Block 0308, lot 001
333 Post St
- City’s use
- Commercial Misc
- Built
- 1900
- Lot
- 113,434 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
72 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 333 Post St | Stages Unlimited | installation and removal of temporary ice rink, skate shop, canopes, and lighting for evening skating.Details
installation and removal of temporary ice rink, skate shop, canopes, and lighting for evening skating. | $150,000 |
| Jun 4, 2026 | In progress issued Aug 2026 | 235 Stockton St | Singular Builders | (n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarmDetails
(n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarm | $1,030,000 |
| Mar 3, 2026 | Completed final sign-off May 2026 | 333 Post St | Eric F Anderson Incorporated | revise p/a 2025-0711-0656 to increase footing size due to changes in proposed equipment and site conditions, include the addition of low voltage line to connect the 2 speaker poles, and the removal of a shelving unit in a storage room.Details
revise p/a 2025-0711-0656 to increase footing size due to changes in proposed equipment and site conditions, include the addition of low voltage line to connect the 2 speaker poles, and the removal of a shelving unit in a storage room. | |
| Jul 23, 2025 | Completed final sign-off Jan 2026 | 333 Post St | Stages Unlimited | installation and removal of temporary ice rink, skate shop, canopes, and lighting for evening skating.Details
installation and removal of temporary ice rink, skate shop, canopes, and lighting for evening skating. | $150,000 |
| Jul 11, 2025 | Completed final sign-off May 2026 | 333 Post St | Eric F Anderson Incorporated | 2 new 24' speaker poles/footing at stage steps. new storage closet in (e) storage room @ garage level 1.Details
2 new 24' speaker poles/footing at stage steps. new storage closet in (e) storage room @ garage level 1. | $425,000 |
| Aug 26, 2024 | Completed final sign-off Jan 2025 | 333 Post St | Stages Unlimited | installation and removal of temporary ice rink, skate shop, canopies, lighting for evening skating.Details
installation and removal of temporary ice rink, skate shop, canopies, lighting for evening skating. | $150,000 |
| Jul 13, 2023 | Completed final sign-off Jan 2024 | 333 Post St | installation of temporary ice rink, ticket booth, skate booth, canopies, lighting for evening skating.Details
installation of temporary ice rink, ticket booth, skate booth, canopies, lighting for evening skating. | $150,000 | |
| Mar 21, 2023 | Completed final sign-off Sep 2023 | 220 Geary St | Sabah International Incorporated | provide modification for the existing voice fire alarm system at the new union square station light rail system.Details
provide modification for the existing voice fire alarm system at the new union square station light rail system. | $38,040 |
| Oct 19, 2022 | Never finaled issued Oct 2022, no final | 220 Geary St | Battalion One Fire Protection | modify existing fire sprinkler system to accommodate, new walls and ceilingDetails
modify existing fire sprinkler system to accommodate, new walls and ceiling | $5,195 |
| Oct 7, 2022 | Completed final sign-off May 2023 | 220 Geary St | Sabah International Incorporated | revise as built permit #2017-0117-7232.sequence of operations matrix for addition of the traction power emergency power of(epo)control.add(2) addressable input modules for epo status monitoring,(1)addressable ouput module for epo trigger.Details
revise as built permit #2017-0117-7232.sequence of operations matrix for addition of the traction power emergency power of(epo)control.add(2) addressable input modules for epo status monitoring,(1)addressable ouput module for epo trigger. | |
| Sep 19, 2022 | Completed final sign-off Jan 2023 | 333 Post St | installation of temporary ice rink, ticket booth, skate booth, canopies, lighting for evening skating.Details
installation of temporary ice rink, ticket booth, skate booth, canopies, lighting for evening skating. | $100,000 | |
| Jun 10, 2022 | Completed final sign-off Jul 2022 | 220 Geary St | Tutor Perini Corporation | to obtain final inspection for work approved under pa# 201905301968. all work is complete.Details
to obtain final inspection for work approved under pa# 201905301968. all work is complete. | |
| Apr 1, 2022 | Never finaled issued Sep 2022, no final | 220 Geary St | union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reservDetails
