Michael Shepherd
- Listed as
- engineer
- Firm
- Syska Hennessy Group
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to May 2021
14 permits since 2000 (engineer on 14 permits): 12 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2021 | Completed final sign-off Feb 2022 | 128 Post St | Clune Construction Company L P | renovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room.Details
renovation of existing retail space ot include new partition walls, suspended ceiling clouds, new plumbing fixtures, electrical & mechanical for open retail display area, small breakroom area for staff, unisex restroom & storage room. | $970,000 |
| Jan 12, 2021 | Completed final sign-off Oct 2025 | 828 Brannan St | Skyline Construction | interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exteriorDetails
interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exterior | $12,000,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 222 Sansome St | Cw Horton General Contractor | new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting.Details
new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting. | $60,000 |
| Jan 17, 2020 | Completed final sign-off Oct 2020 | 3 Embarcadero Center | Skyline Construction | 14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishesDetails
14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishes | $500,000 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 350 California St | Plant Construction Co, Lp | revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipmentDetails
revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipment | |
| Oct 7, 2019 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | ground fl: tenant improvement project involves the construction of a new security desk, lobby feature wall, new finishes, and light fixture installation.n/a for maherDetails
ground fl: tenant improvement project involves the construction of a new security desk, lobby feature wall, new finishes, and light fixture installation.n/a for maher | $230,000 |
| Oct 4, 2019 | Completed final sign-off Feb 2020 | 50 California St | Swinerton Builders | revision to pa # 2019-0703-5113: addendum to electrical drawings eld-425, el-425, epd-425, ep-425.Details
revision to pa # 2019-0703-5113: addendum to electrical drawings eld-425, el-425, epd-425, ep-425. | |
| Oct 4, 2019 | Completed final sign-off Feb 2022 | 222 Sansome St | Cw Horton General Contractor | 3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal.Details
3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal. | $17,000 |
| Jul 3, 2019 | Completed final sign-off Feb 2020 | 50 California St | Swinerton Builders | suite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a.Details
suite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a. | $500,000 |
| Jun 11, 2019 | Completed final sign-off Jun 2022 | 350 California St | Plant Construction Co, Lp | t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maherDetails
t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher | $1,300,000 |
| Apr 12, 2019 | Expired or cancelled cancelled Jan 2026 | 1001 Potrero Av | building #3: accessibility upgrade to auditorium, renovate office space, new ada restroom.Details
building #3: accessibility upgrade to auditorium, renovate office space, new ada restroom. | $550,000 | |
| Dec 5, 2018 | Completed final sign-off Aug 2019 | 560 Mission St | Dome Construction Corp | ti of a suite level 18 inside an existing shell/core 31-level office bldg, to include associated architectural, mechanical, electrical, and plumbing.Details
ti of a suite level 18 inside an existing shell/core 31-level office bldg, to include associated architectural, mechanical, electrical, and plumbing. | $1,166,900 |
| Nov 21, 2018 | Completed final sign-off Aug 2019 | 101 Post St | Bulley & Andrews Inc. | interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & powerDetails
interior ti on ground floor (e) coffee bar refresh surface finish upgrades no change to (e) function of space. work includes minimul demo, plm & power | $40,000 |
| Apr 5, 2018 | Completed final sign-off Apr 2019 | 1000 Montgomery St | C B 2 Builders Incorporated | interior renov of exstg convalescent facility and assoc service and admin rooms. all changes to inside exstg bldg reconfig of toilet partitions for ada floor clearances. change sfdbi occupancy of ground floor from i-2 to i-4. no change to planning dept use/classification.Details
interior renov of exstg convalescent facility and assoc service and admin rooms. all changes to inside exstg bldg reconfig of toilet partitions for ada floor clearances. change sfdbi occupancy of ground floor from i-2 to i-4. no change to planning dept use/classification. | $700,000 |