Ha-Pui Iris Chan
- Listed as
- architect
- Firm
- Huntsman Architectural Group
- Based in
- San Francisco
- On San Francisco permits
- Jul 2020 to Dec 2025
39 permits since 2000 (architect on 39 permits): 34 completed, 2 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2025 | Completed final sign-off Jul 2026 | 220 Bush St | Skyline Construction | suite 650: partial flr t.i. to include non-structural demolition, new non-structural partitions, doors, glazing, millwork and finishes throughout. mech and electrical work included.Details
suite 650: partial flr t.i. to include non-structural demolition, new non-structural partitions, doors, glazing, millwork and finishes throughout. mech and electrical work included. | $1,130,746 |
| Dec 12, 2025 | In progress issued Apr 2026 | 600 Battery St | Bcci Construction Company | interior only impovement at basement. selective demo of partitions/doors. (n) partitions, (n) doors for (n) huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy.Details
interior only impovement at basement. selective demo of partitions/doors. (n) partitions, (n) doors for (n) huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy. | $1,079,200 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 153 Kearny St | C C I Commercial Construction & Improv | 4/fl-ti selective demo and constuction of light fixtures partitions, millwork, doors, interior glazing, ceilings, and finishes. (n) drinking fountainDetails
4/fl-ti selective demo and constuction of light fixtures partitions, millwork, doors, interior glazing, ceilings, and finishes. (n) drinking fountain | $150,000 |
| Aug 21, 2025 | Completed final sign-off Aug 2025 | 560 Mission St | Skyline Construction | 12th fl- revision to pa # 2024-0926-1731. general note and call out for signage and accessibility of phone pods.Details
12th fl- revision to pa # 2024-0926-1731. general note and call out for signage and accessibility of phone pods. | |
| Sep 26, 2024 | Completed final sign-off Aug 2025 | 560 Mission St | Skyline Construction | 12th fl- office ti work of approx 2945 sq ft remove non structural partitions and create large conference roomDetails
12th fl- office ti work of approx 2945 sq ft remove non structural partitions and create large conference room | $650,000 |
| May 29, 2024 | Completed final sign-off Mar 2025 | 505 Brannan St | Novo Construction Inc | 5th fl - selective tenant improvement on existing unoccupied 5th floor to include restroom upgrades new millwork at pantry. finish upgradesDetails
5th fl - selective tenant improvement on existing unoccupied 5th floor to include restroom upgrades new millwork at pantry. finish upgrades | $489,048 |
| May 28, 2024 | Completed final sign-off Mar 2025 | 505 Brannan St | Novo Construction Inc | selective ti on 1st fl. combining three rooms to create multi media room. millwork and restroom upgradesDetails
selective ti on 1st fl. combining three rooms to create multi media room. millwork and restroom upgrades | $1,258,404 |
| May 28, 2024 | Completed final sign-off Mar 2025 | 505 Brannan St | Novo Construction Inc | selective ti on 2nd fl. combining two interview rooms to create one interview room. removal of two servenes at severy area. change game room/it desk to show room. restroom upgrades.Details
selective ti on 2nd fl. combining two interview rooms to create one interview room. removal of two servenes at severy area. change game room/it desk to show room. restroom upgrades. | $1,119,670 |
| Dec 15, 2023 | Completed final sign-off Jan 2025 | 560 Mission St | Skyline Construction | removal of interconnecting stairway from 11th to 12th floor, infilling slab and installation of finishes.Details
removal of interconnecting stairway from 11th to 12th floor, infilling slab and installation of finishes. | $146,160 |
| Dec 14, 2023 | In progress issued Mar 2024 | 255 California St | Principal Builders Inc. | suite 1200: this project is a ti on the 12th fl. scope of work includes demolition of non-structural partitions and lighting. construction of non-structural walls, new doors, frames, glazing and millwork. new electrical and finishes throughout. mep deferred.Details
suite 1200: this project is a ti on the 12th fl. scope of work includes demolition of non-structural partitions and lighting. construction of non-structural walls, new doors, frames, glazing and millwork. new electrical and finishes throughout. mep deferred. | $29,349 |
