Michael Zucker
- Listed as
- architect, attorney, authorized agent-others, engineer
- Firm
- Michael Zucker & Associates
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Sep 2026
173 permits since 2000 (architect on 165 permits, authorized agent-others on 10 permits, engineer on 3 permits, attorney on 1 permit): 119 completed, 12 in progress, 15 never finaled, 27 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 173.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 128 King St | Bonilla Construction | re-establish opening in floor to enable use of existing stair connecting 3rd floor to 2nd floor.Details
re-establish opening in floor to enable use of existing stair connecting 3rd floor to 2nd floor. | $30,000 |
| Aug 3, 2026 | In progress filed Aug 2026, not yet issued | 550 Washington St | to comply with nov 202656835- (n) equpiment at restaurant basement space. walk in cooler hand sink , ice maker and reach in fridge equipment. any mep, life safety will be permit separtelyDetails
to comply with nov 202656835- (n) equpiment at restaurant basement space. walk in cooler hand sink , ice maker and reach in fridge equipment. any mep, life safety will be permit separtely | $5,000 | |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 130 Sutter St | 3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately.Details
3/f: install (5) privacy pods. reverse swing of door at men's toilet room to improve accessibility. any mep or life safety work permitted separately. | $25,000 | |
| Feb 19, 2026 | In progress issued Apr 2026 | 943 Cole St | Vintage Construction | new accessible toilet room at existing restaurant. new toilet room triggers some reorganization of kitchen and back of house space. meps deferred.Details
new accessible toilet room at existing restaurant. new toilet room triggers some reorganization of kitchen and back of house space. meps deferred. | $45,000 |
| Feb 11, 2026 | Completed final sign-off May 2026 | 412 Hayes St | Bic Construction Inc | to comply with nov 202540043 application seeks to legalize the removal of 2 guestrooms on the 1st flDetails
to comply with nov 202540043 application seeks to legalize the removal of 2 guestrooms on the 1st fl | |
| Feb 6, 2026 | Completed final sign-off Jun 2026 | 801 Montgomery St | West Coast Build Aka Fairway Constructio | 2nd/f: revision to 202509256081, new office layout/ phoneroomsDetails
2nd/f: revision to 202509256081, new office layout/ phonerooms | |
| Dec 11, 2025 | In progress filed Dec 2025, not yet issued | 101 New Montgomery St | installation of 4 privacy booths at 5th floor tenant space. any electrical, fire/life safty permitted seperately.Details
installation of 4 privacy booths at 5th floor tenant space. any electrical, fire/life safty permitted seperately. | $20,000 | |
| Dec 9, 2025 | In progress issued Feb 2026 | 1635 Divisadero St | Bernal Hill Drywall | change of use from retail to office ref # 2025-001061prj ( 911 of 2275 sq ft). interior tenant improvements at the ground fl. new partitions, doors, glazing, electrical, lighting, cabinetry and finishes. mep, title 24 energy calcs and life safety permitted separately.Details
change of use from retail to office ref # 2025-001061prj ( 911 of 2275 sq ft). interior tenant improvements at the ground fl. new partitions, doors, glazing, electrical, lighting, cabinetry and finishes. mep, title 24 energy calcs and life safety permitted separately. | $125,000 |
| Nov 18, 2025 | Completed final sign-off Apr 2026 | 85 02nd St | Anderson Construction Group Inc | 7th fl, ste 700 revision to pa 202509084762 (arch'l) & 202510087007 (mech) and add'l work installation of 6 privacy booths; mechanical title 24 docs; electrical - 3 (n) lights/switches, 4 (n) receptacles & title 24 docs.Details
7th fl, ste 700 revision to pa 202509084762 (arch'l) & 202510087007 (mech) and add'l work installation of 6 privacy booths; mechanical title 24 docs; electrical - 3 (n) lights/switches, 4 (n) receptacles & title 24 docs. | $25,000 |
| Oct 29, 2025 | In progress filed Oct 2025, not yet issued | 110 Sutter St | interior remodel @ 5th fl tenant space includes demo, new partitions, doors, lighting and electrical and plumbing. any mep, title 24 energy calcs, and life safety work to be permitted separatelyDetails
interior remodel @ 5th fl tenant space includes demo, new partitions, doors, lighting and electrical and plumbing. any mep, title 24 energy calcs, and life safety work to be permitted separately | $150,000 | |
| Oct 24, 2025 | Completed final sign-off May 2026 | 85 02nd St | C C I Commercial Construction & Improv | installation of 9 phone booths/ privacy pods in the fifth floor tenant space. any mep, fire sprinkler and life safety work permitted separateley.Details
installation of 9 phone booths/ privacy pods in the fifth floor tenant space. any mep, fire sprinkler and life safety work permitted separateley. | $10,000 |
| Oct 6, 2025 | Completed final sign-off Dec 2025 | 85 02nd St | Aquamatic Fire Protection | 7/fl-relocate amd replace (2) , add (1) , plug (2) pendent fire sprinklers. no underground work. ref ti 202509084762Details
7/fl-relocate amd replace (2) , add (1) , plug (2) pendent fire sprinklers. no underground work. ref ti 202509084762 | $5,900 |
