Block 0233, lot 044
4 Embarcadero Center
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress | 4 Embarcadero Center | Gci, Inc | level 16 - 18: finish and guardrail work to (e) stair. | $29,000 |
| Sep 18, 2026 | In progress | 4 Embarcadero Center | Gci, Inc | 17/fl- interior ti to include non structrual partitions, millwork, doors, ceiling and associated mep. soft demo on seperate permit | $3,822,412 |
| Sep 18, 2026 | In progress | 4 Embarcadero Center | Gci, Inc | 16/fl- interior ti to include non structrual partitions, millwork, doors, ceiling and associated mep. soft demo on seperate permit | $4,089,680 |
| Sep 18, 2026 | In progress | 4 Embarcadero Center | Gci, Inc | 18/fl- interior ti to include non structrual partitions, millwork, doors, ceiling and associated mep. soft demo on seperate permit | $4,072,684 |
| Sep 9, 2026 | In progress | 4 Embarcadero Center | Bilcor Inc | 28/f: install (1) new call station rath 2400-808nspm with mushroom button (flush mount). install (1) new call station signage. ref permits - two way ecs permanent backbone infrastructure pa 202009013108, arch ti pa 202606092833. | $2,000 |
| Aug 12, 2026 | In progress | 4 Embarcadero Center | Gci, Inc | interior soft demo on floor 16,17 and 18. ab-017 applies | $100,000 |
| Jul 22, 2026 | In progress | 4 Embarcadero Center | 39th & 40th flrs: tenant improvement including: * selective demolition of offices and pantry * new non-load bearing partitions, ceiling, light fixtures & finishes * new operable partitions | $3,037,500 | |
| Jul 2, 2026 | In progress | 4 Embarcadero Center | construction of new security gates and screens to the existing stairways. interior exit. | $31,500 | |
| Jun 26, 2026 | In progress | 4 Embarcadero Center | Ca United Mechanical, Inc | water cooled chiller replacement | $1,000,000 |
| Jun 18, 2026 | In progress | 4 Embarcadero Center | Bcci Construction Company | 28th flr. mep submittal to support approved arch permit. new hvac system and lighting for renovated office. ref#: 202606092833. | $500,000 |
| Jun 10, 2026 | In progress | 4 Embarcadero Center | Peacock Construction | revision to bpa: 202308305620 - new casework, new kitchen and bar equipment, patch flooring. | $25,000 |
| Jun 9, 2026 | In progress | 4 Embarcadero Center | Bcci Construction Company | 28/fl- interior ti to demo and construct non structrual partitions, doors, ceilings, and finishes | $7,650,300 |
| Apr 6, 2026 | Completed | 4 Embarcadero Center | Clune Construction Company L P | level 25. revision#: 202512302947. upgrade elevator lobby hardware. delete ada counter in bathroom. relocate power location for printer. minor ada bathroom updates. | |
| Mar 23, 2026 | Completed | 4 Embarcadero Center | Bilcor Inc | 27/f- as-builts: install (1) 2 way comm call station with signage. arch ref# 201805189519. | $1,000 |
| Mar 16, 2026 | In progress | 4 Embarcadero Center | Martin Sign Co Inc. | the fabrication and installation of 8 acrylic evacuation maps for 13th and 14th floors. | $5,650 |
| Mar 13, 2026 | In progress | 4 Embarcadero Center | Bcci Construction Company | 28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017. | $150,000 |
| Feb 10, 2026 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the floor 23 suite 2310. remodel under pa#: 202505287341; additons are 1 smoke detectors, 1 module, 4 speaker, 8 speaker/strobes, and 2 strobes. | $13,430 |
| Feb 9, 2026 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | 25/fl-relocate 30 pendents, convert 13 pendents to uprights and remove 5 pendents 2025.1230.2947 | $12,000 |
| Jan 27, 2026 | Completed | 150 Drumm St | Integrated Sign Installations Inc | install 1 single faced electric wall sign 7'-4" x 3'-8" "sens" | $6,000 |
| Jan 27, 2026 | Completed | 150 Drumm St | Integrated Sign Installations Inc | install 1 single faced electric wall sign 8'-8" x 4'-4" "sens" | $6,000 |
| Jan 23, 2026 | In progress | 4 Embarcadero Center | Pioneer Fire Inc. | convert 1 upright to pendent. gc 202512111504 | $300 |
| Jan 21, 2026 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the 13/f. remodel done uner pa# 202508112754; additions are 17 s/d, 1 d/d, 4 pull stations, 3 modules, 50 speakers, 38 speaker/strobes, and 3 strobes. | $97,320 |
| Jan 21, 2026 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | 14/f: fire only work for the remodel done under permit 202508082665. additions are 23 smoke detectors, 1 duct detector, 4 pull stations, 12 modules, 47 speakers, 42 speaker/strobes, and 2 strobes. | $107,880 |
| Jan 16, 2026 | Completed | 4 Embarcadero Center | Bilcor Inc | 13/14/fl-install (4) bath2400-808nspm with mushroom button. ref 202508112754 and 202501905013 | $24,000 |
| Jan 6, 2026 | Completed | 4 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinkler on 13th & 14th fl. relocate 179 pendent sprinklers on the 13th fl, relocate 183 pendent sprinklers and 2 upright sprinkler on the 14th fl. 13th fl bpa# 202509115078 & 202508112754. 14th fl bpa #202509105013 & 202508082665. | $90,500 |
| Dec 30, 2025 | Completed | 4 Embarcadero Center | Clune Construction Company L P | 25/fl- suite 2500- non structural parittions, ceilings, finishes, associated mechanical and electrical work | $800,000 |
| Dec 11, 2025 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | demo of level 28-level 29 convenience stairs & slab in-fill. | $150,000 |
