Block 0232, lot 016
101 Clay St
- City’s use
- Commercial Office
- Built
- 1976
- Stories
- 30
- Building
- 950,741 sq ft
- Lot
- 75,625 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 3 Embarcadero Center | Vulcan Construction Inc | ste 2350- mep deferred for bpa: 202607104811. new lights, new outlets, new floor monuments, new vav to supply new offices.Details
ste 2350- mep deferred for bpa: 202607104811. new lights, new outlets, new floor monuments, new vav to supply new offices. | $75,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 3 Embarcadero Center | M C S Construction Services | demo only permit of level 28 and partial floor 27 (ab-017)Details
demo only permit of level 28 and partial floor 27 (ab-017) | $30,000 |
| Jul 20, 2026 | In progress issued Aug 2026 | 3 Embarcadero Center | M C S Construction Services | 27/f: (e) full fl office suite demised into 2 suites. scope includes: demo and construction of common area and restroom, non-structural partitions, ceilings, doors, millwork and finishes. no change in occupancy, use or area.Details
27/f: (e) full fl office suite demised into 2 suites. scope includes: demo and construction of common area and restroom, non-structural partitions, ceilings, doors, millwork and finishes. no change in occupancy, use or area. | $300,000 |
| Jul 10, 2026 | In progress issued Jul 2026 | 3 Embarcadero Center | Vulcan Construction Inc | suite 2350. remodel existing tenant suite, demo of lighting and finishes, construction of non structural partitions, ceilings, lighting, and finishes. no new plumbing fixtures. mep deferred.Details
suite 2350. remodel existing tenant suite, demo of lighting and finishes, construction of non structural partitions, ceilings, lighting, and finishes. no new plumbing fixtures. mep deferred. | $95,282 |
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 3 Embarcadero Center | construction of new security gates and screens to the existing stairways. interior exit.Details
construction of new security gates and screens to the existing stairways. interior exit. | $31,500 | |
| Jun 3, 2026 | Completed final sign-off Aug 2026 | 3 Embarcadero Center | Vulcan Construction Inc | 8/f: installing transfer grills and replacing lights. (deferred mep for pa# 202603107215)Details
8/f: installing transfer grills and replacing lights. (deferred mep for pa# 202603107215) | $75,000 |
| Apr 3, 2026 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Siemens Industry, Inc. | floor 25;fire only to obtain "as-built" permit for the fire alarm addtions with the floor 25 allen matkins remodels. initial fire alarm pa#: 202511129336.Details
floor 25;fire only to obtain "as-built" permit for the fire alarm addtions with the floor 25 allen matkins remodels. initial fire alarm pa#: 202511129336. | |
| Mar 19, 2026 | Completed final sign-off Jun 2026 | 3 Embarcadero Center | Skyline Construction | 16th fl mechanical and electrical work for ti ref pa 202601214196Details
16th fl mechanical and electrical work for ti ref pa 202601214196 | $140,000 |
| Mar 10, 2026 | Completed final sign-off Aug 2026 | 3 Embarcadero Center | Vulcan Construction Inc | 8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenant suite doors. new common corridor and elevator lobby finishes and ceiling.Details
8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenant suite doors. new common corridor and elevator lobby finishes and ceiling. | $300,000 |
| Jan 21, 2026 | Completed final sign-off Jun 2026 | 3 Embarcadero Center | Skyline Construction | 16/fl-scope of work includes creating (2) spec suites(1630 & 1650) demo of non structural interior partitons, doors, finishes, ceilings and lighting. new consruction includes non-structural partitons, doors, ceilings,lighting, plumbing, and finishes. fls and mep deferred.Details
16/fl-scope of work includes creating (2) spec suites(1630 & 1650) demo of non structural interior partitons, doors, finishes, ceilings and lighting. new consruction includes non-structural partitons, doors, ceilings,lighting, plumbing, and finishes. fls and mep deferred. | $826,866 |
| Jan 7, 2026 | Completed final sign-off Jan 2026 | 3 Embarcadero Center | Bilcor Inc | install 1 call station for elevator lobby. install 1 call station signage. 2 way ecs permanent backbone infrastrcture permit. 202009033421. 25th fl architectural 202507160935.Details
install 1 call station for elevator lobby. install 1 call station signage. 2 way ecs permanent backbone infrastrcture permit. 202009033421. 25th fl architectural 202507160935. | $1,000 |
| Dec 22, 2025 | In progress filed Dec 2025, not yet issued | 3 Embarcadero Center | Bilcor Inc | 25th fl - install 1 call station; install 1 call station signage; 2 way backbone infrastructure 202009033421 25th arch pa 202507160935Details
25th fl - install 1 call station; install 1 call station signage; 2 way backbone infrastructure 202009033421 25th arch pa 202507160935 | $1,000 |
| Dec 19, 2025 | Completed final sign-off Jan 2026 | 3 Embarcadero Center | Mc Millan Electric | suite p2: install lighting control, power outlets & devices, new distribution panel. deferred electrical for t.i. 202510157369Details
suite p2: install lighting control, power outlets & devices, new distribution panel. deferred electrical for t.i. 202510157369 | $80,000 |
| Dec 16, 2025 | Completed final sign-off Jan 2026 | 3 Embarcadero Center | Vulcan Construction Inc | deffered permit for ref ti 202510157369- for mep to include relocate of air duct and registers.Details
deffered permit for ref ti 202510157369- for mep to include relocate of air duct and registers. | $10,000 |
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Principal Builders Inc. | suite 2500. revision to 202507160935. clarifying the door's hardware etec for the egress. door number 2512.Details
suite 2500. revision to 202507160935. clarifying the door's hardware etec for the egress. door number 2512. | |
| Dec 11, 2025 | Completed final sign-off Dec 2025 | 3 Embarcadero Center | Siemens Industry, Inc. | fire work only for the promenade level remodel done under pa#: 202510157369; 1 speaker and 2 speaker/strobes are added, and 3 speaker/strobes are relocated.Details
fire work only for the promenade level remodel done under pa#: 202510157369; 1 speaker and 2 speaker/strobes are added, and 3 speaker/strobes are relocated. | $5,570 |
| Nov 18, 2025 | Completed final sign-off Nov 2025 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler ti - relocate 3 pendents in suite p-2 on the promenade level. ref ti# 202510157369Details
fire sprinkler ti - relocate 3 pendents in suite p-2 on the promenade level. ref ti# 202510157369 | $1,000 |
| Nov 12, 2025 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Siemens Industry, Inc. | 25th fl - fire work only for suite 2500 remodel done under pa 202507160935; additions are 13 smoke detectors, 9 duct detectors, 2 pull stations, 9 modules, 44 speaker/strobes, 55 speakers and 3 strobesDetails
25th fl - fire work only for suite 2500 remodel done under pa 202507160935; additions are 13 smoke detectors, 9 duct detectors, 2 pull stations, 9 modules, 44 speaker/strobes, 55 speakers and 3 strobes | $131,940 |
| Nov 7, 2025 | Completed final sign-off Dec 2025 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | 22nd fl ref pa # 2025-1105-8998: relocate 6 pendent sprinklers and add 1Details
22nd fl ref pa # 2025-1105-8998: relocate 6 pendent sprinklers and add 1 | $3,675 |
| Nov 5, 2025 | In progress issued Nov 2025 | 3 Embarcadero Center | Skyline Construction | 22nd fl new interior partitoins, ceilings, finishes. mep deferredDetails
22nd fl new interior partitoins, ceilings, finishes. mep deferred | $190,000 |
| Oct 15, 2025 | Completed final sign-off Dec 2025 | 3 Embarcadero Center | Vulcan Construction Inc | promenade level consists of demolition of non structural partition, millwork, lighting and finishes. construction of non structural partitions, ceilings, lighting and finishes. no change in occupancy, use or area. mep deferred.Details
promenade level consists of demolition of non structural partition, millwork, lighting and finishes. construction of non structural partitions, ceilings, lighting and finishes. no change in occupancy, use or area. mep deferred. | $292,500 |
| Sep 26, 2025 | Completed final sign-off Feb 2026 | 3 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 25/f suite 2500: fire sprinkler t.i. relocate 222. ref permit 202507160935.Details
25/f suite 2500: fire sprinkler t.i. relocate 222. ref permit 202507160935. | $114,246 |
| Aug 26, 2025 | Completed final sign-off Nov 2025 | 3 Embarcadero Center | Siemens Industry, Inc. | 26th fl ref pa # 2025-0623-9229: fire only work. addition of 2 speaker/strobesDetails
26th fl ref pa # 2025-0623-9229: fire only work. addition of 2 speaker/strobes | $1,922 |
| Aug 14, 2025 | Completed final sign-off Sep 2025 | 3 Embarcadero Center | Pioneer Fire Inc. | 26th/f: relocate 13 pendents, ref to t.i. 202506239229Details
26th/f: relocate 13 pendents, ref to t.i. 202506239229 | $3,250 |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Principal Builders Inc. | 25/f, ste 2500. ref arch set #202507160935. mep for this project.Details
25/f, ste 2500. ref arch set #202507160935. mep for this project. | $2,900,000 |
| Jul 16, 2025 | Completed final sign-off Apr 2026 | 3 Embarcadero Center | Principal Builders Inc. | 25th fl,ste 2500 -ti includes demo of non structural partitions & building new non structural partitions.(n) operable partition; upgrades incude (n) millwork, lighting & finishes throuhgout. all (n) or revised meps under separate permmit. bldg fully sprinklered. (lifeDetails
