Block 3708, lot 095
560 Mission St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress | 560 Mission St | partial interior ti on 6th fl elevator lobby area. installation of (n) non-structural partitions & glazing to enclose the lobby area & core rooms. (n) plumbing fixtures & restroom finishes, lighting & ceiling upgrades. partial floor finish replacement. addition of (n) millwork. | $250,000 | |
| Aug 31, 2026 | In progress | 560 Mission St | interior ti. on portion of 7th floor, including modifications to (e) tenant space including open office areas, breakroom, powder room, conference rooms, as well as new ceiling and light fixtures and mep system in areas throught the floor. | $1,700,000 | |
| Aug 31, 2026 | In progress | 560 Mission St | interior ti on portion of 6th fl: proposed modifications to (e) tenant space including open office area, conference rooms, breakroom, powder room, meeting rooms as well as installation of ceiling & light fixtures & mep systems. | $2,200,000 | |
| Aug 18, 2026 | In progress | 560 Mission St | Bcci Construction Company | 24th floor: mechanical and electrical revision to permits #202605097160 and #202604068938 | |
| Aug 4, 2026 | In progress | 560 Mission St | Bcci Construction Company | 5th fl - mep revision to pa 202603057034 & 202604209713 | |
| Aug 3, 2026 | In progress | 560 Mission St | Bcci Construction Company | 3rd fl/ mep revision to bpa 2026-0225-6475. | |
| Jul 15, 2026 | In progress | 560 Mission St | Bcci Construction Company | 5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated. | |
| Jul 15, 2026 | In progress | 560 Mission St | Bcci Construction Company | 3rd fl revision to 202602256475. existing toilet and associated accessories in the ada stall will be relocated | |
| Jul 1, 2026 | In progress | 560 Mission St | Bcci Construction Company | 4th fl mep plan to support approved arch 202605141273. new ducts, mech equipment, lighting and power | $1,615,500 |
| Jun 26, 2026 | In progress | 560 Mission St | revision to #202501027602- adding push button at restroom ada stall partition door | $1,500 | |
| Jun 3, 2026 | In progress | 560 Mission St | Bcci Construction Company | 4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures. | $250,000 |
| May 14, 2026 | In progress | 560 Mission St | Bcci Construction Company | 4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred. | $4,250,000 |
| May 8, 2026 | In progress | 560 Mission St | Powell's Environmental Graphics Llc | electric blade sign: parking | $4,500 |
| May 8, 2026 | In progress | 560 Mission St | Powell's Environmental Graphics Llc | evac maps for the basement, 1st and 2nd floors | $1,000 |
| Apr 20, 2026 | In progress | 560 Mission St | Acosta And Sons Inc | 5/fl-ref ti 202603057034- (n) mep | $1,628,100 |
| Apr 6, 2026 | In progress | 560 Mission St | Bcci Construction Company | 24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160 | $1,400,000 |
| Apr 3, 2026 | In progress | 560 Mission St | Redwood Electric Group Inc | provision and installation of 4 shield 30 sroiv remote call stations on 8th fl lowrise and midrise elevator lobbies, 21st fl high rise elevator lobby and 29th fl high rise elevator lobby. provision and installation of 3 sisov isolator module at 8th fl,21st fl, 29th fl. riser closet, connect new | $30,000 |
| Mar 27, 2026 | In progress | 560 Mission St | Bcci Construction Company | 21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345 | |
| Mar 27, 2026 | In progress | 560 Mission St | Bcci Construction Company | 29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271 | |
| Mar 27, 2026 | In progress | 560 Mission St | Bcci Construction Company | 8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716 | |
| Mar 19, 2026 | In progress | 560 Mission St | Bcci Construction Company | 3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor. | $500,000 |
| Mar 10, 2026 | In progress | 560 Mission St | Signtech Electrical Advertising Inc. | install 3 illuminated single faced wall sign "jp morgan chase" 32" x 229" | $21,000 |
| Mar 9, 2026 | In progress | 560 Mission St | Bcci Construction Company | 24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred. | $4,250,000 |
| Mar 5, 2026 | In progress | 560 Mission St | Bcci Construction Company | 5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferred | $4,250,000 |
| Feb 25, 2026 | In progress | 560 Mission St | Bcci Construction Company | 3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferred | $4,250,000 |
| Feb 18, 2026 | In progress | 560 Mission St | install (1) illuminated single faced wall sign: "jpmorgan chase" 19'x2' | $15,000 | |
| Feb 9, 2026 | In progress | 560 Mission St | Bcci Construction Company | 8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air. | $75,000 |
| Feb 3, 2026 | In progress | 560 Mission St | Gci, Inc | rev to pa# 202501027602, ti interior common areas within (e) 31-story business occupancy bldg. revision notated as bulletins d & e, due to (e) field conditions & rfi/submittal responses narrative included itemizing changes in detail. ref pa# 202507100540, 202507150838 & 202509195753. | $50,000 |
