Block 0262, lot 020
100 Pine St
- City’s use
- Commercial Office
- Built
- 1971
- Stories
- 33
- Building
- 365,809 sq ft
- Lot
- 15,650 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 100 Pine St | Bobcomm Llc Dba Pacific Das Llc. | to replace the existing signal booster and to add remote shutoff to comply with ch18.2022.nfpa, 2022 sffd ab#2.01 addendum g. reference permit no. 201911197649. all works are low voltage.Details
to replace the existing signal booster and to add remote shutoff to comply with ch18.2022.nfpa, 2022 sffd ab#2.01 addendum g. reference permit no. 201911197649. all works are low voltage. | $25,000 |
| Jan 5, 2026 | Completed final sign-off Mar 2026 | 100 Pine St | Mayco Commercial Construction Inc | 25th fl ref pa #2025-0918-5566: deferred mep. lighting fixtures, power & signal devices. add and relocate diffusers and return air grillsDetails
25th fl ref pa #2025-0918-5566: deferred mep. lighting fixtures, power & signal devices. add and relocate diffusers and return air grills | $85,000 |
| Dec 4, 2025 | In progress issued Dec 2025 | 100 Pine St | Sabah International Incorporated | 25th floor: fire alarm-associated to adding new notification appliances (speaker/strobes). no initiated devices involved in the plan scope. ref pa #202509185566Details
25th floor: fire alarm-associated to adding new notification appliances (speaker/strobes). no initiated devices involved in the plan scope. ref pa #202509185566 | $17,000 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 100 Pine St | Pioneer Fire Inc. | 25/f: relocate (5) pendents, (1) upright. add (5) pendents. convert (2) uprights to pendents. ref ti permit 202509185566Details
25/f: relocate (5) pendents, (1) upright. add (5) pendents. convert (2) uprights to pendents. ref ti permit 202509185566 | $3,250 |
| Sep 18, 2025 | Completed final sign-off Mar 2026 | 100 Pine St | Mayco Commercial Construction Inc | 25th/fl: interior tenant improvement scope includes: demolition and construction of non-structural partitions, door frames, floor finishes, millwork, light fixtures, and 5 new phone booths. deferred mep and life & safety.Details
25th/fl: interior tenant improvement scope includes: demolition and construction of non-structural partitions, door frames, floor finishes, millwork, light fixtures, and 5 new phone booths. deferred mep and life & safety. | $418,888 |
| Feb 26, 2025 | In progress issued Feb 2025 | 100 Pine St | Sabah International Incorporated | 30th flr, ste 300: -ref to t.i. 202409251615. fire alarm improvement. the fire alarm scope is only associated to adding new notification appliances (speaker/strobes) there is no initiating devices involved in the scopeDetails
30th flr, ste 300: -ref to t.i. 202409251615. fire alarm improvement. the fire alarm scope is only associated to adding new notification appliances (speaker/strobes) there is no initiating devices involved in the scope | $16,708 |
| Jan 13, 2025 | Completed final sign-off Mar 2025 | 100 Pine St | Pioneer Fire Inc. | 30th floor. relocate (69) pendents to uprights. gci#: 202409251615.Details
30th floor. relocate (69) pendents to uprights. gci#: 202409251615. | $17,250 |
| Sep 25, 2024 | Completed final sign-off Jun 2025 | 100 Pine St | Hathaway Dinwiddie Co. | 30/f: interior tenant improvement.Details
30/f: interior tenant improvement. | $1,600,000 |
| Jun 22, 2023 | Completed final sign-off Dec 2023 | 100 Pine St | Team Commercial Construction Inc. | 10/f:interior t.i. non structiural demolition of interior partitions, relocate in suite, new non structural partitions & doors, proposed associated electrical, no exterior work proposed.Details
10/f:interior t.i. non structiural demolition of interior partitions, relocate in suite, new non structural partitions & doors, proposed associated electrical, no exterior work proposed. | $171,566 |
| Apr 26, 2023 | Completed final sign-off Jun 2023 | 100 Pine St | Team Commercial Construction Inc. | 7th f/ ste 700: add 1 new hvac & 1 transfer fan, add ceiling diffusers add/ relocate thermostals. ref 2022 1129 7292Details
7th f/ ste 700: add 1 new hvac & 1 transfer fan, add ceiling diffusers add/ relocate thermostals. ref 2022 1129 7292 | $44,318 |
| Apr 26, 2023 | Completed final sign-off May 2023 | 100 Pine St | Team Commercial Construction Inc. | 7th f/ ste 700: lighting fixture and associated circuiting / controls. power and signal devices and associated wiring, ref 2022 1129 7292Details
7th f/ ste 700: lighting fixture and associated circuiting / controls. power and signal devices and associated wiring, ref 2022 1129 7292 | $63,432 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 100 Pine St | Team Commercial Construction Inc. | 17th fl (east) - add 1 vav & heat pump. add/relocate diffusers and r/h grills ref pa 2022-1102-5762Details
17th fl (east) - add 1 vav & heat pump. add/relocate diffusers and r/h grills ref pa 2022-1102-5762 | $73,545 |
| Mar 7, 2023 | Completed final sign-off May 2023 | 100 Pine St | Team Commercial Construction Inc. | 17th fl (east) - lighting fixtures and associate circuiting/controls, power and signal devices and associated wiring. ref pa 2022-1102-5762Details
17th fl (east) - lighting fixtures and associate circuiting/controls, power and signal devices and associated wiring. ref pa 2022-1102-5762 | $84,265 |
| Feb 8, 2023 | Completed final sign-off Feb 2023 | 100 Pine St | Sabah International Incorporated | 7/f: provide modification of (e) f/a system, add (8) led speaker/strobe, add (3) led strobe, add (1) speaker, all ceiling mountedDetails
7/f: provide modification of (e) f/a system, add (8) led speaker/strobe, add (3) led strobe, add (1) speaker, all ceiling mounted | $16,385 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 100 Pine St | Sabah International Incorporated | provide a modification of the (e) fire alarm system add (11) speaker/strobe-ceiling mounted, add (1) speaker/strobe-wall mountedDetails
provide a modification of the (e) fire alarm system add (11) speaker/strobe-ceiling mounted, add (1) speaker/strobe-wall mounted | $16,395 |
| Dec 20, 2022 | Completed final sign-off Jan 2023 | 100 Pine St | Pioneer Fire Inc. | 7/f: relocate (14) pendents, add (3) pendents convert (16) pendents to uprights, remove (8) pendents. gcti #202211297292.Details
7/f: relocate (14) pendents, add (3) pendents convert (16) pendents to uprights, remove (8) pendents. gcti #202211297292. | $18,027 |
| Dec 12, 2022 | Completed final sign-off Jan 2023 | 100 Pine St | Pioneer Fire Inc. | 17/flr, suite 1700: relocate 23 pendants, add 8 pendantsDetails
17/flr, suite 1700: relocate 23 pendants, add 8 pendants | $12,000 |
| Nov 29, 2022 | Completed final sign-off May 2023 | 100 Pine St | Team Commercial Construction Inc. | 7/f: interior tenant improvement including demo and construction of non structural partitions, ceilings, lighting, elec, millwork, finishesDetails
7/f: interior tenant improvement including demo and construction of non structural partitions, ceilings, lighting, elec, millwork, finishes | $313,389 |
| Nov 4, 2022 | Never finaled issued Dec 2022, no final | 100 Pine St | Team Commercial Construction Inc. | 1700: add diffuser, registers, return grilles and new ductwork. relocate thermostats. ref 202205063673.Details
1700: add diffuser, registers, return grilles and new ductwork. relocate thermostats. ref 202205063673. | $35,302 |
| Nov 4, 2022 | Never finaled issued Dec 2022, no final | 100 Pine St | Team Commercial Construction Inc. | 1700: office tenant retrofit-light fixtures and associated circuiting/controls in spec suite tenant space. ref bpa#202205063673Details
1700: office tenant retrofit-light fixtures and associated circuiting/controls in spec suite tenant space. ref bpa#202205063673 | $127,470 |
| Nov 2, 2022 | Completed final sign-off May 2023 | 100 Pine St | Team Commercial Construction Inc. | 17/f (east side): interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes. mep deferred.Details
17/f (east side): interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes. mep deferred. | $616,329 |
| Oct 13, 2022 | Completed final sign-off Apr 2026 | 100 Pine St | Bcci Construction Company | 32nd fl - revision to change configuration of men's restroom. electrical & plumbing & drawings included. ref 2022-0420-2653Details
32nd fl - revision to change configuration of men's restroom. electrical & plumbing & drawings included. ref 2022-0420-2653 | $5,000 |
| Sep 27, 2022 | Completed final sign-off Nov 2022 | 100 Pine St | Sabah International Incorporated | modify (e) fire alarm system add 1 booster power supply 1 sync output module 2 duct smoke detectors, 5 smoke detectors 3 high power control relays, 25 led ceiling speakrs/strobes, 8 led ceiling strobes, 1 led wall strobe, 5 led ceiling speaker, relocate 2 control relays, remove 1 control relay,Details
modify (e) fire alarm system add 1 booster power supply 1 sync output module 2 duct smoke detectors, 5 smoke detectors 3 high power control relays, 25 led ceiling speakrs/strobes, 8 led ceiling strobes, 1 led wall strobe, 5 led ceiling speaker, relocate 2 control relays, remove 1 control relay, | $25,815 |
| Aug 11, 2022 | Completed final sign-off Apr 2026 | 100 Pine St | Bcci Construction Company | 32nd fl mep submittal to support approved ti 202204202653. new hvac layout to reflect new floor plan. add 9 vav boxes, 2 heat pumps, 7 trf fans, 1 fsd elev lobby, 2 fsd rated corridor.Details
32nd fl mep submittal to support approved ti 202204202653. new hvac layout to reflect new floor plan. add 9 vav boxes, 2 heat pumps, 7 trf fans, 1 fsd elev lobby, 2 fsd rated corridor. | $300,000 |
| Aug 3, 2022 | Completed final sign-off Oct 2022 | 100 Pine St | Pioneer Fire Inc. | 32nd/f: adjusting automated fire sprinkler system to proricle coverage per area of construction modification. hangers added to new arm overs, ref to t.i. 202204182415Details
