Jose Herrera
- Listed as
- authorized agent-others, engineer
- Firm
- Syska Hennessy Group Inc
- Based in
- San Diego
- On San Francisco permits
- Feb 2002 to Oct 2025
39 permits since 2000 (engineer on 37 permits, authorized agent-others on 2 permits): 24 completed, 6 in progress, 6 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 14, 2025 | In progress issued Feb 2026 | 500 Terry A Francois Bl | Novo Construction Inc | ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mepDetails
ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mep | $5,263,755 |
| Sep 30, 2025 | Completed final sign-off Jun 2026 | 100 California St | West Coast Build Aka Fairway Constructio | basement: remodel of existing amenity gym. new non-structural partitions, lighting, power, millwork and finishesDetails
basement: remodel of existing amenity gym. new non-structural partitions, lighting, power, millwork and finishes | $1,160,414 |
| Jul 2, 2025 | In progress issued Aug 2025 | 500 Terry A Francois Bl | Novo Construction Inc | 3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included.Details
3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included. | $4,790,589 |
| Jul 1, 2025 | In progress issued Oct 2025 | 500 Terry A Francois Bl | Novo Construction Inc | 4th fl: interior alteration at existing tenant space including light touch alterations, including finishes, fixtures, equipment. mep included.Details
4th fl: interior alteration at existing tenant space including light touch alterations, including finishes, fixtures, equipment. mep included. | $4,322,847 |
| Jun 26, 2025 | In progress issued Aug 2025 | 500 Terry A Francois Bl | Novo Construction Inc | 2/fl: interior alteration of existing tenant spaces\. light touch alteration includes finishes, fixtures, equipment.Details
2/fl: interior alteration of existing tenant spaces\. light touch alteration includes finishes, fixtures, equipment. | $4,203,710 |
| Apr 9, 2025 | Completed final sign-off Sep 2026 | 100 California St | Turner Construction Co | alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way.Details
alterations to the two-story facade fronting the plaza & remedial waterproofing of the (e) planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way. | $1,300,000 |
| Mar 27, 2024 | In progress issued Apr 2024 | 3 Embarcadero Center | Skyline Construction | 14th fl suite 1450 tenant improvement. minor demo of partitions, power lighting & new furniture. install new non bearing partitions, power lighting, finishes and furnitureDetails
14th fl suite 1450 tenant improvement. minor demo of partitions, power lighting & new furniture. install new non bearing partitions, power lighting, finishes and furniture | $230,000 |
| Mar 22, 2024 | Completed final sign-off Apr 2024 | 665 03rd St | Team Commercial Construction Inc. | revision pa# 202206247101 existing hvac system and all associated support to remain and in operationDetails
revision pa# 202206247101 existing hvac system and all associated support to remain and in operation | |
| Oct 17, 2023 | Completed final sign-off Aug 2025 | 180 Sansome St | Bay City Mechanical Inc | replacing fusible link smoke dampers with new automated fire smoke dampers.Details
replacing fusible link smoke dampers with new automated fire smoke dampers. | $369,000 |
| Oct 3, 2023 | Never finaled filed Oct 2023, never issued | 1800 Owens St | new condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural.Details
new condenser water unit & new vfd's on sector 1 roof with associated structural support. chilled water piping from new condenser unit will run in an existing shaft down to level 1. no architectural work proposed. all work is mep w/ structural. | $200,000 | |
| Aug 28, 2023 | In progress issued Nov 2023 | 560 Mission St | Turner Construction Co | 27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical workDetails
27th flr. revision to pa# 202109228950. additions of non-load bearing wall. addition of a fan and minor mechanical work | $115,000 |
| Apr 20, 2022 | Never finaled issued May 2022, no final | 2 Embarcadero Center | Clune Construction Company L P | revision to pa 202009114001 includes (n) return grilles for area on level 20x 21 (n) lighting fixtures and receptacles in various areas.Details
revision to pa 202009114001 includes (n) return grilles for area on level 20x 21 (n) lighting fixtures and receptacles in various areas. | |
| Feb 23, 2022 | Completed final sign-off Apr 2024 | 140 New Montgomery St | 13th fl: mep deferred submittal to support approved arch drawings. ref/rev pa# 202202017102. architectural revDetails
13th fl: mep deferred submittal to support approved arch drawings. ref/rev pa# 202202017102. architectural rev | $300,000 | |