| Sep 25, 2025 | Completed final sign-off Jun 2026 | 801 Montgomery St | West Coast Build Aka Fairway Constructio | 2nd/fl:interior office tenant improvement project at 2nd floor space to include new partitions, doors, glazing, millwork, lighting, electrical, plumbing, mechanical, and finishes. mep tilte 24, and life and safety under seperate permits.Details
2nd/fl:interior office tenant improvement project at 2nd floor space to include new partitions, doors, glazing, millwork, lighting, electrical, plumbing, mechanical, and finishes. mep tilte 24, and life and safety under seperate permits. | $600,000 |
| Sep 8, 2025 | Completed final sign-off Apr 2026 | 85 02nd St | Anderson Construction Group Inc | interior tenant improvement projet on 7th floor: selective demolition, buildout of three small meeting rooms in place of existing tranining room. new walls, doors, galzing and lighting. any mep, title 24 calcs, fire sprinklers & life safety to be permitted separately.Details
interior tenant improvement projet on 7th floor: selective demolition, buildout of three small meeting rooms in place of existing tranining room. new walls, doors, galzing and lighting. any mep, title 24 calcs, fire sprinklers & life safety to be permitted separately. | $30,000 |
| Jul 18, 2025 | Completed final sign-off Apr 2026 | 801 Montgomery St | Tm Demolition Inc | 2/f - demolition of partition walls and ceiling in preperation for future tenant improvement.Details
2/f - demolition of partition walls and ceiling in preperation for future tenant improvement. | $50,000 |
| May 9, 2025 | In progress filed May 2025, not yet issued | 85 02nd St | 7/f suite 710 - installation of (3) single-occupant phone privacy booths. to partially remedy sffd nov 2405-0056.Details
7/f suite 710 - installation of (3) single-occupant phone privacy booths. to partially remedy sffd nov 2405-0056. | $3,000 | |
| Mar 28, 2025 | Completed final sign-off Apr 2026 | 6004 California St | P Jordan Builders Llc | barrier removal work at laundrymat: add push putton actuated power door operator at entrance under abe#202503170312. remodel restroom to make accessible. any mep work permited separately.Details
barrier removal work at laundrymat: add push putton actuated power door operator at entrance under abe#202503170312. remodel restroom to make accessible. any mep work permited separately. | $10,000 |
| Mar 11, 2025 | In progress issued Mar 2025 | 1475 29th Av | We Do Construction Inc. | revision to pa# 202409130762, page a1.2- added lights to dining room and bedrooms; page a1.1- added door #15 and changed size of door #20.Details
revision to pa# 202409130762, page a1.2- added lights to dining room and bedrooms; page a1.1- added door #15 and changed size of door #20. | $7,000 |
| Feb 7, 2025 | Completed final sign-off May 2025 | 30 Hotaling Pl | Bernal Hill Drywall | 3rd fl interior work - new glass door and sidelite @ existing opening @ elevator interior lobby. 2 new exit signsDetails
3rd fl interior work - new glass door and sidelite @ existing opening @ elevator interior lobby. 2 new exit signs | $10,000 |
| Jan 3, 2025 | In progress filed Jan 2025, not yet issued | 2201 Broadway | D Kelly Construction Inc. | repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage.Details
repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage. | $25,000 |
| Oct 16, 2024 | Completed final sign-off Oct 2025 | 85 02nd St | Source Planning And Construction Inc | installation of phone privacy for tenant on first and third floors to partially remedy sffd nov (id 2405-0056)Details
installation of phone privacy for tenant on first and third floors to partially remedy sffd nov (id 2405-0056) | $5,000 |
| Sep 25, 2024 | In progress issued Apr 2026 | 1635 Divisadero St | Kaiser Foundation Health Plan Inc | #625: interior finishes: administrative office space- replace existing lighting fixtures with new led- add power outlets- card readers at entry doors. replace existing plumbing fixtures- upgrade finishes in public corridor and new entry door-configure waiting room in 650.Details
#625: interior finishes: administrative office space- replace existing lighting fixtures with new led- add power outlets- card readers at entry doors. replace existing plumbing fixtures- upgrade finishes in public corridor and new entry door-configure waiting room in 650. | $100,000 |
| Sep 13, 2024 | Completed final sign-off Sep 2025 | 1475 29th Av | We Do Construction Inc. | kitchen and bathroom remodel in single family residence. (e) windows to be replaced w/ new throughout 2/f.Details
kitchen and bathroom remodel in single family residence. (e) windows to be replaced w/ new throughout 2/f. | $155,000 |
| Sep 4, 2024 | In progress issued Sep 2024 | 85 02nd St | 7/fl- interior ti project on 7th floor selective demo plus remodel of (e) pantry area to include (n) island counter, electrical and finishes. all mep, fire work to be on separte permitDetails
7/fl- interior ti project on 7th floor selective demo plus remodel of (e) pantry area to include (n) island counter, electrical and finishes. all mep, fire work to be on separte permit | $30,000 | |
| Aug 29, 2024 | Completed final sign-off Apr 2026 | 6000 California St | P Jordan Builders Llc | abe#: 2019-0204-4898. accessiblity upgrade at entrances to deli-cafe. mep permits separtelyDetails
abe#: 2019-0204-4898. accessiblity upgrade at entrances to deli-cafe. mep permits separtely | $8,000 |