| Sep 14, 2023 | Completed final sign-off Feb 2024 | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | 16th fl: lighting only for t.i. (office) ref pa# 2023-0914-6547Details
16th fl: lighting only for t.i. (office) ref pa# 2023-0914-6547 | $650,360 |
| May 15, 2023 | Completed final sign-off Sep 2023 | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | 3/f- ste 300: non-structural tenant improvement at an existing unoccupied full flood speculative suite, no change in occupancy, use or area.Details
3/f- ste 300: non-structural tenant improvement at an existing unoccupied full flood speculative suite, no change in occupancy, use or area. | $385,246 |
| Mar 15, 2023 | Never finaled issued Apr 2023, no final | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | ste# 450 - spec suite t.i. of existing unoccupied suite on a multi-tenant floor. no change in occupancy, use or area.Details
ste# 450 - spec suite t.i. of existing unoccupied suite on a multi-tenant floor. no change in occupancy, use or area. | $772,622 |
| Nov 3, 2022 | Completed final sign-off Nov 2022 | 1 Post St | Skyline Construction | revision to pa #202207218985 to reclassify the idf closet from it room to it storage per ab 060.Details
revision to pa #202207218985 to reclassify the idf closet from it room to it storage per ab 060. | |
| Jul 21, 2022 | Completed final sign-off Nov 2022 | 1 Post St | Skyline Construction | 33/f: rev to pa202204041474: demo of partitions and ceiling. new finishes. wall & light changes in idf room. maher n/aDetails
33/f: rev to pa202204041474: demo of partitions and ceiling. new finishes. wall & light changes in idf room. maher n/a | $7,000 |
| May 20, 2022 | Never finaled issued Jul 2022, no final | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | ti of an existing unoccupied suite 1750. scope of work to include: selective interior non structural demolition. non structural partitions door frame/hardware/sidelight. finsihes and millwork. ceiling, lighting,. no change in occupancy use of area. accessible restrooms and drinking fountain under sDetails
ti of an existing unoccupied suite 1750. scope of work to include: selective interior non structural demolition. non structural partitions door frame/hardware/sidelight. finsihes and millwork. ceiling, lighting,. no change in occupancy use of area. accessible restrooms and drinking fountain under s | $183,664 |
| May 6, 2022 | Completed final sign-off Aug 2022 | 555 California St | Sc Builders, Inc | 49th fl, ste 4925: demo of (e) non-structural partitions, doors, finishes, ceiling grid, lighting + power. construction of glazing, (n) ceilings, lighting finishes + power. (to a white box condition/ future tenant). meps included. deferred submittal for fire/life.Details
49th fl, ste 4925: demo of (e) non-structural partitions, doors, finishes, ceiling grid, lighting + power. construction of glazing, (n) ceilings, lighting finishes + power. (to a white box condition/ future tenant). meps included. deferred submittal for fire/life. | $400,000 |
| May 6, 2022 | Completed final sign-off Oct 2022 | 555 California St | Sc Builders, Inc | 34th fl, ste 3450: revision to pa# 202203119780. architectural and meps are adjusting the floor.Details
34th fl, ste 3450: revision to pa# 202203119780. architectural and meps are adjusting the floor. | |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 199 Fremont St | Gci, Inc | 23/f: selective demo of (e) non-structural partitions, ceilings, millwork, doors/frames, flooring and other ifnishes, hvac, ab-017 electrical, lighting, plumbing and equipment.Details
23/f: selective demo of (e) non-structural partitions, ceilings, millwork, doors/frames, flooring and other ifnishes, hvac, ab-017 electrical, lighting, plumbing and equipment. | $20,000 |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 199 Fremont St | Pioneer Fire Inc. | 23/f: fire sprinkler demo: remove (e) pendents, all hangers & sway bracing are existing. remove all 1in arm-overs from rmeovel pendent heads in opening ceiling. return to warm shell. ref demo pa202204051551. maher n/a.Details