| Jan 21, 2026 | In progress | 560 Mission St | Bcci Construction Company | 8th floor- revision to include new partitions & door hardware. ref. pa#202507140716 | $50,000 |
| Jan 6, 2026 | In progress | 560 Mission St | Golden Gate Fire Protection Inc | fire sprinkler t.i.: relocate 160 concealed pendents on the 8th floor, relocate 160 concealed pendents on the 21st floor, and relocate 143 concealed pendents on the 29th floor. ref t.i. pa# 202507291872 (8th fl), #202509266212 (21st fl), #202509296303 (29th fl). | $115,750 |
| Jan 5, 2026 | Completed | 560 Mission St | Pioneer Fire Inc. | 2/fl- relocate (155) pendents due to (n) ceiling and wall configuration | $38,750 |
| Dec 18, 2025 | In progress | 560 Mission St | Bcci Construction Company | 4th floor: convert (e) storage room and portion of (e) server room to be new main equipment room/ups and pre action closet. | $459,800 |
| Oct 23, 2025 | In progress | 560 Mission St | Gci, Inc | revision to 202501027602.smoke control zones to combine 1st & 2nd floors due to new opening @ 2nd fl level.updates to fsd schedule due to field verified information.added smoke control matrices. | |
| Sep 29, 2025 | In progress | 560 Mission St | Bcci Construction Company | 29th floor: mep only permit. new ducts, heat and air lighting, power and plumbing. ref pa #202507211271 | $1,240,800 |
| Sep 26, 2025 | In progress | 560 Mission St | Bcci Construction Company | 21st fl ref pa# 202507221345: mep only. new ducts, heat, air, lighting, power & plumbing. | $1,404,750 |
| Sep 3, 2025 | Completed | 560 Mission St | Pioneer Fire Inc. | lobby ref pa # 2025-0102-7602: relocate 88 pendents, convert 9 pendents, add 2 pendents, 14 uprights, demo 2 pendents. | $28,250 |
| Aug 21, 2025 | Completed | 560 Mission St | Skyline Construction | 12th fl- revision to pa # 2024-0926-1731. general note and call out for signage and accessibility of phone pods. | |
| Jul 29, 2025 | In progress | 560 Mission St | Bcci Construction Company | 8th fl - mep to support approved architectural. new ducts, lighting & plumbing. ref 202507140716 | $550,000 |
| Jul 23, 2025 | In progress | 560 Mission St | Golden Gate Fire Protection Inc | 3/f: relocate (17) pendent sprinklers on the 3rd floor. ti ref# 202504255235 | $4,200 |
| Jul 22, 2025 | In progress | 560 Mission St | Bcci Construction Company | 21st/floor: architectural and structural for office build out. new partitions offices and conference rooms. mep deferred | $5,000,000 |
| Jul 21, 2025 | In progress | 560 Mission St | Bcci Construction Company | 29th floor: architectural and structural for office build out. new partitions, offices, and conference rooms. mep deferred. | $5,000,000 |
| Jul 15, 2025 | In progress | 560 Mission St | Gci, Inc | revision to permit 202501027602. completed structural details for stone veneer attachment at ground floor level. | |
| Jul 14, 2025 | In progress | 560 Mission St | Bcci Construction Company | 8th/f: ti to include new offices, conference rooms, breakroom area and restrooms.mep deferred. | $4,250,000 |
| Jul 10, 2025 | In progress | 560 Mission St | Gci, Inc | revision to pa #2025-0102-7602 to document various field/construction changes, general detailing and clarification per rfi responses at ground floor cafe, back of house area and 2nd level. | $14,000 |
| Jul 1, 2025 | Completed | 560 Mission St | Redwood Electric Group Inc | modifications to the 3rd fl. fire alarm system as required by re additon of a copy/mail room, relocate (3) existing ceiling speaker strobe, removal of (1) existing ceiling speaker strobe ref pa# 2025-0425-5235 | $5,000 |
| Jun 13, 2025 | In progress | 560 Mission St | Redwood Electric Group Inc | mods to (e) fire alram life safety system as required by bldg elevator upgrades & removal of sprinkler heads from elevator control rooms. lvl b2,10,11,22 & roof lvl where elevator mech/control rooms are located. only heat detectoors for low, mid & high rise elevator will be removed after upgrades | $30,000 |
| Apr 25, 2025 | Completed | 560 Mission St | Bcci Construction Company | 3rd fl- arch and mep for construction of temp print and mail room | $60,000 |
| Apr 24, 2025 | Completed | 560 Mission St | Bcci Construction Company | levels 8, 21, 29 - interior floor demo only. per ab-017 | $70,000 |
| Apr 10, 2025 | Expired or cancelled | 560 Mission St | 1/fl- interior non structural demo to include removal of floor wall and ceiling finishes as indicated. interior partitions and door and lighting and fixtures floor boxes | $5,000 | |
| Mar 20, 2025 | Completed | 560 Mission St | R L H Fire Protection Inc | fl/10, 11, 22, and roof: fire sprinkler permit. remove all sprinklers and piping from the elevator machine rooms add one upright sprinkler on the 11th floor. | $7,000 |
| Jan 30, 2025 | In progress | 560 Mission St | Redwood Electric Group Inc | 12/fl- ref 202410253716 and 202501218669 as built fire alarm | |
| Jan 21, 2025 | In progress | 560 Mission St | Redwood Electric Group Inc | fire alarm as builts ref 202410253716 | |
| Jan 17, 2025 | In progress | 560 Mission St | Gci, Inc | basement parking garage includes new finishes and lighting at elevator lobby and entry area.g/f: new cafe area, new seating areas throughout, new restrooms and phone rooms, new entry doors and new finishes throughout. 2/f: new seating areas, new training room, new gym area with lockers and showers | $15,000,000 |