| Jul 30, 2024 | Completed final sign-off Sep 2024 | 130 Sutter St | revision to 202312082171 reduction in demolition scope. some walls to remain. tenant space remain vacant per ab-017Details
revision to 202312082171 reduction in demolition scope. some walls to remain. tenant space remain vacant per ab-017 | ||
| Jun 13, 2024 | Completed final sign-off Sep 2024 | 526 Washington St | Bernal Hill Drywall | interior tenant improvement for the art gallery. new partitions, new lighting, new finishes.Details
interior tenant improvement for the art gallery. new partitions, new lighting, new finishes. | $25,000 |
| May 31, 2024 | Completed final sign-off Feb 2025 | 130 Sutter St | United California Glass And Door | g/f: furnish and install dual ada operators for main entry pair changing the swing of the rh door making both the lh and rh doors egress outward.Details
g/f: furnish and install dual ada operators for main entry pair changing the swing of the rh door making both the lh and rh doors egress outward. | $23,060 |
| Mar 18, 2024 | Completed final sign-off Oct 2024 | 2222 Broadway | D Kelly Construction Inc. | remodel toilet rooms at main level. mep, t-24 energy calcs, life safety under separate permit.Details
remodel toilet rooms at main level. mep, t-24 energy calcs, life safety under separate permit. | $175,000 |
| Mar 8, 2024 | Expired or cancelled withdrawn May 2024 | 130 Sutter St | main lobby: minor remodel. new entry doors, lighting and finishes. electrical and any title 24 under separate permit.Details
main lobby: minor remodel. new entry doors, lighting and finishes. electrical and any title 24 under separate permit. | $20,000 | |
| Dec 8, 2023 | Completed final sign-off Sep 2024 | 130 Sutter St | selective interior demolition at 6th floor tenant spaceDetails
selective interior demolition at 6th floor tenant space | $15,000 | |
| Nov 21, 2023 | Completed final sign-off Jun 2024 | 3192 16th St | barrier removal project: in an existing ground flr tenant space modify and upgrade existing unisex ada restroom, and add accessible bar counter to existing bar. any mep, title 24 energy analysis and life safety work permitted separately.Details
barrier removal project: in an existing ground flr tenant space modify and upgrade existing unisex ada restroom, and add accessible bar counter to existing bar. any mep, title 24 energy analysis and life safety work permitted separately. | $20,000 | |
| Jul 7, 2023 | Completed final sign-off Apr 2024 | 1635 Divisadero St | defered submittal 202212229020 for common use path of traval accessibility upgrades. install of truncated domes, restriping of (e) ada parking stall, re slope (e) ramp and retrofit public stair in complaince of current applicable codeDetails
defered submittal 202212229020 for common use path of traval accessibility upgrades. install of truncated domes, restriping of (e) ada parking stall, re slope (e) ramp and retrofit public stair in complaince of current applicable code | $5,000 | |
| May 23, 2023 | Completed final sign-off Apr 2025 | 1812 Webster St | Steelcore Builders Inc | revision to pa# 202103257310,structural elements changed due to field conditions.Details
revision to pa# 202103257310,structural elements changed due to field conditions. | |
| Mar 13, 2023 | Completed final sign-off Feb 2024 | 728 Chenery St | Mark Scott Construction Inc | interior remodel. 2/f: kitchen remodel. 3/f: bedrooms remodel. new deck on 2/f.Details
interior remodel. 2/f: kitchen remodel. 3/f: bedrooms remodel. new deck on 2/f. | $150,000 |
| Nov 17, 2022 | Completed final sign-off Jul 2023 | 3338 17th St | Bic Construction Inc | new partitions clinic in (e) ground floor tenant space work includes partiions, doors, interior glazing, electrical, mechanicalm plumbing, lighting, cabinetry and finishes . mep title 24 enery analysis , fire sprinkler and life safety work permitted seperately.Details
new partitions clinic in (e) ground floor tenant space work includes partiions, doors, interior glazing, electrical, mechanicalm plumbing, lighting, cabinetry and finishes . mep title 24 enery analysis , fire sprinkler and life safety work permitted seperately. | $230,000 |
| Jun 15, 2022 | Completed final sign-off Feb 2023 | 1700 Fillmore St | Northern Sun Associates | revision to work under issued permit (202204041505) interior post & beam structure w/hanging rope.Details
revision to work under issued permit (202204041505) interior post & beam structure w/hanging rope. | $5,000 |
| May 26, 2022 | Completed final sign-off Aug 2023 | 2550 22nd Av | Cepheus Builders Inc | new gyp board at (e) walls at (e) stair. replace stair stringers. raise (e) closet flooring. (n) lighting, 2 new windows. work on the g/fDetails
new gyp board at (e) walls at (e) stair. replace stair stringers. raise (e) closet flooring. (n) lighting, 2 new windows. work on the g/f | $15,000 |
| Apr 4, 2022 | Completed final sign-off Feb 2023 | 1700 Fillmore St | Northern Sun Associates | interior remodel of (e) restaurant. work includes some new partitions, doors, cabinetry, ceilings, lighting, mep & finishes. fire sprinkler work to be permitted separately.Details
interior remodel of (e) restaurant. work includes some new partitions, doors, cabinetry, ceilings, lighting, mep & finishes. fire sprinkler work to be permitted separately. | $350,000 |
