Henry Brazer
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Henry Brazer Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jun 2022 to Sep 2026
28 permits since 2000 (architect on 26 permits, authorized agent-others on 3 permits, engineer on 1 permit): 16 completed, 11 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 192 Casitas Av | exterior remodel (n) decorative roof, replace all exterior siding with (n) stucco & hardi plank, new deck at level 1, replace all exterior doors & windows. interior remodel: relocate living room, dining room, kitchen to level 3,add 2 bedrooms, 2 full bathrooms, 2 1/2 bathrooms, no change to (e) bldgDetails
exterior remodel (n) decorative roof, replace all exterior siding with (n) stucco & hardi plank, new deck at level 1, replace all exterior doors & windows. interior remodel: relocate living room, dining room, kitchen to level 3,add 2 bedrooms, 2 full bathrooms, 2 1/2 bathrooms, no change to (e) bldg | $60,000 | |
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 1380 Noe St | Kyle Gleason And Sons | h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112Details
h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112 | $300,000 |
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 355 Highland Av | interior remodel: remove shower in level 2 bathroom and replace with new washer and dryer, remodel primary bedroom and bathroom, add new bathroom on level 3.Details
interior remodel: remove shower in level 2 bathroom and replace with new washer and dryer, remodel primary bedroom and bathroom, add new bathroom on level 3. | $50,000 | |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 192 Casitas Av | interior remodel relocate living room, dining room, kitchen to level 3 add two bedrooms, add two full bathrooms, and two half bathrooms, no change to (e) building envelopeDetails
interior remodel relocate living room, dining room, kitchen to level 3 add two bedrooms, add two full bathrooms, and two half bathrooms, no change to (e) building envelope | $300,000 | |
| Aug 26, 2026 | In progress issued Aug 2026 | 3955 20th St | demise private storage space in (e) basmentDetails
demise private storage space in (e) basment | $8,000 | |
| Aug 26, 2026 | In progress issued Sep 2026 | 2182 40th Av | Chl Construction Company | kitchen and laundry room remodel.Details
kitchen and laundry room remodel. | $30,000 |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 100 Excelsior Av | to comly with nov# 202655988: legalize unpermitted garage to storage conversion. legalize unpermitted bathroom in same area.Details
to comly with nov# 202655988: legalize unpermitted garage to storage conversion. legalize unpermitted bathroom in same area. | $40,000 | |
| Jun 10, 2026 | In progress issued Sep 2026 | 4 Embarcadero Center | Peacock Construction | revision to bpa: 202308305620 - new casework, new kitchen and bar equipment, patch flooring.Details
revision to bpa: 202308305620 - new casework, new kitchen and bar equipment, patch flooring. | $25,000 |
| Feb 6, 2026 | In progress issued Feb 2026 | 2330 15th St | window replacement. replacement all (e) windows in unit #2330 with aluminum clad wood windows. visible from street all new windows to have u-factor less than or equal to .27. in-kind unless otherwise noted. in kind like for like within same opening. total 16 windows.Details
window replacement. replacement all (e) windows in unit #2330 with aluminum clad wood windows. visible from street all new windows to have u-factor less than or equal to .27. in-kind unless otherwise noted. in kind like for like within same opening. total 16 windows. | $8,000 | |
| Nov 21, 2025 | In progress issued Nov 2025 | 3101 Clay St | Petru Construction Inc | interior renovation to 4th fl, unit 5; kitchen remodel (2) bath remodel, minor reconfiguration of load bearing wall will require roof & floor reinforcement within unit no exterior alterationsDetails
interior renovation to 4th fl, unit 5; kitchen remodel (2) bath remodel, minor reconfiguration of load bearing wall will require roof & floor reinforcement within unit no exterior alterations | $62,000 |
| Oct 24, 2025 | Completed final sign-off Sep 2026 | 2236 18th Av | interior remodel to main level kitchen, bathroom, (n) hallway entry to main level bedrooms, bedroom closet remodelDetails
interior remodel to main level kitchen, bathroom, (n) hallway entry to main level bedrooms, bedroom closet remodel | $50,000 | |
| Aug 19, 2025 | In progress issued Jan 2026 | 2330 15th St | interior remodel of unit 2330 including full kitchen and bathroom remodelsDetails
interior remodel of unit 2330 including full kitchen and bathroom remodels | $120,000 | |
| Aug 18, 2025 | Completed final sign-off Sep 2026 | 152 Fairmount St | D3 Construction | kitchen remodel reivsed layout no change to plumbing fixture countDetails
kitchen remodel reivsed layout no change to plumbing fixture count | $65,000 |
| Aug 15, 2025 | Completed final sign-off Jun 2026 | 74 Belcher St | interior remodel of unit 74 only: existing kitchen and bathroom remodel, add one bathroom, add closets to two bedroom. no change to other units nor the bldg. envelope work at top floor, front building only.Details
interior remodel of unit 74 only: existing kitchen and bathroom remodel, add one bathroom, add closets to two bedroom. no change to other units nor the bldg. envelope work at top floor, front building only. | $70,000 | |
| Aug 15, 2025 | Completed final sign-off Jun 2026 | 74 Belcher St | window replacment: replace alll (e) windows in unit w/aluminum-clad windows for street-facing and vinyl windows for non-street facing. all new windows to have u-factor less than or equal to 0.30. work on top floor, front building only. modify water closet toilet location and add sinkDetails