| Nov 7, 2024 | Completed | 560 Mission St | Golden Gate Fire Protection Inc | 12/fl-ref 202409261731- relocate 15 pendents sprinklers | $3,250 |
| Oct 25, 2024 | Completed | 560 Mission St | Redwood Electric Group Inc | 12th fl - modifications to fire alarm system as required by ti. relocate 4 (e) ceiling speaker strobes. relocate (5) existing smoke detectors. remove (4) existing smoke detectors. remove (1) existing speaker strobe. remove (1) existing ceiling speaker. re-program fire alarm system for removal of | $10,000 |
| Oct 10, 2024 | Completed | 560 Mission St | Skyline Construction | mep work for office ti of approx 2945 sq ft, 12th fl. duct distribution, lighting, power signal. prev apprvd 202409261731 | $150,000 |
| Sep 26, 2024 | Completed | 560 Mission St | Skyline Construction | 12th fl- office ti work of approx 2945 sq ft remove non structural partitions and create large conference room | $650,000 |
| Sep 26, 2024 | Completed | 560 Mission St | Redwood Electric Group Inc | 9th fl - removal of 2 (e) smoke detectors as needed ti; relocation of 3 (e) smoke detectors as needed by ti. reprogram fire alarm system for the removal of 2 smoke detectors. pre test & test floor fire alarm system | $8,500 |
| Aug 22, 2024 | Completed | 560 Mission St | Pioneer Fire Inc. | 9/f: relocate (4) pendent sprinklers. gc ti# 202407156446 | $1,000 |
| Jul 25, 2024 | In progress | 560 Mission St | Redwood Electric Group Inc | 12/f: provision and installation of a notifier frm-1 addressable for override of the visiplex emergency system covering the 12/f and 13/f. program (e) fire alarm system to override the visiplex system during a fire alarm event. voluntary upgrade. | $450 |
| Jul 18, 2024 | In progress | 560 Mission St | Redwood Electric Group Inc | 11th fl. fire alarm as built drawing to reference pa# 2024-0418-0199 | |
| Jul 15, 2024 | Completed | 560 Mission St | Novo Construction Inc | 9th floor: t.i. to include construction of 4 offices with new finishes, non-bearing partitions, ceiling and lighting. mechanical and electrical included. | $80,000 |
| May 8, 2024 | In progress | 560 Mission St | Redwood Electric Group Inc | provision of additonal area smoke detector covage as required by the romoval of stairs between floor 11 and floor 12 located on the west side of passanger elevator lobby reprogramming of 11th fl. fire smoke dumper sequence of operation as required by removal of stairs between 11th & 12the fl. | $10,000 |
| Apr 18, 2024 | In progress | 560 Mission St | Skyline Construction | 16th floor: structural detail for installation of operable partition at welcome zone/flex zone. ref pa#202309186839 | $5,000 |
| Apr 16, 2024 | Completed | 560 Mission St | Redwood Electric Group Inc | 16th fl - ref pa 202309186839 modifications to the existing fire alarm/voice evacuation system as needed by ti to the west side of the floor. program existing fire alarm system to accomodate for new fire alarm devices | $13,000 |
| Mar 22, 2024 | Completed | 560 Mission St | Golden Gate Fire Protection Inc | 11th floor:relocate 2 pendent sprinklers at the stair infill t.i. ref#202312152617 | $1,300 |
| Mar 7, 2024 | Completed | 560 Mission St | Pribuss Engineering Inc | modify (15) sprinkler heads layout to accommodate new walls and ceiling layout | $3,000 |
| Mar 5, 2024 | Completed | 560 Mission St | Skyline Construction | ref pa# 202312152617 deferred mep install air distribution system with ductwork & lighting | $80,000 |
| Feb 7, 2024 | In progress | 560 Mission St | Turner Construction Co | revision to permit # 2021-0922-8950. removed four existing perimeter offices and library to create nine new offices. | $200,000 |
| Feb 1, 2024 | Completed | 560 Mission St | Anderson, Rowe & Buckley, Inc. | 27th floor:extg fire sprinkler system t.i. relocate 9 pendent sprinkers. ref pa#202308285394 | $6,000 |
| Dec 15, 2023 | Completed | 560 Mission St | Skyline Construction | removal of interconnecting stairway from 11th to 12th floor, infilling slab and installation of finishes. | $146,160 |
| Sep 18, 2023 | In progress | 560 Mission St | Skyline Construction | 16th floor office ti - no structural work. | $506,000 |
| Aug 28, 2023 | In progress | 560 Mission St | Turner Construction Co | 27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work | $115,000 |
| Jul 20, 2023 | Expired or cancelled | 560 Mission St | Gci, Inc | 19/f: demo (e) millwork/finishes, install new millwork/finishes, new door hardware on (e) doors, new mechnical, electrical & plumbing | $190,000 |
| Apr 28, 2023 | Expired or cancelled | 560 Mission St | Redwood Electric Group Inc | alarm voluntary upgrade. provision and install of 1 new frm 1 addressable relay for override of card reader security system during an alarm event on level b1 | $2,000 |
| Feb 14, 2023 | Never finaled | 560 Mission St | Worldwide Electrical Signs | install 4 evac maps on 2nd fl | $2,000 |
| Feb 6, 2023 | Completed | 560 Mission St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system tenant improvments new ev charging area-85 sprinklers | $37,240 |