25th fl,ste 2500 -ti includes demo of non structural partitions & building new non structural partitions.(n) operable partition; upgrades incude (n) millwork, lighting & finishes throuhgout. all (n) or revised meps under separate permmit. bldg fully sprinklered. (life | $3,678,028 |
| Jun 23, 2025 | Completed final sign-off Nov 2025 | 3 Embarcadero Center | Principal Builders Inc. | 26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space.Details
26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space. | $957,720 |
| Dec 11, 2024 | In progress issued Dec 2024 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work.Details
lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work. | |
| Oct 18, 2024 | Completed final sign-off Oct 2024 | 3 Embarcadero Center | Siemens Industry, Inc. | 15th floor; fire only work for the qatalyst remodel in floor 15; additions are 4 modules, 12 speaker/strobes, 10 stobes, as well as the relocation of 1 stobes. ref pa#: 202405142073Details
15th floor; fire only work for the qatalyst remodel in floor 15; additions are 4 modules, 12 speaker/strobes, 10 stobes, as well as the relocation of 1 stobes. ref pa#: 202405142073 | $20,000 |
| Oct 4, 2024 | In progress issued Oct 2024 | 3 Embarcadero Center | Corporate Sign Systems | install evacuation maps on the 15th flDetails
install evacuation maps on the 15th fl | $920 |
| Sep 19, 2024 | In progress issued Sep 2024 | 3 Embarcadero Center | Intelligent Technologies & Services Inc | 15th/f: supply & install a complete clean agent system & control system for idf room 1583 on 15th flDetails
15th/f: supply & install a complete clean agent system & control system for idf room 1583 on 15th fl | $35,225 |
| Sep 6, 2024 | Completed final sign-off Oct 2024 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler ti, relocate 85 pendents and 5 concealed pendents on the 15th fl.ref pa#202405142073Details
fire sprinkler ti, relocate 85 pendents and 5 concealed pendents on the 15th fl.ref pa#202405142073 | $22,500 |
| Jun 3, 2024 | Completed final sign-off Jun 2024 | 3 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 14/f: fire sprinkler tenant imrpovements. relocate (4) sprinkler heads. remove (1) sprinkler head. evecore 14th fl.Details
14/f: fire sprinkler tenant imrpovements. relocate (4) sprinkler heads. remove (1) sprinkler head. evecore 14th fl. | $3,000 |
| May 23, 2024 | Completed final sign-off Oct 2024 | 3 Embarcadero Center | Siemens Industry, Inc. | ref pa# 2023-0703-1429 1st fl: fire only work for the conference center remodel. add 2 smoke detectors, 15 duct detectors, 4 modules, 1 strobe power supply, 19 speakers/strobes and 8 strobes.Details
ref pa# 2023-0703-1429 1st fl: fire only work for the conference center remodel. add 2 smoke detectors, 15 duct detectors, 4 modules, 1 strobe power supply, 19 speakers/strobes and 8 strobes. | $73,400 |
| May 14, 2024 | Completed final sign-off Nov 2024 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | 15th fl ti: demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised fire alarm or sprinklers will be design build and submitted separately. (bldg fully sprinklered)Details
15th fl ti: demo of non structural partitions and building (n) non structural partitions. meps included. all new or revised fire alarm or sprinklers will be design build and submitted separately. (bldg fully sprinklered) | $1,200,000 |
| Apr 22, 2024 | Completed final sign-off Nov 2024 | 3 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | ref pa# 2023-0703-1429 2nd fl fire sprinkler add (115) pendents relocate (2) pendentsDetails
ref pa# 2023-0703-1429 2nd fl fire sprinkler add (115) pendents relocate (2) pendents | $72,669 |
| Mar 27, 2024 | In progress issued Apr 2024 | 3 Embarcadero Center | Skyline Construction | 14th fl suite 1450 tenant improvement. minor demo of partitions, power lighting & new furniture. install new non bearing partitions, power lighting, finishes and furnitureDetails
14th fl suite 1450 tenant improvement. minor demo of partitions, power lighting & new furniture. install new non bearing partitions, power lighting, finishes and furniture | $230,000 |
| Mar 27, 2024 | In progress issued Mar 2024 | 3 Embarcadero Center | Siemens Industry, Inc. | 11th floor suite #1120: fire only addition are: 1 smoke detector, 2 modules, 7 speakers, 7 speaker/strobes, ref pa#22401123863Details
11th floor suite #1120: fire only addition are: 1 smoke detector, 2 modules, 7 speakers, 7 speaker/strobes, ref pa#22401123863 | $15,455 |
| Mar 20, 2024 | Completed final sign-off Feb 2025 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | lobby level: refurbish (e) public terrace space w/ (n) furniture & fixturesDetails
lobby level: refurbish (e) public terrace space w/ (n) furniture & fixtures | $190,000 |
| Mar 6, 2024 | Completed final sign-off Apr 2024 | 3 Embarcadero Center | M C S Construction Services | 11/f suite 1120: revision to permit 202401123863. removal and reconfiguration of 2 offices, addition of pocket door, and reconfiguration of support it space.Details
11/f suite 1120: revision to permit 202401123863. removal and reconfiguration of 2 offices, addition of pocket door, and reconfiguration of support it space. | |
| Feb 28, 2024 | Completed final sign-off Apr 2024 | 3 Embarcadero Center | M C S Construction Services | 11th fl, ste 1120 - deferred mech & elect. pa 202401123863 & 202403067187 mech. demo & replacement of grilles, registers & diffusers for office refresh. demo & install new dual duct vav boxes. electrical lighting fixtures & associated circuiting/controls. power & signal devices & associated wiringDetails
11th fl, ste 1120 - deferred mech & elect. pa 202401123863 & 202403067187 mech. demo & replacement of grilles, registers & diffusers for office refresh. demo & install new dual duct vav boxes. electrical lighting fixtures & associated circuiting/controls. power & signal devices & associated wiring | $150,000 |
| Feb 27, 2024 | Completed final sign-off Mar 2024 | 3 Embarcadero Center | Pioneer Fire Inc. | ref# 202401123863- relocate (32) pendents, add (4) pendents, remove (7) pendents- fire sprinklerDetails
ref# 202401123863- relocate (32) pendents, add (4) pendents, remove (7) pendents- fire sprinkler | $4,700 |
| Feb 27, 2024 | Completed final sign-off Feb 2025 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | deferred mep to approved pa# 202307031429.Details
deferred mep to approved pa# 202307031429. | $600,000 |
| Jan 12, 2024 | Completed final sign-off Apr 2024 | 3 Embarcadero Center | M C S Construction Services | 11th fl, ste 1120 project is located scope consists of removal of non-strucutral partitions, glazing, doors, millwork, lighting, wall and floor finishes throughout. construction of (n) non-structural demising partition and internal suite partitions. (n) inferior glazing, doors, lights, millwork andDetails
11th fl, ste 1120 project is located scope consists of removal of non-strucutral partitions, glazing, doors, millwork, lighting, wall and floor finishes throughout. construction of (n) non-structural demising partition and internal suite partitions. (n) inferior glazing, doors, lights, millwork and | $450,000 |
| Nov 2, 2023 | Completed final sign-off Feb 2024 | 3 Embarcadero Center | Peacock Construction | new title 24 compliant lighting and controls ref 202302141991Details
new title 24 compliant lighting and controls ref 202302141991 | $15,000 |
| Aug 1, 2023 | Completed final sign-off Dec 2023 | 3 Embarcadero Center | Gci, Inc | unit 1480: mechanical & electrical properties work for t.i. to consist of new ductwork, grilles & diffisuers as required. new lighting, controls, power & signal devices. ref pa 202305117614Details
unit 1480: mechanical & electrical properties work for t.i. to consist of new ductwork, grilles & diffisuers as required. new lighting, controls, power & signal devices. ref pa 202305117614 | $20,000 |
| Jul 3, 2023 | Completed final sign-off Feb 2025 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | convert (e) cafe and retail spaces into a conference center as a support space new partitions, ceiling and finishes new all gender rest room mep deferredDetails
convert (e) cafe and retail spaces into a conference center as a support space new partitions, ceiling and finishes new all gender rest room mep deferred | $2,000,000 |
| Jul 3, 2023 | Completed final sign-off Sep 2023 | 3 Embarcadero Center | Pioneer Fire Inc. | relocate 15 pendents, add 3 pendents. ref pa 2023-0511-7614Details
relocate 15 pendents, add 3 pendents. ref pa 2023-0511-7614 | $5,500 |
| Jul 3, 2023 | Completed final sign-off Feb 2025 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | 1/f new store front - glazing system in place of the removed store front, new operable store front systems enclosure at (e) walk-way (n) sky lights abv the atriumDetails
1/f new store front - glazing system in place of the removed store front, new operable store front systems enclosure at (e) walk-way (n) sky lights abv the atrium | $500,000 |
| Jun 30, 2023 | Never finaled issued Jul 2023, no final | 3 Embarcadero Center | Siemens Industry, Inc. | fire only work for the suite 1480 remodel on floor 14. additions are 1 smoke detector, 7 speaker strobes, 2 strobes. ref 202305117614Details
fire only work for the suite 1480 remodel on floor 14. additions are 1 smoke detector, 7 speaker strobes, 2 strobes. ref 202305117614 | $8,689 |