| Dec 11, 2025 | In progress | 4 Embarcadero Center | J & C Safety 1st Fire Protection Inc | install a new wet chemical fire suppression system on promenade levl. | $7,000 |
| Dec 8, 2025 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | 23/f: revision to permit 202508082620. relocate one additional sprinkler for architectural changes. ref original t.i permit 202505287341, revised t.i permit 202510086955. | $1,000 |
| Oct 31, 2025 | In progress | 4 Embarcadero Center | Golden Gate Fire Protection Inc | 26/f: relocate 38 pendents. ref t.i permit 202508294183 | $19,950 |
| Oct 28, 2025 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | 26th fl - fire only work ste 2610 remodel done under ref pa 202508294183. additions are 12 speakers, 17 speaker/strobes and 1 strobe | $26,500 |
| Oct 9, 2025 | Completed | 4 Embarcadero Center | City Mechanical Inc | air maid system installation. ansul deferred. | $196,000 |
| Oct 8, 2025 | In progress | 4 Embarcadero Center | Gci, Inc | revision to previously approved permitdrawings for re-arrangement pantry idf copy storage room & (2) offices. previously approved permit#202505287341 | |
| Oct 3, 2025 | Completed | 4 Embarcadero Center | Rossi Builders Inc. | 32/f: suite #3200 - alteration of 2 private offices by moving shared wall. work will enlarge 1 office and reduce the size of the second.electrical and data work, glazin at to offices to be reconfigured. replacememt of crpet tiles. | $85,000 |
| Sep 30, 2025 | In progress | 4 Embarcadero Center | M C S Construction Services | 26/f suite 2610: deferred mechanical and electrical for permit 202508294183. mech - removal of (e) registers, ductwork, install (2) new cooling vavs, new supply/return registers, relocate thermostats, air balancing. elec - lighting fixtures, asso. circuiting/controls, power, signal devices, wiring. | $100,000 |
| Sep 15, 2025 | In progress | 4 Embarcadero Center | Skyline Construction | 14th fl - revision to approved structural element support operable partition ref pa 202508082665 | |
| Sep 11, 2025 | In progress | 4 Embarcadero Center | Skyline Construction | 13/f: mep. new ducts, heating cooling, lighting, power and plumbing. ref permit 202508112754. | $1,200,000 |
| Sep 10, 2025 | In progress | 4 Embarcadero Center | Skyline Construction | 14th fl ref pa # 2025-0808-2665. mep new ducts, heating, cooling, lighting, power and plumbing | $1,200,000 |
| Sep 9, 2025 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only for the wellness room. remodel on floor 29 done under pa: 202507080382. 1 speaker/strobe is added. | $961 |
| Aug 29, 2025 | In progress | 4 Embarcadero Center | M C S Construction Services | 26th fl- demolition of (e) non structural partitions, doors, finishes, ceiling grid & tiles, lighting & construction of (n) non structural partitions, glazing, doors, ceiling. lighting, power & finishes. no change in occupancy, use or area. | $425,000 |
| Aug 28, 2025 | In progress | 4 Embarcadero Center | R L H Fire Protection Inc | 23/f:. fire sprinkler permit. relocate 1 sprinkler in the 23/f elevator lobby. ref t.i #202506108325. | $1,000 |
| Aug 22, 2025 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | ref ti 202507020049- ground floor- fire spriinler add (1) and relocate 3 sprinklers | $2,500 |
| Aug 11, 2025 | In progress | 4 Embarcadero Center | Skyline Construction | 13th office ti: new partitions, conference rooms and offices. mep deferred | $2,200,000 |
| Aug 8, 2025 | In progress | 4 Embarcadero Center | 14th floor: t.i. (arch only) new partitions, conference rooms and offices. | $2,200,000 | |
| Aug 8, 2025 | In progress | 4 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler permit. relocate 31, add 5 and delete 7 pendent sprinklers. add 4 upright sprinklers ti | $26,000 |
| Aug 6, 2025 | Completed | 4 Embarcadero Center | Field Construction Inc. | suite 3120 31st fl ref pa # 202505287367. remove heatpump & pump | |
| Jul 31, 2025 | In progress | 4 Embarcadero Center | Bcci Construction Company | 13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred. | $300,000 |
| Jul 16, 2025 | Completed | 4 Embarcadero Center | electrical/lighting for restroom upgrades at 13th and 14th floors. ref 202505096175 13th, 202505096131 14th | $20,000 | |
| Jul 16, 2025 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | 14th fl: fire only work for the restrooms remodel done under permit # 202505096131. additions are 2 smoke detectors and 2 speaker/strobes. | $3,365 |
| Jul 8, 2025 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 29th/f: interior t.i. of e) office. minor demo of 1 non-load bearing paritions, 1 e) door, frame, 3 hardware. minor finishes, new construction of non-load partition, new bldg standard doors, finishes, & hardware. conver e) copy rm into wellness rm | $60,000 |
| Jul 2, 2025 | In progress | 4 Embarcadero Center | partial demolition of exiisting interiro non bearing partition. removeal of interior door, infill non bearing interior partition to watch. existing wall condition at previous door opening. elec, hvac, lighting to remain. no alterations. | ||
| Jul 2, 2025 | Completed | 4 Embarcadero Center | Silva Custom Builders | ll2: partial demolition of existing interior non bearing partiton. removal of interior door, infill of non bearing interior partition to match. existing wall condition at previous door opening. elec, hvac, lighting to remain. no alterations | $50,000 |
