- Sep 2017 to Sep 2026
51 permits since 2000 (engineer on 51 permits): 29 completed, 18 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 1380 Noe St | Kyle Gleason And Sons | h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112Details
h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112 | $300,000 |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 1747 32nd Av | B-Side Inc. | new second floor deck and stair addition at the rear yard of the property.Details
new second floor deck and stair addition at the rear yard of the property. | $45,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 520 Chestnut St | Andrew Chekene Enterprises/ Dba Ac Enter | revision to pa 202510177628 unit 401 - added gas, plumbing, electrical and intemescent coating to steel beam surfaceDetails
revision to pa 202510177628 unit 401 - added gas, plumbing, electrical and intemescent coating to steel beam surface | $15,000 |
| Jan 21, 2026 | In progress filed Jan 2026, not yet issued | 556 Mississippi St | Esquivel Construction Inc | raise roof of (e) 3/f & add bathroom. convert 2/f bath to office, relocate laundry, remodel half-bath and add tub. reinforce g/f retaining walls.Details
raise roof of (e) 3/f & add bathroom. convert 2/f bath to office, relocate laundry, remodel half-bath and add tub. reinforce g/f retaining walls. | $225,000 |
| Dec 30, 2025 | In progress issued May 2026 | 633 Chestnut St | Roble Builders | 3rd flr remodel: infill lightwell, remodel kitchen, laundry, baths, convert bedroom to walk in closet.Details
3rd flr remodel: infill lightwell, remodel kitchen, laundry, baths, convert bedroom to walk in closet. | $180,000 |
| Dec 26, 2025 | In progress issued Dec 2025 | 99 Uranus Tr | revision 202307121953 to include update to handrail connection to remove welding special inspections. update structural details.Details
revision 202307121953 to include update to handrail connection to remove welding special inspections. update structural details. | ||
| Dec 22, 2025 | Completed final sign-off Apr 2026 | 2837 23rd St | E. N. A Construction Inc. | repair foundation at existing garage, work shop, storage space, trash room and bike storage.Details
repair foundation at existing garage, work shop, storage space, trash room and bike storage. | $10,000 |
| Nov 10, 2025 | Completed final sign-off Aug 2026 | 3440 20th St | B-Side Inc. | common area: structural wall repair. structural construction includes new studs, plywood and mudsill. nov# 202544910Details
common area: structural wall repair. structural construction includes new studs, plywood and mudsill. nov# 202544910 | $5,000 |
| Sep 24, 2025 | In progress issued Oct 2025 | 573 10th Av | Mario Sarmento | interior remodel of kitchen and bathrooms. new water heater & heat pump. replacing 3 windows & 1 door. demo (e) deck, build new deck with exterior stairs.Details
interior remodel of kitchen and bathrooms. new water heater & heat pump. replacing 3 windows & 1 door. demo (e) deck, build new deck with exterior stairs. | $75,000 |
| Sep 9, 2025 | In progress filed Sep 2025, not yet issued | 143 Chilton Av | Pristine Construction | detached new construction 252 sqft local adu with 70 sqft attic and 39 s.f. garage storage closet and 92 sqft deck in the rear yard of the main house. remove existing playhouse and pergola/patio. seperate permit for new pool.Details
detached new construction 252 sqft local adu with 70 sqft attic and 39 s.f. garage storage closet and 92 sqft deck in the rear yard of the main house. remove existing playhouse and pergola/patio. seperate permit for new pool. | $80,000 |
| Jun 30, 2025 | In progress filed Jun 2025, not yet issued | 22 Paloma Av | convert existing lower story storage into adu with new kitchen, 3 baths. replace exterior door with new egress window. comply with nov #201702661.Details
convert existing lower story storage into adu with new kitchen, 3 baths. replace exterior door with new egress window. comply with nov #201702661. | $50,000 | |
| Jun 19, 2025 | Completed final sign-off Jul 2026 | 12 Chattanooga St | Green Bay Remodeling Inc. | #b: 1)create a 61 ft closet for the master bedroom. 2)remove an existing and install a new window to the dining room. 3)install a new window in the closet. 4)install a skylight in the bathroom. 5)install new 2-zone mini-splitDetails
#b: 1)create a 61 ft closet for the master bedroom. 2)remove an existing and install a new window to the dining room. 3)install a new window in the closet. 4)install a skylight in the bathroom. 5)install new 2-zone mini-split | $88,915 |