union square/market st station concourse level - construct 2 vendor kiosks; convert 2 (e) storage to all gender accessible restroom; kiosks & all gender will include elec and plumb for new lightings, power and (n) water use fixtures; (e) undeveloped space to be renovated to a down-time room reserv | $1,000,000 | |
| Jul 26, 2021 | Never finaled issued Jul 2021, no final | 333 Post St | installation of temporary ice rink, ticket booth, skate dispencing booth, canopies for skate, change lighting for evening skating. n/a maher ordinanceDetails
installation of temporary ice rink, ticket booth, skate dispencing booth, canopies for skate, change lighting for evening skating. n/a maher ordinance | $50,000 | |
| Nov 12, 2020 | Completed final sign-off Dec 2023 | 333 Post St | Treaty Construction | replace exterior stair contrasting stripe w/ a distinctive marking stripe per cbc 1011.5.4.1 where riser is less than 4" high. install signage notifying pedestrians of uneven bottom riserDetails
replace exterior stair contrasting stripe w/ a distinctive marking stripe per cbc 1011.5.4.1 where riser is less than 4" high. install signage notifying pedestrians of uneven bottom riser | $20,000 |
| Feb 27, 2020 | Completed final sign-off Oct 2020 | 333 Post St | Pacific Auxiliary Fire Alarm | fire alarm ti: adding 1 power supply and 6 horn strobes to extg notifier afp-300 fire alarm systemDetails
fire alarm ti: adding 1 power supply and 6 horn strobes to extg notifier afp-300 fire alarm system | $11,844 |
| Sep 3, 2019 | Never finaled issued Sep 2019, no final | 333 Post St | installation of temporary ice rink, ticket booth, skate dispencing booth, canopies for skate, change lighting for evening skating. n/a maher ordinanceDetails
installation of temporary ice rink, ticket booth, skate dispencing booth, canopies for skate, change lighting for evening skating. n/a maher ordinance | $26,000 | |
| May 30, 2019 | Completed final sign-off Jul 2022 | 220 Geary St | Tutor Perini Corporation | underground dedicated fire water line to be 8" ductile iron cement lined pipe for ums station approx 1 length. ref pa 2017-0413-3879 (sprinklers) and 2012-0510-0184 (arch)Details
underground dedicated fire water line to be 8" ductile iron cement lined pipe for ums station approx 1 length. ref pa 2017-0413-3879 (sprinklers) and 2012-0510-0184 (arch) | $2,000 |
| Oct 23, 2018 | Completed final sign-off Mar 2023 | 220 Geary St | Sabah International Incorporated | provide a (n) fire alarm system at the new chinatown light rail station. permit number: 2012-0510-0184.**maher n/a**Details
provide a (n) fire alarm system at the new chinatown light rail station. permit number: 2012-0510-0184.**maher n/a** | $90,047 |
| Jul 19, 2018 | Completed final sign-off Nov 2018 | 333 Post St | installation of temporary ice rink-ticket booth. skate dispensing booth. candipes. lighting for evening skating.Details
installation of temporary ice rink-ticket booth. skate dispensing booth. candipes. lighting for evening skating. | $26,000 | |
| Jul 16, 2018 | Expired or cancelled cancelled Jan 2026 | 220 Geary St | revision to pa #2012-0510-0184. confirming as-built width of horizontal transfer between stairs #3 & #4 at mezzanine level between gl 25-29 to 44" clear at 7' above finished floor.Details
revision to pa #2012-0510-0184. confirming as-built width of horizontal transfer between stairs #3 & #4 at mezzanine level between gl 25-29 to 44" clear at 7' above finished floor. | ||
| Dec 11, 2017 | Completed final sign-off Aug 2020 | 333 Post St | Mark Scott Construction Inc | electrical works associated with the replacement of parking access and revenue control systems parcs equipment for the garage. (parcs) equipments are not part of this permit application. n/a for maher.Details
electrical works associated with the replacement of parking access and revenue control systems parcs equipment for the garage. (parcs) equipments are not part of this permit application. n/a for maher. | $650,000 |
| Aug 28, 2017 | Completed final sign-off Oct 2017 | 333 Post St | installation of temporary ice rink, ticket booth, skate dispencing booth, canopies for skate, change lighting for evening skating. n/a maher ordinanceDetails
installation of temporary ice rink, ticket booth, skate dispencing booth, canopies for skate, change lighting for evening skating. n/a maher ordinance | $26,000 | |
| Jun 13, 2017 | Expired or cancelled cancelled Aug 2023 | 220 Geary St | Sabah International Incorporated | ref #2012-0510-0184 (general contractors permit #) provide (2) customer built deluge panelsDetails
ref #2012-0510-0184 (general contractors permit #) provide (2) customer built deluge panels | $72,000 |
