Elias Horat
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Creates Cool
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Sep 2026
100 permits since 2000 (architect on 96 permits, authorized agent-others on 3 permits, designer on 1 permit, engineer on 1 permit): 50 completed, 39 in progress, 8 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 2921 Balboa St | revision to pa 202407237068, only revision to upade architectural floor height to match approved structural. no chane to structural, plumging and electricalDetails
revision to pa 202407237068, only revision to upade architectural floor height to match approved structural. no chane to structural, plumging and electrical | ||
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 1758 Buchanan St | interior remodel of (e) retail and office. removal of (1) exterior door. new non structural work, (n) break areas, (n) accessible restroom.Details
interior remodel of (e) retail and office. removal of (1) exterior door. new non structural work, (n) break areas, (n) accessible restroom. | $70,000 | |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 535 40th Av | interior remodel of sfh, remodel of kitchen,(n) bedroom, bathroom. (n) ground floor, no facade changes, window and door updates. remodel of (e) stair. ab112Details
interior remodel of sfh, remodel of kitchen,(n) bedroom, bathroom. (n) ground floor, no facade changes, window and door updates. remodel of (e) stair. ab112 | $300,000 | |
| Aug 20, 2026 | Completed final sign-off Sep 2026 | 824 Vallejo St | Future General Construction Inc | new interior partitions and door to enclose existing stair, only interior work, no structuralDetails
new interior partitions and door to enclose existing stair, only interior work, no structural | $5,000 |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 110 Corbett Av | interior remodel of 3 existing bathrooms, and 2 existing kitchen. no structural, new finishes and fixtures. no exterior changes. work in 108 abd 110 corbett ave.Details
interior remodel of 3 existing bathrooms, and 2 existing kitchen. no structural, new finishes and fixtures. no exterior changes. work in 108 abd 110 corbett ave. | $100,000 | |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 2543 29th Av | new bedroom and new bath in e garageDetails
new bedroom and new bath in e garage | $70,000 | |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 1035 South Van Ness Av | interior improvement of (e) residential townhouse unit. extend the (e) loft floor area and construct (n) bathroom and walk in closet at loft level to include (n) non bearing interior partitions, pluming and electrical work to be included and (n) guardrails and other ti improvments. no change of useDetails
interior improvement of (e) residential townhouse unit. extend the (e) loft floor area and construct (n) bathroom and walk in closet at loft level to include (n) non bearing interior partitions, pluming and electrical work to be included and (n) guardrails and other ti improvments. no change of use | $50,000 | |
| Jun 18, 2026 | In progress issued Jul 2026 | 2243 Mission St | Xspace Builder | revision to 202603248145. new rear parlor bar and millworkDetails
revision to 202603248145. new rear parlor bar and millwork | $15,000 |
| Jun 10, 2026 | In progress issued Jun 2026 | 880 Urbano Dr | One Contruction General Builders Inc | (e) kitchen remodel and add (n) half bathroomDetails
(e) kitchen remodel and add (n) half bathroom | $20,000 |
| Jun 5, 2026 | In progress issued Jun 2026 | 4490 Mission St | Future General Construction Inc | rev to pa# 2026-0430-0436 scope includes shelves and checkout counter. grocery, general use.Details
rev to pa# 2026-0430-0436 scope includes shelves and checkout counter. grocery, general use. | $5,000 |
| May 17, 2026 | In progress filed May 2026, not yet issued | 4348 21st St | (n) addition to home, into rear yard, (n) bedrooms, office and bathroom and (n) exterior patiosDetails
(n) addition to home, into rear yard, (n) bedrooms, office and bathroom and (n) exterior patios | $600,000 | |
| Apr 30, 2026 | Completed final sign-off May 2026 | 4490 Mission St | Future General Construction Inc | new utility sink in e) restroom, interior only. relocate exsiting gfi outlet to a new location.Details