| May 28, 2025 | Completed final sign-off May 2026 | 275 Downey St | Kyle Gleason And Sons | revision to pa#202403067193. this scope only includes correction to title 24 calculations, raising the living room ceiling, reconstuction of interior and exterior stairs.Details
revision to pa#202403067193. this scope only includes correction to title 24 calculations, raising the living room ceiling, reconstuction of interior and exterior stairs. | $50,000 |
| May 22, 2025 | In progress filed May 2025, not yet issued | 1483 26th Av | remodel of 1st & 2nd fl. infill roof area over atrium & install skylight. 1st/f: new bathroom, closet, office. 2nd/f: remodel bathroom & new stairwell.Details
remodel of 1st & 2nd fl. infill roof area over atrium & install skylight. 1st/f: new bathroom, closet, office. 2nd/f: remodel bathroom & new stairwell. | $75,000 | |
| Apr 29, 2025 | Completed final sign-off Dec 2025 | 639 Belvedere St | Urban Builder General Contracting Inc | 3/f: convert (e) single bath to (2) full baths. new stacked laundry closet. new shearwall. add new skylight and 1-hr rated parapet at roof level. voluntary framing upgrade at garage.Details
3/f: convert (e) single bath to (2) full baths. new stacked laundry closet. new shearwall. add new skylight and 1-hr rated parapet at roof level. voluntary framing upgrade at garage. | $85,000 |
| Feb 7, 2025 | Completed final sign-off Jun 2026 | 63 Walter St | Perez Construction Llc. | legalize (e) 3/f roof deck in rear yard within buildable area. new guardrail. legalize (e) steps to roof deck.Details
legalize (e) 3/f roof deck in rear yard within buildable area. new guardrail. legalize (e) steps to roof deck. | $30,000 |
| Dec 30, 2024 | Completed final sign-off Oct 2025 | 155 Connecticut St | Nima Construction | prop h:change of occupancy from b to e. remove non structural patitions, add ext door, replace windows inkind new toilets, sinks, kitchenette, partitions, deck & ramp (outdoor) new luxury vynil throughout, paint, interior & exteriorDetails
prop h:change of occupancy from b to e. remove non structural patitions, add ext door, replace windows inkind new toilets, sinks, kitchenette, partitions, deck & ramp (outdoor) new luxury vynil throughout, paint, interior & exterior | $250,000 |
| Dec 11, 2024 | Completed final sign-off May 2026 | 237 04th Av | Perez Construction Llc. | interior remodel: (n) family room, office, bath, laundry room at 1st floor. remodel kitchen and half bath at 2nd floor, remodel (2) baths at 3rd floor. shared plans w/ pa# 202411205361Details
interior remodel: (n) family room, office, bath, laundry room at 1st floor. remodel kitchen and half bath at 2nd floor, remodel (2) baths at 3rd floor. shared plans w/ pa# 202411205361 | $350,000 |
| Dec 11, 2024 | Completed final sign-off May 2026 | 237 04th Av | Perez Construction Llc. | infill at 2/f overhang and minor 1/f horizontal addition at rear yard. new roof deck at addition and exterior stair to rear yard; new exterior windows and doors at rear yard. shared plans w/ interior remodel, see pa# 202411205358.Details
infill at 2/f overhang and minor 1/f horizontal addition at rear yard. new roof deck at addition and exterior stair to rear yard; new exterior windows and doors at rear yard. shared plans w/ interior remodel, see pa# 202411205358. | $58,000 |
| Nov 19, 2024 | Completed final sign-off Jul 2026 | 1201 Ortega St | R E R Construction | 1611 sf pavilion in (e) courtyard (partial enclosure). new curtain wall and bifold doors at (e) lobby. demo planting beds/ new pavers set in sand. new egress path from ne corner of courtyard to 19th ave. mech and electrical under deferred permit.Details
1611 sf pavilion in (e) courtyard (partial enclosure). new curtain wall and bifold doors at (e) lobby. demo planting beds/ new pavers set in sand. new egress path from ne corner of courtyard to 19th ave. mech and electrical under deferred permit. | $400,000 |
| Nov 13, 2024 | In progress issued Jun 2026 | 2921 Balboa St | interior remodel of both 1st & 2nd floor with 1st floor infill below (e) 2nd story at the rear. removal of rear exterior stairs, new finishes & appliances included. new bath, kitchen & laundry.Details
interior remodel of both 1st & 2nd floor with 1st floor infill below (e) 2nd story at the rear. removal of rear exterior stairs, new finishes & appliances included. new bath, kitchen & laundry. | $150,000 | |
