Minerva Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Apr 2025
- Last 24 months
- 2 permits filed
10 permits since 2000: 8 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2025 | Completed final sign-off Aug 2026 | 801 Silver Av | asphalt removal and replacement with landscaping. some adjacent repairing does not touch buliding or ada parking/path of travelDetails
asphalt removal and replacement with landscaping. some adjacent repairing does not touch buliding or ada parking/path of travel | $500,000 |
| Apr 17, 2025 | In progress issued Aug 2025 | 2015 Mckinnon Av | commerical ti to (e) tenant space, add new office room, breakroom and mezzanine. replace (e) sliding fence gate with new motorized gate at front.Details
commerical ti to (e) tenant space, add new office room, breakroom and mezzanine. replace (e) sliding fence gate with new motorized gate at front. | $300,000 |
| Apr 23, 2024 | Completed final sign-off Oct 2024 | 5 Aquavista Wy | revision to 202401315012. replace slab throughoutDetails
revision to 202401315012. replace slab throughout | $5,000 |
| Apr 3, 2024 | Completed final sign-off Oct 2024 | 5 Aquavista Wy | structural revision to bpa# 202401315012Details
structural revision to bpa# 202401315012 | $5,000 |
| Jan 31, 2024 | Completed final sign-off Oct 2024 | 5 Aquavista Wy | 1st fl add 1 bedrrom, 1 full bath, laundry, home office and family room 2nd fl remodel kitchen and bathroom. add 1 bath. replace garage door inkind. enclose 1 garage. add new patio in the rear. replace all windowns in kind with aluminum cladDetails
1st fl add 1 bedrrom, 1 full bath, laundry, home office and family room 2nd fl remodel kitchen and bathroom. add 1 bath. replace garage door inkind. enclose 1 garage. add new patio in the rear. replace all windowns in kind with aluminum clad | $180,000 |
| Jan 10, 2024 | Completed final sign-off Dec 2024 | 99 Harding Rd | parking lot and pathway renovations to enhance ada compliance at at harding park golf clubhouse and parking lot. ada barrier removal project consists of demo, minor grading, concrete asphalt paving, landscape planting and irrigation, electrical, paitning, installation of site furnishings and signageDetails
parking lot and pathway renovations to enhance ada compliance at at harding park golf clubhouse and parking lot. ada barrier removal project consists of demo, minor grading, concrete asphalt paving, landscape planting and irrigation, electrical, paitning, installation of site furnishings and signage | $591,000 |
| Oct 5, 2023 | In progress issued Nov 2025 | 335 28th Av | 3-story horizontal & vertical addition. 1/f: add family, 2 bedrm, 1 bath, 1 car garage & patio at rear. 2/f: remodel kitchen, powder rm, add rear deck. 3/f: add master bedrm, 1 bedrm, master bath, 1 bath & laundry. add rear deck. add new roof deck over 3rd fl. sprinkler whole bldg with nfpa 13d.Details
3-story horizontal & vertical addition. 1/f: add family, 2 bedrm, 1 bath, 1 car garage & patio at rear. 2/f: remodel kitchen, powder rm, add rear deck. 3/f: add master bedrm, 1 bedrm, master bath, 1 bath & laundry. add rear deck. add new roof deck over 3rd fl. sprinkler whole bldg with nfpa 13d. | $750,000 |
| Aug 29, 2023 | Completed final sign-off Oct 2025 | 2899 19th Av | complete renovation of (e) playground, replament of play equipment & safety surfacing, new seating & other related new-building amenities, new landscapingDetails
complete renovation of (e) playground, replament of play equipment & safety surfacing, new seating & other related new-building amenities, new landscaping | $1,300,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2023 | 5701 03rd St | relocate athletic field, replace existitng playground, new adult exercise equipment, new accessible paths and fencing (no change to exiting buildings)// space has a new occupant load and new egress plans- vifDetails
relocate athletic field, replace existitng playground, new adult exercise equipment, new accessible paths and fencing (no change to exiting buildings)// space has a new occupant load and new egress plans- vif | $3,000,000 |
| Apr 12, 2018 | Completed final sign-off Mar 2019 | 599 Leland Av | community garden improvements permitted work includes low retaining wall and gazebo.Details
community garden improvements permitted work includes low retaining wall and gazebo. | $100,000 |