window replacment: replace alll (e) windows in unit w/aluminum-clad windows for street-facing and vinyl windows for non-street facing. all new windows to have u-factor less than or equal to 0.30. work on top floor, front building only. modify water closet toilet location and add sink | $10,000 | |
| Jun 13, 2025 | Completed final sign-off Oct 2025 | 2328 15th St | North Pacific Builders | interior remodel of unit 2328 including kitchen and bathroom remodel, no change to plumbing fixture count. replace 2 non street facing windows with new vinyl windows.Details
interior remodel of unit 2328 including kitchen and bathroom remodel, no change to plumbing fixture count. replace 2 non street facing windows with new vinyl windows. | $45,000 |
| May 28, 2025 | Completed final sign-off May 2026 | 275 Downey St | Kyle Gleason And Sons | revision to pa#202403067193. this scope only includes correction to title 24 calculations, raising the living room ceiling, reconstuction of interior and exterior stairs.Details
revision to pa#202403067193. this scope only includes correction to title 24 calculations, raising the living room ceiling, reconstuction of interior and exterior stairs. | $50,000 |
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 124 Teddy Av | Blue Birds Construction Inc | comply with nov 202431587. upper level unpermitted bathroom to be demolished, restored to last permitted condition. kichen countertop demolition only. no other work to be 124 teddyDetails
comply with nov 202431587. upper level unpermitted bathroom to be demolished, restored to last permitted condition. kichen countertop demolition only. no other work to be 124 teddy | |
| Jun 13, 2024 | Completed final sign-off Apr 2025 | 205 Elsie St | J R Home Remodeling Inc | interior remodel: remodel kitchen and two bathrooms, add one bathroom upstiars. add closets in upstairs bedrooms. replace two non street facing windows and infill one non-street facing window.Details
interior remodel: remodel kitchen and two bathrooms, add one bathroom upstiars. add closets in upstairs bedrooms. replace two non street facing windows and infill one non-street facing window. | $130,000 |
| Apr 25, 2024 | Completed final sign-off May 2026 | 275 Downey St | Kyle Gleason And Sons | interior remodel: remodel kitchen, add one and a half bathrooms, add two bedrooms, add laundry and mudroom, new finishes throughout. structural upgrades as required.replace all windows, street-facing windows wood for wood or aluminum-clad wood, simulated divided lite w/ dark spacer barDetails
interior remodel: remodel kitchen, add one and a half bathrooms, add two bedrooms, add laundry and mudroom, new finishes throughout. structural upgrades as required.replace all windows, street-facing windows wood for wood or aluminum-clad wood, simulated divided lite w/ dark spacer bar | $300,000 |
| Mar 21, 2024 | Completed final sign-off May 2024 | 811 San Jose Av | Five Star Plumbing & Rooter | to comply with nov 202418786. demo unpermitted street signage and restore building back to last permitted condition.Details
to comply with nov 202418786. demo unpermitted street signage and restore building back to last permitted condition. | $1,000 |
| Nov 9, 2023 | Completed final sign-off May 2024 | 231 Brookdale Av | Five Star Plumbing & Rooter | to comply with city planning complaint #2021-012457enf & ces nov#202185056. demo unpermitted addition on roof & restore building back to last permitted condition. reroof under separate permit.Details
to comply with city planning complaint #2021-012457enf & ces nov#202185056. demo unpermitted addition on roof & restore building back to last permitted condition. reroof under separate permit. | $1,000 |
| Oct 18, 2023 | Expired or cancelled withdrawn Nov 2023 | 3331 Lawton St | interior remodel - new bedroom & bathroom @ garage level, 400 s.f.Details
interior remodel - new bedroom & bathroom @ garage level, 400 s.f. | $25,000 | |
| Jul 14, 2023 | Completed final sign-off May 2024 | 276 28th St | David Edward Conroy | interior remodel. new primary bathroom. relocate (e) closet. relocate washer/dryer into new laundry closet.Details
interior remodel. new primary bathroom. relocate (e) closet. relocate washer/dryer into new laundry closet. | $25,000 |
| May 30, 2023 | Completed final sign-off Oct 2023 | 1384 Florida St | rear building: replace (e) gas heater for ductless mini-split heat pump system; half bathroom remodel: relocate sink, toilet, washer/dryer, hot water heater; new finishes throughoutDetails
rear building: replace (e) gas heater for ductless mini-split heat pump system; half bathroom remodel: relocate sink, toilet, washer/dryer, hot water heater; new finishes throughout | $30,000 | |
| Jan 4, 2023 | Completed final sign-off Apr 2023 | 254 Downey St | interior remodel, add shower to powder room, millwork storage under stairs. remodel bathroom, maintain rated assembly between units.Details
interior remodel, add shower to powder room, millwork storage under stairs. remodel bathroom, maintain rated assembly between units. | $4,000 | |
| Sep 16, 2022 | Completed final sign-off Mar 2023 | 212 Lexington St | J&J Dynamic Construction Inc | interior remodel: all bedrooms, living rooms, bathrooms, and kitchen. electrical and plumbing to be updated. replace all existing windows like for like with same dimensions, details and exterior materials.Details
interior remodel: all bedrooms, living rooms, bathrooms, and kitchen. electrical and plumbing to be updated. replace all existing windows like for like with same dimensions, details and exterior materials. | $80,000 |
| Jun 23, 2022 | Completed final sign-off May 2023 | 993 South Van Ness Av | unit #2: remodel living spaces, bathroom, and kitchen. electrical and plumbing to be updated.Details
unit #2: remodel living spaces, bathroom, and kitchen. electrical and plumbing to be updated. | $25,000 |