Block 0564, lot 070
2222 Broadway
- City’s use
- Commercial Misc
- Built
- 1904
- Rooms
- 53 bathrooms
- Building
- 117,200 sq ft
- Lot
- 74,797 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
64 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Jul 2026 | 2222 Broadway | City Mechanical Inc | steam boiler replacement with new of same capacity. no architectural or building structural work. no change in gas. new concrete pad. ref serial #57439Details
steam boiler replacement with new of same capacity. no architectural or building structural work. no change in gas. new concrete pad. ref serial #57439 | $189,000 |
| Oct 21, 2025 | Completed final sign-off Apr 2026 | 2222 Broadway | Siemens Industry, Inc. | grant building; fire only work for elevator moderization at the grant bldg. additions are 5 smoke detectors, and 3 modules. no ref as no associated remodel is done.Details
grant building; fire only work for elevator moderization at the grant bldg. additions are 5 smoke detectors, and 3 modules. no ref as no associated remodel is done. | $5,400 |
| Jul 25, 2024 | Completed final sign-off Oct 2024 | 2222 Broadway | Paganini Electric Corp(See Signatories) | lighting upgrades. lighting controls upgrades. power upgrades.Details
lighting upgrades. lighting controls upgrades. power upgrades. | $63,000 |
| Jun 20, 2024 | Completed final sign-off Aug 2024 | 2222 Broadway | Potter Fire Protection | resupply (7) fire sprinklers to remove trip hazard. no ref permit, voluntary remodel.Details
resupply (7) fire sprinklers to remove trip hazard. no ref permit, voluntary remodel. | $4,200 |
| Jun 11, 2024 | Completed final sign-off Aug 2024 | 2222 Broadway | Potter Fire Protection | relocate 3 fire sprinklers. ref 202403188062Details
relocate 3 fire sprinklers. ref 202403188062 | $1,950 |
| May 1, 2024 | Completed final sign-off Sep 2024 | 2222 Broadway | City Mechanical Inc | restroom exhaust installation. ref permit 202403188062Details
restroom exhaust installation. ref permit 202403188062 | $120,000 |
| Apr 30, 2024 | Completed final sign-off Aug 2024 | 2222 Broadway | Siemens Industry, Inc. | ref pa#2024-0318-8062 fire only work for the restroom remodel on 1st fl. 2 strobes are added.Details
ref pa#2024-0318-8062 fire only work for the restroom remodel on 1st fl. 2 strobes are added. | $12,400 |
| Mar 18, 2024 | Completed final sign-off Oct 2024 | 2222 Broadway | D Kelly Construction Inc. | remodel toilet rooms at main level. mep, t-24 energy calcs, life safety under separate permit.Details
remodel toilet rooms at main level. mep, t-24 energy calcs, life safety under separate permit. | $175,000 |
| May 18, 2022 | Completed final sign-off Aug 2024 | 2222 Broadway | City Mechanical Inc | gym installation of split system.Details
gym installation of split system. | $30,000 |
| May 11, 2021 | Completed final sign-off Feb 2023 | 2222 Broadway | Siemens Industry, Inc. | fire only for the "theater" remodel on sub-basement level 2; additions are 1 smoke detector, 4 duct detectors, 1 module, 3 pull stations, 1 horn/strobe power supply, 7 horn/strobes, and 4 strobes. ref. permit app # 2019 1001 3159Details
fire only for the "theater" remodel on sub-basement level 2; additions are 1 smoke detector, 4 duct detectors, 1 module, 3 pull stations, 1 horn/strobe power supply, 7 horn/strobes, and 4 strobes. ref. permit app # 2019 1001 3159 | $17,600 |
| May 6, 2021 | Completed final sign-off Feb 2023 | 2222 Broadway | Siemens Industry, Inc. | fire only work for the voluntary installation of a 2-way communications system. no ref. permit application nuber.Details
fire only work for the voluntary installation of a 2-way communications system. no ref. permit application nuber. | $5,000 |
| Feb 24, 2021 | Completed final sign-off Mar 2023 | 2222 Broadway | D Kelly Construction Inc. | tenant improvement mechanical work. revise existing duckwork & hydronic piping as necessary to accomodate new work. furnish & install new air terminals, vrf systems, fan & piping/ductwork as necessary. air balance & title 24. ref pa# 201910013159.Details