| Jun 30, 2025 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | 19th floor. fire only work for the office remodel on floor 19 done under 202506098227, 1 speaker strobe is relocated. no new devices added. | $961 |
| Jun 30, 2025 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the restrooms remodel on floor 13 done under pa#: 202505096175. additions are 2 smoke detectors and 2 speaker/strobes. | $3,365 |
| Jun 26, 2025 | Completed | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti demo 13th fl - 5 relocated fire sprinklers; 14th fl - 11 recloated fire sprinklers - turned up, 4 relocated fire sprinklers ref pa 202505096175 (13th fl), ref pa 2025-0509-6131 (14th fl) | $31,000 |
| Jun 25, 2025 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler permit: relocate 5 and add 1 sprinkler on the 19th fl. t.i. 202506098227 | $4,000 |
| Jun 24, 2025 | Completed | 4 Embarcadero Center | Skyline Construction | 19th/f: mep for previously approved arch #202506098227.install air distribution and new ductwork for office ti. lighting and power and signal. | $10,000 |
| Jun 11, 2025 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | floor 31; fire only work for suite 3120, remodel on 31 flr done under 202504114228; additions are 2 modules, 5 speaker/strobes, 5 strobes, as wall as 1 relocated smoke detector. | $9,830 |
| Jun 9, 2025 | Completed | 4 Embarcadero Center | Skyline Construction | 19th floor; interior tenant office space area of 465 sqft remove and replace partition, ceiling, and lighting. | $69,350 |
| May 28, 2025 | Completed | 4 Embarcadero Center | Field Construction Inc. | suite 3120 ref pa # 2025-0411-4228: mech- new single duct vav boxes, new water source heat pump, new circulation condenser water pump & new ductwork & air distribution . electrical- power, lighting & signal | $150,000 |
| May 28, 2025 | In progress | 4 Embarcadero Center | Gci, Inc | 23rd flr. demo of non structural insterior partitions, doors, ceilings, lighting, finishes 23rd fl suite 2310. new cosntruction includes new walls, doors, ceilings, lighting, millwork and finishes. mep and fls are deferred. mep and fls are deferred submittals. | $528,024 |
| May 21, 2025 | In progress | 4 Embarcadero Center | R L H Fire Protection Inc | suite #3120: 31st fl ref pa# 2025-0411-4228 fire sprinkler permit relocate 35 add 2 and delete 3 sprinklers | $10,000 |
| May 9, 2025 | Completed | 4 Embarcadero Center | Skyline Construction | 14th fl- tenant improvements of restrooms. work includes non structural demolition and construction of new restrooms and drinking fountain. no change in occupancy, use or area. existing path of travel documentation included for current code cycle approval: bldg entry and route, parking, ground fl | $193,104 |
| May 9, 2025 | Completed | 4 Embarcadero Center | Skyline Construction | 13th/f: t.i. of restrooms services: construction of new restrooms. no change in occupancy, use or area. mep deferred. | $90,346 |
| Apr 11, 2025 | Completed | 4 Embarcadero Center | Field Construction Inc. | suite 3120 (31st/fl): interior demo of non-structural partitions, doors, ceiling, lighting, and finishes. new construction consists of partitions, doors ceilings, lighting, millwork, and finishes. mep and fire safety deferred permits. | $250,000 |
| Dec 18, 2024 | Completed | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 22nd floor: record as built for pa #202407317657. update drawings for adjusted piping plan and final sprinker head positions per inspectors request. 22/f. add fires sprinkler per t.i. ref #202406275406 | |
| Dec 4, 2024 | In progress | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | record as built for pa #202407317658 show final positions of added and relocate sprinler heads per inspcetors request. 10th floor add 2, relocate 5, fire sprinkler per t.i. ref pa#202406134380 job #24-641 | $4,348 |
| Nov 18, 2024 | In progress | 4 Embarcadero Center | 23/fl- ti includes demo of no structural partitions and ceilings. new ceiling tiles carpet and paint throughout. (bldg is fully sprinkled) all new or revised mep life safety work will be design build submitted separately. electrical deffered. | $130,000 | |
| Nov 7, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 22nd floor: structural support for operable partition. ref pa #202406275406 | $10,000 |
| Oct 8, 2024 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 31st fl ref pa 2024-0322-8386 fire only for an as built permit at suite 3100. a module for a/v shutdown was removed | |
| Aug 13, 2024 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | ref pa # 2024-0213-5791 relocate 3 pendant heads | $4,800 |
| Jul 31, 2024 | Completed | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 22/f: add 16 relocate 32 fire sprinkler per t.i. 202406275406 | $29,813 |
| Jul 31, 2024 | Completed | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 10/f: add 15 relocate 21 fire sprinkler per t.i. 202406134380 | $22,360 |
| Jul 26, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 9/f: rev to pa# 2024-0416-0076; 5/a6.01 was removed from scope in error. reinstae 5/a6.01 | |
| Jul 16, 2024 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | 7/f & 36/f: relocate (22) pendents. add (2) pendents. | $4,800 |