| Sep 30, 2024 | Completed final sign-off Sep 2025 | 22 Stanford Heights Av | Beyond The Horizon Construction | interior remodel of kitchen & bathroom per plans; remove non-permitted construction at 1st story, add primary bed & bathroom @ 1st fl; 1 new existing slider door, 1 new window, 1 new skylight; new shear wall wall, ceiling beam at removed load bearing kitchen wall & foundation. reinforcement s.s.d.Details
interior remodel of kitchen & bathroom per plans; remove non-permitted construction at 1st story, add primary bed & bathroom @ 1st fl; 1 new existing slider door, 1 new window, 1 new skylight; new shear wall wall, ceiling beam at removed load bearing kitchen wall & foundation. reinforcement s.s.d. | $150,000 |
| Aug 20, 2024 | In progress issued Sep 2024 | 284 Mallorca Wy | Bernal Hill Builders Inc | create new 250 sf roof deck accessed by new spiral stair replacing (e) spiral stairDetails
create new 250 sf roof deck accessed by new spiral stair replacing (e) spiral stair | $26,000 |
| Jul 30, 2024 | Expired or cancelled expired Nov 2025 | 1201 Ortega St | R E R Construction | new foundations for proposed courtyard canopy (no 202400636prj). add drainage and electrical conduits. finish slab under permit# 202406174654. no work above grade.Details
new foundations for proposed courtyard canopy (no 202400636prj). add drainage and electrical conduits. finish slab under permit# 202406174654. no work above grade. | |
| May 9, 2024 | Completed final sign-off Feb 2025 | 2610 Filbert St | Bjlgc Inc | replace e) deteriorated deck-n) deck will be construscted of pressure treated wood & rot resistant decking to improve safety & mitigation. cantiliver framing & braces for the side. replace deck in kind same size & locationDetails
replace e) deteriorated deck-n) deck will be construscted of pressure treated wood & rot resistant decking to improve safety & mitigation. cantiliver framing & braces for the side. replace deck in kind same size & location | $30,000 |
| Apr 25, 2024 | Completed final sign-off May 2026 | 275 Downey St | Kyle Gleason And Sons | interior remodel: remodel kitchen, add one and a half bathrooms, add two bedrooms, add laundry and mudroom, new finishes throughout. structural upgrades as required.replace all windows, street-facing windows wood for wood or aluminum-clad wood, simulated divided lite w/ dark spacer barDetails
interior remodel: remodel kitchen, add one and a half bathrooms, add two bedrooms, add laundry and mudroom, new finishes throughout. structural upgrades as required.replace all windows, street-facing windows wood for wood or aluminum-clad wood, simulated divided lite w/ dark spacer bar | $300,000 |
| Apr 17, 2024 | Completed final sign-off Jul 2024 | 1778 48th Av | Rt Quality Construction Services Inc | revision 202206236949 to change roof framing from tji to 2x8, change hdu to simpson strong tie ssb anchor bolts, change open cell spray foam to closed cell and change to title 24Details
revision 202206236949 to change roof framing from tji to 2x8, change hdu to simpson strong tie ssb anchor bolts, change open cell spray foam to closed cell and change to title 24 | |
| Mar 15, 2024 | In progress issued Jun 2024 | 4567 19th St | Upcycle Builders Inc. | revision to pa# 202002043484: addition of concrete shear wall on gridline 2, updates to the foundation along gridline. to be supported on hand dug piers, updates to the 3rd fl deck framing, updates to low roof framingDetails
revision to pa# 202002043484: addition of concrete shear wall on gridline 2, updates to the foundation along gridline. to be supported on hand dug piers, updates to the 3rd fl deck framing, updates to low roof framing | $20,000 |
| Nov 28, 2023 | Completed final sign-off Feb 2025 | 875 California St | Bjlgc Inc | ph2-rooftop remodel, new rooftop kitchen, pergola, sound system, fire table, parapet, raised deck area.Details
ph2-rooftop remodel, new rooftop kitchen, pergola, sound system, fire table, parapet, raised deck area. | $90,000 |
| Nov 14, 2023 | In progress issued Nov 2023 | 2509 Bryant St | Axel8 Construction | provide gas appliance fireplaces in 2 first story units 2509 & 2509a bryant st. ref pmw20231106418 - plum/mech. no change to approved unit sizes or location.Details
provide gas appliance fireplaces in 2 first story units 2509 & 2509a bryant st. ref pmw20231106418 - plum/mech. no change to approved unit sizes or location. | $10,000 |