tenant improvement mechanical work. revise existing duckwork & hydronic piping as necessary to accomodate new work. furnish & install new air terminals, vrf systems, fan & piping/ductwork as necessary. air balance & title 24. ref pa# 201910013159. | $225,000 |
| Feb 24, 2021 | Never finaled issued Apr 2021, no final | 2222 Broadway | D Kelly Construction Inc. | new lighting & power signal for existing assembly space, new panel board, new theatrical lighting control system. title 24. ref pa# 201910013159.Details
new lighting & power signal for existing assembly space, new panel board, new theatrical lighting control system. title 24. ref pa# 201910013159. | $310,000 |
| Feb 23, 2021 | Completed final sign-off May 2022 | 2222 Broadway | Potter Fire Protection | install (47) new fire sprinklers in a theater area and lobby. voluntary installation. ref. permit # 2019-10-01-3159Details
install (47) new fire sprinklers in a theater area and lobby. voluntary installation. ref. permit # 2019-10-01-3159 | $23,500 |
| Nov 8, 2019 | Never finaled issued Mar 2020, no final | 2222 Broadway | no construction. administration permit to vest planning commission motion no 20518(planning case #2016004403cua0 to increase enrollement for extg school from 850 to 1050 students and to increase number of faculty and staff from 200 to 205//these occupants loads are approved for the classrooms listedDetails
no construction. administration permit to vest planning commission motion no 20518(planning case #2016004403cua0 to increase enrollement for extg school from 850 to 1050 students and to increase number of faculty and staff from 200 to 205//these occupants loads are approved for the classrooms listed | ||
| Oct 1, 2019 | Completed final sign-off Mar 2023 | 2222 Broadway | D Kelly Construction Inc. | interior renovation of existing assembly space in a private k-12 girls school. no change in use or occupancy. mep & fire alarm under separate permit.Details
interior renovation of existing assembly space in a private k-12 girls school. no change in use or occupancy. mep & fire alarm under separate permit. | $465,120 |
| Aug 14, 2018 | Never finaled issued Aug 2018, no final | 2222 Broadway | D Kelly Construction Inc. | new lighting and branch circuit to existing panel. title 24 compliance ref 201803264571, int renovation of existing restrooms, 2 floorsDetails
new lighting and branch circuit to existing panel. title 24 compliance ref 201803264571, int renovation of existing restrooms, 2 floors | $22,000 |
| Aug 7, 2018 | Completed final sign-off Aug 2018 | 2222 Broadway | Siemens Industry, Inc. | fire alarm work for the restrooms, remodel on floors 1 and 2; addition are (4) strobes. ref#201803264571Details
fire alarm work for the restrooms, remodel on floors 1 and 2; addition are (4) strobes. ref#201803264571 | $2,200 |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 2222 Broadway | Potter Fire Protection | demo and re-install fire sprinkler piping and 16 fire sprinklers. ref pa 2018-0326-4571Details
demo and re-install fire sprinkler piping and 16 fire sprinklers. ref pa 2018-0326-4571 | $8,000 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 2222 Broadway | City Mechanical Inc | grant hall: bathroomslevel 1-2 , hvac improvements. installation sof new restroom & janitor closet. exhaust grilles, ducts and fans. ref 201803264571Details
grant hall: bathroomslevel 1-2 , hvac improvements. installation sof new restroom & janitor closet. exhaust grilles, ducts and fans. ref 201803264571 | $60,000 |
| Mar 26, 2018 | Completed final sign-off Aug 2018 | 2222 Broadway | D Kelly Construction Inc. | interior renovation of 2 existing girls restrooms in private 5-12 girls school. no change in use or occupancy. no change to exterior of buildings. mep to be separate permit. fire alarm to be separate permit.Details