| May 25, 2023 | Completed final sign-off Aug 2023 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinklers: relocate 4 uprights on 1st fl ad relocate 8 uprights on 2nd fl for demo.Details
fire sprinklers: relocate 4 uprights on 1st fl ad relocate 8 uprights on 2nd fl for demo. | $7,440 |
| May 11, 2023 | Completed final sign-off Feb 2024 | 3 Embarcadero Center | Gci, Inc | ste 1480: interior commercial t.i. of (e) space. non-structural demo of (e) t.i. and build-out of new including non-structural partitions, doors, & sidelites, suspended ceilings, casework, & finishes. mep & life safety systems are design-build under separate permit.Details
ste 1480: interior commercial t.i. of (e) space. non-structural demo of (e) t.i. and build-out of new including non-structural partitions, doors, & sidelites, suspended ceilings, casework, & finishes. mep & life safety systems are design-build under separate permit. | $450,562 |
| May 5, 2023 | Completed final sign-off Jul 2023 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only work to add 2 speaker strobes for the restrooms upgrade on fl 16 ref pa# 2023-0303-3028Details
fire only work to add 2 speaker strobes for the restrooms upgrade on fl 16 ref pa# 2023-0303-3028 | $1,822 |
| Mar 3, 2023 | Completed final sign-off Jul 2023 | 3 Embarcadero Center | Peacock Construction | 16th fl: non structural demo upgrade toilet rooms to full t24 compliance (n) finishes in elev. lobby & common corridor no change in occupancy use or area mep, life safet and sprinkers defferedDetails
16th fl: non structural demo upgrade toilet rooms to full t24 compliance (n) finishes in elev. lobby & common corridor no change in occupancy use or area mep, life safet and sprinkers deffered | $175,000 |
| Feb 28, 2023 | Completed final sign-off Nov 2023 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | this project implements no. 2022009016 prj. demolition of extg architectural concrete battered wall at clay street facade at lobby level.Details
this project implements no. 2022009016 prj. demolition of extg architectural concrete battered wall at clay street facade at lobby level. | $170,000 |
| Feb 14, 2023 | Completed final sign-off Feb 2024 | 3 Embarcadero Center | Peacock Construction | demolition of e retail suite at gr fl and lobby level including removal of e storefront. patch back ceiling, walls, flrs, create new publicly accessible open spaceDetails
demolition of e retail suite at gr fl and lobby level including removal of e storefront. patch back ceiling, walls, flrs, create new publicly accessible open space | $195,000 |
| Dec 13, 2022 | Completed final sign-off Jun 2023 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "ropes & gray" remodel on floor 3; additions are (6) speaker/strobes and (1) relay modules. ref permit #202206156376.Details
fire only work for the "ropes & gray" remodel on floor 3; additions are (6) speaker/strobes and (1) relay modules. ref permit #202206156376. | $4,300 |
| Dec 13, 2022 | Completed final sign-off Mar 2023 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "ropes & gray" remodel on floor 2; additions are (3) speaker/strobes and (1) relay modules. ref permit #202206156401.Details
fire only work for the "ropes & gray" remodel on floor 2; additions are (3) speaker/strobes and (1) relay modules. ref permit #202206156401. | $2,400 |
| Dec 7, 2022 | Completed final sign-off Jan 2023 | 3 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 2/f: relocate 6 pendents in new cloud ceiling in wellness room of ropes and gray. ref bldg permit 202206156401 and ref sprinkler permit 202209152480.Details
2/f: relocate 6 pendents in new cloud ceiling in wellness room of ropes and gray. ref bldg permit 202206156401 and ref sprinkler permit 202209152480. | $3,000 |
| Nov 4, 2022 | Completed final sign-off Mar 2023 | 3 Embarcadero Center | Bilcor Inc | 2nd + 3rd fl: install (2) new call stations with mushroom button. 2nd fl architectural ref pa# 202206156401. 3rd fl architectural ref pa# 202206156376.Details
2nd + 3rd fl: install (2) new call stations with mushroom button. 2nd fl architectural ref pa# 202206156401. 3rd fl architectural ref pa# 202206156376. | $2,640 |
| Sep 22, 2022 | Completed final sign-off Mar 2023 | 3 Embarcadero Center | Source Planning And Construction Inc | revision to 202202168054. replace scope. delete mepDetails
revision to 202202168054. replace scope. delete mep | |
| Sep 15, 2022 | Never finaled issued Sep 2022, no final | 3 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | fire sprinkler only relocate 8 uprights and 17 pendents, 3rd fl. relocate 49 pendent , 2nd fl. ref pa 2nd fl - 2022-0615-6401 & 3rd fl - 2022-0615-6376Details
fire sprinkler only relocate 8 uprights and 17 pendents, 3rd fl. relocate 49 pendent , 2nd fl. ref pa 2nd fl - 2022-0615-6401 & 3rd fl - 2022-0615-6376 | $37,500 |
| Aug 25, 2022 | Expired or cancelled withdrawn Feb 2023 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | demolition of portions of existing architectural concrete battered wall at clay street facade at lobby level(level 02)Details
demolition of portions of existing architectural concrete battered wall at clay street facade at lobby level(level 02) | $170,000 |
| Jun 15, 2022 | Completed final sign-off Jul 2023 | 3 Embarcadero Center | Peacock Construction | 2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.Details
2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's. | $856,324 |
| Jun 15, 2022 | Completed final sign-off Jun 2023 | 3 Embarcadero Center | Peacock Construction | 3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.Details
3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep. | $1,025,089 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 3 Embarcadero Center | Pioneer Fire Inc. | 17/f: convert 167 pendent sprinkler heads to upright. remove (9) upright spirnkler heads. maher n/a.Details
17/f: convert 167 pendent sprinkler heads to upright. remove (9) upright spirnkler heads. maher n/a. | $16,750 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 3 Embarcadero Center | M C S Construction Services | 17th fl: demo only permit. ab-017.includes demo of non-structural partitions, fixtures, finishes, (e)suspended ceiling grid & lights. convert (e) fire sprinklers to upright / turn up to return to warm shell condition. ref sprinkler pa# 202206146250.(n) plumbing fixtures under separate permit.Details
17th fl: demo only permit. ab-017.includes demo of non-structural partitions, fixtures, finishes, (e)suspended ceiling grid & lights. convert (e) fire sprinklers to upright / turn up to return to warm shell condition. ref sprinkler pa# 202206146250.(n) plumbing fixtures under separate permit. | $132,000 |
| Apr 4, 2022 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 23/f suite 2350: add 9, relocate 37, change out 21 fire sprinklers per ti. ref ti permit 202203039131.Details
23/f suite 2350: add 9, relocate 37, change out 21 fire sprinklers per ti. ref ti permit 202203039131. | $14,135 |
| Apr 4, 2022 | Completed final sign-off Apr 2022 | 3 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 23/f. ste . add (1), relocate (21) fire sprinkler per t.i ref pa# 202203049255Details
23/f. ste . add (1), relocate (21) fire sprinkler per t.i ref pa# 202203049255 | $6,980 |
| Mar 25, 2022 | Completed final sign-off Aug 2022 | 3 Embarcadero Center | M C S Construction Services | suite 2320: deferred mep permits for title 24 compliance. reference ti pa202203049255. maher naDetails
suite 2320: deferred mep permits for title 24 compliance. reference ti pa202203049255. maher na | $105,000 |
| Mar 25, 2022 | Completed final sign-off Aug 2022 | 3 Embarcadero Center | M C S Construction Services | suite 2350: deferred mep permits for title 24 compliances. reference ti pa202203039131. maher naDetails
suite 2350: deferred mep permits for title 24 compliances. reference ti pa202203039131. maher na | $195,000 |
| Mar 18, 2022 | Never finaled issued Mar 2022, no final | 3 Embarcadero Center | Siemens Industry, Inc. | fire only work for suite 2350: remodel on floor 23. additions are 2 smoke detectors, 1 module, 14 speaker/strobes, and 2 strobes. ref permit app 202203039131Details
fire only work for suite 2350: remodel on floor 23. additions are 2 smoke detectors, 1 module, 14 speaker/strobes, and 2 strobes. ref permit app 202203039131 | $11,750 |
| Mar 18, 2022 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only work for suite 2320: remodel on floor 23. additions are 1 smoke detector, 5 speaker/strobes, and 2 strobes. ref permit app 202203049255Details
fire only work for suite 2320: remodel on floor 23. additions are 1 smoke detector, 5 speaker/strobes, and 2 strobes. ref permit app 202203049255 | $4,900 |
| Mar 4, 2022 | Completed final sign-off Aug 2022 | 3 Embarcadero Center | M C S Construction Services | 23rd floor (ste 2320) t.i. includes demo of non str partitions and build (n) non str, millwork and ceilings. all new or revised. meps life safetywork will be design build and submitted separately if needed (bldg is feelling sprinkled.Details
23rd floor (ste 2320) t.i. includes demo of non str partitions and build (n) non str, millwork and ceilings. all new or revised. meps life safetywork will be design build and submitted separately if needed (bldg is feelling sprinkled. | $245,418 |
| Mar 3, 2022 | Completed final sign-off Aug 2022 | 3 Embarcadero Center | M C S Construction Services | 23rd fl, ste #2350 & 2360: t.t. includes demo of non-structural partitions. building new non-structural partitions, millwork & ceiling. all new or revised design-build mep, speinklers & fire alarm if neeeded, to be submitted separately. (bldg fully sprinklered)Details