new utility sink in e) restroom, interior only. relocate exsiting gfi outlet to a new location. | $400 |
| Apr 16, 2026 | Completed final sign-off May 2026 | 229 09th St | Mizen Construction Inc | new kitchen for bakery and coffee shop, new equipment, finishes and fixtures, no structural, no exterior work. revision to 202507110609Details
new kitchen for bakery and coffee shop, new equipment, finishes and fixtures, no structural, no exterior work. revision to 202507110609 | |
| Mar 24, 2026 | In progress issued Apr 2026 | 2243 Mission St | Xspace Builder | renovation of "e" restaurant and night time entertainment use. project will have new fixtures and new equipment. no structural work. new operator will undergo a cua. partial wiring (n) circuits, underground plumbing and updated bathroom plumbing.Details
renovation of "e" restaurant and night time entertainment use. project will have new fixtures and new equipment. no structural work. new operator will undergo a cua. partial wiring (n) circuits, underground plumbing and updated bathroom plumbing. | $250,000 |
| Mar 24, 2026 | In progress issued Apr 2026 | 425 Pacheco St | Fay Construction & Restoration Inc | renovation of (e) living room ceiling from flat to vaulted structural included, no change to exterior, no mepDetails
renovation of (e) living room ceiling from flat to vaulted structural included, no change to exterior, no mep | $20,000 |
| Mar 18, 2026 | In progress filed Mar 2026, not yet issued | 12 Mint Pz | legalization of interior remodel of an office space to a short term shared living project w/ individual sleeping pods, share bathroom, & kitchen space. change of use: retail sales & service (financial institution) to residential group housing. update (e) kitchen to full kitchen. no exterior changeDetails
legalization of interior remodel of an office space to a short term shared living project w/ individual sleeping pods, share bathroom, & kitchen space. change of use: retail sales & service (financial institution) to residential group housing. update (e) kitchen to full kitchen. no exterior change | $1,500 | |
| Feb 20, 2026 | In progress filed Feb 2026, not yet issued | 995 Market St | Via Construction | 5th fl: new gym space in (e) office. (n) showers, tub, sauna room, locker rooms.Details
5th fl: new gym space in (e) office. (n) showers, tub, sauna room, locker rooms. | $55,000 |
| Feb 6, 2026 | In progress issued Jun 2026 | 2226 Taraval St | 7 Hills Construction | installation of 2 bays and 1 puttview area. retail area. new non-structural partitions.Details
installation of 2 bays and 1 puttview area. retail area. new non-structural partitions. | $40,000 |
| Dec 9, 2025 | In progress filed Dec 2025, not yet issued | 175 Russ St | existing bathroom remodel, new finishes, and fixtures, new closetDetails
existing bathroom remodel, new finishes, and fixtures, new closet | $25,000 | |
| Dec 4, 2025 | Completed final sign-off Mar 2026 | 1318 Grant Av | renovation of e bar into new restaurant. project includes new plumbing and equipment. no structural work or electrical work.Details
renovation of e bar into new restaurant. project includes new plumbing and equipment. no structural work or electrical work. | $12,000 | |
| Dec 4, 2025 | In progress issued Feb 2026 | 220 Ofarrell St | no work to be completed, admim permit is to change of use per commercial permitting services & support sf permit center (see email attached)Details
no work to be completed, admim permit is to change of use per commercial permitting services & support sf permit center (see email attached) | ||
| Nov 13, 2025 | In progress issued Dec 2025 | 801 Columbus Av | Edgewood Construction & Home Repair | revision to 202403198154, minor restroom changes. changing which (e) restroom is accessible one. revert (e) rr 102b + 102c to (e) conditions, not accessible. make 102a accessible by all units.Details
revision to 202403198154, minor restroom changes. changing which (e) restroom is accessible one. revert (e) rr 102b + 102c to (e) conditions, not accessible. make 102a accessible by all units. | |
| Nov 13, 2025 | In progress filed Nov 2025, not yet issued | 2667 21st St | new bathroom in garage and sesmic upgraded.Details
new bathroom in garage and sesmic upgraded. | $20,000 | |