| Nov 8, 2023 | Completed final sign-off Jun 2025 | 57 Joost Av | Mc Remodeling | remove (e) damaged rear decks. add (n) 155sqft rear deck accessible from upper lvl. add (n) 217sqft rear deck at grade lvl. repair dryrot at rear facade & replace siding in-kind. add (n) windows & doors at rear facade. convert grd lvl storage rm to 630 sqft gross conditioned secondary kitchenette...Details
remove (e) damaged rear decks. add (n) 155sqft rear deck accessible from upper lvl. add (n) 217sqft rear deck at grade lvl. repair dryrot at rear facade & replace siding in-kind. add (n) windows & doors at rear facade. convert grd lvl storage rm to 630 sqft gross conditioned secondary kitchenette... | $120,000 |
| Jul 18, 2023 | In progress issued Feb 2024 | 301 Lyon St | Tripalink Builders Llc | interior renovation to create 3 new condominium units exterior work includes: replacement in kind of windows where noted. alteration of 3rd story deck guardrail for code compliance. replacement of garage door w/ pedestrian door/garage door combination.Details
interior renovation to create 3 new condominium units exterior work includes: replacement in kind of windows where noted. alteration of 3rd story deck guardrail for code compliance. replacement of garage door w/ pedestrian door/garage door combination. | $2,000,000 |
| Jul 12, 2023 | In progress issued Jan 2024 | 99 Uranus Tr | 7x7 Construction | 1st flr: remodel (unit 2) bathroom, bedroom, kitchen remodel. remodel interior stair connection to garage from unit (unit 1). 2/f: remodel kitchen, skylight, and bedroom. new and replacement windows, doors, skylight. new plus replacement exterior windows and doors.Details
1st flr: remodel (unit 2) bathroom, bedroom, kitchen remodel. remodel interior stair connection to garage from unit (unit 1). 2/f: remodel kitchen, skylight, and bedroom. new and replacement windows, doors, skylight. new plus replacement exterior windows and doors. | $145,000 |
| May 17, 2023 | Completed final sign-off Dec 2023 | 4412 17th St | Level 21 Construction Company | 18' linear feet existing foundation replacement. new 74 sqft conditioned space addition in rear/drywall repair exterior siding repair/infill (e) doorway with new door new juliette balanies at(e) 2nd story rear doors fence repair at rear side.Details
18' linear feet existing foundation replacement. new 74 sqft conditioned space addition in rear/drywall repair exterior siding repair/infill (e) doorway with new door new juliette balanies at(e) 2nd story rear doors fence repair at rear side. | $27,000 |
| Dec 15, 2022 | Completed final sign-off Feb 2024 | 3141 Jackson St | revision to 202203250866 to add structural support and interior wall changes. no added height or mass, no ext changesDetails
revision to 202203250866 to add structural support and interior wall changes. no added height or mass, no ext changes | $500 | |
| Dec 5, 2022 | Completed final sign-off Dec 2022 | 208 Noe St | B-Side Inc. | add 2 skylights to roof. ref pa 201801118370.Details
add 2 skylights to roof. ref pa 201801118370. | |
| Aug 30, 2022 | Completed final sign-off Dec 2025 | 2509 Bryant St | Axel8 Construction | revision to bpa#201903145204 to provide for future work as approved by planning per #202/0921/4663.modified interior layout & windows,requesting exposure waiver for unit "e";elimination of shear wall @ grid line 4;(n)shear wall @ grid line 1.Details
revision to bpa#201903145204 to provide for future work as approved by planning per #202/0921/4663.modified interior layout & windows,requesting exposure waiver for unit "e";elimination of shear wall @ grid line 4;(n)shear wall @ grid line 1. | |
| Mar 25, 2022 | Completed final sign-off Feb 2024 | 3141 Jackson St | first story remodel: add bedroom, bath to habitable spacing unit above. include replacing damaged slab on grade and columns. replace front window with wood or alum. clad wood window per plan.Details
first story remodel: add bedroom, bath to habitable spacing unit above. include replacing damaged slab on grade and columns. replace front window with wood or alum. clad wood window per plan. | $75,000 | |
| Feb 4, 2022 | Completed final sign-off Oct 2022 | 300 Mangels Av | Red Rock Hill Construction Llc | remodel bathroom & kitchen. remove itnerior partition walls, new cabintry, finisehs, plumbing, electrical, & lighting. no expansion of building evnelop or work at front facade.Details
remodel bathroom & kitchen. remove itnerior partition walls, new cabintry, finisehs, plumbing, electrical, & lighting. no expansion of building evnelop or work at front facade. | $60,000 |