23rd fl, ste #2350 & 2360: t.t. includes demo of non-structural partitions. building new non-structural partitions, millwork & ceiling. all new or revised design-build mep, speinklers & fire alarm if neeeded, to be submitted separately. (bldg fully sprinklered) | $505,000 |
| Feb 16, 2022 | Completed final sign-off Mar 2023 | 3 Embarcadero Center | Source Planning And Construction Inc | 23rd floor: upgrade restrooms to full accessibility compliance and add new finishes in elevator lobby and common hallway. no change in occupancy use or area.Details
23rd floor: upgrade restrooms to full accessibility compliance and add new finishes in elevator lobby and common hallway. no change in occupancy use or area. | $149,284 |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 3 Embarcadero Center | Dome Construction Corp | administrative permit. obtaining a fire assemble permit. no work to be done on this permitDetails
administrative permit. obtaining a fire assemble permit. no work to be done on this permit | |
| Sep 1, 2021 | Completed final sign-off Dec 2021 | 3 Embarcadero Center | Dome Construction Corp | restroom upgrades, alter 1 toilet facility. mep deferred.Details
restroom upgrades, alter 1 toilet facility. mep deferred. | $172,418 |
| Aug 17, 2021 | Completed final sign-off Sep 2021 | 3 Embarcadero Center | Bilcor Inc | 9, 10th flrs: fire life safety. install 4 new call stations with mushroom buttons. ref ti pa 202009033421 and 202106222956Details
9, 10th flrs: fire life safety. install 4 new call stations with mushroom buttons. ref ti pa 202009033421 and 202106222956 | $2,640 |
| Aug 6, 2021 | Completed final sign-off Sep 2021 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only work for partial area models on floor 9 & 10. additions are 3 speakers on floor 10 and 1 strobe on floor 9. ref pa# 202106222956.Details
fire only work for partial area models on floor 9 & 10. additions are 3 speakers on floor 10 and 1 strobe on floor 9. ref pa# 202106222956. | $2,450 |
| Aug 2, 2021 | Completed final sign-off Aug 2021 | 3 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system tenant improvement 9th fl relocate and remove sprinkler, 10thy fl relocate 19 add/sprinklerDetails
existing fire sprinkler system tenant improvement 9th fl relocate and remove sprinkler, 10thy fl relocate 19 add/sprinkler | $14,000 |
| Jun 22, 2021 | Completed final sign-off Nov 2021 | 3 Embarcadero Center | Principal Builders Inc. | partial floor ti on floor 8 (25sf), floor 9 (684sf), floor 10 (1988sf). work includes non structural partitions, finishes and associated mep.Details
partial floor ti on floor 8 (25sf), floor 9 (684sf), floor 10 (1988sf). work includes non structural partitions, finishes and associated mep. | $368,298 |
| Jun 16, 2021 | Completed final sign-off Nov 2021 | 3 Embarcadero Center | 5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountainDetails
5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountain | $10,000 | |
| Jun 11, 2021 | Completed final sign-off Feb 2022 | 3 Embarcadero Center | Msr Mechanical Llc | basement: replace 2 (e) water-cooled chillers. maher n/aDetails
basement: replace 2 (e) water-cooled chillers. maher n/a | $850,000 |
| Jun 8, 2021 | Never finaled issued Jun 2021, no final | 3 Embarcadero Center | Dome Construction Corp | suite r3112: revision to bpa#202012161174. remove casework & coffee shtutles on sales floor. add new casework, bean to cup & ice machine at sales floor. revise espresso machine to be relocated to new casework, remove work tables, coffee brewer & shelving in warming pantryDetails
suite r3112: revision to bpa#202012161174. remove casework & coffee shtutles on sales floor. add new casework, bean to cup & ice machine at sales floor. revise espresso machine to be relocated to new casework, remove work tables, coffee brewer & shelving in warming pantry | |
| Jun 7, 2021 | Never finaled issued Sep 2021, no final | 3 Embarcadero Center | Skyline Construction | emergency evacuation signageDetails
emergency evacuation signage | $6,330 |
| May 18, 2021 | Never finaled issued Jul 2021, no final | 3 Embarcadero Center | Skyline Construction | fire only permit to obtain assembly permit stamps for pa 2020-0714-0168 21st floorDetails
fire only permit to obtain assembly permit stamps for pa 2020-0714-0168 21st floor | |
| Mar 1, 2021 | Completed final sign-off Jul 2021 | 3 Embarcadero Center | Bilcor Inc | fire life safety: install (5) call stations architectural reference t.i.# 2020-0603-9375, 2020-0708-6539, 2020-0708-9841, 2020-0714-0168, 2020-0630-9411Details
fire life safety: install (5) call stations architectural reference t.i.# 2020-0603-9375, 2020-0708-6539, 2020-0708-9841, 2020-0714-0168, 2020-0630-9411 | $3,300 |
| Jan 11, 2021 | Completed final sign-off Mar 2022 | 3 Embarcadero Center | Skyline Construction | handrail for new stair at 20th floor. ref app#202008131714Details
handrail for new stair at 20th floor. ref app#202008131714 | $10,000 |
| Dec 24, 2020 | Completed final sign-off Apr 2021 | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "nomura" remodel on floor 11; additions are 1 smoke detector, 10 speaker/strobes, 7 strobes, and the relocation of 2 speaker/strobes. ref. permit app # 2020-1020-6953.Details
fire alarm work for the "nomura" remodel on floor 11; additions are 1 smoke detector, 10 speaker/strobes, 7 strobes, and the relocation of 2 speaker/strobes. ref. permit app # 2020-1020-6953. | $11,000 |
| Dec 18, 2020 | Completed final sign-off Dec 2022 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033420.Details
deferred submital for novum strucures & concrete works(exterior skin) in lobby improvement area. ref pa# 201910033420. | |
| Dec 16, 2020 | Completed final sign-off Feb 2025 | 3 Embarcadero Center | Dome Construction Corp | suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area.Details
suite r3112 on 1st fl: ti interior renovation w/new interior finishes, fixtures, & equipment. work in retail area. | $150,000 |
| Dec 15, 2020 | Completed final sign-off Aug 2021 | 3 Embarcadero Center | Skyline Construction | ref pa# 202007140168. health department review only for tenant improvement on the 21st fl.Details
ref pa# 202007140168. health department review only for tenant improvement on the 21st fl. | |
| Dec 4, 2020 | Completed final sign-off Apr 2021 | 3 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler permit. relocate 14, add 12 and delete 27 sprinklers for the lobby renovation. t.i. # 2019-1003-3420.Details
fire sprinkler permit. relocate 14, add 12 and delete 27 sprinklers for the lobby renovation. t.i. # 2019-1003-3420. | $20,000 |
| Dec 3, 2020 | Completed final sign-off Apr 2021 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler only - ref # 2020-1020-6953 relocate 50 pendents & 1 upright for nomura sf. 11th floorDetails
fire sprinkler only - ref # 2020-1020-6953 relocate 50 pendents & 1 upright for nomura sf. 11th floor | $25,500 |
| Dec 2, 2020 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Skyline Construction | m.e.p. for t.i. on 19th & 20th fl. ref arch pa# 202007089839 & 202007089841.Details
m.e.p. for t.i. on 19th & 20th fl. ref arch pa# 202007089839 & 202007089841. | |
| Nov 17, 2020 | Completed final sign-off Apr 2021 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinklers; relocate 216 pendent sprinklers and 144 uprightson the 22nd floor. upgrade end of line and earthquake bracing. t.i. ref # 2020-0630-9411.Details
fire sprinklers; relocate 216 pendent sprinklers and 144 uprightson the 22nd floor. upgrade end of line and earthquake bracing. t.i. ref # 2020-0630-9411. | $177,500 |
| Oct 28, 2020 | Completed final sign-off Apr 2021 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler; relocate 200 pendent sprinklers and relocate 129 uprights on the 18th floor. upgrade end of line and earthquake bracing. ti ref # 2020-0630-9375 18th floorDetails
fire sprinkler; relocate 200 pendent sprinklers and relocate 129 uprights on the 18th floor. upgrade end of line and earthquake bracing. ti ref # 2020-0630-9375 18th floor | $164,500 |
| Oct 28, 2020 | Completed final sign-off Nov 2021 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only work for the lobby renovation remodel; additions are 6 smoke detectors, 3 duct detectors, 1 module, and 5 speaker/strobes. ref permit # 2019-1003-3420Details
fire only work for the lobby renovation remodel; additions are 6 smoke detectors, 3 duct detectors, 1 module, and 5 speaker/strobes. ref permit # 2019-1003-3420 | $12,070 |
| Oct 20, 2020 | Completed final sign-off Apr 2021 | 3 Embarcadero Center | Bcci Construction Company | 11/f: new non-structural partitions, new acousticl ceilings, new finishes, lighting, electrical outlets and pantry plumbing. mep included. maher n/a. life safety deferred.Details
11/f: new non-structural partitions, new acousticl ceilings, new finishes, lighting, electrical outlets and pantry plumbing. mep included. maher n/a. life safety deferred. | $850,000 |
| Oct 17, 2020 | Completed final sign-off Aug 2021 | 3 Embarcadero Center | Skyline Construction | 21-22 floor: ti improvement for mechanical, electrical, and plumbing. reference ti 2020-0714-0168 & 2020-0630-9411.Details
21-22 floor: ti improvement for mechanical, electrical, and plumbing. reference ti 2020-0714-0168 & 2020-0630-9411. | |