| Dec 2, 2022 | Completed | 560 Mission St | barrier removal on (e) parking garage in basement level b1; scope of work is limited to 1 accessible evcs. no structural work, no change of use, occupancy or means of egress. fire alarm/sprinklers under separate permits, if applicable. tenant parking only | $5,000 | |
| Nov 17, 2022 | Completed | 560 Mission St | Redwood Electric Group Inc | 2 way communication as-builts drawing for 6th fl. ref pa# 2022-1011-4037 | |
| Oct 19, 2022 | Completed | 560 Mission St | Novo Construction Inc | revision to pa 202010196859 to modify accessible restroom stall at mens and womens restroom. ref 202010196859. | |
| Oct 11, 2022 | Completed | 560 Mission St | Redwood Electric Group Inc | 6th fl - provide and install additional 2-way communication device as needed by tenant improvement on the 6th fl. 2 way scope of work includes the provision and installtion of 1 shield 30, sr 01v call box, 1 shield 30 srbb back box. ref 202009033381. | $10,000 |
| Sep 26, 2022 | Completed | 560 Mission St | Golden Gate Fire Protection Inc | fire sprinklers ti relocate 187 pendent sprinklers on the 19th floor. ref ti 202206106065. | $98,175 |
| Sep 15, 2022 | Completed | 560 Mission St | Redwood Electric Group Inc | 19th fl. design & install: (14) ceiling smoke detectors - 7272-0028:0503, (2) addressable relay modules - 7300-0028:0219, (40) ceiling speaker strobes - 7320-1653:0505, (2) ceiling speakers - 7320-1653:0505. | $68,285 |
| Jul 22, 2022 | Completed | 560 Mission St | Gci, Inc | 19/f: accessibility upgtrades in the (e) restrooms, new finishes, ceiling and lighting fixtures. new door frames and hardware at (e0 elevator lobby and coridors in the tenant suite. | $300,000 |
| Jun 30, 2022 | Completed | 560 Mission St | Novo Construction Inc | 10/f: revision to pa# 202010196859 & 202105261097. to update smoke control report and non-infrigement statements. provide new smoke detectors. | |
| Jun 14, 2022 | Never finaled | 560 Mission St | Maguire Inc Dba Lahue And Associates | 23rd fl - evacuation signs | $1,690 |
| Jun 10, 2022 | Completed | 560 Mission St | Gci, Inc | 19th flr: includes the construction of non structural partitions, millwork, finishes, celing tiles and grids, light fixtures and acessibilty upgrades at restrooms. | $2,750,000 |
| Jun 2, 2022 | Completed | 560 Mission St | Redwood Electric Group Inc | 10th fl: design + install: 3 notifier fsp-951 ceiling smoke detectors with b300-6 bases (7272-0028:0503). 1 notifier frm-1 relay module (7300-0028:0219). | $8,000 |
| Feb 10, 2022 | Completed | 560 Mission St | Redwood Electric Group Inc | 19/f: remove & relocate: 8 fire alarm system sensor wall speaker -strobes (spswl) -7320-1653: 0505 associated with demo pa202110150548 | $9,000 |
| Feb 10, 2022 | Never finaled | 560 Mission St | Maguire Inc Dba Lahue And Associates | 20/f: evacuation plans. | $1,000 |
| Feb 9, 2022 | Never finaled | 560 Mission St | Clune Construction Company L P | 23/f-revision to pa# 202105039686 & 202109299498. revision includes removal of door 0012b, adding door 0012a, updates to partition fire ratings per field verified existing conditions. scope to remove priviously approved door add 90 min door to mech room | |
| Jan 6, 2022 | Completed | 560 Mission St | Redwood Electric Group Inc | 27th fl: design & install 28 notifier fsp/951 ceiling smoke detectors with b300-6 bases (1212-0025:0503). 19 system sensor spscwl ceiling speaker/strobes (7320-1653:0505). 1 notifier frm-1 relay modules (7300-0028:0219). | $22,500 |
| Dec 14, 2021 | Completed | 560 Mission St | Anderson, Rowe & Buckley, Inc. | 19/f: demo permit, change out 149penents to uprights. | $32,000 |
| Dec 2, 2021 | Completed | 560 Mission St | Anderson, Rowe & Buckley, Inc. | 27th flr - t.i. to (e) fire sprinkler system . add 1 sprinkler head, relocate 71 pendents. ref. permit 202109228950 | $22,000 |
| Nov 29, 2021 | Completed | 560 Mission St | Emcor Services/Mesa Energy Systems Inc | basement: remove and replace 1 extg chiller and 2 extg pumps with 1 new high effeciency chiller and 2 new pumps. use extg electrical. extend equipment pad. | $240,000 |
| Nov 9, 2021 | Completed | 560 Mission St | Pribuss Engineering Inc | fire sprinkler t.i. relocate 101 hds, add 5 hds, total 106 hds. intall 2 new fire hose value cabinets, ref 2021 0503 9686 | $54,484 |
| Oct 29, 2021 | Completed | 560 Mission St | Paradigm General Contractors | interior tenant improvements to part of 25th fl office space. new partitions, doors, ceilings | $162,000 |
| Oct 21, 2021 | Completed | 560 Mission St | Redwood Electric Group Inc | suite 600: fire only for ref. pa 202108096026. install 97 notifier fsp/951 ceiling smoke detectors, 1 notifier frm-1 relay module, 1 system sensor scwl ceiling strobe, 2 system sensor spswl wall speaker/strobes, 18 system sensor spscwl ceiling speaker/strobes. | $60,000 |
| Oct 15, 2021 | Completed | 560 Mission St | Turner Construction Co | 19/f: demolition of non structural partitions, doors, ceilings, lighting millwork and finishes. limited construction of temporary light fixtures. no change in occupancy/use. mep, sprinkler and life safety under separate permit. - sprinkler permit for demo/ceiling removal: 202112144336 | $117,746 |