| Jul 12, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 23rd fl - structural support of a new operable partition ref pa 202404290972 | $30,000 |
| Jun 27, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 22nd/f: demo of non-structural partitions & new construction of non-structural partitions including new millwork. mech & electrical | $1,700,000 |
| Jun 21, 2024 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | 22nd floor: fire only work for the "pillsbury" remodel;additions are 9 speaker/strobes and 3 strobes. ref pa#202406134380 | $10,512 |
| Jun 21, 2024 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | 10th floor: fire only work for the "pillsbury" remodel;additions are 6 speaker/strobes and 8 strobes. ref pa#202406134380 | $10,735 |
| Jun 18, 2024 | Completed | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 9th fl - record as built for 202405212568 9th fl - add 6, relcoate 2 fire sprinkler per ti use flexible pipes instaed of hard pipes. ref pa 202404160076 | $4,969 |
| Jun 18, 2024 | Completed | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 23rd fl - record as built for 202405212569 23rd fl - relocate 4 fire sprinkler per ti. use flexible pipe instead of hard pipe. ref pa 202403147793 | $2,484 |
| Jun 13, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 10/f: demo, non structural partitions. construction of new non structural partitions & finishes. mechanical & electrical | $1,000,000 |
| Jun 10, 2024 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 23rd fl - fire only work for the "pillbury" remodel areas; additions are 3 speaker/strobes and 2 strobes. ref pa 202404290972 | $4,125 |
| Jun 10, 2024 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | 9th fl - fire only work for the "pillbury" remodel areas; additions are 6 speakers/strobes and 7 strobes. ref pa 202404160076 | $10,120 |
| Jun 10, 2024 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | floor 28- fire only-ref202403298897- add a speaker/strobe at the west multi office area | $961 |
| May 28, 2024 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | relocate 1 pendent on 28th floor. relocate 5 pendents on 29th floor. ref pa#202403298897 | $1,950 |
| May 21, 2024 | Completed | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 23rd fl: add (1) relocate (14) fire sprinkler t.i job #24-641 ref pa# 2024-0314-7793 | $9,317 |
| May 21, 2024 | Completed | 4 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | 9/f: add (8) relocate (20) fire sprinklers per t.i job #24-641 ref pa# 2024-0416-0076 | $17,391 |
| May 15, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | rev 202404160076- 9th/fl-office ti to convert to an open office layout to secretarial workstations and reuse d/f/h. mechanical changes to accomodate architectural layout changes. new power lighting | |
| Apr 29, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 23rd fl - new non-structural partitions including new millwork & finishes. mechanical - new exhaust fans, ductwork & air distribution, ddc controls & air balance. power, lighting & signal | $1,273,322 |
| Apr 26, 2024 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 35th fl - fire only work for the sutte 3500 remodel. 3 speaker/strobes are removed due to conference rooms becoming offices. no new devices. ref pa 202402226360 | |
| Apr 26, 2024 | Completed | 4 Embarcadero Center | Golden Gate Fire Protection Inc | ref 202402226360- 35th/f office ti for fire sprinklers to relocate (11) pendents | $6,750 |
| Apr 24, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 9/f: mechanical - new exhaust fans, ductwork, heat pump. electrical - power and lighting. ref pa 202404160076 | $550,000 |
| Apr 19, 2024 | In progress | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the suite 3680 remodel on floor 36. 2 speaker strobes added and 33 existing speaker strobes relocated. ref 202403046974 | $1,922 |
| Apr 16, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 9th fl - new non-structural partitions millwork & finishes | $10,000 |
| Apr 12, 2024 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 28th and 29th floors:adjacent mech & electrical etc. for reducing the rented space, refurning a portion of the 28th floor back to the owner. 28th floor have an extg communication stair which they will retain. ref arch. set pa# 202403298897 | $60,000 |
| Mar 29, 2024 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 28 and 29th floor office ti to (e) office space to include soft demo, replace fixtures and finishes. build new non-bearing partitions, doors and finishes (total area 795sf) deferred meps and fire alarm. | $130,000 |
| Mar 22, 2024 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 31st floor: fire only work fr te suite . additions are 1 smoke detector, 1 module, 15 speaker/strobes, and 3 strobes. ref pa#202312061995. | $17,600 |
| Mar 22, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | demo of non structural paritions, doors, millwork and finishes. no ceiling demo | $10,000 |
| Mar 14, 2024 | In progress | 4 Embarcadero Center | Gci, Inc | 23rd floor: demolition of no-structural partition, doors, millwork, and finishes. no ceiling work. | $60,000 |
| Feb 23, 2024 | Completed | 4 Embarcadero Center | Gci, Inc | ref pa 202312061995 new power & data & lighting. modification of existing mechanical hvac & reconfigure of ductwork. new supplemental water source heat pump circulation pump & ceiling exhaust fan | $520,000 |