| Sep 28, 2020 | Completed final sign-off Jan 2021 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | 19/f: relocate 228 pendent sprinklers and relocate 112 uprights. hyroulic calculations included. upgrade end of line and earthquake bracing. ref t.i.202007089839. maher n/a.Details
19/f: relocate 228 pendent sprinklers and relocate 112 uprights. hyroulic calculations included. upgrade end of line and earthquake bracing. ref t.i.202007089839. maher n/a. | $170,000 |
| Sep 24, 2020 | Completed final sign-off Jan 2021 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler; relocate 238 pendant sprinklers and relocate 61 uprights on the 20th fl. relocate 256 pendant sprinklers and relocate 59 uprights on the 21st fl. hydrolic cal included. upgrade end of line bracing and earthquake bracing. ti #202007089841(20/f) 202007140168 (21/f)Details
fire sprinkler; relocate 238 pendant sprinklers and relocate 61 uprights on the 20th fl. relocate 256 pendant sprinklers and relocate 59 uprights on the 21st fl. hydrolic cal included. upgrade end of line bracing and earthquake bracing. ti #202007089841(20/f) 202007140168 (21/f) | $367,000 |
| Sep 19, 2020 | Never finaled issued Feb 2021, no final | 3 Embarcadero Center | Skyline Construction | structural work for slab reinforcement on the 19 & 22nd fl.Details
structural work for slab reinforcement on the 19 & 22nd fl. | $30,000 |
| Sep 19, 2020 | Never finaled issued Jun 2021, no final | 3 Embarcadero Center | Skyline Construction | slab reinforcement on floors 20-22. reinforcement for stair opening. stairs under separate permit.Details
slab reinforcement on floors 20-22. reinforcement for stair opening. stairs under separate permit. | $45,000 |
| Sep 19, 2020 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Skyline Construction | 18th flr mep, ref arch 202006309375 - mechanical, electrical and plumbing for tenant improvement.Details
18th flr mep, ref arch 202006309375 - mechanical, electrical and plumbing for tenant improvement. | |
| Sep 15, 2020 | Never finaled issued Sep 2020, no final | 3 Embarcadero Center | Siemens Industry, Inc. | fire only additions of 2 relay modules on floor 14; these drawings are to obtain a permit to match the installation per the sffd; no ref permitDetails
fire only additions of 2 relay modules on floor 14; these drawings are to obtain a permit to match the installation per the sffd; no ref permit | $1,000 |
| Sep 3, 2020 | Completed final sign-off Dec 2020 | 3 Embarcadero Center | Bilcor Inc | fire life safety: install 1 command center, one distribution board, 1 command center system supervisor, 1 power supply, 4 batteries for ups, 1 power supply monitor, 1 dual monitor module.Details
fire life safety: install 1 command center, one distribution board, 1 command center system supervisor, 1 power supply, 4 batteries for ups, 1 power supply monitor, 1 dual monitor module. | $6,600 |
| Aug 31, 2020 | Completed final sign-off Nov 2020 | 3 Embarcadero Center | M C S Construction Services | suite #1420: new interior improvements. new inteiror non-structural partitions, new door & hardware, new glazing & frames, new wall & floor finishes.Details
suite #1420: new interior improvements. new inteiror non-structural partitions, new door & hardware, new glazing & frames, new wall & floor finishes. | $8,000 |
| Aug 29, 2020 | Completed final sign-off Aug 2021 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only permit for the "cooley" remodel on floor 21; additions are 12 smoke detectors, 15 duct detectors, 1 strobe power supply, 10 modules, 51 speaker/strobes, 6 strobes and 2 2-way comm stations. ref app# 202006309411Details
fire only permit for the "cooley" remodel on floor 21; additions are 12 smoke detectors, 15 duct detectors, 1 strobe power supply, 10 modules, 51 speaker/strobes, 6 strobes and 2 2-way comm stations. ref app# 202006309411 | $74,600 |
| Aug 28, 2020 | Completed final sign-off Sep 2021 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only permit for the "cooley" remodel on floor 20; additions are 11 smoke detectors, 21 duct detectors, 1 strobe power supply, 10 modules, 47 speaker/strobes, 6 strobes and 2 2-way comm stations. ref app# 202007089841Details
fire only permit for the "cooley" remodel on floor 20; additions are 11 smoke detectors, 21 duct detectors, 1 strobe power supply, 10 modules, 47 speaker/strobes, 6 strobes and 2 2-way comm stations. ref app# 202007089841 | $74,600 |
| Aug 27, 2020 | Never finaled issued Sep 2020, no final | 3 Embarcadero Center | Siemens Industry, Inc. | fire only permit for the "cooley" remodel on 19th fl; additionals are 11 smoke detectors, 4 duct detectors, 1 strobe power supply, 10 modules, 41 speakers/strobes, 13 strobes & 2 2-way comm stations. ref pa# 202007089839Details
fire only permit for the "cooley" remodel on 19th fl; additionals are 11 smoke detectors, 4 duct detectors, 1 strobe power supply, 10 modules, 41 speakers/strobes, 13 strobes & 2 2-way comm stations. ref pa# 202007089839 | $54,100 |
| Aug 26, 2020 | Completed final sign-off Sep 2021 | 3 Embarcadero Center | Siemens Industry, Inc. | 18 floor: fire only permit for the cooley remodel; additions are 20 smoke detectors, 3 duct detectors, 8 modules, 1 strobe power supply, 39 speakers/strobes, and 12 strobes, and 2 2-way comm station. ref app#202006309375Details
18 floor: fire only permit for the cooley remodel; additions are 20 smoke detectors, 3 duct detectors, 8 modules, 1 strobe power supply, 39 speakers/strobes, and 12 strobes, and 2 2-way comm station. ref app#202006309375 | $55,400 |
| Aug 26, 2020 | Completed final sign-off Sep 2021 | 3 Embarcadero Center | Siemens Industry, Inc. | fire only permit for the cooley remodel on floor 22; additions are 11 smoke detectors, 4 duct detectors, 1 strobe power supply, 9 modules, 43 speakers/strobes,10 strobes, and 2 2-way comm stations. ref app#202006309411Details
fire only permit for the cooley remodel on floor 22; additions are 11 smoke detectors, 4 duct detectors, 1 strobe power supply, 9 modules, 43 speakers/strobes,10 strobes, and 2 2-way comm stations. ref app#202006309411 | $53,200 |
| Aug 14, 2020 | Completed final sign-off Dec 2020 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | suite 1450:fire sprinklers: relocate 80 pendant sprinklers and 3 concealed pendant sprinklers at 14th floor. ref app#202001172205Details
suite 1450:fire sprinklers: relocate 80 pendant sprinklers and 3 concealed pendant sprinklers at 14th floor. ref app#202001172205 | $43,575 |
| Aug 13, 2020 | Never finaled issued Jul 2021, no final | 3 Embarcadero Center | Skyline Construction | new communicating stairs between 20th & 21st floor.Details
new communicating stairs between 20th & 21st floor. | $250,000 |
| Jul 20, 2020 | Never finaled issued Aug 2020, no final | 101 Clay St | street spaceDetails
street space | ||
| Jul 14, 2020 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Skyline Construction | 21st floor: tenant improvements to include construction of open office, meeting rooms, cafe, new men's and women's restrooms. new horizotal exit. mep, life saftey and fire sprinkler plan under seperate permit.Details
21st floor: tenant improvements to include construction of open office, meeting rooms, cafe, new men's and women's restrooms. new horizotal exit. mep, life saftey and fire sprinkler plan under seperate permit. | $3,000,000 |
| Jul 8, 2020 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Skyline Construction | tenant improvement on the 19/f to include construction of open office, private office, meeting rooms, new men's and women's restrooms. mep, life safety and fire sprinkler plan under sep permitDetails
tenant improvement on the 19/f to include construction of open office, private office, meeting rooms, new men's and women's restrooms. mep, life safety and fire sprinkler plan under sep permit | $3,000,000 |
| Jul 8, 2020 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Skyline Construction | tenant improvement on the 20/f to include construction of open office, private office, meeting rooms, new men's and women's restrooms. mep, life safety and fire sprinkler plan under sep permitDetails
tenant improvement on the 20/f to include construction of open office, private office, meeting rooms, new men's and women's restrooms. mep, life safety and fire sprinkler plan under sep permit | $3,000,000 |
| Jun 30, 2020 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Skyline Construction | 22nd fl. tenant improvement construction of open office, private office, meeting rooms, new men's and women's restroom, mep, life safety and fire sprinkler plan under separate permitDetails
22nd fl. tenant improvement construction of open office, private office, meeting rooms, new men's and women's restroom, mep, life safety and fire sprinkler plan under separate permit | $3,000,000 |
| Jun 30, 2020 | Completed final sign-off Jun 2022 | 3 Embarcadero Center | Skyline Construction | 18th fl. tenant improvement construction of open office, private office, meeting rooms, new men's and women's restroom, mep, life safety and fire sprinkler plan under separate permitDetails
18th fl. tenant improvement construction of open office, private office, meeting rooms, new men's and women's restroom, mep, life safety and fire sprinkler plan under separate permit | $3,000,000 |
| May 8, 2020 | Completed final sign-off Jan 2023 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | 14/f: suite 1450: relocate 80 pendent sprinklers and 3 concealed pendent spirnkler. ref t.i pa202001172205.Details