| Oct 14, 2021 | Completed | 560 Mission St | Golden Gate Fire Protection Inc | 6/f: fire sprinklers, relocate 65 pendent sprinklers. ti ref. pa 202108096026. | $13,000 |
| Oct 6, 2021 | Completed | 560 Mission St | Pribuss Engineering Inc | 20th fl - modify fire sprinklers for ti office space (relocate 141 heads, add 7 heads = total 148 heads) & demo (e) fire hose valve cabinets & secondary floor control riser. ref pa 2021-0610-2112 | $74,000 |
| Sep 29, 2021 | Never finaled | 560 Mission St | Clune Construction Company L P | 23rd floor:revision to app#202105039686. revisions include micro kitchen layout, added 3 compartment sink and mop sink, minor updates to door and hardware schedules; wall floor and ceiling finishes, millwork,lighting and associated mep. | |
| Sep 23, 2021 | Never finaled | 560 Mission St | Redwood Electric Group Inc | 23/f: fire alarm: replace 36 ceiling smoke detec;1 heat detect; 7 duct smoke detect; 3 ceiling strobes,3 wall speakers strobes; 24 ceiling speaker strobes; 13 relay mods - 88 total devices. | $47,600 |
| Sep 23, 2021 | Completed | 560 Mission St | Redwood Electric Group Inc | 20/f: fire alarm: replace 59 ceiling smoke detec; 4 ceiling strobes; 8 wall strobes, 2 wall speaker/strobes; 28 ceiling speaker strobes; 2 relay mods - 103 total devices. maher n/a. | $55,300 |
| Sep 22, 2021 | Never finaled | 560 Mission St | Turner Construction Co | ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep. | $1,500,000 |
| Aug 9, 2021 | Completed | 560 Mission St | Clune Construction Company L P | ste 600: furniture relocation & minor work on finishes. demo of non-structural partitions & celings. mech: demo ductwork, cap duct, relocate linear diffuser,relocate fan power box. elect: power, data/signal. | $2,000,000 |
| Jun 10, 2021 | Completed | 560 Mission St | Clune Construction Company L P | interior tenant demo & improvement of (e) office space, new partitons, ceilings, restrooms, ducts. fire alarm and sprinkler under sep permits. | $2,511,150 |
| May 26, 2021 | Completed | 560 Mission St | Novo Construction Inc | mech look for t.i. on the 10th floor. addition of two(2) new fan powered boxes. ref arch pa# 202010196859. | $5,000 |
| May 3, 2021 | Never finaled | 560 Mission St | Clune Construction Company L P | t.i. to 18,026 sqft alterations include non-struc partitions, finishes, furniture+equipment+associated m.e.p. & smoke control system revisions, , 2-hr horizontal exit, 2-hr fire barrier, 2 zone smoke control. struc work to av supports+header for 3 large openings. expand micro kitchen for food prep. | $2,345,801 |
| Jan 26, 2021 | Completed | 560 Mission St | Redwood Electric Group Inc | provide & install additional 2 way communication device as need by the tenant improvement on the 9th fl. 9th fl. 2 way scope of work includes the provision & installation of: (1) shield 30 - srols - call box (1) shield 30 - srbb - back box | $15,000 |
| Nov 18, 2020 | Never finaled | 560 Mission St | Redwood Electric Group Inc | as-builts drawing to a 2-way communication system permit #2020-0903-3381. this is only for the 11th, 12th 13th floors only. we will be pulling another for the 9th, 30th, 31st at a later time. | |
| Nov 4, 2020 | Never finaled | 560 Mission St | Redwood Electric Group Inc | fire alarm as-built. re: permit #2019-1008-3990. | |
| Oct 19, 2020 | Completed | 560 Mission St | Novo Construction Inc | 10/f: t.i. to demise floor for sublease. selective demo, new partitions, ceiling and finishes. mep included. maher n/a | $420,000 |
| Sep 3, 2020 | Completed | 560 Mission St | Redwood Electric Group Inc | 9, 11th,12th,13th 30, 31 fl: install 2-way communication system backbone + call stations | $57,000 |
| Dec 12, 2019 | Expired or cancelled | 560 Mission St | interior tenant improvement of existing office space, new partitions, ceilings, restrooms | $2,431,000 | |
| Oct 23, 2019 | Expired or cancelled | 560 Mission St | interior demo of non-structural partitions, ceilings, light fixtures, & finishes, selective mep. per ab-017. no plumbing fixtures being removed | $10,000 | |
| Oct 22, 2019 | Never finaled | 560 Mission St | Clune Construction Company L P | revision to pa 201902273940 for rooms 31-043 & 31-044 of suite 3100 to be designated as training rooms w/ complete exit analysis | |
| Oct 8, 2019 | Never finaled | 560 Mission St | Redwood Electric Group Inc | 31st fl - insstall 19 wall speaker strobes; 8 ceiling speaker strobes; 3 wall strobes, 2 dnr duct smoke detectors; 2 addressable relays - 34 devices total | $22,100 |
| Oct 1, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | 29/f: install 6 wall mount speaker strobes spswl - system sensor 7320-1653:0505 3 ceiling mount speaker strobe spscwl - system sensor 7320-1653:0505 | $6,000 |
| Sep 25, 2019 | Completed | 560 Mission St | Hitt Contracting Inc. | ste #2100: 21/f: replace glass, carpet, and millwork architectural finishes. limited demolition of extg door and wall between office suites. n/a for maher | $94,500 |
| Sep 11, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | 22/f: fire alarm as built to 201907115581 add sequence of operation for idf room. | |