| Dec 22, 2021 | Completed final sign-off Sep 2023 | 1 Montgomery St | Bcci Construction Company | 34/f: mep deferred submittal to support previously approved architectural permit. demo 2 vav's and 2 ef. provide 6 new vav's. provide new demand control ventilation. ref permit 202112083996.Details
34/f: mep deferred submittal to support previously approved architectural permit. demo 2 vav's and 2 ef. provide 6 new vav's. provide new demand control ventilation. ref permit 202112083996. | $105,000 |
| Sep 22, 2021 | Never finaled issued Nov 2021, no final | 560 Mission St | Turner Construction Co | ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep.Details
ti on 27th includes demo and construction of new partitions, ceilings, finishes, and mep. | $1,500,000 |
| Jan 12, 2021 | Completed final sign-off Oct 2025 | 828 Brannan St | Skyline Construction | interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exteriorDetails
interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exterior | $12,000,000 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 222 Sansome St | Cw Horton General Contractor | new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting.Details
new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting. | $60,000 |
| Jan 17, 2020 | Completed final sign-off Oct 2020 | 3 Embarcadero Center | Skyline Construction | 14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishesDetails
14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishes | $500,000 |
| Sep 27, 2019 | Expired or cancelled cancelled Jan 2026 | 375 Laguna Honda Bl | addition of an audiovisual system, acoustical panels on walls & ceilings, nd mechanical system renovaiton to imrpove simon theater & moran hall acoustically. the scope also includes accessibility improvements in restrooms serving moran hall & simon theater. maher naDetails
addition of an audiovisual system, acoustical panels on walls & ceilings, nd mechanical system renovaiton to imrpove simon theater & moran hall acoustically. the scope also includes accessibility improvements in restrooms serving moran hall & simon theater. maher na | $1,400,000 | |
| Jul 3, 2019 | Completed final sign-off Feb 2020 | 50 California St | Swinerton Builders | suite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a.Details
suite 2500: interior t.i. demo & new interior non-load bearing partitions including meps, add l/v telecomm equipment installation. fire alarm/fire sprinkler under sep permit. maher n/a. | $500,000 |
| Jun 25, 2019 | Never finaled issued Jun 2019, no final | 1 Post St | Turner Construction Co | revision to pa 2017-1013-1240 - to document location of smoke control panel and designDetails
revision to pa 2017-1013-1240 - to document location of smoke control panel and design | |
| Apr 12, 2019 | Expired or cancelled cancelled Jan 2026 | 1001 Potrero Av | building #3: accessibility upgrade to auditorium, renovate office space, new ada restroom.Details
building #3: accessibility upgrade to auditorium, renovate office space, new ada restroom. | $550,000 | |
| Sep 25, 2017 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13Details
revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13 | |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | 11th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes.Details
11th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes. | $1,100,000 |
| Jun 13, 2017 | Completed final sign-off Sep 2017 | 350 California St | Bcci Construction Company | 4th & 5th floor - revision to pa #201612054179 - revision to drawings ot incorporate new mechanical room on floor (5). n/a maher ordinanceDetails
4th & 5th floor - revision to pa #201612054179 - revision to drawings ot incorporate new mechanical room on floor (5). n/a maher ordinance | |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | 17th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes.Details
17th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes. | $1,100,000 |
| May 2, 2017 | Completed final sign-off Oct 2017 | 201 California St | Peacock Construction | 15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maherDetails
15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maher | $1,252,707 |
| Nov 23, 2016 | Completed final sign-off Apr 2019 | 399 Geary St | Fisher Development Inc | change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep.Details
change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep. | $2,000,000 |
| Aug 14, 2015 | Completed final sign-off Jun 2016 | 350 California St | Swinerton Builders | installation of fuel oil system to serve (e) emergency generator on 23rd floor. includes new exterior fuel oil port, interior fuel oil pump, fuel oil service tank and associated piping and construction. maher naDetails
installation of fuel oil system to serve (e) emergency generator on 23rd floor. includes new exterior fuel oil port, interior fuel oil pump, fuel oil service tank and associated piping and construction. maher na | $1,000,000 |