| Apr 13, 2017 | Completed final sign-off Aug 2022 | 220 Geary St | Cosco Fire Protection Inc. | new water-based fire protection system for ums muni subway station. includes: standpipes within station, aboveground wet sprinklers, undercar track deluge, and 4 preaction systems. greatest demand 807.2 gpm @ 37 psi. ref pa 2012-0510-0184Details
new water-based fire protection system for ums muni subway station. includes: standpipes within station, aboveground wet sprinklers, undercar track deluge, and 4 preaction systems. greatest demand 807.2 gpm @ 37 psi. ref pa 2012-0510-0184 | $1,100,000 |
| Feb 28, 2017 | Completed final sign-off Apr 2023 | 220 Geary St | Cosco Fire Protection Inc. | install new standpipe system for new underground railway tunnels. connect to stations on future permits. compliance with maher ord 155-13.Details
install new standpipe system for new underground railway tunnels. connect to stations on future permits. compliance with maher ord 155-13. | $12,000 |
| Jan 17, 2017 | Completed final sign-off Jun 2022 | 220 Geary St | Sabah International Incorporated | install 3 (n) fm-200 clean agent fire supression system, total 22 cylinders, to protect the following: 1)main elec cn04/annex cn07, 2)train ctrl pl01/aux comm pl03, 3)comm equip mz05/gap breaker mz07. ref ti pa#201205100184. preactions for each space under separate permit(s).n/a for maher ordinance.Details
install 3 (n) fm-200 clean agent fire supression system, total 22 cylinders, to protect the following: 1)main elec cn04/annex cn07, 2)train ctrl pl01/aux comm pl03, 3)comm equip mz05/gap breaker mz07. ref ti pa#201205100184. preactions for each space under separate permit(s).n/a for maher ordinance. | $515,699 |
| Nov 4, 2016 | Completed final sign-off Oct 2021 | 333 Post St | E F Brett & Company Inc | elevator modernization: voluntary barrier removal. elevator only. see exemption by disablity access coord. area of work 200 sq ft. n/a for maherDetails
elevator modernization: voluntary barrier removal. elevator only. see exemption by disablity access coord. area of work 200 sq ft. n/a for maher | $16,000 |
| Sep 29, 2016 | Completed final sign-off Sep 2022 | 333 Post St | Tutor Perini Corporation | revision to 2012-0510-0184 due to field issues & unforseen conditions - construct garage ramp; demolition of (e) garage columns (partial) to accommodate new garage. the submitted plans are revisions to the approved; n/a maher ordDetails
revision to 2012-0510-0184 due to field issues & unforseen conditions - construct garage ramp; demolition of (e) garage columns (partial) to accommodate new garage. the submitted plans are revisions to the approved; n/a maher ord | $50,000 |
| Sep 20, 2016 | Completed final sign-off Nov 2016 | 333 Post St | to obtain final inspection for work approved under pa 201103222548; all work is complete. ada remediation in various locations in union square.Details
to obtain final inspection for work approved under pa 201103222548; all work is complete. ada remediation in various locations in union square. | ||
| Sep 19, 2016 | Never finaled issued Sep 2016, no final | 333 Post St | street spaceDetails
street space | ||
| Sep 7, 2016 | Completed final sign-off Jan 2017 | 333 Post St | installation of temporary ice rink, ticket booth, skate dispencing booth, canopies for skate, change lighting for evening skating. n/a maher ordinanceDetails
installation of temporary ice rink, ticket booth, skate dispencing booth, canopies for skate, change lighting for evening skating. n/a maher ordinance | $26,000 | |
| Aug 8, 2016 | Expired or cancelled cancelled Jan 2026 | 220 Geary St | Tutor Perini Corporation | revision to pa #201205100184 - revised plumbing drawing - addition of piping for water proofing system within union square plaza.Details
revision to pa #201205100184 - revised plumbing drawing - addition of piping for water proofing system within union square plaza. | $10,000 |
| Aug 17, 2015 | Completed final sign-off Jan 2016 | 333 Post St | install temporary ice skating rink, ticket booth, skate dispencing booth, skate change area canopies lights for evening skating. nov 4, 2015 to jan 18, 2016 (250 occupant load). n/a maher ordinanceDetails
install temporary ice skating rink, ticket booth, skate dispencing booth, skate change area canopies lights for evening skating. nov 4, 2015 to jan 18, 2016 (250 occupant load). n/a maher ordinance | $26,000 | |
| Jan 8, 2015 | Completed final sign-off Feb 2015 | 333 Post St | Cosco Fire Protection Inc. | moving existing fire hose racks on 3 levelsDetails