| Aug 28, 2019 | Completed | 560 Mission St | Maguire Inc Dba Lahue And Associates | 22nd fl - 4 evacuation signs | $1,690 |
| Aug 9, 2019 | Never finaled | 560 Mission St | Clune Construction Company L P | suite 3100 - revision to 201902273940 the structural scope of work is limited to provide support steel for a leaf wall on 31st floor | |
| Jul 12, 2019 | Never finaled | 560 Mission St | Golden Gate Fire Protection Inc | fire sprinkler only for ti office | $75,500 |
| Jul 11, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | f/a on 22nd fl: 57 fsp-951 smoke detector-ceiling mounted (7272-0028:0503), 3 frm-1 relay modules (7300-0028:0219), 3 scwl strobe-ceiling mounted (7125-1653:0504), 38 spswl speaker/strobes-ceiling mounted (7320-1653:0505). | $60,000 |
| Jul 11, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | f/a on 30th fl: install of 21 spswl wall speaker-strobes (7320-1653:0505), 4 spscwl ceiling speaker-strobes (7320-1653:0505), 5 swl strobes-wall (7125-1653:0504). all devices are system sensor. | $18,000 |
| Jul 11, 2019 | Completed | 560 Mission St | R M I Mechanical Contractors | new ceiling supply diffusers, new return air grilles, relocate thormostats, new ductwork, & insulation, a d air balance | $40,000 |
| Jul 8, 2019 | Completed | 560 Mission St | Anderson, Rowe & Buckley, Inc. | scope of fire sprinkler work includes 145 relocates and 17 added fire sprinklers. arch 201906042380 | $48,715 |
| Jun 4, 2019 | Completed | 560 Mission St | Clune Construction Company L P | 22/f: rev to pa201809049073 to general partition layout and passenger elevator exiting. maher n/a. | $1,000 |
| May 8, 2019 | Expired or cancelled | 560 Mission St | revision to bpa #201809049073 to revise work related to electrical u.p.s riser. 22nd fl. | $1,000 | |
| May 8, 2019 | Expired or cancelled | 560 Mission St | revision to bpa #201809049073 to revise exitin from passenger elevator lobby. 22nd fl. | $1,000 | |
| Apr 26, 2019 | Completed | 560 Mission St | Red Hawk Fire & Security Ca Llc | 21/f: as-built plans showing modification to permitted plans due to field conditions. ref pa#201903266197 | |
| Apr 25, 2019 | Never finaled | 560 Mission St | Maguire Inc Dba Lahue And Associates | 18thflr - evac maps | $1,266 |
| Apr 24, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | 21st floor: install 3 system sensor swl wall mount strobes, 9 system sensor spswl wall mount speaker/strobes. 1 system sensor spscwl ceiling mount speaker/strobe. | $7,800 |
| Apr 24, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | 18th floor: as builts to fa pa # 2019-0228-3985. | |
| Mar 26, 2019 | Completed | 560 Mission St | Red Hawk Fire & Security Ca Llc | 21st flr. modify (e) automatic fire sprinklers to accomodate new remodel | $4,000 |
| Mar 22, 2019 | Completed | 560 Mission St | Dome Construction Corp | 21st fl - ti and renovation in suite 2150. demo & construction of non-structural partitions, door, light fixtures, millwork and finishes. no chanes i noccupancy/use, mep, sprinkler; life safety under permit | $352,685 |
| Feb 28, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | install fire alarm - 42 ceiling smk det w/base, 2 relay modules, 40 ceiling speakers-strobes. maher na | $26,000 |
| Feb 27, 2019 | Never finaled | 560 Mission St | Clune Construction Company L P | 31st flr interior renovation for in-place tenant. full floor ti suite 3100. | $1,500,000 |
| Feb 25, 2019 | Never finaled | 560 Mission St | Clune Construction Company L P | interior renovation for in place tenant, partial tenant floor of 29th fl. and full fl. tenant of 30th fl. to include mep | $1,400,000 |
| Feb 20, 2019 | Completed | 560 Mission St | Paradigm General Contractors | revision to pa #201710060628. relocation of the women's accessible toilet fixture and accesories to the opposite side of the stall. | $30,500 |
| Feb 8, 2019 | Completed | 560 Mission St | Red Hawk Fire & Security Ca Llc | install new flex drop sprinklers due to ti ref 201812057511 104 flexible drops | $17,000 |
| Feb 8, 2019 | Completed | 560 Mission St | Red Hawk Fire & Security Ca Llc | install new flexible drops in corridors and replace add uprights in portion of floor to return to market ready bldg permit # 201812057522 1 flexible drop/46-ssu | $9,100 |
| Jan 3, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | 26th flr - fire alarm - 22 wall mount strobes, 2 wall mount speaker strobes, 29 ceiling mount speaker strobes, 90 smke det. 4 relay modules maher na | $30,000 |
| Jan 3, 2019 | Completed | 560 Mission St | Redwood Electric Group Inc | 25th flr - fire alarm - 18 wall mount strobes, 2 wall mount speaker strobes, 28 ceiling mount speaker strobes, 68 smke det. 4 relay modules maher na | $30,000 |
| Dec 27, 2018 | Never finaled | 560 Mission St | Redwood Electric Group Inc | install 5 fire alarm speaker strobes wall mount ref# 201809140149 | $5,000 |
| Dec 20, 2018 | Never finaled | 560 Mission St | Golden Gate Fire Protection Inc | 2nd fl - fire srpinklers; relocate 23 upright sprinklers. relocate 7 pendent sprinklers. ref pa 2018-0914-0149 | $15,750 |