interior renovation of 2 existing girls restrooms in private 5-12 girls school. no change in use or occupancy. no change to exterior of buildings. mep to be separate permit. fire alarm to be separate permit. | $56,400 |
| Mar 12, 2018 | Completed final sign-off Mar 2018 | 2222 Broadway | Siemens Industry, Inc. | fire alarm, as built add - 2 relay modules for scoreboard shutdown upon an alarm condiditon in the bldg. original job was a voluntary upgrade to the system. this meets requirments for sffd testing inspector for final approvalDetails
fire alarm, as built add - 2 relay modules for scoreboard shutdown upon an alarm condiditon in the bldg. original job was a voluntary upgrade to the system. this meets requirments for sffd testing inspector for final approval | $1,060 |
| Aug 24, 2017 | Completed final sign-off Nov 2017 | 2222 Broadway | D Kelly Construction Inc. | 2nd and 3rd flr restrooms - mechanical and electrical plans and t-24. ref. app#2017-05-24-7475Details
2nd and 3rd flr restrooms - mechanical and electrical plans and t-24. ref. app#2017-05-24-7475 | $72,000 |
| Aug 23, 2017 | Completed final sign-off Nov 2017 | 2222 Broadway | D Kelly Construction Inc. | mechanical plan & title 24, electrical plan & title 24. ref pa 201705237325Details
mechanical plan & title 24, electrical plan & title 24. ref pa 201705237325 | $122,000 |
| Jul 21, 2017 | Completed final sign-off Mar 2018 | 2222 Broadway | Siemens Industry, Inc. | fire alarm additions to upgrade the (e) system to have voice capability. this is a "voluntary upgrade" by the owner. a (n) panel & devices are being installed at the gym to replace (e) equipment under this work.Details
fire alarm additions to upgrade the (e) system to have voice capability. this is a "voluntary upgrade" by the owner. a (n) panel & devices are being installed at the gym to replace (e) equipment under this work. | $28,500 |
| Jul 7, 2017 | Never finaled issued Jul 2017, no final | 2222 Broadway | Potter Fire Protection | relocate 25 fire sprinklers. plug 2 fire sprinklers ref 201705237325Details
relocate 25 fire sprinklers. plug 2 fire sprinklers ref 201705237325 | $12,500 |
| May 24, 2017 | Completed final sign-off Aug 2017 | 2222 Broadway | D Kelly Construction Inc. | interior renovation of (2) existing girls restroom in a private k-12 girls school. no change in use or occupancy. no change to exterior of building. mep to be separate design build permit. fire alarm to be separate permitDetails
interior renovation of (2) existing girls restroom in a private k-12 girls school. no change in use or occupancy. no change to exterior of building. mep to be separate design build permit. fire alarm to be separate permit | $53,852 |
| May 23, 2017 | Completed final sign-off Nov 2017 | 2222 Broadway | D Kelly Construction Inc. | interior renovation of existing science classrooms to a private k-12 school. mep to separate design build pemrit. no change in use or occupancy. fire larm and sprinklers to be separate permit.Details
interior renovation of existing science classrooms to a private k-12 school. mep to separate design build pemrit. no change in use or occupancy. fire larm and sprinklers to be separate permit. | $300,000 |
| Sep 15, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | D Kelly Construction Inc. | electrical plan, lighting, t-24 for room 2b01. ref app# 201607212943Details
electrical plan, lighting, t-24 for room 2b01. ref app# 201607212943 | $2,500 |
| Aug 9, 2016 | Completed final sign-off Dec 2016 | 2222 Broadway | Siemens Industry, Inc. | replacement of the fire alarm system including the main panel, 31 smoke detectors, 3 duct detectors, and 5 zone modules. a new graphic annunciator is being added at the front entryDetails
replacement of the fire alarm system including the main panel, 31 smoke detectors, 3 duct detectors, and 5 zone modules. a new graphic annunciator is being added at the front entry | $29,000 |
