Steven G Weindel
- Listed as
- architect, attorney, designer
- Firm
- Gensler
- Based in
- Oakland
- On San Francisco permits
- Mar 2016 to Sep 2019
8 permits since 2000 (architect on 6 permits, attorney on 1 permit, designer on 1 permit): 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 20, 2019 | Completed final sign-off Jun 2021 | 633 Folsom St | Plant Construction Co, Lp | public art (ref pa# 2017/06/01/8184-s) new entry, street tree's and fdc's. ** maher: n/a **Details
public art (ref pa# 2017/06/01/8184-s) new entry, street tree's and fdc's. ** maher: n/a ** | $100,000 |
| Jun 1, 2017 | Completed final sign-off Jul 2021 | 633 Folsom St | Plant Construction Co, Lp | vertical addition. 5 story vertical addition to existing 7 story office building to create high rise with fsae's. reconfigure lobby, retail public open space, 53 class 1 bike spaces. no off street parking.Details
vertical addition. 5 story vertical addition to existing 7 story office building to create high rise with fsae's. reconfigure lobby, retail public open space, 53 class 1 bike spaces. no off street parking. | $72,000,000 |
| Jul 25, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | D Kelly Construction Inc. | electrical t-24 and mechanical t-24 (plumbing only) ref pa 2016-0418-4994 for presidents office, ground floorDetails
electrical t-24 and mechanical t-24 (plumbing only) ref pa 2016-0418-4994 for presidents office, ground floor | $24,500 |
| Jul 25, 2016 | Completed final sign-off Mar 2017 | 2201 Broadway | D Kelly Construction Inc. | electrical t-24 (power lighting) and mechanical t-24 (replace fan coil). ref pa 20160602-8956 admissions offices on first floorDetails
electrical t-24 (power lighting) and mechanical t-24 (replace fan coil). ref pa 20160602-8956 admissions offices on first floor | $62,200 |
| Jul 25, 2016 | Completed final sign-off Mar 2017 | 2222 Broadway | D Kelly Construction Inc. | electrical t-24 lighting on ground floor only. grand hall classrooms ref pa 2016-0426-5676. fire under separate permitDetails
electrical t-24 lighting on ground floor only. grand hall classrooms ref pa 2016-0426-5676. fire under separate permit | $15,000 |
| Jun 2, 2016 | Completed final sign-off Mar 2017 | 2201 Broadway | D Kelly Construction Inc. | interior renovation of basement level including new offices & updated restrooms, property is considered historic, no exterior work, mep under separate permit. life safety deferred.Details
interior renovation of basement level including new offices & updated restrooms, property is considered historic, no exterior work, mep under separate permit. life safety deferred. | $100,000 |
| Apr 12, 2016 | Expired or cancelled cancelled Jan 2026 | 2201 Broadway | D Kelly Construction Inc. | demolition of non-bearing walls & finishes, construction of new walls, replacement of restoom fixtures, new doors, & finishes. mep to be separate design build permitDetails
demolition of non-bearing walls & finishes, construction of new walls, replacement of restoom fixtures, new doors, & finishes. mep to be separate design build permit | $150,000 |
| Mar 21, 2016 | Completed final sign-off Nov 2016 | 100 Pine St | Team Commercial Construction Inc. | 18th floor office t.i. - demo, non-bearing partitions, ceilings, floors. deferred submittals for m.e.p. & fire system. n/a maher ordinanceDetails
18th floor office t.i. - demo, non-bearing partitions, ceilings, floors. deferred submittals for m.e.p. & fire system. n/a maher ordinance | $1,700,000 |