| Dec 17, 2018 | Never finaled | 560 Mission St | Skyline Construction | ref arch 201809140149; mechanical work for t.i. at suite 230. addition of low pressure ductwork and new diffusers. | $5,000 |
| Dec 6, 2018 | Completed | 560 Mission St | Maguire Inc Dba Lahue And Associates | 11th flr - evac signs | $1,600 |
| Dec 5, 2018 | Completed | 560 Mission St | Dome Construction Corp | 18th floor: addition of a new corridor and demising walls to split a extg full floor tenant into half including work to the elevator lobby & upgrades to the restrooms as needed. this includes demolition & construction of non structural partitions, door, light fixtures, millwork & finishes, mep, | $124,800 |
| Dec 5, 2018 | Completed | 560 Mission St | Dome Construction Corp | ti of a suite level 18 inside an existing shell/core 31-level office bldg, to include associated architectural, mechanical, electrical, and plumbing. | $1,166,900 |
| Dec 4, 2018 | Completed | 560 Mission St | Skender Construction Llc | 26th floor: revision to app#201804136286. revise exiting from elevator lobby. n/a for maher | |
| Dec 4, 2018 | Completed | 560 Mission St | Skender Construction Llc | 25th floor: revision to app#201804136280. revise exiting from elevator lobby. n/a for maher | |
| Dec 4, 2018 | Completed | 560 Mission St | Maguire Inc Dba Lahue And Associates | 25th and 26th floors: 8 evacuation signs. n/a for maher | $3,380 |
| Nov 30, 2018 | Never finaled | 560 Mission St | Redwood Electric Group Inc | 10th fl - fire alarm as builts to ref pa 201811095466 - 2 wall mounts changed to 2 ceiling mount strobes | |
| Nov 30, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | 11th fl - fire alarm as builts to ref pa 201808318848 - change 6 wall mount speaker strobes to 6 ceiling mount speaker strobes. | |
| Nov 27, 2018 | Expired or cancelled | 560 Mission St | Paradigm General Contractors | revision to da checklist for pa #201710060625 | |
| Nov 26, 2018 | Completed | 560 Mission St | Ayoob & Peery Plumbing Co Inc | 10th floor: add 1 and relocate 3 sprinklers to conferm with the new wall /ceiling layout of the t.i. ref app#201705126453 job #18-746 | $1,200 |
| Nov 9, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | 10/f: install 3 fire alarm strobes wall mount maher na, ref pa#201810102738 | $6,000 |
| Nov 2, 2018 | Expired or cancelled | 560 Mission St | 25th flr - revision to 201804136280 redefine requires fire rating of passenger elevator lobby maher na | ||
| Nov 2, 2018 | Expired or cancelled | 560 Mission St | 26th flr - revision to 201804136286redefine requires fire rating of passenger elevator lobby maher na | ||
| Nov 2, 2018 | Completed | 560 Mission St | Paradigm General Contractors | to obtain final inspection for work approved under pa#20161092320 & 201707182208. all work is complete. | |
| Oct 24, 2018 | Never finaled | 560 Mission St | R L H Fire Protection Inc | 26/f: f/s: relocate 135 heads, add 48 and remove/delete 29 pendent sprinklres. relocate 1 upright on the 26/f. ref pa201804136286. maher n/a. | $51,500 |
| Oct 23, 2018 | Completed | 560 Mission St | R L H Fire Protection Inc | ref pa# 201804136280; fire sprinkler permit relocate 151, add 24 and delete 78 pendent sprinklers, relocate 2 and add 1 upright sprinklers on the 25th fl. | $43,000 |
| Oct 10, 2018 | Completed | 560 Mission St | Novo Construction Inc | revision to 201809180597 to revise non infringement statement | |
| Oct 9, 2018 | Completed | 560 Mission St | Golden Gate Fire Protection Inc | 12th flr - fire sprinklers - remove concealed heads out of wood ceiling show curtain around stairs. ref 201807134478 mahe na | $1,000 |
| Oct 2, 2018 | Completed | 560 Mission St | Turner Construction Co | 29/f: title 24 compliance. electrical lighting for pa201709198898. maher n/a. | |
| Oct 2, 2018 | Completed | 560 Mission St | Turner Construction Co | level b1: title 24 compliance. electrical lighting for pa201709198895. maher n/a. | |
| Oct 2, 2018 | Completed | 560 Mission St | Turner Construction Co | 21/f: title 24 compliance. electrical lighting for pa201709198897. maher n/a. | |
| Sep 26, 2018 | Completed | 560 Mission St | Novo Construction Inc | mep tenant improvement. duct distribution to be modified per new space plan and elec work ref 201809180597 | $50,000 |
| Sep 18, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | as builts fire alarm to ref#201807124356. n/a for maher. | |
| Sep 18, 2018 | Completed | 560 Mission St | Novo Construction Inc | 10th flr - ti convert a single tenant floor to a multi tenant. work to include demo, new partiions, ceiling and finishes maher na | $250,000 |
| Sep 14, 2018 | Completed | 560 Mission St | Skyline Construction | tenant improvement and renovations in suite 230. includes demo and construction of non structural paritions, doors, light fixtures, millwork, and finishes. no change in occupancy or use. mep, sprinkler, life safety under separate permit | $233,958 |
| Sep 4, 2018 | Completed | 560 Mission St | Clune Construction Company L P | 22nd floor: removal of interior non structural t.i. new t.i. including new restrooms. n/a for maher | $2,431,000 |