| Jan 20, 2022 | Completed final sign-off Mar 2022 | 665 Chestnut St | Bic Construction Inc | to abate nov 202185327, to legalizae work in projgres at the base3ment level, which includes work at the toilet rooms. mep under sep permit. nov eid 202185622 & nov pid 202179023.Details
to abate nov 202185327, to legalizae work in projgres at the base3ment level, which includes work at the toilet rooms. mep under sep permit. nov eid 202185622 & nov pid 202179023. | $25,000 |
| Nov 10, 2021 | Completed final sign-off Jul 2022 | 85 02nd St | Evolv Commercial Construction Inc | 1st fl, tenant improvement - expansion of existing furniture showroom into adjacent tenant space. work include new partitions, door millwork, lighting, electrical and finishes; no exterior work; mep, fire sprinklers & life safety under separate permits.Details
1st fl, tenant improvement - expansion of existing furniture showroom into adjacent tenant space. work include new partitions, door millwork, lighting, electrical and finishes; no exterior work; mep, fire sprinklers & life safety under separate permits. | $223,000 |
| Aug 24, 2021 | Completed final sign-off Nov 2021 | 745 Cesar Chavez St | Reliable Construction Inc | construction new storage platform inside warehouseDetails
construction new storage platform inside warehouse | $25,000 |
| Jul 30, 2021 | Completed final sign-off Nov 2022 | 416 Hayes St | 1/f commerical space: relocate stair access to basement storage. new wall/door, plus accessibility improvement at entry and toilet room. mep, fire, and life safety to be separate permitDetails
1/f commerical space: relocate stair access to basement storage. new wall/door, plus accessibility improvement at entry and toilet room. mep, fire, and life safety to be separate permit | $25,000 | |
| Mar 25, 2021 | Completed final sign-off Apr 2025 | 1812 Webster St | Steelcore Builders Inc | remodel of 2-story single family home.work includes:excavation under house to add 1-car garage,include new interior stair to 1st floor, remodel of kitchen and dining, w/new 1/2 bath; addition at rear of house at 2nd floor lvl to replace(e)deck;(n)roof deck w/stairs penthouseDetails
remodel of 2-story single family home.work includes:excavation under house to add 1-car garage,include new interior stair to 1st floor, remodel of kitchen and dining, w/new 1/2 bath; addition at rear of house at 2nd floor lvl to replace(e)deck;(n)roof deck w/stairs penthouse | $350,000 |
| Dec 23, 2020 | Never finaled issued Jun 2021, no final | 972 Mission St | R & S Erection Of S F Inc | new security gates/grilles at storefront & mezzanine windows of ground floor tenant space.Details
new security gates/grilles at storefront & mezzanine windows of ground floor tenant space. | $7,500 |
| Dec 10, 2020 | Completed final sign-off Apr 2023 | 1050 North Point St | Rinaldi Construction | unit 209: remodel kitchen and bathroom. new lighting and finishes thru out. mep permitted separatelyDetails
unit 209: remodel kitchen and bathroom. new lighting and finishes thru out. mep permitted separately | $50,000 |
| Nov 21, 2020 | Completed final sign-off Dec 2021 | 420 Jersey St | D Kelly Construction Inc., Lyons Building & Associates Inc. | new home office on ground floor. excavation to achieve greater ceiling hight. new concrete slab & concrete foundation underpping in area of work. relocation of steel support post. 3 new windows at property line.Details
new home office on ground floor. excavation to achieve greater ceiling hight. new concrete slab & concrete foundation underpping in area of work. relocation of steel support post. 3 new windows at property line. | $30,000 |
| Nov 13, 2020 | Completed final sign-off Sep 2022 | 2541 Washington St | Lyons Building & Associates Inc. | 2/f: remodel of kitchen & bar; 3/f: remodel of laundry & office/den. mep permitted seperately.Details
2/f: remodel of kitchen & bar; 3/f: remodel of laundry & office/den. mep permitted seperately. | $85,000 |
| Aug 15, 2020 | Completed final sign-off May 2023 | 1522 Howard St | Jing Hua Construction Corp | application for adu in existing ground floor space. new work to include new kitchen, remodel of existing bathroom, and new doors and window out to rear yard. mep, and any required title 24 calcs, permitted separately. per ord 162-16.Details
application for adu in existing ground floor space. new work to include new kitchen, remodel of existing bathroom, and new doors and window out to rear yard. mep, and any required title 24 calcs, permitted separately. per ord 162-16. | $50,000 |
| May 13, 2020 | Completed final sign-off Apr 2021 | 2541 Washington St | Lyons Building & Associates Inc. | 1st flr - repairs due to flood damage. remodel kitchen and bathroom.Details
1st flr - repairs due to flood damage. remodel kitchen and bathroom. | $50,000 |
| Feb 7, 2020 | Completed final sign-off Apr 2020 | 1412 Van Ness Av | demolition of 1st fl interior space in prep for new tenants who will fire for improvements under a separate permit. ab-017.Details
demolition of 1st fl interior space in prep for new tenants who will fire for improvements under a separate permit. ab-017. | $4,000 | |
| Feb 4, 2020 | Completed final sign-off Mar 2021 | 130 Sutter St | J M E Construction Services Inc | revision to app#201911016184 to clarify fire rating of 2 hour wallDetails
revision to app#201911016184 to clarify fire rating of 2 hour wall | |