32nd/f: adjusting automated fire sprinkler system to proricle coverage per area of construction modification. hangers added to new arm overs, ref to t.i. 202204182415 | $25,000 |
| Jun 23, 2022 | Completed final sign-off Apr 2023 | 100 Pine St | Invertice Inc, Metropolitan Electrical Construction | at&t cell site mod: r/r 4 antennas,remove 4 rru's,install new rf safety signs,striping.remove 1-5216,16-155ah batteries,12-160ah batteries,install 12 new 190ah lead acid batteries in (e) rack,8 new 190ah lead acide battieres in (e) power plant rack and 2 new rectifiers in (e) power plant rack.Details
at&t cell site mod: r/r 4 antennas,remove 4 rru's,install new rf safety signs,striping.remove 1-5216,16-155ah batteries,12-160ah batteries,install 12 new 190ah lead acid batteries in (e) rack,8 new 190ah lead acide battieres in (e) power plant rack and 2 new rectifiers in (e) power plant rack. | $65,000 |
| Jun 13, 2022 | Completed final sign-off Mar 2023 | 100 Pine St | Sabah International Incorporated | provide modification of the extg system. add 1 smoke detector and 6 new sprinkler/strobes.Details
provide modification of the extg system. add 1 smoke detector and 6 new sprinkler/strobes. | $13,080 |
| Jun 1, 2022 | Completed final sign-off Jul 2022 | 100 Pine St | Pioneer Fire Inc. | 17th fl ste 1700: replace 8 existing pendents with 8 uprights. ref pa# 202205063673.Details
17th fl ste 1700: replace 8 existing pendents with 8 uprights. ref pa# 202205063673. | $2,000 |
| May 6, 2022 | Never finaled issued May 2022, no final | 100 Pine St | Team Commercial Construction Inc. | 17/f: interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes, including restroom upgrades.Details
17/f: interior tenant improvement. demolition and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes, including restroom upgrades. | $297,062 |
| Apr 20, 2022 | Completed final sign-off Apr 2023 | 100 Pine St | Bcci Construction Company | 32nd flr ste 3200: arch only. office t.i new partitions, offices and conference rooms. mep/life safety deferred. ref 202204182415/202204152322.Details
32nd flr ste 3200: arch only. office t.i new partitions, offices and conference rooms. mep/life safety deferred. ref 202204182415/202204152322. | $2,505,780 |
| Apr 18, 2022 | Never finaled issued Apr 2022, no final | 100 Pine St | Bcci Construction Company | 32nd fl: demo only permit per ab-017. remove non-structural partitions and ceilings. sprinkler permit: pa# 202204152322Details
32nd fl: demo only permit per ab-017. remove non-structural partitions and ceilings. sprinkler permit: pa# 202204152322 | $100,000 |
| Apr 15, 2022 | Completed final sign-off Jun 2022 | 100 Pine St | Ayoob & Peery Plumbing Co Inc | 32nd fl: fire demo changeout 105 sprinklers.Details
32nd fl: fire demo changeout 105 sprinklers. | $23,625 |
| Mar 11, 2022 | Completed final sign-off Aug 2022 | 100 Pine St | Sabah International Incorporated | 27/f: t.i. 202112134252, modify (e) fire alarm system. add (2) smoke detectors, (1) sunchronization module, (1) booster power supply, (30) led ceiling speaker/strobe, (6) led ceiling strobes, (1) led wall storage, (1) led ceiling speaker.Details
27/f: t.i. 202112134252, modify (e) fire alarm system. add (2) smoke detectors, (1) sunchronization module, (1) booster power supply, (30) led ceiling speaker/strobe, (6) led ceiling strobes, (1) led wall storage, (1) led ceiling speaker. | $22,375 |
| Feb 28, 2022 | Completed final sign-off Jun 2022 | 100 Pine St | Sabah International Incorporated | 33rd fl: modify (e) fire alarm system. add 2 smoke detectors, 1 synchronization module, 1 booster power supply, 2 led ceiling strobes. 15 ceiling speaker/strobes.Details
33rd fl: modify (e) fire alarm system. add 2 smoke detectors, 1 synchronization module, 1 booster power supply, 2 led ceiling strobes. 15 ceiling speaker/strobes. | $19,356 |
| Feb 7, 2022 | Completed final sign-off Mar 2022 | 100 Pine St | Pioneer Fire Inc. | 33/f: relocate 38 pendent sprinklers heads, convert 17 pendent to upright, remove 2 pendents, add 9 pendent sprinklers and 4 upright. ref ti permit 202112073825.Details
33/f: relocate 38 pendent sprinklers heads, convert 17 pendent to upright, remove 2 pendents, add 9 pendent sprinklers and 4 upright. ref ti permit 202112073825. | $20,500 |
| Feb 1, 2022 | Completed final sign-off Jun 2022 | 100 Pine St | Pioneer Fire Inc. | 27/f: relocate 68 pendent fire sprinkler heads, convert 60 headst to upright, remove 5 pendent heads, add 7 pendents and 24 uprights. ref t.i. pa 202112134252. maher n/a.Details
27/f: relocate 68 pendent fire sprinkler heads, convert 60 headst to upright, remove 5 pendent heads, add 7 pendents and 24 uprights. ref t.i. pa 202112134252. maher n/a. | $41,000 |
| Jan 31, 2022 | Completed final sign-off Sep 2022 | 100 Pine St | Principal Builders Inc. | 33/f: deferred mep to permit 202112073825. install 2 new vav with reheat coil. install 1 new heat pump, low pressure ductwork, hydronic piping and 1 new exhaust fan. lighting and power to ti.Details
33/f: deferred mep to permit 202112073825. install 2 new vav with reheat coil. install 1 new heat pump, low pressure ductwork, hydronic piping and 1 new exhaust fan. lighting and power to ti. | |
| Dec 13, 2021 | Completed final sign-off Jan 2023 | 100 Pine St | Team Commercial Construction Inc. | project scope is to renovate the 27th fl of e 33 story building. renovated space will serve as an expansion suite for an existing business occupancy tenant. select demo of e interior fit ou to facilitate new work. new open work space, enclosed offices, accessible restrooms, meeting rooms, coffee barDetails
project scope is to renovate the 27th fl of e 33 story building. renovated space will serve as an expansion suite for an existing business occupancy tenant. select demo of e interior fit ou to facilitate new work. new open work space, enclosed offices, accessible restrooms, meeting rooms, coffee bar | $1,634,222 |
| Dec 7, 2021 | Completed final sign-off Sep 2022 | 100 Pine St | Principal Builders Inc. | 33rd fl: tenant improvement includes the demo of non-structural partitions and building new non-structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be by design build and submitted separately. (building fully sprinkled)Details
33rd fl: tenant improvement includes the demo of non-structural partitions and building new non-structural partitions. all new or revised. hvac, electrical, plumbing and life safety work will be by design build and submitted separately. (building fully sprinkled) | $978,000 |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 100 Pine St | Team Commercial Construction Inc. | suite 1400: provide lighting t.i. to 4,770 sq ft offfice space. ref bpa#202107275138Details
suite 1400: provide lighting t.i. to 4,770 sq ft offfice space. ref bpa#202107275138 | $37,918 |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 100 Pine St | Team Commercial Construction Inc. | suite 1400: add one transfer fan/add ceiling diffusers/relocate ceiling diffusers/relocate extg thermostats and induction unit thermostats/air balancing. ref app#202107275138Details
suite 1400: add one transfer fan/add ceiling diffusers/relocate ceiling diffusers/relocate extg thermostats and induction unit thermostats/air balancing. ref app#202107275138 | $41,220 |
| Oct 14, 2021 | Completed final sign-off Mar 2022 | 100 Pine St | Sabah International Incorporated | new two way emergency communication system infranstructure backbone to accomodate future tenant build out. add (2) main control unit, (1) master console, (1) telephone interface, (2) relay isolation module, (2) remote isolation module (2) remote call stations, (2) dual input modules.Details
new two way emergency communication system infranstructure backbone to accomodate future tenant build out. add (2) main control unit, (1) master console, (1) telephone interface, (2) relay isolation module, (2) remote isolation module (2) remote call stations, (2) dual input modules. | $40,942 |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 100 Pine St | Team Commercial Construction Inc. | suite 3050: provide power and lighting t.i. to 3,521 sq ft of office space. ref. pa 202108096056Details
suite 3050: provide power and lighting t.i. to 3,521 sq ft of office space. ref. pa 202108096056 | $4,820 |
| Oct 12, 2021 | Completed final sign-off Nov 2021 | 100 Pine St | Sabah International Incorporated | ref#202107275138. provide modification of the existing fire alarm system. add (1) new strobes,(1) ceiling strobe & (7) speaker/strobes. demolish (7) existing strobes (5) speakers & (2) ceiling speakers.Details
ref#202107275138. provide modification of the existing fire alarm system. add (1) new strobes,(1) ceiling strobe & (7) speaker/strobes. demolish (7) existing strobes (5) speakers & (2) ceiling speakers. | $12,000 |
| Oct 12, 2021 | Never finaled issued Oct 2021, no final | 100 Pine St | Team Commercial Construction Inc. | ste 3050, 30th fl - add 1 diffuser fan; add 5 ceiling diffusers & relocate ceiling diffusers. relocate (e) thermostats induction unit thermostats. air balance. ref pa 2021-0809-6056Details
ste 3050, 30th fl - add 1 diffuser fan; add 5 ceiling diffusers & relocate ceiling diffusers. relocate (e) thermostats induction unit thermostats. air balance. ref pa 2021-0809-6056 | $9,020 |
| Oct 12, 2021 | Completed final sign-off Nov 2021 | 100 Pine St | Sabah International Incorporated | provide a modification of existing fire alarm system. add (1) new strobe, (3) new speaker/strobes. demolish (4) existing speakers. ref pa# 202108096056Details
provide a modification of existing fire alarm system. add (1) new strobe, (3) new speaker/strobes. demolish (4) existing speakers. ref pa# 202108096056 | $11,500 |