| Jan 10, 2022 | Completed final sign-off Oct 2024 | 628 29th St | Mario Sarmento | new concrete parking deck on pt joists with steel beams, fence and parking are not within front set back; fence is less than 10' high.Details
new concrete parking deck on pt joists with steel beams, fence and parking are not within front set back; fence is less than 10' high. | $50,000 |
| Nov 23, 2021 | Expired or cancelled withdrawn Jan 2022 | 628 29th St | Mario Sarmento | new concrete parking deck on pt joists with steel beams. fence and parking are not within the front setback. fence is less than 10' high.Details
new concrete parking deck on pt joists with steel beams. fence and parking are not within the front setback. fence is less than 10' high. | $50,000 |
| Nov 10, 2021 | Completed final sign-off Aug 2024 | 1457 23rd Av | Mario Sarmento | interior remodel: convert unconditioned garage to [n] living, kitchen, bath. add 27sf as downward infill@ garage level. infill two lightwells. remodel bedrooms & 3 baths on 2nd story. rebuild front steps in kind. relocate garage door.Details
interior remodel: convert unconditioned garage to [n] living, kitchen, bath. add 27sf as downward infill@ garage level. infill two lightwells. remodel bedrooms & 3 baths on 2nd story. rebuild front steps in kind. relocate garage door. | $250,000 |
| Sep 24, 2021 | In progress issued Nov 2023 | 4570 19th St | Cook Construction, Upcycle Builders Inc. | remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors.Details
remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors. | $409,937 |
| Sep 20, 2021 | Completed final sign-off Jul 2022 | 556 Mississippi St | Esquivel Construction Inc | remodel ktichen and bath, relocate laundry, replace(e) interior stair in kindDetails
remodel ktichen and bath, relocate laundry, replace(e) interior stair in kind | $120,000 |
| Mar 11, 2021 | Completed final sign-off Sep 2023 | 1014 Castro St | Level 21 Construction Company | remodeling kitchen, bathroom and dining room. adding bathroom and bedroom in (e) basement. excavating part of rear yeard for new 1st story access.Details
remodeling kitchen, bathroom and dining room. adding bathroom and bedroom in (e) basement. excavating part of rear yeard for new 1st story access. | $145,000 |
| Sep 2, 2020 | Completed final sign-off Dec 2022 | 208 Noe St | B-Side Inc. | revision to pa# 201801118370 s-1. revision to structural details & foundation.Details
revision to pa# 201801118370 s-1. revision to structural details & foundation. | |
| Jun 29, 2020 | In progress issued Sep 2024 | 20 Paloma Av | horizontal addition. add new basement storage, remodel of all stories, no change to occupancy or parking.Details
horizontal addition. add new basement storage, remodel of all stories, no change to occupancy or parking. | $500,000 | |
| Feb 18, 2020 | Completed final sign-off Jul 2025 | 1364 Union St | Terence Mcmahon Construction | add new clerestory sawtooth above extg entry, relocate extg skylight. partial remodel at extg kitchen. remodel extg guest and master bathroom. replace extg furnace.Details
add new clerestory sawtooth above extg entry, relocate extg skylight. partial remodel at extg kitchen. remodel extg guest and master bathroom. replace extg furnace. | $300,000 |
| Feb 6, 2020 | Completed final sign-off Nov 2023 | 232 Precita Av | D K G Construction Inc | remodel of (e) kitchen and 1(e) bath, 2(n) baths, and 1 (n) bedrm. excavate approx 138.8cu yards of soil at (e) basement for approx 932 sf of (n) living space.Details
remodel of (e) kitchen and 1(e) bath, 2(n) baths, and 1 (n) bedrm. excavate approx 138.8cu yards of soil at (e) basement for approx 932 sf of (n) living space. | $400,000 |
| Aug 16, 2019 | Never finaled issued Sep 2021, no final | 79 Uranus Tr | 1st fl:12x15 horizontal add'n. rear yard: add pool per sfpc 136(c)24(b). 3rd fl: demo (e) deck & rebuild 5' from lot line. interior remodel. 1st fl: (n) bedroom, bath & stair. 2nd fl: remodel kitchen/bath,entryhall, new deck.Details
1st fl:12x15 horizontal add'n. rear yard: add pool per sfpc 136(c)24(b). 3rd fl: demo (e) deck & rebuild 5' from lot line. interior remodel. 1st fl: (n) bedroom, bath & stair. 2nd fl: remodel kitchen/bath,entryhall, new deck. | $150,000 | |
| Sep 7, 2017 | Never finaled issued Jan 2023, no final | 432 Cortland Av | to erect 4-story new building, 3-dwelling units building with commercial on street level.Details
to erect 4-story new building, 3-dwelling units building with commercial on street level. | $1,150,000 |