23/f: fire sprinkler demo: remove (e) pendents, all hangers & sway bracing are existing. remove all 1in arm-overs from rmeovel pendent heads in opening ceiling. return to warm shell. ref demo pa202204051551. maher n/a. | $19,000 |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 199 Fremont St | Gci, Inc | 2/f: interior demo of (e) unoccupied 2/f includes demo of non-structural partitions, ceilings, lighting, finishes, doors, frames and ab-017 millwork. fire sprinkler 202204051588Details
2/f: interior demo of (e) unoccupied 2/f includes demo of non-structural partitions, ceilings, lighting, finishes, doors, frames and ab-017 millwork. fire sprinkler 202204051588 | $10,000 |
| Apr 5, 2022 | Completed final sign-off Jun 2022 | 199 Fremont St | Pioneer Fire Inc. | 2/f: fire sprinkler demo: remove (e) pendent.remove all 1in arm-overs from removed pendent heads in open ceiling. ref demo pa202204051550. maher n/a.Details
2/f: fire sprinkler demo: remove (e) pendent.remove all 1in arm-overs from removed pendent heads in open ceiling. ref demo pa202204051550. maher n/a. | |
| Apr 4, 2022 | Completed final sign-off Nov 2022 | 1 Post St | 33/f: demolition of partitions, millwork, ceilings. construction of new non-structural partitions, new finishes, restroom upgrade. new plumbing, electrical and mcchanical - deferred submittal.Details
33/f: demolition of partitions, millwork, ceilings. construction of new non-structural partitions, new finishes, restroom upgrade. new plumbing, electrical and mcchanical - deferred submittal. | $1,200,000 | |
| Mar 30, 2022 | Completed final sign-off Jan 2023 | 101 Mission St | Gci, Inc | 10th fl - ti of an (e) unoccupied suite on a multi tenant floor; no change in occupancy use or area.mep, fire/life safety and sprinkler drawings are deferred submittal.Details
10th fl - ti of an (e) unoccupied suite on a multi tenant floor; no change in occupancy use or area.mep, fire/life safety and sprinkler drawings are deferred submittal. | $377,116 |
| Mar 29, 2022 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Gci, Inc | 16th fl: new elevator lobby layout. revised hallway closet layout and supplements construction details. ref pa# 202202168067.Details
16th fl: new elevator lobby layout. revised hallway closet layout and supplements construction details. ref pa# 202202168067. | $42,000 |
| Mar 11, 2022 | Completed final sign-off Oct 2022 | 555 California St | Sc Builders, Inc | suite 3450/34 floor: demo (e) nonstructural partitions, doors, finishes, ceiling grid, & tiles, lighting/power. construction of new nonstructural partitions, glazing, doors, ceilings, lighting finishes, & power. mep's included.Details
suite 3450/34 floor: demo (e) nonstructural partitions, doors, finishes, ceiling grid, & tiles, lighting/power. construction of new nonstructural partitions, glazing, doors, ceilings, lighting finishes, & power. mep's included. | $669,793 |
| Mar 2, 2022 | Completed final sign-off Jun 2022 | 555 California St | Bcci Construction Company | 28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810.Details
28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810. | $500,000 |
| Feb 16, 2022 | Completed final sign-off Feb 2023 | 140 New Montgomery St | Gci, Inc | 16th floor: interior t.i. non structural partition demo, new non-structural partitions, glazing, millwork, and finishes. mep deferred.Details
16th floor: interior t.i. non structural partition demo, new non-structural partitions, glazing, millwork, and finishes. mep deferred. | $1,000,000 |
| Feb 16, 2022 | Completed final sign-off Mar 2023 | 3 Embarcadero Center | Source Planning And Construction Inc | 23rd floor: upgrade restrooms to full accessibility compliance and add new finishes in elevator lobby and common hallway. no change in occupancy use or area.Details
23rd floor: upgrade restrooms to full accessibility compliance and add new finishes in elevator lobby and common hallway. no change in occupancy use or area. | $149,284 |
| Dec 10, 2021 | Completed final sign-off Aug 2022 | 1 Market St | Gci, Inc | 10/f: interior t.i.: selective demo and construction of non-structural partitions, doors and sidelights, ceilings, lighting, power, millwork and finishes. no change in occupancy, use or area.Details
10/f: interior t.i.: selective demo and construction of non-structural partitions, doors and sidelights, ceilings, lighting, power, millwork and finishes. no change in occupancy, use or area. | $966,899 |