| Sep 17, 2021 | Completed final sign-off Oct 2021 | 100 Pine St | Sabah International Incorporated | modify (e) fire alarm system. add 1 high power control rezay. ref t.i. 2021 0603 1597Details
modify (e) fire alarm system. add 1 high power control rezay. ref t.i. 2021 0603 1597 | $8,450 |
| Sep 9, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Pioneer Fire Inc. | 30/f, suite 3050: relocate (6) pendent heads. ref bpa# 202108096056Details
30/f, suite 3050: relocate (6) pendent heads. ref bpa# 202108096056 | |
| Sep 9, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Pioneer Fire Inc. | 14/f: relocate (6) pendent heads. ref bpa# 202107275138Details
14/f: relocate (6) pendent heads. ref bpa# 202107275138 | |
| Aug 26, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Sabah International Incorporated | ste 250 as-built for permit 2021-0520-0749; updated the evacuation voice message to match system programed message, showed smoke detector relocated.Details
ste 250 as-built for permit 2021-0520-0749; updated the evacuation voice message to match system programed message, showed smoke detector relocated. | |
| Aug 9, 2021 | Completed final sign-off Jun 2022 | 100 Pine St | Team Commercial Construction Inc. | 3oth/f, ste 3050- t.i. selective demo and construction of non-structural, non-rated partitions, ceilings, lighting, and finishes. no structural, no increasing area or change of use. mep deferredDetails
3oth/f, ste 3050- t.i. selective demo and construction of non-structural, non-rated partitions, ceilings, lighting, and finishes. no structural, no increasing area or change of use. mep deferred | $234,465 |
| Jul 27, 2021 | Never finaled issued Aug 2021, no final | 100 Pine St | Team Commercial Construction Inc. | 14th fl: interior tenant improvement including selective demo and construction of non structural, non rated partitions, ceilings, lighting and finsihes including restrooms, no structural, no increase in area or change of use. mep deferredDetails
14th fl: interior tenant improvement including selective demo and construction of non structural, non rated partitions, ceilings, lighting and finsihes including restrooms, no structural, no increase in area or change of use. mep deferred | $812,775 |
| Jun 23, 2021 | Completed final sign-off May 2022 | 100 Pine St | Team Commercial Construction Inc. | suite 250: add 1 vav box, relocate 1 vav box/ add difusser, register, side wall registers and new ductwork/add 1 vav thermostat, relcate vav thermostats/relocate induction unit thermostats/air balance. ref app#202101293572Details
suite 250: add 1 vav box, relocate 1 vav box/ add difusser, register, side wall registers and new ductwork/add 1 vav thermostat, relcate vav thermostats/relocate induction unit thermostats/air balance. ref app#202101293572 | $10,233 |
| Jun 16, 2021 | Never finaled issued Jun 2021, no final | 100 Pine St | Sabah International Incorporated | as-built. ref #2021-0506-9954Details
as-built. ref #2021-0506-9954 | |
| Jun 4, 2021 | Completed final sign-off Oct 2021 | 100 Pine St | Team Commercial Construction Inc. | suite 250: provide power & lighting tenant improvements to 9.890 sq. ft. of office area. ref pa# 202101298672Details
suite 250: provide power & lighting tenant improvements to 9.890 sq. ft. of office area. ref pa# 202101298672 | $28,620 |
| Jun 3, 2021 | Completed final sign-off Oct 2021 | 100 Pine St | Hathaway Dinwiddie Co. | in-kind replace of 2 (e) pair of glass doors at the building entrance. (n) dooe pull hardware. replace of (e) auto door device, no change to (e) facade, no structural work, no mepDetails
in-kind replace of 2 (e) pair of glass doors at the building entrance. (n) dooe pull hardware. replace of (e) auto door device, no change to (e) facade, no structural work, no mep | $14,231 |
| Jun 3, 2021 | Completed final sign-off Aug 2021 | 100 Pine St | Sabah International Incorporated | ti # 2019-1203-8488 modify existing fire alarm system. add (3) ceiling speaker/strobes, (1) ceiling strobeDetails
ti # 2019-1203-8488 modify existing fire alarm system. add (3) ceiling speaker/strobes, (1) ceiling strobe | $10,297 |
| Jun 2, 2021 | Completed final sign-off May 2022 | 100 Pine St | Team Commercial Construction Inc. | 23/f: provide power & lighting t.i to 9890sf of office area. ref t.i. pa202101192912. maher n/a.Details
23/f: provide power & lighting t.i to 9890sf of office area. ref t.i. pa202101192912. maher n/a. | $41,735 |
| Jun 1, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Team Commercial Construction Inc. | suite 2250 & common areas: add ceiling diffusers & sidewall diffusers. relocate (e) vav thermostats & relocate in thermostats air balancing.Details
suite 2250 & common areas: add ceiling diffusers & sidewall diffusers. relocate (e) vav thermostats & relocate in thermostats air balancing. | $10,223 |
| May 27, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Team Commercial Construction Inc. | provide power and lighting t.i. to 9890 sq ft of office area. ref app#202101152841Details
provide power and lighting t.i. to 9890 sq ft of office area. ref app#202101152841 | $17,495 |
| May 20, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Sabah International Incorporated | ti #2021-0129-3672 modify existing fire alarm system. add (8) ceiling speaker/strobes, (1) ceiling high candela speaker/strobe, (1) wall speaker/strobe, (2) ceiling strobes. relocate (1) smoke detector.Details
ti #2021-0129-3672 modify existing fire alarm system. add (8) ceiling speaker/strobes, (1) ceiling high candela speaker/strobe, (1) wall speaker/strobe, (2) ceiling strobes. relocate (1) smoke detector. | $11,720 |
| May 13, 2021 | Completed final sign-off Aug 2021 | 100 Pine St | Sabah International Incorporated | ti # 2021-0119-2912 modify existing fire alarm system add (10) ceiling led speaker/strobes, (1) smoke detectorDetails
ti # 2021-0119-2912 modify existing fire alarm system add (10) ceiling led speaker/strobes, (1) smoke detector | $13,800 |
| May 6, 2021 | Never finaled issued May 2021, no final | 100 Pine St | Team Commercial Construction Inc. | ste 500: electrical - provide power + lighting tenant improvements to 5,670 sqft of office areas. ref pa# 202101293673.Details
ste 500: electrical - provide power + lighting tenant improvements to 5,670 sqft of office areas. ref pa# 202101293673. | $8,011 |
| May 6, 2021 | Never finaled issued May 2021, no final | 100 Pine St | Sabah International Incorporated | modify existing fire alarm system per new errcs system installed. add (1) errcs annunciator, (2) multi-function cabinets, (2) universal input/output modules, (1) smoke detector, (7) control relays, (4) dual input/output modules.Details
modify existing fire alarm system per new errcs system installed. add (1) errcs annunciator, (2) multi-function cabinets, (2) universal input/output modules, (1) smoke detector, (7) control relays, (4) dual input/output modules. | $9,283 |
| Apr 29, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Team Commercial Construction Inc. | ste #2250: revision to pa# 202101152841. scope of work includes 3 new offices, new non-structural partitions, ceilings and lighting, electrical. no structural, no increase in area, no change of occupancy. mep deferred.Details
ste #2250: revision to pa# 202101152841. scope of work includes 3 new offices, new non-structural partitions, ceilings and lighting, electrical. no structural, no increase in area, no change of occupancy. mep deferred. | $7,500 |
| Feb 4, 2021 | Completed final sign-off Mar 2021 | 100 Pine St | Pioneer Fire Inc. | relocate (7) pendent sprinklers; convert (5) pendent heads to upright heads; remove (3) pendent heads. gcti# 2021101293672Details
relocate (7) pendent sprinklers; convert (5) pendent heads to upright heads; remove (3) pendent heads. gcti# 2021101293672 | $3,000 |
| Jan 29, 2021 | Never finaled issued Mar 2021, no final | 100 Pine St | Team Commercial Construction Inc. | 5/f suite 500 interior t.i.: demo and construction of non-structural partitions, celings, lighting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s f/a f/s deferred. maher n/a.Details
5/f suite 500 interior t.i.: demo and construction of non-structural partitions, celings, lighting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s f/a f/s deferred. maher n/a. | $232,306 |
| Jan 29, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Team Commercial Construction Inc. | 2/f suite 250: interior t.i.: demo and construction of non-structural partitions, celings, lighhting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s f/a f/s deferred. maher n/a.Details
2/f suite 250: interior t.i.: demo and construction of non-structural partitions, celings, lighhting, millwork and finishes. no structural, no increase in area, no change of occupancy or use. mep, l/s f/a f/s deferred. maher n/a. | $577,246 |
| Jan 19, 2021 | Completed final sign-off May 2022 | 100 Pine St | Team Commercial Construction Inc. | 23rd fl - interior ti including demo and construction of non-structural partitions, ceilings, lighting & finishes. includes restroom and corridor work, no structural, no increase in area, no change of use, mep & fire life safety deferredDetails
23rd fl - interior ti including demo and construction of non-structural partitions, ceilings, lighting & finishes. includes restroom and corridor work, no structural, no increase in area, no change of use, mep & fire life safety deferred | $991,052 |
| Jan 15, 2021 | Completed final sign-off Sep 2021 | 100 Pine St | Team Commercial Construction Inc. | 22/f: interior tenant improvement: demo & construct non-structural partitions, ceilings, lighting & finishes. includes restroom & cooridor work. no structural, no increase of area, no change of use. mep & fire safety deferred.Details
22/f: interior tenant improvement: demo & construct non-structural partitions, ceilings, lighting & finishes. includes restroom & cooridor work. no structural, no increase of area, no change of use. mep & fire safety deferred. | $217,628 |