| Feb 22, 2024 | In progress | 4 Embarcadero Center | Skyline Construction | 35/f suite 3500: tenant improvement. conversion of meeting space into private offices. demolition of (e) partitions, ceiling and finishes. construction of non-load bearing partitions, ceilings, and finishes for new private offices. | $20,000 |
| Feb 6, 2024 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | 31/f: relocate (18) pendents, add (4) pendents. gcti# 202312061995 | $3,300 |
| Jan 22, 2024 | Completed | 4 Embarcadero Center | Gci, Inc | 31/f: new phone booth added to the area of work. no channge in occupancy use or area. | $30,000 |
| Dec 18, 2023 | Completed | 4 Embarcadero Center | Bilcor Inc | 15/f: install 2 call station rath 2400-808nspn, two-way ref # 202009013108, arch ref# 202310068167, fire ref # 202311271354. | $1,332 |
| Dec 13, 2023 | Completed | 4 Embarcadero Center | Gci, Inc | removal of interconnecting staircase and infill slab between floors 31 and 32. no change of occupancy or use. | $65,481 |
| Dec 6, 2023 | Completed | 4 Embarcadero Center | Gci, Inc | 31st fl, ste 3100 - demo of non structural partitions, glazing, doors, millwork, wall & floor finishes throughout & selective demo of light fixtures; construction of (n) non-structural demizing partition & internal suite partitions; (n) glazing, doors, lights, millwork and finishes | $417,252 |
| Nov 27, 2023 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 15th fl - fire only work to add a module for door lock release; no ref pa (fire alarm addition only) | $600 |
| Sep 5, 2023 | Completed | 4 Embarcadero Center | Golden Gate Fire Protection Inc | 29th fl - fire sprinklers add 2 pendants and relocate 1 pendent. ref pa 2023-0621-0462 | $1,860 |
| Aug 30, 2023 | In progress | 4 Embarcadero Center | Guzman Construction Group Inc. | suite 101: demolition of (e) casework and booths, new bar casework, new partition walls, new all infill, new butler door, new light fixtures and new bar and handwash sinks. patch and repair of (e) floor tiles, new paint finish | $200,000 |
| Jul 27, 2023 | Completed | 4 Embarcadero Center | Warwick Construction Inc | revision to pa# 202307031382 & 202208120488, to include special inspection checklist. | |
| Jul 3, 2023 | Completed | 4 Embarcadero Center | Warwick Construction Inc | revision to pa# 202208120488, to include the ada checklist amendment. | |
| Jun 21, 2023 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 29th fl - revision to pa 2023-0602-9092. reconfiguration of hallway door at stair area | |
| Jun 20, 2023 | Completed | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | t.i - existing fire sprinkler system.45 relocated and 5 add pendents sprinkers, 4 relocated upright sprinklers, 9 removed pendents sprinklers. ref pa# 202306089518 | $34,000 |
| Jun 20, 2023 | Never finaled | 4 Embarcadero Center | Battalion One Fire Protection | rotate (3) exiting pendants in demo'd soffit to new uprights. field verify sprinkler coverage ref 2022-0812-0488 | $5,000 |
| Jun 8, 2023 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the sute 710 remodel on floor 7; additions are 1 smoke detector, 8 speaker/strobers and 4 strobes. ref pa 202305308775 | $10,892 |
| Jun 6, 2023 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 1/f: remodel "fedex" office, (2) pull stations being replaced, addition of (6) speaker/strobes, (2) strobes. ref bpa#202208120488 | $7,621 |
| Jun 2, 2023 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 29th flr. 275 sq ft. interior ti of existing office space. demo existing partitions and associated doors. construction of non load bearing partitions, doors, finishes, millwork, new mech and elec as required. | $110,000 |
| Jun 1, 2023 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 25/f: add speaker/strobe in (e) office. no ref bpa. | $961 |
| May 17, 2023 | Completed | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | demo plan - 13th floor - removed 139 sprinklers. | $20,000 |
| May 2, 2023 | Never finaled | 4 Embarcadero Center | Peacock Construction | 1/f: new lighting & controls | $5,000 |
| Mar 27, 2023 | Completed | 4 Embarcadero Center | Insign Electric | install (1) illuminated single faced wall sign on interior window: "fedex office" 7'-8" x 1'-2" | $5,000 |
| Mar 27, 2023 | Completed | 4 Embarcadero Center | Insign Electric | install (2) non-illuminated double faced projecting signs: "fedex office" 2'-9" x 11" | $3,000 |
| Feb 14, 2023 | Never finaled | 4 Embarcadero Center | W. Wong Construction Co. Inc. | add one entrance door to lobby of plaza area, fill (e) niche at walk way for part of cold storage within restaurant kitchen. fire sprinkler and life safety under seperate permit. | $50,000 |
| Dec 22, 2022 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "zurich" remodel on 37/f; additionas are 4 strobes and 1 module, ref pa# 202209222939 | $2,700 |
| Oct 21, 2022 | Completed | 4 Embarcadero Center | Bilcor Inc | 30th fl: install (1) new call station rath 2400-808 nspm w/mushroom button, flush mount. ref pa#202207057733. | $660 |
| Oct 18, 2022 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 30/f structural only - installation of core holes in steel floor beams at the 30th floor. ref 202207057733. | $10,000 |