moving existing fire hose racks on 3 levels | $2,500 |
| Dec 29, 2014 | Completed final sign-off Nov 2016 | 333 Post St | corrective measures for access barriers at union square plaza. work includes granite permanant edge protection, granite cane detectors at bottom of handrails. concrete stepping stones on curves. handrails, guiderails, stairlight replacement,repair to water proofing. ref. #201103222548. n/a maherDetails
corrective measures for access barriers at union square plaza. work includes granite permanant edge protection, granite cane detectors at bottom of handrails. concrete stepping stones on curves. handrails, guiderails, stairlight replacement,repair to water proofing. ref. #201103222548. n/a maher | $100,000 | |
| Oct 29, 2014 | Expired or cancelled withdrawn Dec 2014 | 220 Geary St | revision to appl #201205100184 - partial demolitoin of sprinkler & standpipe piping at powell street station for new central subway union square/market street station entrance. n/a maher ordinance.Details
revision to appl #201205100184 - partial demolitoin of sprinkler & standpipe piping at powell street station for new central subway union square/market street station entrance. n/a maher ordinance. | $50,000 | |
| Aug 4, 2014 | Completed final sign-off Aug 2014 | 333 Post St | Potter Fire Protection | relocate a section of 4' fire sprinkler main to accomodate a new hvac installation. ref app#201406198884. n/a for the maher ordinance #155-13Details
relocate a section of 4' fire sprinkler main to accomodate a new hvac installation. ref app#201406198884. n/a for the maher ordinance #155-13 | $1,200 |
| Jul 28, 2014 | Completed final sign-off Nov 2014 | 333 Post St | install temporary ice skating rink, ticket booth, skate dispencing booth, skate change area canopies lights for evening skating. nov 5, 2014 to jan 19, 2015 (250 occupant load). n/a maher ordinanceDetails
install temporary ice skating rink, ticket booth, skate dispencing booth, skate change area canopies lights for evening skating. nov 5, 2014 to jan 19, 2015 (250 occupant load). n/a maher ordinance | $26,000 | |
| Jun 19, 2014 | Completed final sign-off Oct 2014 | 333 Post St | D Kelly Construction Inc. | commissary-storage area, walk in freezer, clean up ara for carts. no sprinklers, life safety; maher not rquiredDetails
commissary-storage area, walk in freezer, clean up ara for carts. no sprinklers, life safety; maher not rquired | $75,000 |
| Nov 18, 2013 | Never finaled issued Nov 2013, no final | 333 Post St | American Mechanical Inc | installation of an automatic carbon monoxide sensing (amcs) system (to modulate existing garage ventilation system) 72 sensors totalDetails
installation of an automatic carbon monoxide sensing (amcs) system (to modulate existing garage ventilation system) 72 sensors total | $214,000 |
| Jul 29, 2013 | Completed final sign-off Jan 2014 | 333 Post St | install temporary ice skating rink. ticket booth, skate dispencing booth skate change area canopies, lights for evening skating. nov 7, 2013 to jan 20, 2014. 250 occupancy load.Details
install temporary ice skating rink. ticket booth, skate dispencing booth skate change area canopies, lights for evening skating. nov 7, 2013 to jan 20, 2014. 250 occupancy load. | $26,000 | |
| Jul 31, 2012 | Completed final sign-off Jan 2013 | 333 Post St | install temp ice skating rink, ticket booth, skate dispense booth skate change area, canopies, lights for evening skating. nov 7, 12 to jan, 21, 2013. 250 occupant load. (ref. appl.#201108313614).Details
install temp ice skating rink, ticket booth, skate dispense booth skate change area, canopies, lights for evening skating. nov 7, 12 to jan, 21, 2013. 250 occupant load. (ref. appl.#201108313614). | $26,000 | |
| May 31, 2012 | Never finaled issued May 2012, no final | 220 Geary St | to create new address at central subway union square station as 220 geary st.Details
to create new address at central subway union square station as 220 geary st. | ||
| May 10, 2012 | Completed final sign-off Jul 2025 | 220 Geary St | Tutor Perini Corporation | partial demolition of union square plaza and garage, construction of new central subway union square/market street station entrance.Details
partial demolition of union square plaza and garage, construction of new central subway union square/market street station entrance. | $16,126,562 |
| Mar 2, 2012 | Never finaled issued Mar 2012, no final | 350 Powell St | P. L. Annuzzi, Inc. | to complete work & obtain final inspection for work approved under pa #2010-08-11-8561.Details