| Jan 6, 2021 | Completed final sign-off Mar 2021 | 100 Pine St | Pioneer Fire Inc. | convert (7) upright heads to pendent. convert (12) pendents to upright. relocate (3) pendents, add 4Details
convert (7) upright heads to pendent. convert (12) pendents to upright. relocate (3) pendents, add 4 | |
| Dec 23, 2020 | Completed final sign-off Feb 2021 | 100 Pine St | Pioneer Fire Inc. | fire sprinklers relocate 6 pendentsDetails
fire sprinklers relocate 6 pendents | $1,800 |
| Dec 21, 2020 | Completed final sign-off Apr 2021 | 100 Pine St | Pioneer Fire Inc. | fire sprinklers relocate 2 pendents, adding 1 pendent and adding 1 upright.Details
fire sprinklers relocate 2 pendents, adding 1 pendent and adding 1 upright. | $2,000 |
| Oct 29, 2020 | Completed final sign-off Oct 2021 | 100 Pine St | Metropolitan Electrical Construction, Ericsson Inc Dba E U S Inc | at&t - remove & replace 4 rru. add 4 new rru. add 12 new batteries in existing rack.Details
at&t - remove & replace 4 rru. add 4 new rru. add 12 new batteries in existing rack. | $8,000 |
| Oct 16, 2020 | Completed final sign-off Nov 2020 | 100 Pine St | Sabah International Incorporated | ti #2019-1226-0696. modify existing fire alarm system. add (3) ceiling speaker strobes.Details
ti #2019-1226-0696. modify existing fire alarm system. add (3) ceiling speaker strobes. | $10,845 |
| Sep 18, 2020 | Completed final sign-off Oct 2020 | 100 Pine St | Pioneer Fire Inc. | 1st flr - relocate (21) concealed pendents, ti permit# 201912260696.Details
1st flr - relocate (21) concealed pendents, ti permit# 201912260696. | $9,500 |
| Sep 12, 2020 | Completed final sign-off Jan 2021 | 100 Pine St | Capitol Electric Const | 1st floor: provide power & lighting for ti #2018-1010-2762.Details
1st floor: provide power & lighting for ti #2018-1010-2762. | $11,830 |
| Sep 1, 2020 | Never finaled issued Oct 2020, no final | 100 Pine St | Peacock Construction | 1/f: t.i. to (e) commercial office, no change in use. revision to bpa#201912260696: demo, new partitions, electrical/mechanical duct work only. plumbing, new finishes & structural modification to slabDetails
1/f: t.i. to (e) commercial office, no change in use. revision to bpa#201912260696: demo, new partitions, electrical/mechanical duct work only. plumbing, new finishes & structural modification to slab | |
| Jun 30, 2020 | Completed final sign-off Aug 2020 | 100 Pine St | Sabah International Incorporated | 30thfl suite #3050: modify existing fire alarm system. add 1 ceiling speaker/strobe. ti #2019-1112-7053Details
30thfl suite #3050: modify existing fire alarm system. add 1 ceiling speaker/strobe. ti #2019-1112-7053 | $7,724 |
| Jun 26, 2020 | Never finaled issued Jul 2020, no final | 100 Pine St | Maguire Inc Dba Lahue And Associates | install non-electric double faced wall sign (lou's cafe)Details
install non-electric double faced wall sign (lou's cafe) | $2,000 |
| Jun 8, 2020 | Completed final sign-off May 2021 | 100 Pine St | Team Commercial Construction Inc. | suite #3050: provide power and lighting tenant improvements to 4,521 sq. ft. office area.Details
suite #3050: provide power and lighting tenant improvements to 4,521 sq. ft. office area. | $29,204 |
| Feb 24, 2020 | Completed final sign-off Aug 2020 | 100 Pine St | Sabah International Incorporated | 10th fl - add 1 booster power supply, 35 speaker strobes, 1 smoke detector, 1 high power control relay; relocate 1 smoke detector ref pa 2019-0725-6907.Details
10th fl - add 1 booster power supply, 35 speaker strobes, 1 smoke detector, 1 high power control relay; relocate 1 smoke detector ref pa 2019-0725-6907. | $19,472 |
| Feb 24, 2020 | Completed final sign-off Apr 2020 | 100 Pine St | Pioneer Fire Inc. | 10/f, suite 1000: fire sprinklers: relocate 11 pendents and add 1 pendent. ref pa201907256907Details
10/f, suite 1000: fire sprinklers: relocate 11 pendents and add 1 pendent. ref pa201907256907 | $6,000 |
| Feb 14, 2020 | Completed final sign-off Apr 2020 | 100 Pine St | Sabah International Incorporated | ref pa# 201912048597; modify (e) fire alarm system, add (3) ceiling speaker/strobes, adjust (3) wall strobe candeza ratingsDetails
ref pa# 201912048597; modify (e) fire alarm system, add (3) ceiling speaker/strobes, adjust (3) wall strobe candeza ratings | $12,200 |
| Jan 24, 2020 | Completed final sign-off Feb 2020 | 100 Pine St | Rossi Builders Inc. | 2910: add and relocate diffusers and registers, add and reroute ductwork, relocate thermostat and air balance rf 201908269827Details
2910: add and relocate diffusers and registers, add and reroute ductwork, relocate thermostat and air balance rf 201908269827 | |
| Jan 17, 2020 | Completed final sign-off Feb 2020 | 100 Pine St | Pioneer Fire Inc. | fire sprinkler for suite 300: relocate 2 pendents. ref pa #201911278310Details
fire sprinkler for suite 300: relocate 2 pendents. ref pa #201911278310 | $4,350 |
| Jan 16, 2020 | Completed final sign-off Sep 2020 | 100 Pine St | Team Commercial Construction Inc. | provide power and lighting tenant improvement to 1836 sq ft of office area ref 201911278310Details
provide power and lighting tenant improvement to 1836 sq ft of office area ref 201911278310 | $11,842 |
| Jan 13, 2020 | Completed final sign-off Feb 2020 | 100 Pine St | Rossi Builders Inc. | ref pa# 201908269827; title 24- electricalDetails
ref pa# 201908269827; title 24- electrical | |
| Dec 26, 2019 | Never finaled issued Jun 2020, no final | 100 Pine St | Peacock Construction | ground fl: ti scope to include demo, new partitions, mep (duct work only), new finishes. maher naDetails
ground fl: ti scope to include demo, new partitions, mep (duct work only), new finishes. maher na | $565,930 |
| Dec 20, 2019 | Expired or cancelled cancelled Jan 2026 | 100 Pine St | erect 3'-7" x 3'-7" (c/b trust) illuminated sign.Details
erect 3'-7" x 3'-7" (c/b trust) illuminated sign. | $5,000 | |
| Dec 20, 2019 | Never finaled issued Jul 2020, no final | 100 Pine St | Sign Centric & Awnings Inc | install door decals (c/b trust- california bank & trust- house of opperation) (sign d)Details
install door decals (c/b trust- california bank & trust- house of opperation) (sign d) | $1,000 |
| Dec 20, 2019 | Never finaled issued Jul 2020, no final | 100 Pine St | Sign Centric & Awnings Inc | erect 2- 3'-7" x 24"" (california bank & trust) illuminated sign. (sign a & b).Details
erect 2- 3'-7" x 24"" (california bank & trust) illuminated sign. (sign a & b). | $10,000 |
| Dec 17, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Sabah International Incorporated | 29th floor: add 2 speaker strobes, relocate 1 strobes, remove 2 speaker. reference pa# 2019-0826-9827Details
29th floor: add 2 speaker strobes, relocate 1 strobes, remove 2 speaker. reference pa# 2019-0826-9827 | $3,974 |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 100 Pine St | street spaceDetails
street space | ||
| Dec 4, 2019 | Completed final sign-off May 2020 | 100 Pine St | Team Commercial Construction Inc. | 22/f: deferred mep from pa #2019-1203-8488Details
22/f: deferred mep from pa #2019-1203-8488 | |
| Dec 3, 2019 | Completed final sign-off May 2020 | 100 Pine St | Team Commercial Construction Inc. | ti for partial e office, includes new conf rm relocate break rm, relaxation room, new partitions deferred mep and fire protection, maher not reqDetails
ti for partial e office, includes new conf rm relocate break rm, relaxation room, new partitions deferred mep and fire protection, maher not req | $646,014 |
| Nov 27, 2019 | Completed final sign-off Oct 2020 | 100 Pine St | 3rd fl - selective demo of partitions, ceiling, light fixtures and finishes. construction of new partitions, ceiling, lighting & finishes. no change in occupancy or use. this project is to be design-build mep, life safety & sprinklers to be filed under separate permitDetails
3rd fl - selective demo of partitions, ceiling, light fixtures and finishes. construction of new partitions, ceiling, lighting & finishes. no change in occupancy or use. this project is to be design-build mep, life safety & sprinklers to be filed under separate permit | $143,448 | |
| Nov 19, 2019 | Completed final sign-off Oct 2026 | 100 Pine St | Capitol Electric Const | installation of emergency responder radio coverage system. **maher n/a**Details
installation of emergency responder radio coverage system. **maher n/a** | $50,000 |
| Nov 12, 2019 | Completed final sign-off May 2021 | 100 Pine St | Team Commercial Construction Inc. | ste. 3035: tenant improvement to existing office space. new non structural partitions celing tile, lighting, finishes. demo 201910174768Details
ste. 3035: tenant improvement to existing office space. new non structural partitions celing tile, lighting, finishes. demo 201910174768 | $296,330 |
| Oct 29, 2019 | Never finaled issued Nov 2019, no final | 100 Pine St | Capitol Electric Const | construction of 2 hr rated shaft enclosure to house 2 way communication emergency radio conduit through 2nd & 8th floor elevator lobbies. no structural work to be included in scope, no increase in area. no increase in occupancy or useDetails
construction of 2 hr rated shaft enclosure to house 2 way communication emergency radio conduit through 2nd & 8th floor elevator lobbies. no structural work to be included in scope, no increase in area. no increase in occupancy or use | $50,000 |
| Oct 17, 2019 | Completed final sign-off May 2021 | 100 Pine St | Team Commercial Construction Inc. | suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit.Details
suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit. | $23,103 |
| Sep 24, 2019 | Expired or cancelled withdrawn Dec 2019 | 100 Pine St | 30th floor: non-structuraldemo. new non-structural partitions, cieling, lighting, millwork and finishes. no change in occupancy, use, or area. mep, life safty and sprinklers under seperate permit. n/a for maherDetails