| Sep 27, 2022 | Never finaled | 4 Embarcadero Center | Siemens Industry, Inc. | 30/f: fire alarm ti: full floor "vista equity" removal, addition of (24) smoke detectors, (1) duct detector, (3) pull stations, (8) modules, (19) speakers, (43) speaker/strobes, (6) strobes. ref bpa#202207057733. | $64,800 |
| Sep 23, 2022 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 30th fl - mechanical and electrical for permit # 202207057733. | $700,000 |
| Sep 22, 2022 | Completed | 4 Embarcadero Center | Hitt Contracting Inc. | 37/f partial interior t.i. new partitions, privacy door, mep, relocating portion of (e) millwork. life safety deferred. | $100,000 |
| Sep 22, 2022 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the tenant remodel on 34/f; 2 speaker/strobes are added and 2 existing speakers are relocated. ref pa# 202207128225 | $1,900 |
| Sep 8, 2022 | Completed | 4 Embarcadero Center | Skyline Construction | 26/f suite 2600: mechanical and electrical work for ti. ref arch. permit 202206216646. | $55,000 |
| Aug 31, 2022 | Completed | 4 Embarcadero Center | M C S Construction Services | ste 1400. interior t.i updating and replaceing various interior finishes in the corridors, reception and community cafe. no outside catering. breakroom for employee use. | $434,422 |
| Aug 30, 2022 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | 19th fl. relocate 8 pendents sprinklers for new ceiling on the 19th fl. ref pa#2020-0912-4077 & 2021-0104-20191 | $2,000 |
| Aug 26, 2022 | Never finaled | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for suit 2600 partial areas remodel on 26 floor additions are 1 smoke, 1 speaker,/strobe, and 4 strobes re pa# 2022-0621-6646 | $3,465 |
| Aug 23, 2022 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | 30/f: convert 167 pendents to uprights. add 19 pendents. remove 3 uprights. ref pa 202204273075. | $40,800 |
| Aug 22, 2022 | Completed | 4 Embarcadero Center | Intelligent Technologies & Services Inc | 30th fl - supply and install a complete clean agent detection and control system with fire alarm panel within new idf room a3013. ref 202208231037/t.i. ref 202204273075. fire alarm to tie into facp under separate permit. | $32,000 |
| Aug 22, 2022 | Completed | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 26/f: t.i. (e) fire sprinkler system relocate 21 sprinklers. ref t.i. pa202207128225. maher n/a | $13,000 |
| Aug 15, 2022 | Never finaled | 4 Embarcadero Center | Martin Sign Co Inc. | fabrication and installatoin of 3 evacuation maps for the 35th fl, embarcadero center 4 | $750 |
| Aug 12, 2022 | Completed | 4 Embarcadero Center | Warwick Construction Inc | 1st fl tenant improvement for fedex office store. new finishes, graphics, lighting, new and relocated fixtures, equipment, relocated plumbing fixture, new mop sink, new restroom accessories, distribution of phone and pwr/data to equipment. mod mech, elec, plumbing work and mod to sprinkler/fire sys | $350,000 |
| Jul 22, 2022 | Completed | 4 Embarcadero Center | Bilcor Inc | 35/fl install (1) new call station rath 2400-808nspm w. mushroom button two way ecs permanent backbone infrastructure permit 202009013108 arch reference t.i. 202111293199 | $660 |
| Jul 15, 2022 | Completed | 4 Embarcadero Center | Bilcor Inc | 12/f: install (2) new call stations rath 2400-808nspm w/mushroom button two-way ecs permanent backbone infrastructure permit. ref bpa#202009013108 & arch b;a#202201125848 | $1,320 |
| Jul 14, 2022 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 36/f: relocate 1 fire alarm speaker/strobe in suite 3660. ref pa202203170209. maher n/a | $635 |
| Jul 5, 2022 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 30/f: tenant improvement. renovation including non-load bearing partitions, ceiling and finishes. deferred submittals: mep, life safety and sprinkler to be submitted later. | $3,800,000 |
| Jun 21, 2022 | Completed | 4 Embarcadero Center | Skyline Construction | 26th flr ste 2600: interior demolition, new full/partial height partitions, ceiling and millwork. mep & life safety under separate permits. restroom upgrades. | $350,000 |
| Jun 6, 2022 | Completed | 4 Embarcadero Center | M C S Construction Services | suite 3660: deferred mechanical & electrical permit. ref t.i. pa 202203170209. maher n/a. | |
| Jun 6, 2022 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "k&l gates" remodel on floor 12 additions are 2 smoke detectos, 40 speakers, 25 speakers/strobes, and 7 strobes ref pa# 202201125848 | $46,350 |
| May 16, 2022 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | fire sprinker permit. relocate 172 add 96 and delete 29 sprinklers on the 35th floor. t.i. 202202027136 | $85,000 |
| May 2, 2022 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | 36/f suite 3660: relocate 2 pendent sprinkler heads, 2 upright sprinkler heads, convert 2 pendent sprinlers to upright, add 2. ref permit 202203170209. | $3,000 |
| Apr 27, 2022 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 30th floor: demo of non load bearing partitions, doors/glazing, ceilings, finishes, mech, electrical, & plmg. srpinkler permit ref pa# 202204252880 | $125,000 |
| Apr 25, 2022 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | 30/f: convert pendent sprinkler heads to upright | $2,500 |