| Oct 14, 2025 | Completed final sign-off Aug 2026 | 1338 28th Av | Paul O'driscoll Inc | revision to (e) permit# 202308315751: remove (e) post and replace (e) deteriorated concrete foundation in kind on the ground floor.Details
revision to (e) permit# 202308315751: remove (e) post and replace (e) deteriorated concrete foundation in kind on the ground floor. | $25,000 |
| Oct 7, 2025 | In progress filed Oct 2025, not yet issued | 153 Divisadero St | remodel bathroom, closet and new floors. replace kitchen lighting. replace one window in kind.Details
remodel bathroom, closet and new floors. replace kitchen lighting. replace one window in kind. | $50,000 | |
| Oct 2, 2025 | Completed final sign-off Mar 2026 | 2058 45th Av | Kag Designs And Construction Llc | revision - minor interior change to smaller closet and legal bedroomDetails
revision - minor interior change to smaller closet and legal bedroom | |
| Jul 15, 2025 | In progress issued Jul 2026 | 740 Washington St | change of occupancy and use. interior remodel for proposed restaurant at first floor and basement levels. including exterior work for front entry at first level. accessible sidewalk entrance into existing retail space under previously approved permit # 2023-0929-7718.Details
change of occupancy and use. interior remodel for proposed restaurant at first floor and basement levels. including exterior work for front entry at first level. accessible sidewalk entrance into existing retail space under previously approved permit # 2023-0929-7718. | $450,000 | |
| Jul 11, 2025 | Completed final sign-off May 2026 | 229 09th St | Mizen Construction Inc | t.i. new kitchen for bakery and coffee shop. new equipment, finishes and fixtures. no structural or exterior work. mep deferred.Details
t.i. new kitchen for bakery and coffee shop. new equipment, finishes and fixtures. no structural or exterior work. mep deferred. | $60,000 |
| Jun 26, 2025 | In progress issued Jul 2025 | 2863 Union St | Kag Designs And Construction Llc | revision #3 to pa 202406214986 bathroom changes, interior door changes, storage room changes. no change on plumbing fixtures!Details
revision #3 to pa 202406214986 bathroom changes, interior door changes, storage room changes. no change on plumbing fixtures! | |
| Jun 26, 2025 | Completed final sign-off Dec 2025 | 706 Foerster St | Greenport Construction Inc | convert existing closet to bedroom on 2nd fl, no exterior work, no structural workDetails
convert existing closet to bedroom on 2nd fl, no exterior work, no structural work | $5,000 |
| Jun 25, 2025 | In progress issued Jun 2025 | 1420 Sloat Bl | Kag Designs And Construction Llc | revision to pa 2025-0509-6149 remove scope of stair and new half bath. keep both (e). remove window at rearDetails
revision to pa 2025-0509-6149 remove scope of stair and new half bath. keep both (e). remove window at rear | |
| Jun 25, 2025 | In progress issued Jun 2025 | 2851 Union St | Doyle Developments | revision to pa #202412197139. removal of existing wall, updated structural, new kitchen layout. removal of mech room, new washer and dryer in unit. demo existing fire placeDetails
revision to pa #202412197139. removal of existing wall, updated structural, new kitchen layout. removal of mech room, new washer and dryer in unit. demo existing fire place | |
| Jun 25, 2025 | Completed final sign-off Oct 2025 | 145 Divisadero St | Kag Designs And Construction Llc | interior remodel of (e) office, new loft and built in storage, (n) electrical, no structural or exterior workDetails
interior remodel of (e) office, new loft and built in storage, (n) electrical, no structural or exterior work | $15,000 |
| Jun 12, 2025 | Completed final sign-off Sep 2025 | 396 Harrison St | 7 Hills Construction | restaurant remodel, interior non structural partitions, new millwork, new equipmentDetails
restaurant remodel, interior non structural partitions, new millwork, new equipment | $60,000 |
| May 30, 2025 | Completed final sign-off Jan 2026 | 2234 California St | Greenport Construction Inc, Kag Designs And Construction Llc | unit b: e) pantry to be turned into new bathroom & laundry.Details
unit b: e) pantry to be turned into new bathroom & laundry. | $20,000 |
| May 29, 2025 | Completed final sign-off Feb 2026 | 1001 Ulloa St | Deleon Builders Inc | interior in kind remodel of kitchen and baths at 2nd flDetails