| Dec 20, 2019 | Expired or cancelled expired Feb 2024 | 972 Mission St | Modern Construction Inc | barrier removal project to include: removal of elevator and enlargement of elevator shaft in preparation for new elevator, work also includes new finishes and lighting at elevator lobby, mep, title 24 energy calcs, fire sprinklers and life safety under separate permitDetails
barrier removal project to include: removal of elevator and enlargement of elevator shaft in preparation for new elevator, work also includes new finishes and lighting at elevator lobby, mep, title 24 energy calcs, fire sprinklers and life safety under separate permit | $100,000 |
| Dec 9, 2019 | Completed final sign-off Jul 2020 | 59 Rosewood Dr | Steelcore Builders Inc | new deck at rear yardDetails
new deck at rear yard | $35,000 |
| Nov 1, 2019 | Completed final sign-off Mar 2021 | 130 Sutter St | J M E Construction Services Inc | construction of new elevator machikne room in basement for (e) frieght elevator. mep/title 24 energy calcs, fire sprinklers and life saety under seperate permit. maher n/a.Details
construction of new elevator machikne room in basement for (e) frieght elevator. mep/title 24 energy calcs, fire sprinklers and life saety under seperate permit. maher n/a. | $15,000 |
| Oct 17, 2019 | Completed final sign-off Jul 2020 | 59 Rosewood Dr | Steelcore Builders Inc | amend to pa#201908229512 & 201907024917: new exterior widnows , doors, reroofing. full interior remodel including addition of one bedroom, 2 full baths & 1/2 baths. removal of interior walls not to exceed 75%. deck removal under seperate permit.Details
amend to pa#201908229512 & 201907024917: new exterior widnows , doors, reroofing. full interior remodel including addition of one bedroom, 2 full baths & 1/2 baths. removal of interior walls not to exceed 75%. deck removal under seperate permit. | $350,000 |
| Sep 25, 2019 | Expired or cancelled expired Feb 2024 | 972 Mission St | Modern Construction Inc | barrier removal: replacement of (e) elevator with new larger elevator, work also includes new elevator machine room penthouse, to replace (e) mep, title 24 enerry calc, fire sprinklers, life safety, & elevator construction under separate permits: 201912200109.Details
barrier removal: replacement of (e) elevator with new larger elevator, work also includes new elevator machine room penthouse, to replace (e) mep, title 24 enerry calc, fire sprinklers, life safety, & elevator construction under separate permits: 201912200109. | $80,000 |
| Jun 12, 2019 | Completed final sign-off Aug 2020 | 1715 Octavia St | D Kelly Construction Inc. | new kitchen & restrooms at hight school multipurpose room, work includes new walls, doors, millwork, lighting, mechanical, elec, plumbing, and finishes, mep, title 24 energy calcs, fire sprinklers and life safety permitted sep. decorative brackets to be salvaged/reinstalled.Details
new kitchen & restrooms at hight school multipurpose room, work includes new walls, doors, millwork, lighting, mechanical, elec, plumbing, and finishes, mep, title 24 energy calcs, fire sprinklers and life safety permitted sep. decorative brackets to be salvaged/reinstalled. | $475,000 |
| May 8, 2019 | Completed final sign-off Nov 2019 | 615 Prague St | D Kelly Construction Inc. | revision to pa 2017-0124-7807.... to comply with nov 201690034Details
revision to pa 2017-0124-7807.... to comply with nov 201690034 | |
| Apr 26, 2019 | Never finaled filed Apr 2019, never issued | 425 Mission St | Turner Construction Co | proj-19-0249; tjpa-ti space# 216, 218 & 220 (dental office). 1st time t.i. on the 2nd floor of the transit center. total square footage is 3323 sq.ft.Details
proj-19-0249; tjpa-ti space# 216, 218 & 220 (dental office). 1st time t.i. on the 2nd floor of the transit center. total square footage is 3323 sq.ft. | $1,000,000 |
| Mar 21, 2019 | Expired or cancelled cancelled Nov 2022 | 900 Powell St | legalize (e) unit per ord 43-14. exit window to be enlarged to comply with section 1030.2. exit window to be lowered to comply with section 1030.3. upgrade plumbing fixtures to comply with cal-green standards.Details
legalize (e) unit per ord 43-14. exit window to be enlarged to comply with section 1030.2. exit window to be lowered to comply with section 1030.3. upgrade plumbing fixtures to comply with cal-green standards. | $5,000 | |
| Jan 14, 2019 | Never finaled issued Jan 2019, no final | 212 Church St | J M E Construction Services Inc | interior demo of restaurant space preparation for new restaurant, interior improvements under sep permitDetails
interior demo of restaurant space preparation for new restaurant, interior improvements under sep permit | $12,000 |
| Oct 26, 2018 | Never finaled issued Nov 2018, no final | 447 Bush St | Rico's General Construction | 2nd fl combining 2 guest rooms int0 1 accessible suite, add 1 guest rm in former lounge space to maintain guest room total work includes 2 new baths, rmodel e bath into accesible one. mep fire spr, t24 separately. both units remain residentialDetails
2nd fl combining 2 guest rooms int0 1 accessible suite, add 1 guest rm in former lounge space to maintain guest room total work includes 2 new baths, rmodel e bath into accesible one. mep fire spr, t24 separately. both units remain residential | $140,000 |
