Ramid Arbabaraghi
- Listed as
- engineer, pmt consultant/expediter
- Firm
- Hra Consulting Engineers
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Apr 2025
11 permits since 2000 (engineer on 10 permits, pmt consultant/expediter on 1 permit): 7 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2025 | Completed final sign-off Aug 2025 | 745 Kearny St | revision to permit 202311281504 to modify electrical design. modifications are the result of state elevator inspection. scope includes rerouting conduits providing power to devices in storage room so they are connected to panel a on level-1.Details
revision to permit 202311281504 to modify electrical design. modifications are the result of state elevator inspection. scope includes rerouting conduits providing power to devices in storage room so they are connected to panel a on level-1. | ||
| Nov 3, 2022 | Completed final sign-off Mar 2025 | 25 Van Ness Av | 7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles.Details
7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles. | $1,275,000 | |
| Jul 13, 2022 | Completed final sign-off Jul 2025 | 27 Van Ness Av | Chiang C M Construction Inc. | tenant improvement of 27 van ness suite with demolition and construction scope for wall partitions, flooring, ceilings, finishes, as well as related mechanical, plumbing, fire protection, and electrical work.Details
tenant improvement of 27 van ness suite with demolition and construction scope for wall partitions, flooring, ceilings, finishes, as well as related mechanical, plumbing, fire protection, and electrical work. | $1,750,000 |
| Apr 1, 2022 | Never finaled issued Sep 2022, no final | 220 Geary St | union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reservDetails
union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reserv | $1,000,000 | |
| Dec 27, 2019 | Completed final sign-off Apr 2023 | 5701 03rd St | Minerva Construction | relocate athletic field, replace existitng playground, new adult exercise equipment, new accessible paths and fencing (no change to exiting buildings)// space has a new occupant load and new egress plans- vifDetails
relocate athletic field, replace existitng playground, new adult exercise equipment, new accessible paths and fencing (no change to exiting buildings)// space has a new occupant load and new egress plans- vif | $3,000,000 |
| Dec 23, 2019 | Completed final sign-off Nov 2020 | 617 Mission St | Mik Construction Inc | 2nd & 3rd fl - renovation of existing office space & existing server room for the dept. of child support services. maher naDetails
2nd & 3rd fl - renovation of existing office space & existing server room for the dept. of child support services. maher na | $792,993 |
| Sep 27, 2019 | Expired or cancelled cancelled Jan 2026 | 375 Laguna Honda Bl | addition of an audiovisual system, acoustical panels on walls & ceilings, nd mechanical system renovaiton to imrpove simon theater & moran hall acoustically. the scope also includes accessibility improvements in restrooms serving moran hall & simon theater. maher naDetails
addition of an audiovisual system, acoustical panels on walls & ceilings, nd mechanical system renovaiton to imrpove simon theater & moran hall acoustically. the scope also includes accessibility improvements in restrooms serving moran hall & simon theater. maher na | $1,400,000 | |
| Aug 8, 2017 | Completed final sign-off Mar 2018 | 1 Newhall St | Clark Construction Group Ca Lp | revision to permit #2014-0626-9545 s7. to facilitate emergency generator/fuel oil system review & fire alarm system review. update accurate locations of fsd's in electrical drawings, and provide load calcs for emergency generator. maher naDetails
revision to permit #2014-0626-9545 s7. to facilitate emergency generator/fuel oil system review & fire alarm system review. update accurate locations of fsd's in electrical drawings, and provide load calcs for emergency generator. maher na | |
| Sep 24, 2014 | Never finaled issued Oct 2014, no final | 2601 Mariposa St | Gci, Inc | new electrical: new l/s strobes, new hand dryer occupancy sensor, floor heating wiring. ref app#201408274903. n/a for the maher ordinance #155-13Details
new electrical: new l/s strobes, new hand dryer occupancy sensor, floor heating wiring. ref app#201408274903. n/a for the maher ordinance #155-13 | $30,000 |
| Jun 26, 2014 | Completed final sign-off Mar 2018 | 1 Newhall St | Clark Construction Group Ca Lp, Johnson Controls Fire | interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
interior expansion, exterior renovation of (e) 2 story warehouse (circa 1986). new 2nd floor, new roof, renovated & upgraded building & site. change of use from city storage facility to sf office of chief med exam. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $28,000,000 |
| May 24, 2005 | Expired or cancelled cancelled Dec 2011 | 251 06th St | demolish 2 stories audo manu and garment manu.Details
demolish 2 stories audo manu and garment manu. |