | 1493 Webster St | ground floor t.i. for new medical office, work includes (n) partitoins, fixtures, flooring, ceilings, (n) bathrooms, (n) m.e.p., no change of occupancy, fire protection under separate permit. replace (e) storefront door & window in kind.Details
ground floor t.i. for new medical office, work includes (n) partitoins, fixtures, flooring, ceilings, (n) bathrooms, (n) m.e.p., no change of occupancy, fire protection under separate permit. replace (e) storefront door & window in kind. | $500,000 |
| Dec 6, 2011 | Completed final sign-off Apr 2012 | 417 Stockton St | expansion of (e) kitchen of restaurant on 2nd floor. work includes remodeled bathrooms, removal of raised seating area, new booth seating, partition walls & dropped ceiling. fire protection under seperate permitDetails
expansion of (e) kitchen of restaurant on 2nd floor. work includes remodeled bathrooms, removal of raised seating area, new booth seating, partition walls & dropped ceiling. fire protection under seperate permit | $115,000 |
| Nov 21, 2011 | Completed final sign-off Dec 2011 | 50 Post St | minor interior alteration to (e) restaurant including (n) flooring (n) ceiling, (n) casework, (n) partition. no changes to mechanical or lighting. fire protection under separate permit.Details
minor interior alteration to (e) restaurant including (n) flooring (n) ceiling, (n) casework, (n) partition. no changes to mechanical or lighting. fire protection under separate permit. | $76,200 |
| Nov 16, 2011 | Never finaled issued Nov 2011, no final | 50 Post St | space 55 & 56 - interior soft demo (non-structural) in advance of tenant improvement under separate permit. fire protection under separate permit.Details
space 55 & 56 - interior soft demo (non-structural) in advance of tenant improvement under separate permit. fire protection under separate permit. | $6,200 |
| Oct 25, 2011 | Expired or cancelled cancelled Nov 2014 | 155 04th St | space 1050: change of use from merchantile to restaurant (t.i. to 2330 s.f.) space facing 4th street. work includes new kitchen, bar, dining room, wait station, to go food prep & pick up area & restrooms. kitchen type i hood, ul300 system, sprinkler/fire alarm system revision seperate permitDetails
space 1050: change of use from merchantile to restaurant (t.i. to 2330 s.f.) space facing 4th street. work includes new kitchen, bar, dining room, wait station, to go food prep & pick up area & restrooms. kitchen type i hood, ul300 system, sprinkler/fire alarm system revision seperate permit | $700,000 |
| Oct 17, 2011 | Completed final sign-off Feb 2012 | 135 04th St | space fc-02: new quick service restaurant in food court of metron remodel.Details
space fc-02: new quick service restaurant in food court of metron remodel. | $200,000 |
| Aug 8, 2011 | Completed final sign-off Nov 2011 | 123 Battery St | tenant improvement to an existing space (cafe to cafe)installation of equipment, fixtures ,furnishings, new ceiling, new finishes- plumbing and electricalDetails
tenant improvement to an existing space (cafe to cafe)installation of equipment, fixtures ,furnishings, new ceiling, new finishes- plumbing and electrical | $150,000 |
| Apr 6, 2010 | Completed final sign-off Aug 2010 | 1270 Valencia St | interior t.i. for (n) bakery/cafe. work includes (n) walls, ducting, lighting, finishes, casework and equipment. no exterior alteration (fire protection under separate permit.)Details
interior t.i. for (n) bakery/cafe. work includes (n) walls, ducting, lighting, finishes, casework and equipment. no exterior alteration (fire protection under separate permit.) | $124,500 |
| Mar 11, 2010 | Completed final sign-off Jul 2010 | 2000 Union St | to complete work and obtain final inspection for work approved under pa# 200701222259 (structural upgrade); all work is completeDetails
to complete work and obtain final inspection for work approved under pa# 200701222259 (structural upgrade); all work is complete | |
| Mar 11, 2010 | Completed final sign-off Jul 2010 | 2000 Union St | to complete work and obtain final inspection for work approved under pa# 200812037682 (fire sprinkler as builts) .all work is completeDetails
to complete work and obtain final inspection for work approved under pa# 200812037682 (fire sprinkler as builts) .all work is complete | |
| Mar 11, 2010 | Completed final sign-off Jul 2010 | 2000 Union St | to complete work and obtain final inspection for work approved under pa# 200701302925 (dry rot repair); all work is completeDetails
to complete work and obtain final inspection for work approved under pa# 200701302925 (dry rot repair); all work is complete | |
| Mar 11, 2010 | Completed final sign-off Jul 2010 | 2000 Union St | to complete work and obtain final inspection for work approved under pa#200610205631 (exterior alteration)Details
to complete work and obtain final inspection for work approved under pa#200610205631 (exterior alteration) | $15,000 |
| Mar 11, 2010 | Completed final sign-off Jul 2010 | 2000 Union St | to complete work and obtain final inspection for work approved under pa# 200703065554; (interior t.i.)Details
to complete work and obtain final inspection for work approved under pa# 200703065554; (interior t.i.) | $130,000 |
| Jul 21, 2009 | Completed final sign-off Oct 2009 | 733 Front St | tenant improvement on the 1st. floor of 733 front st. adding; (5) duct detectors, (9) horn /strobes, (10) strobes, (1) dual sync module, (1) light to the (e) graphic panel.Details