to complete work & obtain final inspection for work approved under pa #2010-08-11-8561. | $32,700 |
| Mar 2, 2012 | Never finaled filed Mar 2012, never issued | 350 Powell St | P. L. Annuzzi, Inc. | revision to pa# 2010-0811-8561-changes marked in delta 3, revision includes new louvretel trellis structure & relocattion of windscreen on top of (e) surrounding curbDetails
revision to pa# 2010-0811-8561-changes marked in delta 3, revision includes new louvretel trellis structure & relocattion of windscreen on top of (e) surrounding curb | $10,000 |
| Aug 31, 2011 | Completed final sign-off Jan 2012 | 333 Post St | install temporary ice skating rink, ticket booth. skate dispensing booth, skate chane area. canopies, lights for evening skating. dates range from 11/9/11 to 1/16/12- 250 occupant load- assembly and tent permits required from sffdDetails
install temporary ice skating rink, ticket booth. skate dispensing booth, skate chane area. canopies, lights for evening skating. dates range from 11/9/11 to 1/16/12- 250 occupant load- assembly and tent permits required from sffd | $26,000 | |
| Aug 4, 2011 | Never finaled issued Aug 2011, no final | 350 Powell St | P. L. Annuzzi, Inc. | revisions to 201106218634. revised work includes changes to plumbing, electrical, minor architecural design to achieve cost savingsDetails
revisions to 201106218634. revised work includes changes to plumbing, electrical, minor architecural design to achieve cost savings | |
| Jun 21, 2011 | Never finaled issued Jun 2011, no final | 350 Powell St | P. L. Annuzzi, Inc. | int. t.i. for new coffee cafe in union square. work is for new fixtures finnishes, equipment, lighting plumbing. no exterior work fire protection under seperate permit.Details
int. t.i. for new coffee cafe in union square. work is for new fixtures finnishes, equipment, lighting plumbing. no exterior work fire protection under seperate permit. | $50,000 |
| Apr 1, 2011 | Never finaled issued Apr 2011, no final | 333 Post St | temorary installation of 82x212 membrane structure red cross gala and reception at union square above parking garage. dates of events: 4/15 & 4/16Details
temorary installation of 82x212 membrane structure red cross gala and reception at union square above parking garage. dates of events: 4/15 & 4/16 | $30,000 | |
| Mar 22, 2011 | Never finaled issued Oct 2011, no final | 333 Post St | provide ada remediation i various places in union square.Details
provide ada remediation i various places in union square. | $100,000 | |
| Mar 15, 2011 | Never finaled issued Mar 2011, no final | 333 Post St | revision to 201103071553: 3rd night added and changes made to layout of tables. fire permit for temporary membrane structureDetails
revision to 201103071553: 3rd night added and changes made to layout of tables. fire permit for temporary membrane structure | ||
| Mar 7, 2011 | Never finaled issued Mar 2011, no final | 333 Post St | union square. temporary installation of 82' x 212' tent on top of parking area for " i can dinner" lunch and dinner event on 3/16/11 approved occupant load 980 persons.Details
union square. temporary installation of 82' x 212' tent on top of parking area for " i can dinner" lunch and dinner event on 3/16/11 approved occupant load 980 persons. | $30,000 | |
| Feb 4, 2011 | Completed final sign-off Mar 2011 | 333 Post St | temporary installation of 82' x 212' tent on top of city parking garage for sf gfeneral hospital annual lunch.Details
temporary installation of 82' x 212' tent on top of city parking garage for sf gfeneral hospital annual lunch. | $30,000 | |
| Dec 1, 2010 | Completed final sign-off Nov 2012 | 333 Post St | Bauman Landscape & Construction Inc. | acc barrier removal - restripe for revised accessible parking, revise/add signage, add railing & fencing at overhead obstructions.Details
acc barrier removal - restripe for revised accessible parking, revise/add signage, add railing & fencing at overhead obstructions. | $200,000 |
| Aug 23, 2010 | Completed final sign-off Oct 2011 | 333 Post St | union square. install temporary ice skating rink, ticket booth, skate dispensing booth, skate change area . november 10 to january 17.Details
union square. install temporary ice skating rink, ticket booth, skate dispensing booth, skate change area . november 10 to january 17. | $26,000 | |
| Aug 11, 2010 | Never finaled issued Aug 2010, no final | 350 Powell St | P. L. Annuzzi, Inc. | removal of landscape adjacent to (e) pavilion at west side of union square. install (n) drainage, pavers, glass windscreen on (e) curbwall, and tables and chairs.Details
