Permit GraphShortlistSan Francisco building permits since 2000

Michael Shepherd

License
E20195
Electrical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up E20195 at the Board for Professional Engineers
Listed as
engineer
Firm
Syska Hennessy Group
Based in
San Francisco
On San Francisco permits
Apr 2018 to May 2021

14 permits since 2000 (engineer on 14 permits): 12 completed, 1 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Plant Construction Co, Lp (3), Cw Horton General Contractor (2), Skyline Construction (2), Swinerton Builders (2), Bulley & Andrews Inc., C B 2 Builders Incorporated, Clune Construction Company L P, Dome Construction Corp
Architects
Roy J. Militar (3), Donnie Lam, James Terry, John V. Mares, Rene Garcia Calara, Rory James Carroll, Stanley Lew, Tom Lee, William Schmalz
Engineers
Jose Herrera (5), Seth Sherman (5), Emily Guglielmo, Geoffrey Bomba, Robert Pekelnicky
Authorized agents
Marc Marzane

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 21, 2021Completed
final sign-off Feb 2022
128 Post StClune Construction Company L Prenovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room.
Details
Permit
202105210819
Permit issued
Jul 20, 2021
Final sign-off
Feb 24, 2022

renovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room.

Open the permit page

$970,000
Jan 12, 2021Completed
final sign-off Oct 2025
828 Brannan StSkyline Constructioninterior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exterior
Details
Permit
202101122525
Permit issued
Sep 26, 2022
Final sign-off
Oct 6, 2025

interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exterior

Open the permit page

$12,000,000
Jul 1, 2020Never finaled
issued Jul 2020, no final
222 Sansome StCw Horton General Contractornew livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting.
Details
Permit
202007019469
Permit issued
Jul 10, 2020

new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting.

Open the permit page

$60,000
Jan 17, 2020Completed
final sign-off Oct 2020
3 Embarcadero CenterSkyline Construction14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishes
Details
Permit
202001172205
Permit issued
Feb 20, 2020
Final sign-off
Oct 27, 2020

14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishes

Open the permit page

$500,000
Jan 16, 2020Completed
final sign-off Oct 2020
350 California StPlant Construction Co, Lprevision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipment
Details
Permit
202001162095
Permit issued
Jan 29, 2020
Final sign-off
Oct 23, 2020

revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipment

Open the permit page

Oct 7, 2019Completed
final sign-off Sep 2020
350 California StPlant Construction Co, Lpground fl: tenant improvement project involves the construction of a new security desk, lobby feature wall, new finishes, and light fixture installation.n/a for maher
Details
Permit
201910073768
Permit issued
Nov 8, 2019
Final sign-off
Sep 24, 2020

ground fl: tenant improvement project involves the construction of a new security desk, lobby feature wall, new finishes, and light fixture installation.n/a for maher

Open the permit page

$230,000
Oct 4, 2019Completed
final sign-off Feb 2022
222 Sansome StCw Horton General Contractor3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal.
Details
Permit
201910043609
Permit issued
Oct 31, 2019
Final sign-off
Feb 9, 2022

3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal.

Open the permit page

$17,000
Oct 4, 2019Completed
final sign-off Feb 2020
50 California StSwinerton Buildersrevision to pa # 2019-0703-5113: addendum to electrical drawings eld-425, el-425, epd-425, ep-425.
Details
Permit
201910043553
Permit issued
Oct 8, 2019
Final sign-off
Feb 28, 2020

revision to pa # 2019-0703-5113: addendum to electrical drawings eld-425, el-425, epd-425, ep-425.

Open the permit page

Jul 3, 2019Completed
final sign-off Feb 2020
50 California StSwinerton Builderssuite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a.
Details
Permit
201907035113
Permit issued
Aug 15, 2019
Final sign-off
Feb 28, 2020

suite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a.

Open the permit page

$500,000
Jun 11, 2019Completed
final sign-off Jun 2022
350 California StPlant Construction Co, Lpt.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher
Details
Permit
201906113057
Permit issued
Jul 16, 2019
Final sign-off
Jun 22, 2022

t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher

Open the permit page

$1,300,000
Apr 12, 2019Expired or cancelled
cancelled Jan 2026
1001 Potrero Avbuilding #3: accessibility upgrade to auditorium, renovate office space, new ada restroom.
Details
Permit
201904127824

building #3: accessibility upgrade to auditorium, renovate office space, new ada restroom.

Open the permit page

$550,000
Dec 5, 2018Completed
final sign-off Aug 2019
560 Mission StDome Construction Corpti of a suite level 18 inside an existing shell/core 31-level office bldg, to include associated architectural, mechanical, electrical, and plumbing.
Details
Permit
201812057511
Permit issued
Feb 1, 2019
Final sign-off
Aug 15, 2019

ti of a suite level 18 inside an existing shell/core 31-level office bldg, to include associated architectural, mechanical, electrical, and plumbing.

Open the permit page

$1,166,900
Nov 21, 2018Completed
final sign-off Aug 2019
101 Post StBulley & Andrews Inc.interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & power
Details
Permit
201811216581
Permit issued
Aug 12, 2019
Final sign-off
Aug 14, 2019

interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & power

Open the permit page

$40,000
Apr 5, 2018Completed
final sign-off Apr 2019
1000 Montgomery StC B 2 Builders Incorporatedinterior renov of exstg convalescent facility and assoc service and admin rooms. all changes to inside exstg bldg reconfig of toilet partitions for ada floor clearances. change sfdbi occupancy of ground floor from i-2 to i-4. no change to planning dept use/classification.
Details
Permit
201804055560
Permit issued
Jun 8, 2018
Final sign-off
Apr 8, 2019

interior renov of exstg convalescent facility and assoc service and admin rooms. all changes to inside exstg bldg reconfig of toilet partitions for ada floor clearances. change sfdbi occupancy of ground floor from i-2 to i-4. no change to planning dept use/classification.

Open the permit page

$700,000