| Jun 21, 2018 | Completed final sign-off Oct 2018 | 110 Sutter St | Evolv Commercial Construction Inc | interior remodel at 10th floor tenant space. work includes new partitions, doors. lighting, electrical and accessibility upgrade restroom. mep and life safety permitted separatelyDetails
interior remodel at 10th floor tenant space. work includes new partitions, doors. lighting, electrical and accessibility upgrade restroom. mep and life safety permitted separately | $80,000 |
| May 24, 2018 | Completed final sign-off Nov 2018 | 110 Sutter St | Evolv Commercial Construction Inc | remodel of extg 5th fl: for use by single tenant. work includes interior partitions, susp. ceiling, lighting, electrical, plmg, casework and finishes. work includes one new toilet room. mep, title 24 and life safety to be permitted seperately.Details
remodel of extg 5th fl: for use by single tenant. work includes interior partitions, susp. ceiling, lighting, electrical, plmg, casework and finishes. work includes one new toilet room. mep, title 24 and life safety to be permitted seperately. | $300,000 |
| Apr 20, 2018 | Completed final sign-off Sep 2018 | 526 Washington St | Trainor Commercial Construction Inc. | minor demolition barrior removal, new cabinetry, new path to accessible restrooms. area plus or minus 1700 sq ft. n/a for maherDetails
minor demolition barrior removal, new cabinetry, new path to accessible restrooms. area plus or minus 1700 sq ft. n/a for maher | $15,000 |
| Feb 27, 2018 | Completed final sign-off Apr 2019 | 2940 Lyon St | revision to pa 2015-1202-3936 - replacement in kind of existing wall due to dry rot. same as (e) color, horiz wd siding. n/a for maher.Details
revision to pa 2015-1202-3936 - replacement in kind of existing wall due to dry rot. same as (e) color, horiz wd siding. n/a for maher. | $2,000 | |
| Jan 31, 2018 | Never finaled issued Mar 2018, no final | 110 Sutter St | Evolv Commercial Construction Inc | interior demolition at 5th floor. includes demolition of interior partitions and restroom in preparation for future improvement. no ceiling demo.Details
interior demolition at 5th floor. includes demolition of interior partitions and restroom in preparation for future improvement. no ceiling demo. | $24,000 |
| Dec 14, 2017 | Completed final sign-off Apr 2018 | 260 California St | Build Group Inc. | 8th fl - remodel and expansion of existing tenant space into adjacent tenant space. work includes new partitions, doors, interior glazing, millwork, lighting, electrical and new finishes. mep,title 24 lighting, fire sprinkler and life safety work to be permitte separatelyDetails
8th fl - remodel and expansion of existing tenant space into adjacent tenant space. work includes new partitions, doors, interior glazing, millwork, lighting, electrical and new finishes. mep,title 24 lighting, fire sprinkler and life safety work to be permitte separately | $120,000 |
| Oct 26, 2017 | Completed final sign-off Apr 2019 | 2942 Lyon St | Jame L Kelly Construction | revision to pa 2015-1202-3936 remove & replace in like kind methods, damage cement plaster, dryrotted trim/siding & backing at front facade adjacent to previously premitted window replacement. remove & replace in kind damaged wood siding & dryrtoted trim at north west corner of bldg. approx area ofDetails
revision to pa 2015-1202-3936 remove & replace in like kind methods, damage cement plaster, dryrotted trim/siding & backing at front facade adjacent to previously premitted window replacement. remove & replace in kind damaged wood siding & dryrtoted trim at north west corner of bldg. approx area of | $3,000 |
| Oct 25, 2017 | Never finaled issued Nov 2017, no final | 110 Sutter St | Evolv Commercial Construction Inc | 2nd floor #200 - amep remodel of ~1300 sq ft tenant space work includes new partitions, susp ceiling, lighting, electrical, plumbing, casework & finsihes. fire under separate permit(s).Details
2nd floor #200 - amep remodel of ~1300 sq ft tenant space work includes new partitions, susp ceiling, lighting, electrical, plumbing, casework & finsihes. fire under separate permit(s). | $120,000 |
| Sep 11, 2017 | Completed final sign-off Mar 2018 | 245 11th St | Rico's General Construction | title 24 for 2017-0131-8272. maher n/aDetails
title 24 for 2017-0131-8272. maher n/a | |
| Aug 15, 2017 | Never finaled issued Aug 2017, no final | 2940 Lyon St | Jame L Kelly Construction | revision to #201512023936. clarifications to site conditions: revisions to layout in units at level 2, removal of skylight and relocation & addition of roof drains. maher naDetails
revision to #201512023936. clarifications to site conditions: revisions to layout in units at level 2, removal of skylight and relocation & addition of roof drains. maher na | |
| Jun 29, 2017 | Expired or cancelled withdrawn Feb 2019 | 855 Howard St | change of use from restaurant to office. soft demo in preparation for future tenant improvementDetails
change of use from restaurant to office. soft demo in preparation for future tenant improvement | $9,500 | |
| Feb 21, 2017 | Expired or cancelled cancelled Jan 2026 | 85 02nd St | Engler Construction | remodel at first floor display window, any mep, t-24 7 fire sprinkler work under separate permits. n/a maher ordinanceDetails
remodel at first floor display window, any mep, t-24 7 fire sprinkler work under separate permits. n/a maher ordinance | $3,500 |