removal of landscape adjacent to (e) pavilion at west side of union square. install (n) drainage, pavers, glass windscreen on (e) curbwall, and tables and chairs. | $32,700 |
| Sep 2, 2009 | Completed final sign-off Mar 2010 | 333 Post St | install temporary ice skating ring, ticket booth, skate dispensing booth, change area & canopies from november 11 thru january 18, 2010. sffd permits required for tenants and assembly. provide emergency lighting and exit signs. 250 occupant load for tents and 80 for skate change area and tents.Details
install temporary ice skating ring, ticket booth, skate dispensing booth, change area & canopies from november 11 thru january 18, 2010. sffd permits required for tenants and assembly. provide emergency lighting and exit signs. 250 occupant load for tents and 80 for skate change area and tents. | $26,000 | |
| May 27, 2009 | Expired or cancelled cancelled Jan 2026 | 333 Post St | build temporary (3 days) structure on union square plaza. create 19'lx14'w truss framed structure for creation of hotel room mock-up, no public access performers only from 6-15-09 to 6-18-09. event to be part of the parc 55 hotel re-openingDetails
build temporary (3 days) structure on union square plaza. create 19'lx14'w truss framed structure for creation of hotel room mock-up, no public access performers only from 6-15-09 to 6-18-09. event to be part of the parc 55 hotel re-opening | $5,000 | |
| Apr 6, 2009 | Never finaled issued Apr 2009, no final | 360 Powell St | request additional address for block 0308 lot 001Details
request additional address for block 0308 lot 001 | ||
| Nov 10, 2008 | Completed final sign-off Dec 2008 | 350 Powell St | Zebra Awning Co Inc | fabricate & install 1 triangle awningDetails
fabricate & install 1 triangle awning | $1,200 |
| Nov 7, 2008 | Completed final sign-off Mar 2009 | 333 Post St | revision to app #200810245113. new ada ramp to toilet facilities. new door to skate rental shopDetails
revision to app #200810245113. new ada ramp to toilet facilities. new door to skate rental shop | ||
| Oct 24, 2008 | Completed final sign-off Mar 2009 | 333 Post St | install temporary ice skating rink, ticket booth, skate dispensing both, change area & canopies. (union square - from nov 12, 2008 to jan 04, 2009.)Details
install temporary ice skating rink, ticket booth, skate dispensing both, change area & canopies. (union square - from nov 12, 2008 to jan 04, 2009.) | $26,000 | |
| May 30, 2003 | Expired or cancelled expired Nov 2005 | 333 Post St | Foothill Air Cond & Htg | modification of (1) existing return duct addition of (1) 3 ton ductless split system unitDetails
modification of (1) existing return duct addition of (1) 3 ton ductless split system unit | $10,000 |
| Mar 20, 2003 | Expired or cancelled expired Nov 2005 | 333 Post St | interior t/i of (e) shell, including (n) partitions, counters, equipment, fixtures and finishesDetails
interior t/i of (e) shell, including (n) partitions, counters, equipment, fixtures and finishes | $150,000 | |
| Jul 25, 2002 | Expired or cancelled cancelled Mar 2004 | 333 Post St | Cahill Contractors Inc | install emergency generator and fuel tankDetails
install emergency generator and fuel tank | $60,000 |
| Feb 28, 2002 | Expired or cancelled expired Nov 2005 | 333 Post St | J Gibbs Sons Inc | fuel oil piping between level,fill port and emergency generator (no structural work under this permiDetails
fuel oil piping between level,fill port and emergency generator (no structural work under this permi | $30,000 |
| Feb 27, 2002 | Expired or cancelled expired Nov 2005 | 333 Post St | Pacific Auxiliary Fire Alarm | installation of new fire alarm systemDetails
installation of new fire alarm system | $25,000 |
| Aug 20, 2001 | Expired or cancelled expired Oct 2002 | 333 Post St | Cahill Const Service Inc | fire sprinikler plan please submit to inspector r gallotDetails
fire sprinikler plan please submit to inspector r gallot | $80,000 |
| Dec 20, 2000 | Never finaled filed Dec 2000, never issued | 333 Post St | Cahill Contractors Inc | demolition of park levelDetails
demolition of park level | $700,000 |
| Oct 12, 2000 | Expired or cancelled expired Nov 2005 | 333 Post St | Cahill Contractors Inc **See 1011738** | this project will renovate the entire union square plaza & add 2 structures to the park. add a new eDetails
this project will renovate the entire union square plaza & add 2 structures to the park. add a new e |
Find contractors for work like this