14/f: suite 1450: relocate 80 pendent sprinklers and 3 concealed pendent spirnkler. ref t.i pa202001172205. | $43,575 |
| Mar 12, 2020 | Completed final sign-off Dec 2020 | 3 Embarcadero Center | Siemens Industry, Inc. | 14th fl - fire alarm work for the "evercore" remodel. additions sare 1 smoke detector and 20 speaker/strobes, as well as the relocation of 4 speakers. ref pa 2020-0117-2205Details
14th fl - fire alarm work for the "evercore" remodel. additions sare 1 smoke detector and 20 speaker/strobes, as well as the relocation of 4 speakers. ref pa 2020-0117-2205 | $14,600 |
| Feb 21, 2020 | Expired or cancelled cancelled Jan 2026 | 3 Embarcadero Center | Principal Builders Inc. | evacuation signs for 8th fl maher not reqDetails
evacuation signs for 8th fl maher not req | $3,500 |
| Jan 17, 2020 | Completed final sign-off Oct 2020 | 3 Embarcadero Center | Skyline Construction | 14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishesDetails
14th fl, ste 1450 - partial floor ti to include new non-load bearing partitions, lighting, poiwer, mechanical and electrical. new finishes | $500,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 3 Embarcadero Center | street space w/mtaDetails
street space w/mta | ||
| Dec 13, 2019 | Completed final sign-off Dec 2020 | 3 Embarcadero Center | Gci, Inc, Siemens Industry, Inc. | suite#1350. rev to pa# 201905150671 install voluntary overide switch, not in the direction of egress. the door was approved as a mag lock door with sensor release and card reader on the corridor side and this switch is requested by the owner for after hours release of the door manually without alarmDetails
suite#1350. rev to pa# 201905150671 install voluntary overide switch, not in the direction of egress. the door was approved as a mag lock door with sensor release and card reader on the corridor side and this switch is requested by the owner for after hours release of the door manually without alarm | |
| Nov 6, 2019 | Completed final sign-off Nov 2019 | 3 Embarcadero Center | Siemens Industry, Inc. | 8th fl - fire alarm "as-built" permit to indicate 2 added relay modules for the "troutman sanders" and restroom remodels. ref pa 2019-0814-8774 and 2019-0820-9290Details
8th fl - fire alarm "as-built" permit to indicate 2 added relay modules for the "troutman sanders" and restroom remodels. ref pa 2019-0814-8774 and 2019-0820-9290 | $1,000 |
| Oct 21, 2019 | Never finaled filed Oct 2019, never issued | 3 Embarcadero Center | revision to 201908209290 to change locking mechanisms to electromagnetic locks per comments during inspection regarding path of egressDetails
revision to 201908209290 to change locking mechanisms to electromagnetic locks per comments during inspection regarding path of egress | ||
| Oct 21, 2019 | Completed final sign-off Feb 2020 | 3 Embarcadero Center | Principal Builders Inc. | 8th floor: revision to 201908209290 change locking mechanism to electromagnetic locks per comments during inspection regarding path of egressDetails
8th floor: revision to 201908209290 change locking mechanism to electromagnetic locks per comments during inspection regarding path of egress | |
| Oct 3, 2019 | Completed final sign-off Dec 2022 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a**Details
lobby improvement includes new curtain wall & minor slab infill ceilings, partitions & assocated steel structure, floor, wall, elevator cab finsishes, & mep. replacement of glass canopy @ podium court yard & addition of (n) stair from lobby to promenade level. maher n/a** | $2,250,000 |
| Sep 26, 2019 | Never finaled issued Sep 2019, no final | 3 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 8th floor: added sprinkler heads:1 relocated sprinklers heads:8 ref app#201908148774Details
8th floor: added sprinkler heads:1 relocated sprinklers heads:8 ref app#201908148774 | $4,900 |
| Sep 24, 2019 | Completed final sign-off Nov 2019 | 3 Embarcadero Center | Siemens Industry, Inc. | 8th fl - fire alarm work for the "troutman sanders" and restroom remodel; additions are 1 smoke detector, 1 speaker, 7 speaker/strobes and the relocation of 2 speaker/strobes. ref pa 2019-0814-8774 and 2019-0820-9290Details
8th fl - fire alarm work for the "troutman sanders" and restroom remodel; additions are 1 smoke detector, 1 speaker, 7 speaker/strobes and the relocation of 2 speaker/strobes. ref pa 2019-0814-8774 and 2019-0820-9290 | $6,100 |
| Sep 4, 2019 | Never finaled issued Sep 2019, no final | 3 Embarcadero Center | Principal Builders Inc. | 8th fl - revision to pa 2019-0814-8774 to add new fire smoke swing door and leaf.Details
8th fl - revision to pa 2019-0814-8774 to add new fire smoke swing door and leaf. | $100 |
| Aug 20, 2019 | Completed final sign-off Feb 2020 | 3 Embarcadero Center | Principal Builders Inc. | 8/f: t.i. on partial floor to demo and construct partitions, finishes, millwork and mep systems. fire alarm and sprinlkers under seperate permit. n/a for maherDetails
8/f: t.i. on partial floor to demo and construct partitions, finishes, millwork and mep systems. fire alarm and sprinlkers under seperate permit. n/a for maher | $544,137 |
| Aug 14, 2019 | Completed final sign-off Mar 2020 | 3 Embarcadero Center | Principal Builders Inc. | 8th floor: t.i. to construct new partitions and t-24 lighting. fire alarm and spirnklers on seperate permit. no new mechanical or plumbing. n/a for maherDetails
8th floor: t.i. to construct new partitions and t-24 lighting. fire alarm and spirnklers on seperate permit. no new mechanical or plumbing. n/a for maher | $184,320 |
| Aug 6, 2019 | Completed final sign-off Aug 2019 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | 13th fl, ste 1350 - fire srpinkler only. relocate 38 pendents for comerica ref pa 2019-0515-0671Details
13th fl, ste 1350 - fire srpinkler only. relocate 38 pendents for comerica ref pa 2019-0515-0671 | $19,000 |
| Jul 25, 2019 | Never finaled issued Jul 2019, no final | 3 Embarcadero Center | street spaceDetails
street space | ||
| Jul 25, 2019 | Never finaled issued Jul 2019, no final | 3 Embarcadero Center | Golden Gate Sign Company Inc. | install electric single faced window sign 2'-9" (amazon go)Details
install electric single faced window sign 2'-9" (amazon go) | $1,000 |
| Jul 25, 2019 | Never finaled issued Jul 2019, no final | 3 Embarcadero Center | Golden Gate Sign Company Inc. | install projecting double faced sign replacement panels 33.5'x 11" (amazon go) qty 2Details
install projecting double faced sign replacement panels 33.5'x 11" (amazon go) qty 2 | $300 |
| Jul 25, 2019 | Never finaled issued Jul 2019, no final | 3 Embarcadero Center | Golden Gate Sign Company Inc. | install electric single faced wall sign 5-'-4 1/4" x 3 3/8 " (amazon go)Details
install electric single faced wall sign 5-'-4 1/4" x 3 3/8 " (amazon go) | $2,500 |
| Jul 25, 2019 | Never finaled issued Jul 2019, no final | 3 Embarcadero Center | Golden Gate Sign Company Inc. | install breakfast, lunch, ninner, snacks, non -electric single faced window sign 2nd surace windlow vinyls centered in windowsDetails
install breakfast, lunch, ninner, snacks, non -electric single faced window sign 2nd surace windlow vinyls centered in windows | $500 |
| Jul 23, 2019 | Completed final sign-off Mar 2021 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | new bridge walkways at lobby level w/ glass guardrails.Details
new bridge walkways at lobby level w/ glass guardrails. | $200,000 |
| Jun 27, 2019 | Completed final sign-off Mar 2025 | 3 Embarcadero Center | Siemens Industry, Inc. | 13th floor: fire alarm work for the suite 1350 remodel on floor 13; additions are 1 smoke detector, 1 module, 1 speaker, 12 speaker/strobes and 3 strobes.Details
13th floor: fire alarm work for the suite 1350 remodel on floor 13; additions are 1 smoke detector, 1 module, 1 speaker, 12 speaker/strobes and 3 strobes. | $11,650 |
| May 15, 2019 | Completed final sign-off Dec 2020 | 3 Embarcadero Center | Gci, Inc | ste 1350: non structural demo, new drywall partitions, doors, millwork , electrical mechanical and plumbing. no change to extg egress or bldg occupancy types. n/a for maher.Details
ste 1350: non structural demo, new drywall partitions, doors, millwork , electrical mechanical and plumbing. no change to extg egress or bldg occupancy types. n/a for maher. | $905,000 |
| Apr 19, 2019 | Completed final sign-off Jun 2019 | 3 Embarcadero Center | Siemens Industry, Inc. | ref permit app: 201812128172- fire alarm work for the suite r3112 remodel on floor 1: additions are 3 smoke detectors, 8 duct detectors, 6 modules, 1 strobe power supply, 1 speaker, 11 speakers/strobes, and 2 storage.Details
ref permit app: 201812128172- fire alarm work for the suite r3112 remodel on floor 1: additions are 3 smoke detectors, 8 duct detectors, 6 modules, 1 strobe power supply, 1 speaker, 11 speakers/strobes, and 2 storage. | $27,860 |
| Apr 9, 2019 | Completed final sign-off Dec 2019 | 3 Embarcadero Center | Peacock Construction | demo of 1 non structural partition and raised file rail floor,demo onlyDetails
demo of 1 non structural partition and raised file rail floor,demo only | $25,000 |
| Feb 14, 2019 | Completed final sign-off Jul 2019 | 3 Embarcadero Center | Dome Construction Corp | rev to pa# 201812128172; rev to site plans, demo plan, updated floor slab penetration plan per additional sink, door relocation, location changes for freezer,refrigerators, added ofi pickup locker, altered exterior elev. sheets, interior signage changes, ceiling plan, changes to interiorDetails