| Jan 31, 2017 | Completed final sign-off Mar 2018 | 245 11th St | Rico's General Construction | base building improvements, new elevator lobby on 1st and 3rd fl, modifications to entrance on kissling, new vertical platform lift, replacement of steel windows w/ alum at 2nd fl on kissling, replacement of exterior lighting. mep, title 24 , fire sprinkler work permitted separatelyDetails
base building improvements, new elevator lobby on 1st and 3rd fl, modifications to entrance on kissling, new vertical platform lift, replacement of steel windows w/ alum at 2nd fl on kissling, replacement of exterior lighting. mep, title 24 , fire sprinkler work permitted separately | $50,000 |
| Jan 24, 2017 | Completed final sign-off Nov 2019 | 615 Prague St | D Kelly Construction Inc. | legalization of dwelling unit installed without permit.Details
legalization of dwelling unit installed without permit. | $75,700 |
| Jan 11, 2017 | Never finaled issued Jan 2017, no final | 2358 Market St | Adam's Construction & Painting | to comply with complaint #201642161. remove flourescent lighting & install led. new construction housing with track lighting to meet title 24 code.Details
to comply with complaint #201642161. remove flourescent lighting & install led. new construction housing with track lighting to meet title 24 code. | $10,000 |
| Jan 9, 2017 | Completed final sign-off May 2018 | 227 Front St | Evolv Commercial Construction Inc | replace existing old electrical service with new electrical service in same general location maher not req; architectural work to create new electrical room.Details
replace existing old electrical service with new electrical service in same general location maher not req; architectural work to create new electrical room. | $5,000 |
| Dec 27, 2016 | Expired or cancelled withdrawn Jun 2017 | 2942 Lyon St | Cary Wing Plumbing & Fire Protection Inc | revision to 201512023936. new trash enclosureDetails
revision to 201512023936. new trash enclosure | |
| Sep 23, 2016 | Completed final sign-off Dec 2016 | 28 Geary St | O'connor Plumbing & Fire Protection | repair to fire dept connection as a result of work under app#201511021401. n/a for maherDetails
repair to fire dept connection as a result of work under app#201511021401. n/a for maher | |
| Sep 15, 2016 | Completed final sign-off Dec 2016 | 110 Sutter St | Evolv Commercial Construction Inc | interior demolition at 4th floor, includes demolition of interior partitions and restrooms in preparation for future tenant improvements under separate permit application. no exterior work. fire under separate permitDetails
interior demolition at 4th floor, includes demolition of interior partitions and restrooms in preparation for future tenant improvements under separate permit application. no exterior work. fire under separate permit | $26,000 |
| Aug 11, 2016 | Completed final sign-off Nov 2016 | 303 Sacramento St | Rico's General Construction | 3/f- title 24 lighting calcs. for work under t.i. pa#201605197877. n/a ordinance #155-13Details
3/f- title 24 lighting calcs. for work under t.i. pa#201605197877. n/a ordinance #155-13 | |
| Jun 29, 2016 | Completed final sign-off Nov 2016 | 447 Bush St | Rico's General Construction | title 24 documentation & calcs in ref pa 2016 0315 2009 maher naDetails
title 24 documentation & calcs in ref pa 2016 0315 2009 maher na | |
| Jun 13, 2016 | Never finaled issued Jun 2016, no final | 524 Washington St | selective interior partition demo & removal of interior finishes in prepartion for future ti under separate permit . ab-017 applies.Details
selective interior partition demo & removal of interior finishes in prepartion for future ti under separate permit . ab-017 applies. | $7,500 | |
| Jun 1, 2016 | Expired or cancelled cancelled Jan 2018 | 1910 Mission St | change of use. tenant improvement project to build out 1st fl space as a restaurant. work to include (n) walls, doors, millwork, soffits, ramping & finishes. mep, fire sprinklers, life safety & title 24 under separate permit.Details
change of use. tenant improvement project to build out 1st fl space as a restaurant. work to include (n) walls, doors, millwork, soffits, ramping & finishes. mep, fire sprinklers, life safety & title 24 under separate permit. | $180,000 | |
| May 19, 2016 | Completed final sign-off Nov 2016 | 303 Sacramento St | Rico's General Construction | t.i. at 3rd floor office space: work includes new partitions, doors, interior window, millwork, lighting, electrical, plumbing, new toilet rooms, and new finishes. mep, title 24, &fire sprinkler work to be permitted seperate. n/a for maher.Details
t.i. at 3rd floor office space: work includes new partitions, doors, interior window, millwork, lighting, electrical, plumbing, new toilet rooms, and new finishes. mep, title 24, &fire sprinkler work to be permitted seperate. n/a for maher. | $145,000 |
| May 12, 2016 | Completed final sign-off Aug 2017 | 85 Carl St | ada as part to soft story for commercial.Details
ada as part to soft story for commercial. | $2,500 | |
| May 5, 2016 | Completed final sign-off Jun 2016 | 801 Montgomery St | Pacific General Construction | 4th floor interior office tenant improvement project to include new partitions, doors, glazing, millwork, lighitng, electrical & finishes. mep, title 24 energy calcs, & life safety under separate permits. n/a maher ordinanceDetails