| Aug 31, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | 11th floor -install 1 fire alarm duct smoke detector, 73 fire alarm smoke detectors, 20 fire alarm spekaer strobe ceiling, 11 fire alarm speaker strobe wall, 4 fire alarm strobe ceiling, 1 fire alarm strobe wall, 1 fire alarm relay module ref 201807205049 | $30,000 |
| Aug 3, 2018 | Never finaled | 560 Mission St | Skyline Construction | 11th/12th flr - new stair between 11th & 12th maher na | $150,000 |
| Aug 3, 2018 | Never finaled | 560 Mission St | Skyline Construction | 11/f - mechanical electrical plumbing for to ref 201807205049 maher na 1 new fsd, includes new revised smoke control narrative. | $250,000 |
| Jul 20, 2018 | Never finaled | 560 Mission St | Skyline Construction | ti on the 11th fl to consist of new non-structural partitions, new glazing, doors, floor and finishes. mep & fire life safety under separate permit | $500,000 |
| Jul 20, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | 9/f: as built ref 201805118855 fire alarm | |
| Jul 19, 2018 | Completed | 560 Mission St | Maguire Inc Dba Lahue And Associates | evacuation signs on the 9th fl, 3 signs. maher not req | $1,000 |
| Jul 13, 2018 | Completed | 560 Mission St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 158 pendent sprinklers on the 11th fl. relocate 102 upright sprinklers | $143,000 |
| Jul 12, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | install (4) fire alarm area smoke detector, (4) fire alarm speaker-strobe, (1) fire alarm speaker-strobe, ref pa#201710060625 | $10,000 |
| Jul 5, 2018 | Completed | 560 Mission St | R L H Fire Protection Inc | fire sprinkler for 5th fl: relocate 2 and add 4 pendent sprinklers. ref ti #201710060625. | $3,857 |
| Jul 2, 2018 | Never finaled | 560 Mission St | Skyline Construction | demo of partitions, ceilings, lighting, finishes, doors, frames, hardware & finishes ab017 | $60,000 |
| May 25, 2018 | Completed | 560 Mission St | Skyline Construction | ti and renovations, in suite 2800. demolition & construction of non-structural partitions, doors, millwork and finishes, no changes in occupancy/use. mep, sprinkler, life safety under seperate permit | $260,875 |
| May 14, 2018 | Expired or cancelled | 560 Mission St | 22nd floor: remove non-structural partitions, doors,& frames back to bldg core condition. per ab-017. n/a for maher | $20,000 | |
| May 11, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | f/a on 9th fl: install (36) fire alarm area smoke detectors, (31) fire alarm speaker-strobe, (3) fire alarm strobe. ref #201804035362. maher na | $45,000 |
| May 9, 2018 | Completed | 560 Mission St | R L H Fire Protection Inc | 9th flr - fire sprinkler permit relocate 126 and add 22 pendents, delete 34 pendents. relocate 2 uprights. ref 201804035362. maher na | $38,000 |
| May 3, 2018 | Expired or cancelled | 560 Mission St | 25th fl: remove non-structural partitions, doors & finishes back to building core condition. per ab-017. maher na | $20,000 | |
| May 3, 2018 | Expired or cancelled | 560 Mission St | 26th fl: remove non-structural partitions, doors & finishes back to building core condition. per ab-017. maher na | $20,000 | |
| May 3, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | 13 floor: revision to f/a as built ref app#201804257310. install 5 ceiling speakers. arch ref app#201712065617. n/a ti 201712065617 | |
| May 3, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | 12th floor: revision to f/a as built ref app#201804257307. install 8 ceiling speakers. t.i. ref app#201712065614. n/a for maher | |
| Apr 30, 2018 | Completed | 560 Mission St | Skyline Construction | 9th fl - revision to pa 2018-0403-5362 to update non-infringement statememt | |
| Apr 25, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | as built fire alarm ti for full 13th floor, ref pa 201803022642 and 201801168626. change description for id tag (from door hold release to elevator lobby fsd). n/a for maher. | |
| Apr 25, 2018 | Completed | 560 Mission St | Redwood Electric Group Inc | as builts fire alarm ti for 12th floor, ref 201803022646 and 201801168626, add one monitoring module for epo actuation from preaction system, revise duplicate smoke addresses. n/a for maher. | |
| Apr 23, 2018 | Completed | 560 Mission St | Paradigm General Contractors | revision to 201707182208 to add exit corridor off corridor and pantry | $5,000 |
| Apr 18, 2018 | Completed | 560 Mission St | Skyline Construction | mechanical, electrical & plumbing for tenant improvement on the 9th fl ref 201804035362 maher not req | $850,000 |
| Apr 13, 2018 | Completed | 560 Mission St | Skender Construction Llc | 25th fl full floor tenant improvement. amep included, 1-hr idf rooms, demo to elevator lobby doors. new controll egress and two fire smoke dampers. sprinklers, two communication and fire alarm separate permits. | $2,462,856 |
| Apr 13, 2018 | Completed | 560 Mission St | Skender Construction Llc | 26th fl full floor interior ti, non structural amep included, includes elevator core, lobbies, and restrooms. fire under separate permits (sprinklers, alarm, two-way communication) | $2,470,776 |
| Apr 3, 2018 | Completed | 560 Mission St | 9th floor: t.i. to include demolition, new partitions, ceiling and finishes. mep under seperate permit. n/a for maher | $1,600,000 |