Alex D Filatov
- License
- C85023
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C85023 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Aug 2020 to Oct 2026
5 permits since 2000 (engineer on 5 permits): 3 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Blue Bay Painting Contractor, Skyline Construction
- Architects
- Stephen Jouflas (2), George Soskin, Jacqui Atiya Hogans, Jason Milam, Lawrence Smith, Marcus Cross
- Engineers
- Amit Wadhwa (2), Levi G. Abarte (2), Meng-Hsiu Chen
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 30, 2026 | In progress filed Oct 2026, not yet issued | 100 Pine St | demo of (e) cmu walls and door to allow for upgrades to the fire pump on basement level b2. construction of new cmu wall and door.Details
demo of (e) cmu walls and door to allow for upgrades to the fire pump on basement level b2. construction of new cmu wall and door. | $17,233 | |
| Oct 16, 2026 | In progress filed Oct 2026, not yet issued | 425 Market St | 16th flr: partial floor interior t.i. new partitions, ceilings, finishes and mepDetails
16th flr: partial floor interior t.i. new partitions, ceilings, finishes and mep | $4,859,591 | |
| Oct 16, 2026 | In progress filed Oct 2026, not yet issued | 1 Front St | 34th flr: interior t.i. new partitions, celings. | $4,400,000 | |
| May 5, 2023 | Never finaled issued Jun 2023, no final | 1998 Broadway | Blue Bay Painting Contractor | removal of (e) waterproofing membrane, overburden & plants @ g3 garage level roof, installation of new drains, waterpoofing membrane, overburden and landscaping @ g3 garage level roof, repair of (e) concrete cracks & spalls @ g3 garage level ceilingDetails
removal of (e) waterproofing membrane, overburden & plants @ g3 garage level roof, installation of new drains, waterpoofing membrane, overburden and landscaping @ g3 garage level roof, repair of (e) concrete cracks & spalls @ g3 garage level ceiling | $650,000 |
| Aug 13, 2020 | Never finaled issued Jul 2021, no final | 3 Embarcadero Center | Skyline Construction | new communicating stairs between 20th & 21st floor.Details
new communicating stairs between 20th & 21st floor. | $250,000 |