4th floor interior office tenant improvement project to include new partitions, doors, glazing, millwork, lighitng, electrical & finishes. mep, title 24 energy calcs, & life safety under separate permits. n/a maher ordinance | $275,000 |
| Apr 29, 2016 | Completed final sign-off Nov 2016 | 447 Bush St | Rico's General Construction | public health dept review only - ref approved pa 2016-0315-2009. other departments approval under pa 2016-0315-2009.Details
public health dept review only - ref approved pa 2016-0315-2009. other departments approval under pa 2016-0315-2009. | |
| Mar 15, 2016 | Never finaled issued Apr 2016, no final | 447 Bush St | Rico's General Construction | new hotel bar in first floor space. work includes new walls, ceiling, door s, millwork and finishes. mep, alarm, title 24 calcs and fire sprinkler work to be permitted separately. maher naDetails
new hotel bar in first floor space. work includes new walls, ceiling, door s, millwork and finishes. mep, alarm, title 24 calcs and fire sprinkler work to be permitted separately. maher na | $140,000 |
| Dec 2, 2015 | Completed final sign-off Apr 2019 | 2942 Lyon St | Jame L Kelly Construction | alterations to (e) restaurant/bar w/2 apt units on upper floor. bldg was damaged by fire. repairs involved & a full seismic upgrade. changes to the layouts of the resid'l units & on the restaurant level. the mezz at back is being lowered to the level of main floor & basement slab below is beingDetails
alterations to (e) restaurant/bar w/2 apt units on upper floor. bldg was damaged by fire. repairs involved & a full seismic upgrade. changes to the layouts of the resid'l units & on the restaurant level. the mezz at back is being lowered to the level of main floor & basement slab below is being | $300,000 |
| Nov 2, 2015 | Expired or cancelled withdrawn Oct 2018 | 447 Bush St | work at 2nd floor to include addition of one new tourist guest room, and remodel of one extg guest room. work includes 2 new bathrooms. mep and fire sprinklers permitted separately. n/a for maher.Details
work at 2nd floor to include addition of one new tourist guest room, and remodel of one extg guest room. work includes 2 new bathrooms. mep and fire sprinklers permitted separately. n/a for maher. | $50,000 | |
| Nov 2, 2015 | Completed final sign-off Dec 2016 | 28 Geary St | replace storefront at retail space on geary st. replace bldg entrance on geary st. n/a for maherDetails
replace storefront at retail space on geary st. replace bldg entrance on geary st. n/a for maher | $80,000 | |
| Oct 20, 2015 | Completed final sign-off Jan 2016 | 801 Montgomery St | Pacific General Construction | minor remodel to bld entrance hall and elevator lobby on 1 st flr. work includes minor demo, patching in, new light fixtures, paint and some new lighting. maher naDetails
minor remodel to bld entrance hall and elevator lobby on 1 st flr. work includes minor demo, patching in, new light fixtures, paint and some new lighting. maher na | $10,000 |
| Jul 21, 2015 | Completed final sign-off Feb 2016 | 1906 Mission St | Rico's General Construction | to legalize 3 additional guest rooms bringing the current 28 guest rooms to a total. 31 guestrooms with 1 of the new guestroom to have cooking.Details
to legalize 3 additional guest rooms bringing the current 28 guest rooms to a total. 31 guestrooms with 1 of the new guestroom to have cooking. | |
| May 28, 2015 | Completed final sign-off Sep 2015 | 333 Bush St | Field Construction Inc. | 15th floor - demolition only including removal of interior partitoins, t-bar (selective) ceiling & finish flooring (carpet & base) per ab-017.Details
15th floor - demolition only including removal of interior partitoins, t-bar (selective) ceiling & finish flooring (carpet & base) per ab-017. | $25,000 |
| May 13, 2015 | Completed final sign-off Aug 2015 | 1775 Union St | Jame L Kelly Construction | tenant improvement in 1st fl space for new fitness studio. work includes new partitons, doors, millwork, lighting, elec, plumbing, finishes. elec, plum, fire sprinkler under sep permit. maher not reqDetails
tenant improvement in 1st fl space for new fitness studio. work includes new partitons, doors, millwork, lighting, elec, plumbing, finishes. elec, plum, fire sprinkler under sep permit. maher not req | $50,000 |
| Mar 3, 2015 | Completed final sign-off Nov 2016 | 447 Bush St | Rico's General Construction | relocation of hotel reception desk to 1st fl to include new lobby space, breakfast area, storage room, and remodel of toilet rooms. mep and fire sprinklers permitted separately. n/a for maher ordinance.Details
relocation of hotel reception desk to 1st fl to include new lobby space, breakfast area, storage room, and remodel of toilet rooms. mep and fire sprinklers permitted separately. n/a for maher ordinance. | $40,000 |
| Feb 19, 2015 | Completed final sign-off May 2015 | 85 02nd St | Engler Construction | tenant improvements in first floor space for furniture showroom, work includes, new partitions, door, millwork, lighting, electrical & finishes, mep, life safety & fire sprinklers under separate permit; maher n/a. comply with nov # 201521931Details
tenant improvements in first floor space for furniture showroom, work includes, new partitions, door, millwork, lighting, electrical & finishes, mep, life safety & fire sprinklers under separate permit; maher n/a. comply with nov # 201521931 | $65,000 |