rev to pa# 201812128172; rev to site plans, demo plan, updated floor slab penetration plan per additional sink, door relocation, location changes for freezer,refrigerators, added ofi pickup locker, altered exterior elev. sheets, interior signage changes, ceiling plan, changes to interior | |
| Jan 23, 2019 | Never finaled issued Jan 2019, no final | 3 Embarcadero Center | Pioneer Fire Inc. | suite r3112: relocate 3 pendetns, relocate 11 uprights, relocate 1 dry prendant, relocate 200 degree head and remove 3 uprightsDetails
suite r3112: relocate 3 pendetns, relocate 11 uprights, relocate 1 dry prendant, relocate 200 degree head and remove 3 uprights | $14,857 |
| Jan 17, 2019 | Completed final sign-off Feb 2019 | 3 Embarcadero Center | Peacock Construction | 4th floor: non- structural demo. new elecxtrical and finishes, lighting. no change in occupancy use or area. mep, life safety and sprinkler under separate permit.Details
4th floor: non- structural demo. new elecxtrical and finishes, lighting. no change in occupancy use or area. mep, life safety and sprinkler under separate permit. | $83,106 |
| Dec 28, 2018 | Completed final sign-off Jun 2019 | 3 Embarcadero Center | Dome Construction Corp | grind concrete at entryway to accomodate new tile. t.i. on seperate permit# 201812128172. n/a for maherDetails
grind concrete at entryway to accomodate new tile. t.i. on seperate permit# 201812128172. n/a for maher | $5,000 |
| Dec 24, 2018 | Completed final sign-off Feb 2019 | 3 Embarcadero Center | Siemens Industry, Inc. | 11th flr - fire alarm "momura: add 1 smk det, 1 smk power supply, 3 modules, 1 speaker, 21 speaker/strobes and 1 strobe maher naDetails
11th flr - fire alarm "momura: add 1 smk det, 1 smk power supply, 3 modules, 1 speaker, 21 speaker/strobes and 1 strobe maher na | $18,200 |
| Dec 18, 2018 | Completed final sign-off Feb 2019 | 3 Embarcadero Center | Source Planning And Construction Inc | 23rd fl: revision to 201808248225 new changed partitions, electrical and finishesDetails
23rd fl: revision to 201808248225 new changed partitions, electrical and finishes | |
| Dec 14, 2018 | Completed final sign-off Jan 2019 | 3 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 11th flr - relocate and add/remove fire sprinklers per ti. 81 relocate, 5 add, 22 removeDetails
11th flr - relocate and add/remove fire sprinklers per ti. 81 relocate, 5 add, 22 remove | $20,850 |
| Dec 12, 2018 | Completed final sign-off Jul 2019 | 3 Embarcadero Center | Dome Construction Corp | suite # r3112: 3451 sf new build out of existing tenant space including non-structural framing, plumbing, electrical, mechanical and interior decorative materials and surfaces.Details
suite # r3112: 3451 sf new build out of existing tenant space including non-structural framing, plumbing, electrical, mechanical and interior decorative materials and surfaces. | $1,100,000 |
| Nov 27, 2018 | Completed final sign-off Dec 2018 | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm "drybar_ 1st flr add 2 duct det, 1 modulem 7 speaker/strobes, 2 strobes maher na ref#201810112907Details
fire alarm "drybar_ 1st flr add 2 duct det, 1 modulem 7 speaker/strobes, 2 strobes maher na ref#201810112907 | $9,200 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 3 Embarcadero Center | Discount Signs & Neon Inc | install illuminated wall channel letters for "dry bar"Details
install illuminated wall channel letters for "dry bar" | $5,000 |
| Oct 26, 2018 | Completed final sign-off May 2019 | 3 Embarcadero Center | Gci, Inc | revision to permit 201805169221. delete storefront work and modify interior layout incl changes to wall and mepDetails
revision to permit 201805169221. delete storefront work and modify interior layout incl changes to wall and mep | |
| Oct 25, 2018 | Completed final sign-off Oct 2018 | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "suite 3" rmeodel on the promenade level; additions are 3 speakers/strobes. ref pa #201808036345.Details
fire alarm work for the "suite 3" rmeodel on the promenade level; additions are 3 speakers/strobes. ref pa #201808036345. | $1,895 |
| Oct 17, 2018 | Completed final sign-off Dec 2018 | 3 Embarcadero Center | Pribuss Engineering Inc | fire sprinkler ti on 1st fl relocate 23 sprinklers, add 3, total 26Details
fire sprinkler ti on 1st fl relocate 23 sprinklers, add 3, total 26 | $13,304 |
| Oct 16, 2018 | Completed final sign-off Jan 2019 | 3 Embarcadero Center | Source Planning And Construction Inc | promenade level. electrical work for tenant improvement. new power & data, new lighting controlds. ref pa 201808036345. maher n/aDetails
promenade level. electrical work for tenant improvement. new power & data, new lighting controlds. ref pa 201808036345. maher n/a | |
| Oct 16, 2018 | Completed final sign-off Nov 2018 | 3 Embarcadero Center | Source Planning And Construction Inc | 23rd flr. electrical work for tenant improvement. provide new lighting & branch circuiting to (e) panel, new power and signal outlets. ref pa 201807205048. maher n/aDetails
23rd flr. electrical work for tenant improvement. provide new lighting & branch circuiting to (e) panel, new power and signal outlets. ref pa 201807205048. maher n/a | |
| Oct 9, 2018 | Completed final sign-off Mar 2019 | 3 Embarcadero Center | Turner Construction Co | 11th fl: include drywall, ceiling, finishes, lighting, electric & hvacDetails
11th fl: include drywall, ceiling, finishes, lighting, electric & hvac | $1,149,500 |
| Oct 4, 2018 | Completed final sign-off Dec 2018 | 3 Embarcadero Center | Siemens Industry, Inc. | 23rd fl - fire alarm work for the "suite 2330" remodel. additions are 1 smoke detector, 4 speakers/strobes and 1 strobe. ref pa 2018-0824-8225Details
23rd fl - fire alarm work for the "suite 2330" remodel. additions are 1 smoke detector, 4 speakers/strobes and 1 strobe. ref pa 2018-0824-8225 | $3,720 |
| Oct 3, 2018 | Completed final sign-off Feb 2019 | 3 Embarcadero Center | Source Planning And Construction Inc | 23rd flr. electrical work for tenant improvement. ref pa 201808248225Details
23rd flr. electrical work for tenant improvement. ref pa 201808248225 | $20,000 |
| Sep 5, 2018 | Never finaled issued Jul 2019, no final | 3 Embarcadero Center | Embree Construction Group Inc | unit #3111a: shoe rack permit: removing extg furniture and installing new freestanding fixture being bolted into the ground. just a curved fixture being added. 300 sqftDetails
unit #3111a: shoe rack permit: removing extg furniture and installing new freestanding fixture being bolted into the ground. just a curved fixture being added. 300 sqft | $2,000 |
| Aug 24, 2018 | Completed final sign-off Feb 2019 | 101 Clay St | Source Planning And Construction Inc | 23rd fl: non-structural demo. (n) non-structural partitions, finishes, (e) ceiling, lighting & outlets to remain. mep, life safety & sprinklers under sep permit. maher naDetails
23rd fl: non-structural demo. (n) non-structural partitions, finishes, (e) ceiling, lighting & outlets to remain. mep, life safety & sprinklers under sep permit. maher na | $335,244 |
| Aug 23, 2018 | Completed final sign-off Sep 2018 | 3 Embarcadero Center | R L H Fire Protection Inc | fire sprinklers: relocate 1 pendent sprinkler on the promenade level. ti #201807063863.Details
fire sprinklers: relocate 1 pendent sprinkler on the promenade level. ti #201807063863. | $1,000 |
| Aug 8, 2018 | Completed final sign-off Aug 2018 | 3 Embarcadero Center | R L H Fire Protection Inc | fire sprinklers, promenade level. relocate 7 pendent sprinklers. ref t.i pa # 201807205048. maher n/aDetails
fire sprinklers, promenade level. relocate 7 pendent sprinklers. ref t.i pa # 201807205048. maher n/a | $1,500 |
| Aug 3, 2018 | Completed final sign-off Jan 2019 | 3 Embarcadero Center | Source Planning And Construction Inc | promenade level: non-structural demo, (n) non-structural partitions, ceilgins, lighting, finishes, millwork. no change in area, occupancy, or use. mep sprinklers, life safety uner sep. permit. maher naDetails
promenade level: non-structural demo, (n) non-structural partitions, ceilgins, lighting, finishes, millwork. no change in area, occupancy, or use. mep sprinklers, life safety uner sep. permit. maher na | $89,705 |
| Jul 27, 2018 | Completed final sign-off Jan 2019 | 3 Embarcadero Center | Sc Builders, Inc | promenade level - electrical for 201807063863 new power and data for new tv locations, 2 new decorative sconce light in room 1013Details
promenade level - electrical for 201807063863 new power and data for new tv locations, 2 new decorative sconce light in room 1013 | $12,000 |
| Jul 26, 2018 | Completed final sign-off Nov 2018 | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm for "columbia" remodel - add 4 speaker/strobes ref 201807063863 maher na; promenade levelDetails
fire alarm for "columbia" remodel - add 4 speaker/strobes ref 201807063863 maher na; promenade level | $2,540 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 3 Embarcadero Center | Source Planning And Construction Inc | 25th fl - mechanical & electrical for pa 2018-0329-4927Details
25th fl - mechanical & electrical for pa 2018-0329-4927 | $70,000 |
| Jul 20, 2018 | Completed final sign-off Nov 2018 | 3 Embarcadero Center | Source Planning And Construction Inc | non-struct, demo, (n) non-struct partition, doors glazing, finishes, no change in occupancy use, or area, mep, life safety, sprinklers under sep pemitDetails
non-struct, demo, (n) non-struct partition, doors glazing, finishes, no change in occupancy use, or area, mep, life safety, sprinklers under sep pemit | $236,570 |
