Syska Hennessy
- Listed as
- architect, engineer
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Apr 2019
7 permits since 2000 (engineer on 4 permits, architect on 3 permits): 5 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2019 | Never finaled filed Apr 2019, never issued | 425 Mission St | Turner Construction Co | proj-19-0249; tjpa-ti space# 216, 218 & 220 (dental office). 1st time t.i. on the 2nd floor of the transit center. total square footage is 3323 sq.ft.Details
proj-19-0249; tjpa-ti space# 216, 218 & 220 (dental office). 1st time t.i. on the 2nd floor of the transit center. total square footage is 3323 sq.ft. | $1,000,000 |
| Aug 1, 2013 | Completed final sign-off Feb 2014 | 1455 Market St | Deb Construction Llc | demo short partition wall, construct new demising wall to seperate a portion of the 7th floor. separate mechanical hvac and electrical system from newly demised area.Details
demo short partition wall, construct new demising wall to seperate a portion of the 7th floor. separate mechanical hvac and electrical system from newly demised area. | $450,000 |
| Nov 8, 2010 | Completed final sign-off Feb 2011 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | relocate upright fire sprinklers on the 22 nd fl. 42 relocatedDetails
relocate upright fire sprinklers on the 22 nd fl. 42 relocated | $8,500 |
| Oct 5, 2010 | Completed final sign-off Dec 2010 | 1455 Market St | Ayoob & Peery Plumbing Co Inc | revision to pa# 2010-0824-9502-additonal cut sheets & spec sheetsDetails
revision to pa# 2010-0824-9502-additonal cut sheets & spec sheets | |
| Dec 11, 2009 | Completed final sign-off Dec 2010 | 1455 Market St | City Building Inc. | replace fire sprinkler control valves assembling per plans & specs. on each floor at each sprinklers.Details
replace fire sprinkler control valves assembling per plans & specs. on each floor at each sprinklers. | $130,000 |
| Oct 8, 2009 | Completed final sign-off Feb 2010 | 555 California St | Turner Construction Co | 7th & 9th floor new bldg control system. install a monitoring system in the 7th floor mechanical room & ups room & the 9th floor network equipment room to allow the owner to monitor equipment & instruments in those rooms from a remote location.Details
7th & 9th floor new bldg control system. install a monitoring system in the 7th floor mechanical room & ups room & the 9th floor network equipment room to allow the owner to monitor equipment & instruments in those rooms from a remote location. | $78,190 |
| Sep 25, 2009 | Never finaled issued Oct 2009, no final | 315 Montgomery St | Hathaway Dinwiddie Co. | replace the extg four pneumatic vav boxes, cooling only with 4 pneumatic vav boxes with heating capacity on the mezzanine floor conference room.Details
replace the extg four pneumatic vav boxes, cooling only with 4 pneumatic vav boxes with heating capacity on the mezzanine floor conference room. | $30,000 |