interior in kind remodel of kitchen and baths at 2nd fl | $60,000 |
| May 9, 2025 | In progress issued May 2025 | 1420 Sloat Bl | Kag Designs And Construction Llc | interior remodel of non structural partitions, moved powder room, new pantry, kitchen and bath remodels, (e) window replacement in kind on facade. aluminum clad wood for front 2 windows, replace 4 side/rear windows as wellDetails
interior remodel of non structural partitions, moved powder room, new pantry, kitchen and bath remodels, (e) window replacement in kind on facade. aluminum clad wood for front 2 windows, replace 4 side/rear windows as well | $100,000 |
| May 8, 2025 | Completed final sign-off Jul 2026 | 1240 11th Av | Canseco Construction Corp | interior remodel to bathroom & add new bathroom. no structural work. work only in 1240 11th ave.Details
interior remodel to bathroom & add new bathroom. no structural work. work only in 1240 11th ave. | $60,000 |
| Apr 29, 2025 | In progress issued May 2025 | 2863 Union St | Kag Designs And Construction Llc | 2nd revision to pa #202406214986. revise kitchen and bathroom layouts, new interior doors to new closet. washer and dryer change of location. new wall in garage for storage room. no structural or plumbing changes.Details
2nd revision to pa #202406214986. revise kitchen and bathroom layouts, new interior doors to new closet. washer and dryer change of location. new wall in garage for storage room. no structural or plumbing changes. | |
| Apr 24, 2025 | Completed final sign-off Nov 2025 | 3562 Sacramento St | Future General Construction Inc | interior renovation (t.i.) of one commercial unit, new furniture, fixtures, non structural partitions and new sinkDetails
interior renovation (t.i.) of one commercial unit, new furniture, fixtures, non structural partitions and new sink | $10,000 |
| Jan 9, 2025 | Completed final sign-off Mar 2026 | 2058 45th Av | Kag Designs And Construction Llc | interior remodel adding new office and bathroom in existing garage space. removal of upstairs structural wall. convert 170 sqft uncondition to conditioned space.Details
interior remodel adding new office and bathroom in existing garage space. removal of upstairs structural wall. convert 170 sqft uncondition to conditioned space. | $60,000 |
| Jan 3, 2025 | In progress issued Jan 2025 | 2863 Union St | Kag Designs And Construction Llc | rev 202406214986- update washer and dryer location, (n) kitchen layout and interior door changes.Details
rev 202406214986- update washer and dryer location, (n) kitchen layout and interior door changes. | |
| Dec 19, 2024 | In progress issued Mar 2025 | 2851 Union St | Doyle Developments | complete remodel of (e) unit. new structural footing & floor framing. new rear windows and doors. remodel of kitchen and bath. add a bedroom. scope is rear grade/first level unit.Details
complete remodel of (e) unit. new structural footing & floor framing. new rear windows and doors. remodel of kitchen and bath. add a bedroom. scope is rear grade/first level unit. | $100,000 |
| Dec 13, 2024 | Completed final sign-off Sep 2025 | 2853 Union St | Boss Construction Inc. | kitchen and bath remodel, new washer and dryerDetails
kitchen and bath remodel, new washer and dryer | $20,000 |
| Dec 4, 2024 | Completed final sign-off Dec 2025 | 6275 03rd St | Deleon Builders Inc | interior remodel of liquor store to sandwich shop. to comply with health violation #1700Details
interior remodel of liquor store to sandwich shop. to comply with health violation #1700 | $60,000 |
| Nov 13, 2024 | Completed final sign-off Jul 2025 | 1154 Eddy St | Ayala Builder's And Company Inc | unit c - interior renovation of condo. remodel includes kitchen and bath new millwork finishes and fixtures. no exterior or structural workDetails
unit c - interior renovation of condo. remodel includes kitchen and bath new millwork finishes and fixtures. no exterior or structural work | $60,000 |
| Nov 13, 2024 | In progress issued Jun 2026 | 2921 Balboa St | interior remodel of both 1st & 2nd floor with 1st floor infill below (e) 2nd story at the rear. removal of rear exterior stairs, new finishes & appliances included. new bath, kitchen & laundry.Details