30th floor: non-structuraldemo. new non-structural partitions, cieling, lighting, millwork and finishes. no change in occupancy, use, or area. mep, life safty and sprinklers under seperate permit. n/a for maher | $296,330 | |
| Sep 19, 2019 | Completed final sign-off Mar 2020 | 100 Pine St | Pioneer Fire Inc. | suite 3050 -relocate 25 pendents remove 5 uprights//hydro required >20 heads re locatedDetails
suite 3050 -relocate 25 pendents remove 5 uprights//hydro required >20 heads re located | $12,500 |
| Sep 19, 2019 | Completed final sign-off Dec 2019 | 100 Pine St | Pioneer Fire Inc. | suite 2900 -relocate 13 pendents remove 4 uprights ref 201908269827Details
suite 2900 -relocate 13 pendents remove 4 uprights ref 201908269827 | $6,500 |
| Sep 17, 2019 | Completed final sign-off Jan 2021 | 100 Pine St | Hathaway Dinwiddie Co. | deferred submittal fountain per 201810102762 replace existing fountain plumbing deferred submittalDetails
deferred submittal fountain per 201810102762 replace existing fountain plumbing deferred submittal | $80,000 |
| Aug 26, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Rossi Builders Inc. | suite #2900: the scope of work inlcludes non-load bearing partition sidelight, power portion of ceiling grid and tile. new non load bearing interior partition, lighting, power and finishes. mep will be deffered. n/a for maherDetails
suite #2900: the scope of work inlcludes non-load bearing partition sidelight, power portion of ceiling grid and tile. new non load bearing interior partition, lighting, power and finishes. mep will be deffered. n/a for maher | $690,000 |
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 100 Pine St | Sabah International Incorporated | 20th fl - ref pa 2019-0607-2810 modify existing fire alarm system. add 1 booster power supply, 1 synchronization module, 27 ceiling speaker/strobesDetails
20th fl - ref pa 2019-0607-2810 modify existing fire alarm system. add 1 booster power supply, 1 synchronization module, 27 ceiling speaker/strobes | $14,215 |
| Aug 9, 2019 | Completed final sign-off Oct 2019 | 100 Pine St | Sabah International Incorporated | 28th st - add 1 speaker strobes, relocate 9 speakers, relocate 1 speaker strobes, relocate 1 speaker strobes, relocate 1 strobes. ref pa 2019-0716-5979Details
28th st - add 1 speaker strobes, relocate 9 speakers, relocate 1 speaker strobes, relocate 1 speaker strobes, relocate 1 strobes. ref pa 2019-0716-5979 | $12,366 |
| Aug 6, 2019 | Completed final sign-off Oct 2019 | 100 Pine St | Team Commercial Construction Inc. | ref pa# 201906072810; provide lighting & power, t.i. to 2,007 sq fl of office space/ remove & cap unused ductwork/install 12 new vav terminal new exhuast fan for idf roomDetails
ref pa# 201906072810; provide lighting & power, t.i. to 2,007 sq fl of office space/ remove & cap unused ductwork/install 12 new vav terminal new exhuast fan for idf room | $91,225 |
| Aug 1, 2019 | Completed final sign-off Jan 2021 | 100 Pine St | Hathaway Dinwiddie Co. | revision to 2018-1010-2762, to provide structural foundation details.Details
revision to 2018-1010-2762, to provide structural foundation details. | $56,000 |
| Jul 26, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Capitol Electric Const | provide lighting for the ti on 28th fl. ref ti #201907246771.Details
provide lighting for the ti on 28th fl. ref ti #201907246771. | $11,725 |
| Jul 25, 2019 | Completed final sign-off Jul 2020 | 100 Pine St | Team Commercial Construction Inc. | suite 1000: the proposed pnc layout is app. 13,500 sq ft.for a full floor tenant interior alteration including new lighting to meet t-24 requirement, nw furniture, and nw wall to accommodateDetails
suite 1000: the proposed pnc layout is app. 13,500 sq ft.for a full floor tenant interior alteration including new lighting to meet t-24 requirement, nw furniture, and nw wall to accommodate | $1,300,500 |
| Jul 24, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Bcci Construction Company | revision to pa 201906183765. correction of floor number to 28th flrDetails
revision to pa 201906183765. correction of floor number to 28th flr | |
| Jul 16, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Bcci Construction Company | 28th floor: mechanical only permit to support arch. add thermostat for induction units. air balance floor. ref app#201906183765 n/a for maherDetails
28th floor: mechanical only permit to support arch. add thermostat for induction units. air balance floor. ref app#201906183765 n/a for maher | $50,000 |
| Jul 2, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Pioneer Fire Inc. | 28/f: f/s: relocate 10 pendents, add 1 pendent & remove 3 pendents. ref pa #2019061833765. maher n/a.Details
28/f: f/s: relocate 10 pendents, add 1 pendent & remove 3 pendents. ref pa #2019061833765. maher n/a. | $5,000 |
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 100 Pine St | Pioneer Fire Inc. | f/s: relocate 14 pendents, add 2 pendetns & relocate 4 uprights. ref pa #201906072810.Details
f/s: relocate 14 pendents, add 2 pendetns & relocate 4 uprights. ref pa #201906072810. | $8,900 |
| Jun 20, 2019 | Completed final sign-off Aug 2019 | 100 Pine St | Sabah International Incorporated | 31st floor: modify extg fire alarm system. add 18 ceiling speaker/strobes, 1 ceiling strobe. demo 2 smoker detectors, 19 ceiling speaker/strobes, 2 wall strobes. n/a for maher. ref app#201905140537Details
31st floor: modify extg fire alarm system. add 18 ceiling speaker/strobes, 1 ceiling strobe. demo 2 smoker detectors, 19 ceiling speaker/strobes, 2 wall strobes. n/a for maher. ref app#201905140537 | $10,000 |
| Jun 18, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Bcci Construction Company | 21st flr. new offices, meeting room and break room area. mep and life safety deferredDetails
21st flr. new offices, meeting room and break room area. mep and life safety deferred | $312,500 |
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 100 Pine St | street spaceDetails
street space | ||
| Jun 7, 2019 | Completed final sign-off Oct 2019 | 100 Pine St | Team Commercial Construction Inc. | 20th fl - demo of (e) light fixtures. construction of (n) non-struc'l walls, doors and frames, light fixtures, millwork & finishes. no struc'l work to be included in scope. no increase in area. no change in occupancy or use. mep to be design-build under separate permit. life safety & sprinkler to beDetails
20th fl - demo of (e) light fixtures. construction of (n) non-struc'l walls, doors and frames, light fixtures, millwork & finishes. no struc'l work to be included in scope. no increase in area. no change in occupancy or use. mep to be design-build under separate permit. life safety & sprinkler to be | $847,842 |
| Jun 4, 2019 | Completed final sign-off Sep 2019 | 100 Pine St | Team Commercial Construction Inc. | provide lighting t.i. to 7450 sq ft of office space. demolish extg ductwork, diffusers, and provide new. relocate extg thermostats. provide new transfer fan for copy room. ref app#201903286512. n/a for maherDetails
provide lighting t.i. to 7450 sq ft of office space. demolish extg ductwork, diffusers, and provide new. relocate extg thermostats. provide new transfer fan for copy room. ref app#201903286512. n/a for maher | $114,622 |
| May 14, 2019 | Completed final sign-off Jun 2019 | 100 Pine St | Pioneer Fire Inc. | 31st fl - relocate 28 pendents and add 3 pendents and remove 4 pendents. ref pa 2019-0328-6512Details
31st fl - relocate 28 pendents and add 3 pendents and remove 4 pendents. ref pa 2019-0328-6512 | $11,500 |
| May 10, 2019 | Completed final sign-off Jan 2021 | 100 Pine St | Hathaway Dinwiddie Co. | demo of (e) glass storefront between lobby & plaza construction of new storefront. not visible from street. no increase in area. no change in occupancy or use.Details
demo of (e) glass storefront between lobby & plaza construction of new storefront. not visible from street. no increase in area. no change in occupancy or use. | $185,000 |
| Mar 28, 2019 | Completed final sign-off Sep 2019 | 100 Pine St | Team Commercial Construction Inc. | interior t.i. of office and related spaces, interior non-rated partitions, finishes, millwork. n/a maher mep deferred.Details
interior t.i. of office and related spaces, interior non-rated partitions, finishes, millwork. n/a maher mep deferred. | $560,000 |
| Jan 8, 2019 | Completed final sign-off Feb 2019 | 100 Pine St | Pioneer Fire Inc. | 20th fl - relocate 5 pendents ref pa 2018-0914-0155Details
20th fl - relocate 5 pendents ref pa 2018-0914-0155 | $6,377 |
| Dec 21, 2018 | Never finaled issued Dec 2018, no final | 100 Pine St | street space onlyDetails
street space only | ||
| Oct 24, 2018 | Never finaled issued Oct 2018, no final | 100 Pine St | Team Commercial Construction Inc. | 21st floor: provide lighting improvements to 2,846 sq ft of office space. n/a for maher. ref app#201808137128, lighting only for this permitDetails
21st floor: provide lighting improvements to 2,846 sq ft of office space. n/a for maher. ref app#201808137128, lighting only for this permit | $17,640 |
| Oct 19, 2018 | Completed final sign-off Nov 2018 | 100 Pine St | Sabah International Incorporated | add 6 speaker/strobes to existing system for the 21st fl. te ref pa 2018-0813-7128Details
add 6 speaker/strobes to existing system for the 21st fl. te ref pa 2018-0813-7128 | $7,200 |
| Oct 10, 2018 | Completed final sign-off Jan 2021 | 100 Pine St | Hathaway Dinwiddie Co. | ground fl - accessibility upgrade to (e) plaza; maintenance repair to existing finishes. demo of wall and floor finishes, door and frame, replacement of finishes construction of new accessible lift and ramp stairs. no change in use or occupancy. maher n/a.Details