| Jul 25, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | D Kelly Construction Inc. | electrical t-24 and mechanical t-24 (plumbing only) ref pa 2016-0418-4994 for presidents office, ground floorDetails
electrical t-24 and mechanical t-24 (plumbing only) ref pa 2016-0418-4994 for presidents office, ground floor | $24,500 |
| Jul 25, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | D Kelly Construction Inc. | electrical t-24 lighting on ground floor only. grand hall classrooms ref pa 2016-0426-5676. fire under separate permitDetails
electrical t-24 lighting on ground floor only. grand hall classrooms ref pa 2016-0426-5676. fire under separate permit | $15,000 |
| Jul 21, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | D Kelly Construction Inc. | ti - classroom: replace carpet, lighting, ceiling - furred out walls. paint space. electrical work throughout.Details
ti - classroom: replace carpet, lighting, ceiling - furred out walls. paint space. electrical work throughout. | $135,000 |
| Apr 26, 2016 | Expired or cancelled cancelled Jan 2026 | 2222 Broadway | interior renovation of classroom space in to 2 classrooms. no change in use or occupancy. sprinklers and fire alarm on sep permits, and mep seperate permit.Details
interior renovation of classroom space in to 2 classrooms. no change in use or occupancy. sprinklers and fire alarm on sep permits, and mep seperate permit. | $92,628 | |
| Apr 26, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | D Kelly Construction Inc. | interior renovation of office space to classroom. demolition of non bearing walls, new finishes. no exterior work, no sprinklers, fire alarm sep permit, and mep seperate permit.Details
interior renovation of office space to classroom. demolition of non bearing walls, new finishes. no exterior work, no sprinklers, fire alarm sep permit, and mep seperate permit. | $56,400 |
| Apr 18, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | D Kelly Construction Inc. | demo of non-bearing interior walls & finishes, new wall & door for new president's office. mep to be separate design build permit. no change of use or occupancy. no exterior work. fire alarm under separate permitDetails
demo of non-bearing interior walls & finishes, new wall & door for new president's office. mep to be separate design build permit. no change of use or occupancy. no exterior work. fire alarm under separate permit | $88,968 |
| Jul 23, 2015 | Completed final sign-off Oct 2015 | 2201 Vallejo St | D Kelly Construction Inc. | revision to 201506249771. room 5306 a remove existing panic hardware add sign not and exit to door.Details
revision to 201506249771. room 5306 a remove existing panic hardware add sign not and exit to door. | $300 |
| Jul 23, 2015 | Completed final sign-off Dec 2016 | 2222 Broadway | H C I Systems Inc | fire alarm ti add new fire alarm devices in flood and siboni buildings to existing fire alarm system in new ti space . includes 8 strobes, 11 horn strobes, 1 bps and 1 duct detDetails
fire alarm ti add new fire alarm devices in flood and siboni buildings to existing fire alarm system in new ti space . includes 8 strobes, 11 horn strobes, 1 bps and 1 duct det | $7,840 |
| Jul 17, 2015 | Completed final sign-off Oct 2015 | 2201 Vallejo St | D Kelly Construction Inc. | revision to appl #2015.0624.9771 - mep only - install new exhaust on roof & new hot water heating coil above ceiling on 3rd floor.Details
revision to appl #2015.0624.9771 - mep only - install new exhaust on roof & new hot water heating coil above ceiling on 3rd floor. | $3,000 |
| Jul 15, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | D Kelly Construction Inc. | revision to 201506249820. 2nd fl open area and new officeDetails
revision to 201506249820. 2nd fl open area and new office | $2,000 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | Paganini Electric Corp(See Signatories) | classroom upgrades including new light fixtures, lighting control and receptacles, ref 201506249812 er lightingDetails