| Nov 19, 2021 | Completed final sign-off Jun 2022 | 4 Embarcadero Center | Bcci Construction Company | 37th/f t.i.: selective demo & construction of new non structural partitions, ceiling lights, doors/windows, electrical, millwork and finishes. no change of occupancy use or area. life safety and sprinklers are design-build.Details
37th/f t.i.: selective demo & construction of new non structural partitions, ceiling lights, doors/windows, electrical, millwork and finishes. no change of occupancy use or area. life safety and sprinklers are design-build. | $1,202,422 |
| Nov 4, 2021 | Never finaled issued Dec 2021, no final | 4 Embarcadero Center | Source Planning And Construction Inc | demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or useDetails
demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or use | $200,000 |
| Oct 7, 2021 | Completed final sign-off Jun 2022 | 555 California St | Bcci Construction Company | 4350: selective demo of (e) non-structural partitions & doors, finishes, ceiling grid & tiles, lighting, power, construction of (n) non-structural partitons, glazing, doors, ceilings, lighting, finishes, power no change in occupancy or floor area - 43rd fl.Details
4350: selective demo of (e) non-structural partitions & doors, finishes, ceiling grid & tiles, lighting, power, construction of (n) non-structural partitons, glazing, doors, ceilings, lighting, finishes, power no change in occupancy or floor area - 43rd fl. | $45,649 |
| Oct 5, 2021 | Completed final sign-off May 2022 | 4 Embarcadero Center | Gci, Inc | 31/f: upgrade restrooms to full accessibilty comliance and add new finishes in elevator lobby and common hallway. no change in occupancy, use or area.Details
31/f: upgrade restrooms to full accessibilty comliance and add new finishes in elevator lobby and common hallway. no change in occupancy, use or area. | $149,284 |
| Sep 13, 2021 | Completed final sign-off Jun 2022 | 405 Howard St | Sc Builders, Inc | 3rd fl: construction of (1) conference room. installation of furniture partitions, lighting, power and finishes. no change in occupancy or use.Details
3rd fl: construction of (1) conference room. installation of furniture partitions, lighting, power and finishes. no change in occupancy or use. | $959,900 |
| Sep 10, 2021 | Completed final sign-off Dec 2021 | 535 Mission St | Skyline Construction | 24th fl: ti add two (2) new conference rooms and reception area. demolition of non-structural partitions. new non-structural partitions /glazing new lighting and ceiling.Details
24th fl: ti add two (2) new conference rooms and reception area. demolition of non-structural partitions. new non-structural partitions /glazing new lighting and ceiling. | $165,000 |
| Jun 1, 2021 | Completed final sign-off Feb 2022 | 315 Montgomery St | Bcci Construction Company | 3rd fl - revision to pa 2019-1028-5690. new non structural partitions, ceilings, lighting, finishes, doors, frames, hardware and millwork. removal of 1 a-3 occupancy space. meeting room is an a-3 assembly space mep includedDetails
3rd fl - revision to pa 2019-1028-5690. new non structural partitions, ceilings, lighting, finishes, doors, frames, hardware and millwork. removal of 1 a-3 occupancy space. meeting room is an a-3 assembly space mep included | $132,000 |
| Apr 30, 2021 | Completed final sign-off Aug 2021 | 100 Montgomery St | Gci, Inc | 12/f: demo of 1 non-structural partition. construction of header at removed partition. patching of affected finishes.Details
12/f: demo of 1 non-structural partition. construction of header at removed partition. patching of affected finishes. | $7,500 |
| Jul 10, 2020 | Completed final sign-off Jun 2021 | 75 Hawthorne St | Rudolph Commercial Interiors Inc, Rci | 19th flr - interior tenant improvement. scope includes demo of non structural partitions, construction of non structural partitions, doors, interior glazing, light fixtures and finishes. new two-way comm and evac signs in elev lobby under sep permit. ls/fa/sprinklers under sep permit.Details
19th flr - interior tenant improvement. scope includes demo of non structural partitions, construction of non structural partitions, doors, interior glazing, light fixtures and finishes. new two-way comm and evac signs in elev lobby under sep permit. ls/fa/sprinklers under sep permit. | $35,752 |