| Apr 21, 2022 | Completed | 4 Embarcadero Center | Anderson, Rowe & Buckley, Inc. | 12th fl, ste 1200: fire sprinkler only. relocate 114 pendents & add 8 pendents. relocate 17 conceal, add 2 concealed hd plug off 15 outlets for k&l. | $66,000 |
| Mar 31, 2022 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 35/f suite 3500: fire only work for the "hogan lovells" remodel. additions and replacements are 14 smoke detectors, 3 pull stations, 4 modules, 40 speaker/strobes, and 5 strobes. ref permit 202202027136. | $40,500 |
| Mar 28, 2022 | Completed | 4 Embarcadero Center | Skyline Construction | deferred mep ref ti pa 202202027136 | |
| Mar 22, 2022 | Completed | 4 Embarcadero Center | Golden Gate Fire Protection Inc | 12/f: fire sprinklers, add (2) upgrights sprinklers for stair infill. ref bpa#202111041782 | $1,000 |
| Mar 17, 2022 | Completed | 4 Embarcadero Center | M C S Construction Services | 36/f suite 3660: interior ti. new construction includes new interior partitions, ceilings, mechanical, electrical, lighting, millwork. life safety, fire sprinkler, and mep deferred. no exterior work, no hazmat, no structural. | $125,000 |
| Mar 8, 2022 | Never finaled | 4 Embarcadero Center | Skyline Construction | ste 3500: demolition of (e) partitions, restrooms, associated mep and finishes. demo ref pa# 202202027136. "no ceiling work" | $50,000 |
| Feb 3, 2022 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | 37/f: fire sprinkler permit: relocate 49, add 11 and delete 1 sprinkler. ref ti permit 202111192772. | $13,500 |
| Feb 2, 2022 | Completed | 4 Embarcadero Center | Skyline Construction | suite 3500: interior t.i. (e) ofc, demo (e) partitions, ceilings, restrooms, associated mep & finishes, constr of non-load baring partitions, ceilings, restroom fixtures, mep & assoc finishes. mep deferred | $7,000,000 |
| Jan 21, 2022 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "sand hill global advisors" remodel on floor 31. 10 speaker/strobes are added. ref pa# 202111152334. | $6,350 |
| Jan 14, 2022 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "audax group" remodel on floor 37. additions are 6 speakers, 14 speaker/strobes, and 2 strobes. ref pa# 202111192772. | $13,800 |
| Jan 12, 2022 | Completed | 4 Embarcadero Center | Gci, Inc | 12th fl: interior t.i. upgraded office area including restrooms & mep. | $2,000,000 |
| Jan 11, 2022 | Completed | 4 Embarcadero Center | Bilcor Inc | 32nd fl: fire life safety: inatll 1 new call station rath 2400-808nspm. two way ecs backbone infastructure permit # 2020090131083 architectural ref ti# 202111293199. | $660 |
| Jan 7, 2022 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 32/f: fire only work for the "g.i partners" remodel. additions are 2 speakers and 7 strobes, as well as the relocation of 6 speakers. ref permit 202109178613. | $7,025 |
| Dec 14, 2021 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | 31/f: fire sprinkler ti of existing system. 55 revised/relocated pendent heads and 1 upright. ref. permit 202111152334. | $13,159 |
| Dec 13, 2021 | Completed | 4 Embarcadero Center | Golden Gate Fire Protection Inc | fire sprinklers; relocate 11 pendent sprinklers on the 36th fl | $2,400 |
| Dec 1, 2021 | Completed | 4 Embarcadero Center | Skyline Construction | 36/f: mechanical and electrical work for tenant improvement. ref t.i pa 202107194589. | $15,000 |
| Nov 29, 2021 | Completed | 4 Embarcadero Center | Rossi Builders Inc. | 32/f: ref #202109178613. mep deferred | $295,000 |
| Nov 29, 2021 | Completed | 4 Embarcadero Center | Rossi Builders Inc. | 32/f: ref #202109178613. modify wall separating office from convenience stair per sffd plan check. revise womens bathroom layout. minor modification to some offices. | $100 |
| Nov 19, 2021 | Completed | 4 Embarcadero Center | Bcci Construction Company | 37th/f t.i.: selective demo & construction of new non structural partitions, ceiling lights, doors/windows, electrical, millwork and finishes. no change of occupancy use or area. life safety and sprinklers are design-build. | $1,202,422 |
| Nov 15, 2021 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 31/f ste 3150 t.i.: demo of non-structural partitions and build new partitions.new or revised mech and electrical including in this set, life safety & fire sprinklers under sep permits. building has f/s. maher n/a | $500,000 |
| Nov 10, 2021 | In progress | 4 Embarcadero Center | Pioneer Fire Inc. | add 4 sidewall sprinkler heads | $2,000 |
| Nov 1, 2021 | Completed | 4 Embarcadero Center | Golden Gate Fire Protection Inc | 32nd fl - fire sprinklers relocated 43 pendent sprinklers on the 32nd fl; ti ref pa 2021-0917-8613 | $8,400 |
| Oct 5, 2021 | Completed | 4 Embarcadero Center | Gci, Inc | 31/f: upgrade restrooms to full accessibilty comliance and add new finishes in elevator lobby and common hallway. no change in occupancy, use or area. | $149,284 |
| Sep 17, 2021 | Completed | 4 Embarcadero Center | Rossi Builders Inc. | partial office ti on 32nd fl. 21,500 sf. incl new private offices partial restroom remodel. encl stair to 31st fl w/2hr rating no changes to site, ext appear or (e) bldg struc are required. modifications to mech, elec, plumb, automatic fire sprinkler and fire alarm to be submitted under sep permits. | $1,200,000 |