ground fl - accessibility upgrade to (e) plaza; maintenance repair to existing finishes. demo of wall and floor finishes, door and frame, replacement of finishes construction of new accessible lift and ramp stairs. no change in use or occupancy. maher n/a. | $201,884 |
| Oct 4, 2018 | Completed final sign-off Oct 2018 | 100 Pine St | Pioneer Fire Inc. | 21st fl - relocate 23 pendents and remove 9 pendents. ref pa 2018-0813-7128Details
21st fl - relocate 23 pendents and remove 9 pendents. ref pa 2018-0813-7128 | $5,782 |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | Team Commercial Construction Inc. | 21st flr. demo duct work, relcate grilles and thermostats, install new exhaust fan, install new vav balance, rebalance vavs to values maher not reqDetails
21st flr. demo duct work, relcate grilles and thermostats, install new exhaust fan, install new vav balance, rebalance vavs to values maher not req | $13,213 |
| Sep 14, 2018 | Never finaled issued Oct 2018, no final | 100 Pine St | Team Commercial Construction Inc. | 21st fl - provide lighting ti to 1,877 sf of office space. ref pa 2018-0326-4553Details
21st fl - provide lighting ti to 1,877 sf of office space. ref pa 2018-0326-4553 | $20,860 |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 100 Pine St | Team Commercial Construction Inc. | 15th fl - provide lighting ti to 1,112 sf of office space. ref pa 2018-0511-8852Details
15th fl - provide lighting ti to 1,112 sf of office space. ref pa 2018-0511-8852 | $18,105 |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 100 Pine St | Team Commercial Construction Inc. | non-struct partitions, doors & finishes, no change in occupancy use or area. replace 1 set of new elevator lobby doors (20 min). mep, life safety & sprinkler under sep permitDetails
non-struct partitions, doors & finishes, no change in occupancy use or area. replace 1 set of new elevator lobby doors (20 min). mep, life safety & sprinkler under sep permit | $150,555 |
| Sep 13, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | Team Commercial Construction Inc. | 25th floor: provide lighting t.i. to 9,888 square feet of office space.Details
25th floor: provide lighting t.i. to 9,888 square feet of office space. | $67,250 |
| Sep 11, 2018 | Completed final sign-off Sep 2018 | 100 Pine St | Sabah International Incorporated | 25th flr- ti 201806202360 modify (e) fire alarm system. add 1 booster power supply, 10 ceiling speaker/strobes, 2 ceiling strobes, 1 ceiling speaker maher naDetails
25th flr- ti 201806202360 modify (e) fire alarm system. add 1 booster power supply, 10 ceiling speaker/strobes, 2 ceiling strobes, 1 ceiling speaker maher na | $7,500 |
| Aug 13, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | Team Commercial Construction Inc. | 21st fl: demolition of non-structural partitions, doors, frames, floor finishes, millwork, electrical & lights. new construction non-structural partitions, doors, frames, millwork & finishes. no structural work in scope. no increase in area, no change in occupancy or use.Details
21st fl: demolition of non-structural partitions, doors, frames, floor finishes, millwork, electrical & lights. new construction non-structural partitions, doors, frames, millwork & finishes. no structural work in scope. no increase in area, no change in occupancy or use. | $237,210 |
| Jul 30, 2018 | Completed final sign-off Aug 2018 | 100 Pine St | Pioneer Fire Inc. | suite 2500 -relocate 43 pendents, remove 5. relocate 4 upright ref 201806202360 maher naDetails
suite 2500 -relocate 43 pendents, remove 5. relocate 4 upright ref 201806202360 maher na | $20,807 |
| Jun 25, 2018 | Never finaled issued Jun 2018, no final | 100 Pine St | Sabah International Incorporated | modify existing fire alarm system on 26th fl. add (20) ceiling speaker/strobes, (1) wall speaker/strobe, (6) ceiling strobes, (2) duct detectors, (3) high powered control relays. ref ti #201802232069. maher na v vif no card readers in elevator lobby.Details
modify existing fire alarm system on 26th fl. add (20) ceiling speaker/strobes, (1) wall speaker/strobe, (6) ceiling strobes, (2) duct detectors, (3) high powered control relays. ref ti #201802232069. maher na v vif no card readers in elevator lobby. | $7,000 |
| Jun 20, 2018 | Completed final sign-off Jan 2019 | 100 Pine St | Team Commercial Construction Inc. | 25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plumbing to be design build under separate permit. life & safety & sprinkler under separate permitDetails
25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plumbing to be design build under separate permit. life & safety & sprinkler under separate permit | $857,547 |
| Jun 19, 2018 | Completed final sign-off Jul 2018 | 100 Pine St | Pioneer Fire Inc. | ref pa# 201805219679; relocate (3) pendents and raised (10) sprinklersDetails
ref pa# 201805219679; relocate (3) pendents and raised (10) sprinklers | $8,875 |
| Jun 8, 2018 | Never finaled issued Jun 2018, no final | 100 Pine St | street spaceDetails
street space | ||
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 100 Pine St | Team Commercial Construction Inc. | 26th flr ref pa# 201802232069, partial- scope office tenant retrofit: wiring lighting and controls, elec t-24Details
26th flr ref pa# 201802232069, partial- scope office tenant retrofit: wiring lighting and controls, elec t-24 | $61,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 100 Pine St | Team Commercial Construction Inc. | 26th flr - mechanicall: demo ductwork-relocate stats & grilles. install new vavs - ductwork & grilles. install new heat pump in it room. install new 2 fire smoke dampers ref 201802232069Details
26th flr - mechanicall: demo ductwork-relocate stats & grilles. install new vavs - ductwork & grilles. install new heat pump in it room. install new 2 fire smoke dampers ref 201802232069 | $114,000 |
| Jun 5, 2018 | Never finaled filed Jun 2018, never issued | 100 Pine St | street space | ||
| May 29, 2018 | Completed final sign-off Jan 2021 | 100 Pine St | Hathaway Dinwiddie Co. | ground floor - power and lighting throughout lobby area, restroom and mail room. ref 201805219679Details
ground floor - power and lighting throughout lobby area, restroom and mail room. ref 201805219679 | $75,000 |
| May 21, 2018 | Completed final sign-off Jan 2021 | 100 Pine St | Hathaway Dinwiddie Co. | ground floor: demo of non structural ceiling and light fixtures, construction of replacement ceiling and lights, energy upgrade ground floor restroom accessibility upgrade.Details
ground floor: demo of non structural ceiling and light fixtures, construction of replacement ceiling and lights, energy upgrade ground floor restroom accessibility upgrade. | $176,280 |
| May 15, 2018 | Completed final sign-off May 2018 | 100 Pine St | Sabah International Incorporated | ref #201803264553 add (6) speakers/strobes to suite 2150 on 21st floorDetails
ref #201803264553 add (6) speakers/strobes to suite 2150 on 21st floor | $7,000 |
| May 11, 2018 | Completed final sign-off Feb 2019 | 100 Pine St | Team Commercial Construction Inc. | demolition of non structural partitions, doors, frames, floor finishes, millwork, elec, light fix. new construction non structural partitions, doors, frames, millwork and finishes. no structural included.no increase in area,occupancy or use. mep design build. ls and sp design build, maher not reqDetails
demolition of non structural partitions, doors, frames, floor finishes, millwork, elec, light fix. new construction non structural partitions, doors, frames, millwork and finishes. no structural included.no increase in area,occupancy or use. mep design build. ls and sp design build, maher not req | $88,128 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 100 Pine St | Pioneer Fire Inc. | relocate 5 uprights, remove 1 upricht, relocate 39 pendents ref 201802232069 suite 2600Details
relocate 5 uprights, remove 1 upricht, relocate 39 pendents ref 201802232069 suite 2600 | $24,411 |
| Apr 17, 2018 | Completed final sign-off Apr 2018 | 100 Pine St | Pioneer Fire Inc. | relocate 4 pendents, 201803264553.Details
relocate 4 pendents, 201803264553. | $5,483 |
| Mar 28, 2018 | Completed final sign-off Sep 2020 | 100 Pine St | Metropolitan Electrical Construction | at&t - install 2 new antennas, install new screening, paint to match, remove all unused equip, install striping & barricades per emf report, r&r 4(e) rrus with 4(n) rrus. install 2(n) rrus.Details
at&t - install 2 new antennas, install new screening, paint to match, remove all unused equip, install striping & barricades per emf report, r&r 4(e) rrus with 4(n) rrus. install 2(n) rrus. | $23,000 |
| Mar 26, 2018 | Never finaled issued Mar 2018, no final | 100 Pine St | Team Commercial Construction Inc. | suite #2150 demo of non structural partitions, doors, frames, finishes millwork, light fixs & electrical. construct non structural partitions, glazing, doors, frames, millwork & finishes. non structural work included in scope, no change occupancy, use life safety sprinkler mep design build underDetails
suite #2150 demo of non structural partitions, doors, frames, finishes millwork, light fixs & electrical. construct non structural partitions, glazing, doors, frames, millwork & finishes. non structural work included in scope, no change occupancy, use life safety sprinkler mep design build under | $152,950 |
| Feb 23, 2018 | Completed final sign-off Dec 2018 | 100 Pine St | Team Commercial Construction Inc. | demo of non-struc'l partitions, doors, frames, floor finishes, millwork, electrical and light fixtures. new construction consists of non-struct'l partitions, doors, frames, millwork and finishes. no struct'l work included in scope. no increase in area, change in use or occupancy. mep & life safetyDetails