classroom upgrades including new light fixtures, lighting control and receptacles, ref 201506249812 er lighting | $13,000 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | Paganini Electric Corp(See Signatories) | classroom upgrades including new light fixtures, lighting control and receptacles, mnor hvac equipment connections ref 201506249820 er exit signs and lighting.Details
classroom upgrades including new light fixtures, lighting control and receptacles, mnor hvac equipment connections ref 201506249820 er exit signs and lighting. | $75,000 |
| Jul 10, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | Paganini Electric Corp(See Signatories) | classroom upgrades new light fixtures, lighting control and plugs, minor hvac equip connections ref 201506249809 er lightingDetails
classroom upgrades new light fixtures, lighting control and plugs, minor hvac equip connections ref 201506249809 er lighting | $20,000 |
| Jul 10, 2015 | Never finaled issued Jul 2015, no final | 2201 Vallejo St | Paganini Electric Corp(See Signatories) | classroom upgrades including new light fixtures, lighting control and receptacles. minor hvac equip connections er lighting ref pa#201506249771Details
classroom upgrades including new light fixtures, lighting control and receptacles. minor hvac equip connections er lighting ref pa#201506249771 | $30,000 |
| Jun 26, 2015 | Never finaled issued Jun 2015, no final | 2201 Vallejo St | Potter Fire Protection | relocate 4 and add 2 fire sprinklers. t.i. pa #201506249771Details
relocate 4 and add 2 fire sprinklers. t.i. pa #201506249771 | $3,500 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | 2nd flr: remodel class rooms #108,109 & 110 and break out space (study area), provide 2 new offices #112 and 113 in open space area #111, new ceiling, mill work, flooring lighting.Details
2nd flr: remodel class rooms #108,109 & 110 and break out space (study area), provide 2 new offices #112 and 113 in open space area #111, new ceiling, mill work, flooring lighting. | $142,920 | |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2201 Vallejo St | D Kelly Construction Inc. | 3rd floor - remodel of art room #5306a & b. new gypsum ceiling, mill work & new cabinets. sprinklers and fire alarm separate permit.Details
3rd floor - remodel of art room #5306a & b. new gypsum ceiling, mill work & new cabinets. sprinklers and fire alarm separate permit. | $63,855 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | D Kelly Construction Inc. | lower level: remodel existing classroom #104 and 105, new ceiling light fixtures millwork flooringDetails
lower level: remodel existing classroom #104 and 105, new ceiling light fixtures millwork flooring | $49,600 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2222 Broadway | D Kelly Construction Inc. | lower level: remodel of classroom 1b06, new gypsum ceiling, new lighting fixtures, millwork, new flooring, new soffitDetails
lower level: remodel of classroom 1b06, new gypsum ceiling, new lighting fixtures, millwork, new flooring, new soffit | $34,250 |
| Jun 18, 2015 | Never finaled filed Jun 2015, never issued | 2222 Broadway | streetspace | ||
| Jun 16, 2015 | Completed final sign-off Aug 2015 | 2222 Broadway | D Kelly Construction Inc. | 2nd fl: demo only as per ab-017 interior non bearing partitions, doors, electrical fixtures, plumbing, flooring. tenant improvement under separate permit. life safety (if required) deferred.Details
2nd fl: demo only as per ab-017 interior non bearing partitions, doors, electrical fixtures, plumbing, flooring. tenant improvement under separate permit. life safety (if required) deferred. | $5,000 |
| Jun 16, 2015 | Completed final sign-off Aug 2015 | 2201 Vallejo St | D Kelly Construction Inc. | 3rd fl: demo only as per ab-017 interior ceiling, light fixtures, flooring, mill work. tenant improvement under separate permit.Details
3rd fl: demo only as per ab-017 interior ceiling, light fixtures, flooring, mill work. tenant improvement under separate permit. | $3,000 |
