Michael Smith
- License
- 30683
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Dec 2019 to Oct 2020
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Empire Landscaping Inc, Minerva Construction
- Architects
- Cathy L. Merrill, J. Lee Stickles
- Engineers
- Farokh Dirozmand, Hamid Arabaraghi, Saied A. Khan
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 3, 2020 | Completed final sign-off Nov 2023 | 1140 Fillmore St | Empire Landscaping Inc | fillmore-turk mini-park renovation: repair & improve drainage, new pavement, grass, irrigation, seating and site furnishings.Details
fillmore-turk mini-park renovation: repair & improve drainage, new pavement, grass, irrigation, seating and site furnishings. | $500,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2023 | 5701 03rd St | Minerva Construction | relocate athletic field, replace existitng playground, new adult exercise equipment, new accessible paths and fencing (no change to exiting buildings)// space has a new occupant load and new egress plans- vifDetails
relocate athletic field, replace existitng playground, new adult exercise equipment, new accessible paths and fencing (no change to exiting buildings)// space has a new occupant load and new egress plans- vif | $3,000,000 |