demo of non-struc'l partitions, doors, frames, floor finishes, millwork, electrical and light fixtures. new construction consists of non-struct'l partitions, doors, frames, millwork and finishes. no struct'l work included in scope. no increase in area, change in use or occupancy. mep & life safety | $857,547 |
| Feb 9, 2018 | Completed final sign-off Dec 2018 | 100 Pine St | Team Commercial Construction Inc. | #375:add and relocate ceiling/return air diffusers relocate thermostat, new duct work and air balance. ref app#201710131174. n/a for maherDetails
#375:add and relocate ceiling/return air diffusers relocate thermostat, new duct work and air balance. ref app#201710131174. n/a for maher | $8,010 |
| Jan 19, 2018 | Completed final sign-off Dec 2018 | 100 Pine St | Team Commercial Construction Inc. | # 375: partial scope office tenant retrofit: lighting and controls. ref. arch. permit app#201710131174. n/a for maherDetails
# 375: partial scope office tenant retrofit: lighting and controls. ref. arch. permit app#201710131174. n/a for maher | $10,210 |
| Nov 29, 2017 | Completed final sign-off Dec 2017 | 100 Pine St | Sabah International Incorporated | as built for 201711033089. n/a for maherDetails
as built for 201711033089. n/a for maher | |
| Nov 22, 2017 | Completed final sign-off Nov 2018 | 100 Pine St | Team Commercial Construction Inc. | change to mechanical 201709229355 architectural 201707101312. new fsd not needed at (e) mens room maher naDetails
change to mechanical 201709229355 architectural 201707101312. new fsd not needed at (e) mens room maher na | |
| Nov 10, 2017 | Completed final sign-off Nov 2017 | 100 Pine St | Pioneer Fire Inc. | suite 375 -relocating 4 pendents ref pa 2017-1013-1174Details
suite 375 -relocating 4 pendents ref pa 2017-1013-1174 | $4,295 |
| Nov 3, 2017 | Completed final sign-off Dec 2017 | 100 Pine St | Sabah International Incorporated | add 2 new duct smoke detectors, 2 new high power control relay to existing fa permit 201709198972 ref mech permit 201709229355Details
add 2 new duct smoke detectors, 2 new high power control relay to existing fa permit 201709198972 ref mech permit 201709229355 | $9,000 |
| Oct 13, 2017 | Completed final sign-off Dec 2018 | 100 Pine St | Team Commercial Construction Inc. | 3/f -demolition of non structural wall, ceiling & light fixtures. new construction consists of non structural wall, ceiling and new light fixtures. no structural work included in scope, no increase in area . no change in occupancy or use. life safety and sprinkler to be design build under sep permitDetails
3/f -demolition of non structural wall, ceiling & light fixtures. new construction consists of non structural wall, ceiling and new light fixtures. no structural work included in scope, no increase in area . no change in occupancy or use. life safety and sprinkler to be design build under sep permit | $208,728 |
| Oct 5, 2017 | Never finaled issued Oct 2017, no final | 100 Pine St | Team Commercial Construction Inc. | 7th fl, ste 775 - provide lighting ti to 1531 sq ft of office space. ref pa 2017-0519-7086Details
7th fl, ste 775 - provide lighting ti to 1531 sq ft of office space. ref pa 2017-0519-7086 | $10,200 |
| Sep 22, 2017 | Never finaled issued Sep 2017, no final | 100 Pine St | Team Commercial Construction Inc. | 5th fl: provide lighting tenant improvments to 4934 sq ft of office space. ref pa #201707101312. maher naDetails
5th fl: provide lighting tenant improvments to 4934 sq ft of office space. ref pa #201707101312. maher na | $7,060 |
| Sep 22, 2017 | Completed final sign-off Nov 2018 | 100 Pine St | Team Commercial Construction Inc. | 5th fl: install new exhaust fan, vav boxes, supply/return diffusers, thermostats. ref pa #201707101312. maher not reqDetails
5th fl: install new exhaust fan, vav boxes, supply/return diffusers, thermostats. ref pa #201707101312. maher not req | $58,211 |
| Sep 19, 2017 | Completed final sign-off Dec 2017 | 100 Pine St | Sabah International Incorporated | 5/f, suite 590: f/a: add 10 new ceiling speakers/strobes, add 1 new speaker/strobe, add 2 new weather proof speakers/strobes. ref t.i. pa#2017-0710-1312.Details
5/f, suite 590: f/a: add 10 new ceiling speakers/strobes, add 1 new speaker/strobe, add 2 new weather proof speakers/strobes. ref t.i. pa#2017-0710-1312. | $10,059 |
| Aug 30, 2017 | Never finaled issued Aug 2017, no final | 100 Pine St | Pioneer Fire Inc. | 5/f: relocate 31 pendents, relocate 10 uprights, remove 4 pendents ti 201707101312Details
5/f: relocate 31 pendents, relocate 10 uprights, remove 4 pendents ti 201707101312 | $13,929 |
| Jul 10, 2017 | Completed final sign-off Nov 2018 | 100 Pine St | Team Commercial Construction Inc. | 5/f:demo of (e) non-structural partition, millwork, doors, frames, floor finishes electrical & light fixtures.(n) constructoin constist of non-structural partitions, doors,frames,glazing,millwork & finishes.no increase in area. no change in occupancy or use.Details
5/f:demo of (e) non-structural partition, millwork, doors, frames, floor finishes electrical & light fixtures.(n) constructoin constist of non-structural partitions, doors,frames,glazing,millwork & finishes.no increase in area. no change in occupancy or use. | $275,082 |
| Jun 22, 2017 | Completed final sign-off Jul 2017 | 100 Pine St | Pioneer Fire Inc. | ste. 775: relocate (2) fire sprinklers.Details
ste. 775: relocate (2) fire sprinklers. | $4,000 |
| Jun 15, 2017 | Completed final sign-off Nov 2017 | 100 Pine St | Metropolitan Electrical Construction | att modification: install (4) (n) rrus-e2, (8) (n) diplexes, (2)(n) surge suppresors, other small equipment; relocate (10) (e) rrus. maher naDetails
att modification: install (4) (n) rrus-e2, (8) (n) diplexes, (2)(n) surge suppresors, other small equipment; relocate (10) (e) rrus. maher na | $25,000 |
| Jun 5, 2017 | Completed final sign-off Jun 2017 | 100 Pine St | Sabah International Incorporated | 31/f- add (3) new ceiling speaker/strobes, relocate (1) existing speaker/strobe. ti. pa# 201703070865. n/a ordinance #155-13Details
31/f- add (3) new ceiling speaker/strobes, relocate (1) existing speaker/strobe. ti. pa# 201703070865. n/a ordinance #155-13 | $6,961 |
| May 19, 2017 | Completed final sign-off Nov 2018 | 100 Pine St | Team Commercial Construction Inc. | demolition of non-structural partitions, doors, frames, floor finishes, millwork, elec, & lighting fixtures, nw construction consists of non structural partitions doors, frames,millwork, finishes. no structural work included in scope. mech, elec, &plmg are seperate permit. l/s is design bld seperateDetails
demolition of non-structural partitions, doors, frames, floor finishes, millwork, elec, & lighting fixtures, nw construction consists of non structural partitions doors, frames,millwork, finishes. no structural work included in scope. mech, elec, &plmg are seperate permit. l/s is design bld seperate | $160,037 |
| May 18, 2017 | Completed final sign-off Feb 2019 | 100 Pine St | Team Commercial Construction Inc. | 26th floor: revision to 201704103520 millwork, sink, and 1 interior door added to project. no structural workDetails
26th floor: revision to 201704103520 millwork, sink, and 1 interior door added to project. no structural work | $24,000 |
| Apr 18, 2017 | Completed final sign-off Nov 2017 | 100 Pine St | Pioneer Fire Inc. | 26/f- return to system to warmshell. t.i.pa#201704103520. n/a ordinance #155-13Details
26/f- return to system to warmshell. t.i.pa#201704103520. n/a ordinance #155-13 | $11,971 |
| Apr 18, 2017 | Completed final sign-off Apr 2017 | 100 Pine St | Pioneer Fire Inc. | 31/f #3110- relocate 4 pendents, add 2 and remove 1 pendent. t.i. pa#201703070865. n/a ordinance #155-13Details
31/f #3110- relocate 4 pendents, add 2 and remove 1 pendent. t.i. pa#201703070865. n/a ordinance #155-13 | $7,837 |
| Apr 10, 2017 | Completed final sign-off Feb 2019 | 100 Pine St | Team Commercial Construction Inc. | demolition of non structural partitions, doors, frames, floor finishes, millwork, elec and light fixtures. new construction consists of non structural partitions, doors, frames, millwork, finishes. no structural work included in scope. no increase in area, change in use or occupancy. mep and lifeDetails
demolition of non structural partitions, doors, frames, floor finishes, millwork, elec and light fixtures. new construction consists of non structural partitions, doors, frames, millwork, finishes. no structural work included in scope. no increase in area, change in use or occupancy. mep and life | $825,786 |
| Mar 7, 2017 | Completed final sign-off Oct 2017 | 100 Pine St | Team Commercial Construction Inc. | suite 3110 commercial tenant improvement on a asingle floor. work includes new partitions, doors, frames, ceiling, lighting, finishes, casework, electrical, mechanical maher not reqDetails
suite 3110 commercial tenant improvement on a asingle floor. work includes new partitions, doors, frames, ceiling, lighting, finishes, casework, electrical, mechanical maher not req | $150,000 |
| Mar 3, 2017 | Completed final sign-off Mar 2017 | 100 Pine St | Sabah International Incorporated | 30/f- provide modification to (e) fire alarm system, relocate (1) existing speaker/strobe, demo (1) existing strobe, (1) existing speaker, adjust (1) existing strobe candela rating. n/a ordinance #155-13Details
30/f- provide modification to (e) fire alarm system, relocate (1) existing speaker/strobe, demo (1) existing strobe, (1) existing speaker, adjust (1) existing strobe candela rating. n/a ordinance #155-13 | $7,558 |
| Mar 1, 2017 | Completed final sign-off Mar 2017 | 100 Pine St | Pioneer Fire Inc. | 30th flr: 10 relocated pendents and remove 1 pendent 201612144884 arch. gc permit # 201701318267 mep maher naDetails
30th flr: 10 relocated pendents and remove 1 pendent 201612144884 arch. gc permit # 201701318267 mep maher na | $4,379 |