| May 12, 2015 | Completed final sign-off Sep 2015 | 2222 Broadway | Meylan Construction | barrier removal, install (n) handrail & guardrail at (e) stair.Details
barrier removal, install (n) handrail & guardrail at (e) stair. | $208,561 |
| Jan 29, 2015 | Never finaled issued Jan 2015, no final | 2222 Broadway | H C I Systems Inc | fire alarm reprograming and changing matrix. per app#201411171215Details
fire alarm reprograming and changing matrix. per app#201411171215 | $8,720 |
| Jan 29, 2015 | Never finaled issued Jan 2015, no final | 2222 Broadway | H C I Systems Inc | fire alarm reprograming elevator modernization project. elevator recall (201411121213) as built plans.Details
fire alarm reprograming elevator modernization project. elevator recall (201411121213) as built plans. | $6,120 |
| Nov 12, 2014 | Completed final sign-off Jan 2015 | 2222 Broadway | H C I Systems Inc | add 5 mew smoke detectors and 4 control module to existing fire alarm system for the elevator modernization project appl. # 201404012112.Details
add 5 mew smoke detectors and 4 control module to existing fire alarm system for the elevator modernization project appl. # 201404012112. | $6,120 |
| Nov 12, 2014 | Completed final sign-off Jan 2015 | 2222 Broadway | H C I Systems Inc | add 7 horn strobes, 1 bps and 1 module to an existing fire alarm system in the new classroom. t.i. appl. #201408053000. one new smoke detector will be added above the new bps.Details
add 7 horn strobes, 1 bps and 1 module to an existing fire alarm system in the new classroom. t.i. appl. #201408053000. one new smoke detector will be added above the new bps. | $8,720 |
| Aug 18, 2014 | Completed final sign-off Oct 2014 | 2222 Broadway | H C I Systems Inc | lower level: add 1 new horn strobe in the newly remodel classroom. t.i. pa#201406128228)Details
lower level: add 1 new horn strobe in the newly remodel classroom. t.i. pa#201406128228) | $3,940 |
| Aug 5, 2014 | Expired or cancelled cancelled Jan 2026 | 2222 Broadway | interior renovation of lower of an (e) k-8 co-ed schoolDetails
interior renovation of lower of an (e) k-8 co-ed school | $50,000 | |
| Jun 12, 2014 | Completed final sign-off Mar 2015 | 2222 Broadway | Meylan Construction | modification to extg class room including new flooring, lighting and radiant heater.Details
modification to extg class room including new flooring, lighting and radiant heater. | $74,500 |
| Jun 5, 2014 | Never finaled issued Jun 2014, no final | 2222 Broadway | street spaceDetails
street space | ||
| Jun 3, 2014 | Never finaled filed Jun 2014, never issued | 2222 Broadway | street space | ||
| Apr 1, 2014 | Never finaled issued Apr 2014, no final | 2222 Broadway | street spaceDetails
street space | ||
| Apr 1, 2014 | Completed final sign-off Jan 2015 | 2222 Broadway | Meylan Construction | barrier removal and elevator modernization. architectural only. fire sprinklers life safety system, extg elevator and equipment modernization engineering under separate permits by design build contractors.Details
barrier removal and elevator modernization. architectural only. fire sprinklers life safety system, extg elevator and equipment modernization engineering under separate permits by design build contractors. | $227,400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D Kelly Construction Inc. (24), Siemens Industry, Inc. (8), H C I Systems Inc (6), Potter Fire Protection (6), Paganini Electric Corp(See Signatories) (5), City Mechanical Inc (4), Meylan Construction (3)
- Architects
- Carey Woo (4), Douglas Zucker (2), Louis Felthouse (2), Karen Cribbingskduklin, Michael Zucker, Steven G Weindel
- Engineers
- Alexander Joseph Pacheco (4), Pablo Orozco (2), Antoine Samra, Jesus Cabellon Jr., Lefler Engineering, Meng Hsiu Chen, Satwant Bhatia, Stephen Ratchye, Yi-Shu Kung
- Attorneys
- Steven G Weindel
- Authorized agent-otherss
- Jim Gherardi
- Designers
- Robert Baum, Ronald Demartini