| Sep 8, 2021 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | construct 2 new walls with 1 maintenance access door to close off the communicating stair between floors 37th and 38th fl . stair is not part of existing means of egress. ref pa 201905090198. | $5,000 |
| Aug 4, 2021 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 20/f: converting open office area 20024 to a fix office including full neight wall and interior storefront system and new security doors as outlined in accociated document. (e) hvac system to remain | $22,160 |
| Jul 19, 2021 | Completed | 4 Embarcadero Center | Skyline Construction | new interior improvement on the 36/f, new non-structural partitions, doors and hardware, glazing and frame and new ceiling. elect and hvac under sep permit. | $100,000 |
| Jul 6, 2021 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 19/f: fire only work to obtain as built permit for genstar remodel on floor 19 which includes reinstallation of 4 pull stations previously removed | $1,100 |
| Jun 24, 2021 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "woodline partners" remodel on floor 34; 2 speakers are added. 4 spreakers and 2 strobes are relocated. | $1,270 |
| Jun 18, 2021 | Expired or cancelled | 4 Embarcadero Center | Skyline Construction | evacuation plan signages | $800 |
| Jun 14, 2021 | Completed | 4 Embarcadero Center | Pioneer Fire Inc. | add (3) pendent sprinklers, remove (2) pendent sprinklers, relocate (2) pendent sprinklers. gcti # 2021-0607-1844 | $3,500 |
| May 12, 2021 | Completed | 4 Embarcadero Center | Source Planning And Construction Inc | 39th fl (ste 3950) rev to 202001131732. correction to scope of work statement to remove life safety deferred. submittal from scope "no mep or life safety work for this permit. sheet a1.58 change indicate location of (e) outdoor strobe for reference no scope required. | |
| May 5, 2021 | Completed | 4 Embarcadero Center | Bilcor Inc | fire life saftey: 2, 3, 4, 33, 40 floors -rove (8) existing temporary tw-way call box -install (8) new call station referencet.i. #: 2020-0901-3108 | $5,280 |
| May 5, 2021 | Never finaled | 4 Embarcadero Center | Bilcor Inc | fire life saftey 19th floor: install (2) new call stations with mushroom button reference permit#s: 2020-0901-3108 2021-0104-2019 | $1,320 |
| Apr 2, 2021 | Completed | 4 Embarcadero Center | Skyline Construction | 19/f: mechanical, electrical and plumbing plans for approved pa 202101042019 | |
| Mar 18, 2021 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler permit. relocate 63, add 17 and delete 31 sprinklers on the 19th floor. t.i.# 2020-0912-4077 | $26,000 |
| Mar 10, 2021 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the "genstar" remodel on floor 19; additions are 23 smoke detectors, 3 duct detectors, 8 modules, 1 strobe power supply, 18 speakers, 39 speaker/strobes, and 13 strobes. ref. permit app # 2021 0104 2019 | $68,250 |
| Jan 4, 2021 | Completed | 4 Embarcadero Center | Skyline Construction | 19/f: interior tenant improvement of office. deferred mep. maher n/a. | $1,500,000 |
| Dec 8, 2020 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire alarm "as-built" permit which indicates the deletion of 9 smoke detectors and 2 duct detectors at fsd locations where they were not required due to areas served by these fsds having smoke detector "total-coverage." ref. permit app # 2019-1112-6924 for initial permit. | |
| Nov 19, 2020 | Completed | 4 Embarcadero Center | Bilcor Inc | fls - install (1) new call station reference permit #s: 2020-0901-3108; 2019-0509-0198 | $660 |
| Oct 27, 2020 | Completed | 4 Embarcadero Center | R L H Fire Protection Inc | fire sprinkler demo permit. remove all pendant sprinklers and arm over piping. replace with 116 upright sprinklers on the 19th floor. | $25,000 |
| Sep 18, 2020 | Completed | 4 Embarcadero Center | 20th fl: revision to pa# 201908158941. electrical drawings. | $25,000 | |
| Sep 12, 2020 | Completed | 4 Embarcadero Center | Skyline Construction | 19th flr. interior demo partitions, doors, plumbing fixtures, sprinkler equipment and gtc . ab-017 applies customer supplied referenced f/s permit application 2020-1027-7517 12/3/2020-rl | $100,000 |
| Sep 2, 2020 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the ste 2570. remodel on fl 25; additions are 1 smoke detector, 4 speaker/strobes, and 1 strobes. ref pa# 202001151921 | $3,720 |
| Sep 2, 2020 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | 37th floor: fire only work for suite 3700, remodel additions are 1 smoke detector, 7 speaker/strobes, and 1 strobe, ref pa# 201912240445 | $5,625 |
| Sep 2, 2020 | Completed | 4 Embarcadero Center | Siemens Industry, Inc. | fire only work for the ste 3660. remodel on fl 36; additions are 1 smoke detector, 6 speaker/strobes, and 2 strobes. ref pa# 201912240441 | $5,540 |
| Sep 1, 2020 | Completed | 4 Embarcadero Center | Bilcor Inc | fire life safety: install 1 command center. 1 distribution board. 2 command center system supervisor. 1 power supply/ups backup. 7 backup batteries for ups. 1 power supply monitor, and 1 dual monitor module. | $9,240 |
| Aug 26, 2020 | Never finaled | 4 Embarcadero Center | Source Planning And Construction Inc | suite 2100. office partition ( glass w/ door ) | $40,000 |
| Aug 20, 2020 | Never finaled | 4 Embarcadero Center | Source Planning And Construction Inc | (25th fl, ste 2570) mech & electricl for pa# 202001151921 | $245,000 |