| Apr 23, 2015 | Never finaled issued Jun 2015, no final | 315 Montgomery St | Balfour Beatty Construction Llc | interior work only at first floor, includes raised floor, new access ramp, new offices & meeting rooms, ceiling design, restrooms and breakroom. also, includes new furniture & finishes. compliance with maher ordinance no 155-13 not required.Details
interior work only at first floor, includes raised floor, new access ramp, new offices & meeting rooms, ceiling design, restrooms and breakroom. also, includes new furniture & finishes. compliance with maher ordinance no 155-13 not required. | $600,000 |
| Apr 10, 2014 | Expired or cancelled cancelled Jul 2023 | 50 San Jose Av | vertical & horizontal extension. demo of attached garage & construct new 3 story bldg with mezzanie, in place of (e) garage, all connected to 2 (e) condo units. 50 san jose ave will become 4 bedroom, 3.5 baths. 52 san jose ave will become 2 bedroom, 2 bath.Details
vertical & horizontal extension. demo of attached garage & construct new 3 story bldg with mezzanie, in place of (e) garage, all connected to 2 (e) condo units. 50 san jose ave will become 4 bedroom, 3.5 baths. 52 san jose ave will become 2 bedroom, 2 bath. | $275,000 | |
| Jan 8, 2014 | Completed final sign-off Feb 2014 | 400 California St | Truebeck Construction | adjust mechanical duct work to provide comfort for new offices includes modifying supply and return diffusers. add (2) van boxes. compliance with ordinance no. 155-13 not required, excavation <50 cu.yd.Details
adjust mechanical duct work to provide comfort for new offices includes modifying supply and return diffusers. add (2) van boxes. compliance with ordinance no. 155-13 not required, excavation <50 cu.yd. | $15,000 |
| Dec 31, 2013 | Completed final sign-off Jan 2014 | 400 California St | Deb Construction Llc | remodel of single tenant floor. upgrade to existing finishes, flooring, paint, furniture, new millwork. demolition limited to finishes, slect partitions. mep for partial single tenant floor. ref 201311273017Details
remodel of single tenant floor. upgrade to existing finishes, flooring, paint, furniture, new millwork. demolition limited to finishes, slect partitions. mep for partial single tenant floor. ref 201311273017 | $20,000 |
| Dec 20, 2013 | Completed final sign-off Nov 2016 | 75 Hawthorne St | Turner Construction Co | full 11th floor t.i. selective demo, partitions, mep. structural limited to server room. sprinklers & fire alarm on separate permit. interim controls - market street & soma: permit for structural or architectural work above ground floor.Details
full 11th floor t.i. selective demo, partitions, mep. structural limited to server room. sprinklers & fire alarm on separate permit. interim controls - market street & soma: permit for structural or architectural work above ground floor. | $1,898,641 |
| Dec 20, 2013 | Completed final sign-off Jan 2017 | 75 Hawthorne St | Turner Construction Co | full 1st&13/fl ti.partial 2/fl ti. restroom fully upgraded. mep,sprinkler,fire alarm & ti on separate permit. accessory child care use on grd fl. interim controls - market street & soma: permit for structural or architectural work above ground floor.Details
full 1st&13/fl ti.partial 2/fl ti. restroom fully upgraded. mep,sprinkler,fire alarm & ti on separate permit. accessory child care use on grd fl. interim controls - market street & soma: permit for structural or architectural work above ground floor. | $9,498,301 |
| Dec 18, 2013 | Completed final sign-off Nov 2016 | 75 Hawthorne St | Turner Construction Co | full floor tenant improvement for 14th, 15th & 16th floor. selective demo, partitions, structural, mep, restrooms to be fully upgraded. fire alarm & sprinklers under separate permit.Details
full floor tenant improvement for 14th, 15th & 16th floor. selective demo, partitions, structural, mep, restrooms to be fully upgraded. fire alarm & sprinklers under separate permit. | $5,687,824 |
| Dec 18, 2013 | Completed final sign-off Jan 2017 | 75 Hawthorne St | Turner Construction Co | 8th & 9th tenant improvement. selective demo, partitions, structural, mep, restrooms fully upgraded. fire alarm & sprinklers under separate permit.Details
8th & 9th tenant improvement. selective demo, partitions, structural, mep, restrooms fully upgraded. fire alarm & sprinklers under separate permit. | $3,791,882 |
| Jul 3, 2002 | Completed final sign-off Nov 2003 | 215 Roosevelt Wy | deleted partial bsmnt from approved applicationDetails
deleted partial bsmnt from approved application | ||
| Feb 13, 2002 | Completed final sign-off Apr 2003 | 20 California St | voluntary seismic improvementDetails
voluntary seismic improvement | $68,000 |