tenant improvement on the 1st. floor of 733 front st. adding; (5) duct detectors, (9) horn /strobes, (10) strobes, (1) dual sync module, (1) light to the (e) graphic panel. | $11,000 |
| Jun 12, 2009 | Completed final sign-off Oct 2009 | 733 Front St | divide (e) office space (lot 9) into 2 seperate offices with (n) partitions, doors , int,windows. breakroom, fixtures, finishes.Details
divide (e) office space (lot 9) into 2 seperate offices with (n) partitions, doors , int,windows. breakroom, fixtures, finishes. | $117,500 |
| May 6, 2009 | Never finaled issued May 2009, no final | 733 Front St | non structural interior demo to remove e wood flooring, e stone tiles, e acoustic tiles, ceiling grid in area of approx 1000 sf. ti installation under sep permit. work on ground floor onlyDetails
non structural interior demo to remove e wood flooring, e stone tiles, e acoustic tiles, ceiling grid in area of approx 1000 sf. ti installation under sep permit. work on ground floor only | $2,500 |
| Mar 23, 2009 | Completed final sign-off Mar 2009 | 301 Howard St | renew pa# 2006/04/13/8845 to obtain final inspection. all work has been completed.Details
renew pa# 2006/04/13/8845 to obtain final inspection. all work has been completed. | |
| Mar 23, 2009 | Completed final sign-off Mar 2009 | 301 Howard St | renew pa# 2006/01/26/3143 to obtain final inspection. all work has been completed.Details
renew pa# 2006/01/26/3143 to obtain final inspection. all work has been completed. | |
| Feb 3, 2009 | Completed final sign-off Mar 2009 | 580 California St | revision to 200808280235, changes and reduction to mechanical plansDetails
revision to 200808280235, changes and reduction to mechanical plans | $500 |
| Aug 28, 2008 | Completed final sign-off Mar 2009 | 580 California St | new quick service soup restaurant on ground floor-architectural and mep on this permit.Details
new quick service soup restaurant on ground floor-architectural and mep on this permit. | $110,000 |
| Jul 15, 2008 | Completed final sign-off Jul 2008 | 373 Broadway | 1st floor - renew expired permit 200709102183 for final inspection.Details
1st floor - renew expired permit 200709102183 for final inspection. | |
| Mar 6, 2007 | Expired or cancelled expired Jul 2010 | 2000 Union St | interior tenant improvement. work includes (n) partitions, (n) lighting, (n) ducting & equipment, (n) kitchen, (n) finishes, (n) casework. no change of use. exterior work approved under pa#2006/10/20/5631. structural upgrade under pa#2007/01/22/2259.Details
interior tenant improvement. work includes (n) partitions, (n) lighting, (n) ducting & equipment, (n) kitchen, (n) finishes, (n) casework. no change of use. exterior work approved under pa#2006/10/20/5631. structural upgrade under pa#2007/01/22/2259. | $695,000 |
| Oct 31, 2006 | Completed final sign-off Feb 2007 | 1 California St | change of use-734 sq ft interior t.i. remodel, non structural, no seating. sf soup company, ground floor level. health approved plans are included.Details
change of use-734 sq ft interior t.i. remodel, non structural, no seating. sf soup company, ground floor level. health approved plans are included. | $120,000 |
| Nov 14, 2005 | Completed final sign-off Jan 2006 | 2100 Union St | non-structural interior modifications to existing retail store, demolition of non bearing partitions, new lighting and finishes.Details
non-structural interior modifications to existing retail store, demolition of non bearing partitions, new lighting and finishes. | $80,000 |
| Jul 5, 2005 | Expired or cancelled expired Jun 2010 | 1638 Post St | revision to pa #200410298068Details
revision to pa #200410298068 | $5,000 |
| Dec 20, 2004 | Completed final sign-off Apr 2005 | 50 Fremont St | #120- com'l interior t.i.,new door,new light fixtures,route ductwork to adjacent space.install hood,Details
#120- com'l interior t.i.,new door,new light fixtures,route ductwork to adjacent space.install hood, | $120,000 |
| Jun 14, 2004 | Completed final sign-off Nov 2004 | 2340 Polk St | interior tenant imrovement/non structural to extg retail spaceDetails
interior tenant imrovement/non structural to extg retail space | $110,000 |
| Nov 28, 2001 | Expired or cancelled expired Sep 2002 | 350 California St | rev to 200109198659 (first flr birley space)Details
rev to 200109198659 (first flr birley space) | $15,300 |
| May 11, 2001 | Expired or cancelled expired Sep 2001 | 165 Steuart St | addendum to pa#2001/05/04/8458Details
addendum to pa#2001/05/04/8458 | $400 |
| May 4, 2001 | Expired or cancelled expired Nov 2003 | 165 Steuart St | remove (e) "harry denton" signs & awnings; patch & repair (e) plaster, replace (e) storefront & doorDetails
remove (e) "harry denton" signs & awnings; patch & repair (e) plaster, replace (e) storefront & door | $8,000 |
| May 1, 2001 | Completed final sign-off Jun 2001 | 1 Market St | interior ti of restaurant incl (n)finishes,(n)partitions,(n)casework & (n)eqptDetails
interior ti of restaurant incl (n)finishes,(n)partitions,(n)casework & (n)eqpt | $55,000 |
| Apr 11, 2001 | Completed final sign-off Apr 2001 | 3583 16th St | submit 'as build' mechanical plan to contain minor change to original appl#200008016655Details
submit 'as build' mechanical plan to contain minor change to original appl#200008016655 | |
| Apr 3, 2001 | Completed final sign-off Apr 2001 | 3583 16th St | renew permit app#200004137210,200005180368,200005220652,200005301280 for final inspectionDetails
renew permit app#200004137210,200005180368,200005220652,200005301280 for final inspection |