| Jul 6, 2018 | Completed final sign-off Nov 2018 | 3 Embarcadero Center | Sc Builders, Inc | promenade level: non structural demo. non-structural (n) partitions, electrical finishes, no change in occupancy, use or area. mep, life safety & sprinklers under sep permitDetails
promenade level: non structural demo. non-structural (n) partitions, electrical finishes, no change in occupancy, use or area. mep, life safety & sprinklers under sep permit | $306,598 |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "goodwin" remodel on floor 25; additions are 4 smoke detector replacements and 6 speaker/strobes, as well as the relocation of 1 strobe. ref pa 2018-0329-4927Details
fire alarm work for the "goodwin" remodel on floor 25; additions are 4 smoke detector replacements and 6 speaker/strobes, as well as the relocation of 1 strobe. ref pa 2018-0329-4927 | $6,350 |
| Jun 19, 2018 | Completed final sign-off Oct 2018 | 3 Embarcadero Center | Siemens Industry, Inc. | ref pa# 201805250158; fire alarm work for the suite 1440 remodel on 14th fl. addition is 1 strobe for the new coffee area. n/a maherDetails
ref pa# 201805250158; fire alarm work for the suite 1440 remodel on 14th fl. addition is 1 strobe for the new coffee area. n/a maher | $550 |
| Jun 7, 2018 | Completed final sign-off Dec 2018 | 3 Embarcadero Center | R L H Fire Protection Inc | 25th fl - fire sprinkler permit. ref pa 2018-0329-4927. relocate 11, add 2, delete 5Details
25th fl - fire sprinkler permit. ref pa 2018-0329-4927. relocate 11, add 2, delete 5 | $3,500 |
| May 25, 2018 | Completed final sign-off Oct 2018 | 3 Embarcadero Center | Peacock Construction | 14th floor: (n) non-struct. partitions, doors, millwork & finishes, no change in occupancy use, or area mep, life safety & sprinklers under sep permit.Details
14th floor: (n) non-struct. partitions, doors, millwork & finishes, no change in occupancy use, or area mep, life safety & sprinklers under sep permit. | $110,277 |
| May 16, 2018 | Completed final sign-off May 2019 | 3 Embarcadero Center | Gci, Inc | build out new t.i. in extg retail space. install new glass entry doors on drum street. n/a maher.Details
build out new t.i. in extg retail space. install new glass entry doors on drum street. n/a maher. | $238,000 |
| May 3, 2018 | Completed final sign-off Jun 2018 | 3 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 14th flr - relocate 8 fire sprinklers. ref 201804247266 maher naDetails
14th flr - relocate 8 fire sprinklers. ref 201804247266 maher na | $2,000 |
| Apr 25, 2018 | Never finaled issued Apr 2018, no final | 3 Embarcadero Center | Siemens Industry, Inc. | 1st flr - fire alarm requested by sffd testing inspector for the addition of an audio/visual shutdow module for "ann taylor" remodel ref 201710171431 maher naDetails
1st flr - fire alarm requested by sffd testing inspector for the addition of an audio/visual shutdow module for "ann taylor" remodel ref 201710171431 maher na | $530 |
| Apr 24, 2018 | Completed final sign-off Oct 2018 | 3 Embarcadero Center | Peacock Construction | 14th fl: t-24 electrical for work under pa #201801309842. maher naDetails
14th fl: t-24 electrical for work under pa #201801309842. maher na | $6,800 |
| Apr 3, 2018 | Completed final sign-off Oct 2018 | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "restrooms" remodel on floor 14; additions are 2 duct detectors, 2 speakers and 2 strobes. ref. permit applic. #201801309842Details
fire alarm work for the "restrooms" remodel on floor 14; additions are 2 duct detectors, 2 speakers and 2 strobes. ref. permit applic. #201801309842 | $5,500 |
| Mar 29, 2018 | Completed final sign-off Oct 2018 | 3 Embarcadero Center | Source Planning And Construction Inc | 25th fl. minor alt of exist office space single tenant floor. demo non-load bearing walls, ceilings & cieling grid, associated mech + electr. install new non-load bearing partitions, arch casework, create new shower rms + new finishes -mep, sprinklers and fire alarm.Details
25th fl. minor alt of exist office space single tenant floor. demo non-load bearing walls, ceilings & cieling grid, associated mech + electr. install new non-load bearing partitions, arch casework, create new shower rms + new finishes -mep, sprinklers and fire alarm. | $1,300,000 |
| Mar 28, 2018 | Completed final sign-off Mar 2018 | 3 Embarcadero Center | Westates Mechanical Corporation Inc | as builts for 201802060534. fire sprinklers maher naDetails
as builts for 201802060534. fire sprinklers maher na | |
| Mar 15, 2018 | Completed final sign-off Oct 2018 | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the voluntary replacement of all fire alarm networked control panels, this work will upgrade the system. (e) field devices will not require replacement.Details
fire alarm work for the voluntary replacement of all fire alarm networked control panels, this work will upgrade the system. (e) field devices will not require replacement. | $200,000 |
| Mar 13, 2018 | Completed final sign-off May 2018 | 3 Embarcadero Center | Peacock Construction | 13th fl - demo (e) ac unit and associated 3 fsd duct work, install new heat pump and condenser water piping. maher n/aDetails
13th fl - demo (e) ac unit and associated 3 fsd duct work, install new heat pump and condenser water piping. maher n/a | $12,500 |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 3 Embarcadero Center | Hathaway Dinwiddie Co. | provide & install (3) new vav's & transfer fan ref arch pa 2017-1213-6314 provide plumbing for break room appliancesDetails
provide & install (3) new vav's & transfer fan ref arch pa 2017-1213-6314 provide plumbing for break room appliances | $50,000 |
| Feb 23, 2018 | Completed final sign-off Jun 2018 | 3 Embarcadero Center | Hathaway Dinwiddie Co. | provide new lighting and electrical to spec suite. ref pa 2017-1213-6314Details
provide new lighting and electrical to spec suite. ref pa 2017-1213-6314 | $50,000 |
| Feb 21, 2018 | Completed final sign-off Apr 2018 | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for spec suite 610 remodel fl00r 6, addition are 1 smoke detector, 6 speaker strobes, 1 strobe. ref pa# 201712136314Details
fire alarm work for spec suite 610 remodel fl00r 6, addition are 1 smoke detector, 6 speaker strobes, 1 strobe. ref pa# 201712136314 | $5,080 |
| Feb 14, 2018 | Completed final sign-off Mar 2018 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | suite 610: fire sprinkler only - relocate 8 pendents; 2 add relocate 28 uprights. add 2 (40 heads) for spec suite 610Details
suite 610: fire sprinkler only - relocate 8 pendents; 2 add relocate 28 uprights. add 2 (40 heads) for spec suite 610 | $10,000 |
| Feb 13, 2018 | Completed final sign-off Mar 2018 | 3 Embarcadero Center | Golden Gate Fire Protection Inc | street level: fire sprinklers relocate 12 pendent sprinklers and relocate 19 uprights. as built to app#201711133805. n/a for maherDetails
street level: fire sprinklers relocate 12 pendent sprinklers and relocate 19 uprights. as built to app#201711133805. n/a for maher | $1,000 |
| Feb 7, 2018 | Never finaled issued Feb 2018, no final | 3 Embarcadero Center | Siemens Industry, Inc. | fire alarm work for the "ann taylor" remodel on floor 1; additions are 2 duct detectors, 2 pull stations, 11 speaker/strobes and 2 strobes. ref pa 2017-1017-1431 maher naDetails
fire alarm work for the "ann taylor" remodel on floor 1; additions are 2 duct detectors, 2 pull stations, 11 speaker/strobes and 2 strobes. ref pa 2017-1017-1431 maher na | $12,600 |
| Feb 6, 2018 | Completed final sign-off Mar 2018 | 3 Embarcadero Center | Westates Mechanical Corporation Inc | relocate and add fire sprinklers as ti in the area of work maher na 201710171431 app total heads 51Details
relocate and add fire sprinklers as ti in the area of work maher na 201710171431 app total heads 51 | $26,780 |
| Feb 1, 2018 | Completed final sign-off Aug 2018 | 3 Embarcadero Center | Crane Construction Company Inc. | revision to pa 2017-1017-1431 space r3111a, relocate air handling unit, arch, mech & electrical workDetails
revision to pa 2017-1017-1431 space r3111a, relocate air handling unit, arch, mech & electrical work | $300,000 |
| Feb 1, 2018 | Completed final sign-off Mar 2018 | 3 Embarcadero Center | Crane Construction Company Inc. | space 2555, ann taylor - anchorage of fixed and/or mobile retail shelves units. these drawings contain plans & details pertaining to the proper anchorage of back of house fixed and/or mobile show rack systems. ref pa 2017-1017-1431Details
space 2555, ann taylor - anchorage of fixed and/or mobile retail shelves units. these drawings contain plans & details pertaining to the proper anchorage of back of house fixed and/or mobile show rack systems. ref pa 2017-1017-1431 | $12,331 |
| Jan 30, 2018 | Completed final sign-off Oct 2018 | 3 Embarcadero Center | Peacock Construction | 14th fl - non-structural demo. (n) fixtures, lighting, ceiling, finishes. no change in occupancy use, or area. mep under separate permitDetails
14th fl - non-structural demo. (n) fixtures, lighting, ceiling, finishes. no change in occupancy use, or area. mep under separate permit | $157,000 |
| Jan 12, 2018 | Completed final sign-off Dec 2018 | 3 Embarcadero Center | Instant Neon | replacement of (2) "ann taylor" halo-lit channel logo stem mounted on wireway. (8"hx8'3"w, 5.5 sf each) maher naDetails
replacement of (2) "ann taylor" halo-lit channel logo stem mounted on wireway. (8"hx8'3"w, 5.5 sf each) maher na | $4,500 |