| Jan 31, 2017 | Never finaled issued Feb 2017, no final | 100 Pine St | Team Commercial Construction Inc. | 22nd fl: demolition of non-structural partitions, doors, frames, floor finishes, millwork, electrical & light fixtures. nw construction consists of non-structural partitions, doors, frames, millwork, & finishes. no structural work. fire & life safty to be disign bldg under seprte. mep is includedDetails
22nd fl: demolition of non-structural partitions, doors, frames, floor finishes, millwork, electrical & light fixtures. nw construction consists of non-structural partitions, doors, frames, millwork, & finishes. no structural work. fire & life safty to be disign bldg under seprte. mep is included | $196,202 |
| Jan 31, 2017 | Completed final sign-off Jun 2017 | 100 Pine St | Novo Construction Inc | 30th flr, suite 3000: mep for ti ref pa 201612144884 maher naDetails
30th flr, suite 3000: mep for ti ref pa 201612144884 maher na | $10,000 |
| Dec 14, 2016 | Completed final sign-off Jun 2017 | 100 Pine St | Novo Construction Inc | modification & expansion of (e) tenant improvement to include seelective demo and construction of non-load bearing partitions. mep, l/s & f/s under sep permits.Details
modification & expansion of (e) tenant improvement to include seelective demo and construction of non-load bearing partitions. mep, l/s & f/s under sep permits. | $110,000 |
| Nov 17, 2016 | Completed final sign-off Dec 2016 | 100 Pine St | Pioneer Fire Inc. | 25th floor: remove 8 pendent sprinkler and provide 8 upright sprinklers coverage in open ceiling areas. ref app#201509167168. n/a for maher.Details
25th floor: remove 8 pendent sprinkler and provide 8 upright sprinklers coverage in open ceiling areas. ref app#201509167168. n/a for maher. | $5,000 |
| Sep 27, 2016 | Completed final sign-off Oct 2016 | 100 Pine St | Anderson, Rowe & Buckley, Inc. | 31st & 32nd floors fire sprinkler system tenant improvements. 31st floor - 4 relocate & 1 added sprinkler. 32nd floor - 1 added sprinkler. ref pa #201607011464. n/a maher ordinanceDetails
31st & 32nd floors fire sprinkler system tenant improvements. 31st floor - 4 relocate & 1 added sprinkler. 32nd floor - 1 added sprinkler. ref pa #201607011464. n/a maher ordinance | $1,800 |
| Sep 23, 2016 | Completed final sign-off Oct 2016 | 100 Pine St | Sabah International Incorporated | 9th floor: relocate 92) wall strobes, remove (1) smoke detector, add (1) ceiling speaker/strobe, adjust (1) existing wall strobe. 11th floor: remove (4) wall strobes, relocate (11) ceiling speaker, add (2) ceiling strobe and (5) ceiling speaker/strobe, adjust (1) existing wall strobeDetails
9th floor: relocate 92) wall strobes, remove (1) smoke detector, add (1) ceiling speaker/strobe, adjust (1) existing wall strobe. 11th floor: remove (4) wall strobes, relocate (11) ceiling speaker, add (2) ceiling strobe and (5) ceiling speaker/strobe, adjust (1) existing wall strobe | $16,032 |
| Sep 21, 2016 | Completed final sign-off Apr 2017 | 100 Pine St | Metropolitan Electrical Construction | revision to app#201602220168. at&t modification. locate new antenna in sector a to new location on verticle column, set back from parapet. n/a maher ordinanceDetails
revision to app#201602220168. at&t modification. locate new antenna in sector a to new location on verticle column, set back from parapet. n/a maher ordinance | |
| Sep 14, 2016 | Completed final sign-off Sep 2016 | 100 Pine St | Pioneer Fire Inc. | as built fire sprinkler drawings to permit 201605268437. n/a for maher.Details
as built fire sprinkler drawings to permit 201605268437. n/a for maher. | $9,975 |
| Aug 23, 2016 | Completed final sign-off Aug 2016 | 100 Pine St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system, ti 9th floor - 2 relocated sprinklers, 1 added sprinkler. 11th floor - 4 relocated sprinklers, 2 added srpinklers. 9th floor ref pa 201-0805-4284 and 11th floor - 2016-0805-4288Details
existing fire sprinkler system, ti 9th floor - 2 relocated sprinklers, 1 added sprinkler. 11th floor - 4 relocated sprinklers, 2 added srpinklers. 9th floor ref pa 201-0805-4284 and 11th floor - 2016-0805-4288 | $4,500 |
| Aug 5, 2016 | Never finaled issued Aug 2016, no final | 100 Pine St | Rudolph And Sletten Inc | a/mep no new fsd's 11/f- demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new non structural partitions, doors, frames, millwork & finishes. no structural work. fire life safety & sprinkler seperate design build. n/a maherDetails
a/mep no new fsd's 11/f- demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new non structural partitions, doors, frames, millwork & finishes. no structural work. fire life safety & sprinkler seperate design build. n/a maher | $123,960 |
| Aug 5, 2016 | Completed final sign-off Sep 2016 | 100 Pine St | Rudolph And Sletten Inc | a/mep no new fsd's 9/f - demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new construct of non structural partitions, doors, frames, millwork & finishes. no structural work. fire, life safety & sprinkler separate design build. n/a maherDetails
a/mep no new fsd's 9/f - demo non structural partitions, doors, frames, floor finishes, electrical & light fixtures. new construct of non structural partitions, doors, frames, millwork & finishes. no structural work. fire, life safety & sprinkler separate design build. n/a maher | $1,215,000 |
| Aug 3, 2016 | Completed final sign-off Nov 2016 | 100 Pine St | Sabah International Incorporated | as built dwgs, ref. 201604064037; maher n/aDetails
as built dwgs, ref. 201604064037; maher n/a | |
| Jul 1, 2016 | Completed final sign-off Dec 2016 | 100 Pine St | Principal Builders Inc. | partial 31st flr ti for partial floor and 32nd floor ti for full floor - minor demo, partitions, mechanical, electrical, ceiling and finishes. minor accessibility upgrades to the bldg core restrooms, include new accessible, minor toilet partition revisions and accessory adjustmentsDetails
partial 31st flr ti for partial floor and 32nd floor ti for full floor - minor demo, partitions, mechanical, electrical, ceiling and finishes. minor accessibility upgrades to the bldg core restrooms, include new accessible, minor toilet partition revisions and accessory adjustments | $138,000 |
| Jun 22, 2016 | Completed final sign-off Jun 2016 | 100 Pine St | Sabah International Incorporated | 15th flr: provide a modification of the (e) fa system for partial ti ref pa 2016 0425 5566 maher naDetails
15th flr: provide a modification of the (e) fa system for partial ti ref pa 2016 0425 5566 maher na | $8,196 |
| Jun 20, 2016 | Completed final sign-off Jun 2016 | 100 Pine St | Pioneer Fire Inc. | 15th floor: relocate 4 pendents and add 2 pendent. t.i app#201604255566. n/a for maherDetails
15th floor: relocate 4 pendents and add 2 pendent. t.i app#201604255566. n/a for maher | $4,885 |
| May 31, 2016 | Completed final sign-off Mar 2018 | 100 Pine St | Sabah International Incorporated | modification of existing fire alarm system for parial tenant build out on 18th fl. add 20 new speaker strobes, relocate 1 existing smoke detector, 3 existing strobes, demolish 3 existing smoke detectors, 2 existing duct smoke detectors, 13 e strobes, 16 speakers, ref 201603212548Details
modification of existing fire alarm system for parial tenant build out on 18th fl. add 20 new speaker strobes, relocate 1 existing smoke detector, 3 existing strobes, demolish 3 existing smoke detectors, 2 existing duct smoke detectors, 13 e strobes, 16 speakers, ref 201603212548 | $8,061 |
| May 26, 2016 | Completed final sign-off Dec 2016 | 100 Pine St | Principal Builders Inc. | 32nd floor: partial floor ti for full floor tenant. minor demolition, partitions, mechanical, electrical, ceiling finishes & life safety. minor accessibility upgrades to restrooms including signage, toilet partition & accessories.Details
32nd floor: partial floor ti for full floor tenant. minor demolition, partitions, mechanical, electrical, ceiling finishes & life safety. minor accessibility upgrades to restrooms including signage, toilet partition & accessories. | $150,000 |
| May 26, 2016 | Completed final sign-off Sep 2016 | 100 Pine St | Pioneer Fire Inc. | 18/f: relocate 33 pendents, add 9 pendents, add 2 upright pendents ref 201603212548 maher not reqDetails
18/f: relocate 33 pendents, add 9 pendents, add 2 upright pendents ref 201603212548 maher not req | $19,920 |
| Apr 25, 2016 | Completed final sign-off Apr 2017 | 100 Pine St | Team Commercial Construction Inc. | ti suite 1500: install non bearing walls, doors, finishes. some mech and elecDetails
ti suite 1500: install non bearing walls, doors, finishes. some mech and elec | $140,000 |
| Apr 19, 2016 | Completed final sign-off Nov 2016 | 100 Pine St | Team Commercial Construction Inc. | 18th floor: t.i. mep's had been previously deferred until now. ref app#201603212548. n/a for maher.Details
18th floor: t.i. mep's had been previously deferred until now. ref app#201603212548. n/a for maher. | |
| Apr 6, 2016 | Completed final sign-off Nov 2016 | 100 Pine St | Sabah International Incorporated | 14th floor: provide modification of extg fire alarm system for tenant improvement on 14th floor. install 6 new speaker/strobes, 1 smoke detector. remove 3 extg strobes and remove 3 extg speakers. n/a for maher.Details
14th floor: provide modification of extg fire alarm system for tenant improvement on 14th floor. install 6 new speaker/strobes, 1 smoke detector. remove 3 extg strobes and remove 3 extg speakers. n/a for maher. | $8,248 |
| Mar 21, 2016 | Completed final sign-off Nov 2016 | 100 Pine St | Team Commercial Construction Inc. | 18th floor office t.i. - demo, non-bearing partitions, ceilings, floors. deferred submittals for m.e.p. & fire system. n/a maher ordinanceDetails
18th floor office t.i. - demo, non-bearing partitions, ceilings, floors. deferred submittals for m.e.p. & fire system. n/a maher ordinance | $1,700,000 |