interior remodel of both 1st & 2nd floor with 1st floor infill below (e) 2nd story at the rear. removal of rear exterior stairs, new finishes & appliances included. new bath, kitchen & laundry. | $150,000 | |
| Sep 20, 2024 | In progress filed Sep 2024, not yet issued | 143 The Embarcadero | installation of a third temporary padel court in the plaza.Details
installation of a third temporary padel court in the plaza. | $60,000 | |
| Sep 20, 2024 | In progress filed Sep 2024, not yet issued | 137 Santa Rosa Av | conversion of first floor level to include (n) bathroom, wet bar, appliances and millwork. no structrual or exterior work . converting (e) garage space to condition living space (685sf). partial demo of non sturctural partition and stairs.Details
conversion of first floor level to include (n) bathroom, wet bar, appliances and millwork. no structrual or exterior work . converting (e) garage space to condition living space (685sf). partial demo of non sturctural partition and stairs. | $60,000 | |
| Sep 13, 2024 | Completed final sign-off Jul 2025 | 1075 Fell St | interior remodel of laundry/mechanical rm to half bathroom w/ laundry closet. no exterior/ strutural work with laundry closetDetails
interior remodel of laundry/mechanical rm to half bathroom w/ laundry closet. no exterior/ strutural work with laundry closet | $10,000 | |
| Sep 10, 2024 | In progress issued Feb 2026 | 1575 17th Av | O'shea Co. Home Grown Construction | turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from living room and closing off front entry stairs to be interior.Details
turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from living room and closing off front entry stairs to be interior. | $150,000 |
| Sep 3, 2024 | In progress filed Sep 2024, not yet issued | 1237 De Haro St | no change to existing footprint. existing front exterior stairs replacement. non structural, includes exterior finishes and waterproofing only.Details
no change to existing footprint. existing front exterior stairs replacement. non structural, includes exterior finishes and waterproofing only. | $20,000 | |
| Aug 27, 2024 | Completed final sign-off Mar 2025 | 3141 16th St | Leafair Construction | interior remodel of 1st floor restaurant. scope includes front and back of house spaces. new flushes, fixtures and electrical. no structural workDetails
interior remodel of 1st floor restaurant. scope includes front and back of house spaces. new flushes, fixtures and electrical. no structural work | $30,000 |
| Aug 1, 2024 | Completed final sign-off Jan 2025 | 220 Richardson Av | revision to permit# 202208231102: scope is to change to a shower instead of tub. addition of a 30" parapet wall on roof property line wall - 16 ft due to skylights being within 5ft of wallDetails
revision to permit# 202208231102: scope is to change to a shower instead of tub. addition of a 30" parapet wall on roof property line wall - 16 ft due to skylights being within 5ft of wall | ||
| Jul 26, 2024 | Completed final sign-off Oct 2024 | 2863 Union St | Kag Designs And Construction Llc | exterior rear deck repair of second (less than 50%, inkind) and fourth floor decks (full) like to like repair.Details
exterior rear deck repair of second (less than 50%, inkind) and fourth floor decks (full) like to like repair. | $10,000 |
| Jun 21, 2024 | In progress issued Aug 2024 | 2863 Union St | Kag Designs And Construction Llc | unit 2861: interior remodel of ground level studio unit; making (e) storage new conditioned space and new office. remodel of (e) bathroom, and remodel of (e) kitchen.Details
unit 2861: interior remodel of ground level studio unit; making (e) storage new conditioned space and new office. remodel of (e) bathroom, and remodel of (e) kitchen. | $50,000 |
| May 14, 2024 | Completed final sign-off Jul 2024 | 2133 Lincoln Wy | Future General Construction Inc | new half bath and closet, only interior work, no demolition or structural work.Details
new half bath and closet, only interior work, no demolition or structural work. | $10,000 |
| Mar 19, 2024 | In progress issued Dec 2024 | 801 Columbus Av | Edgewood Construction & Home Repair | to comply w/ nov 202316135: removal of unpermitted work including showers, stoves in commercial space 100a, 100b, 100c. to comply w/ planning enforcement: 2023-003827enf. new door opener at entry for accessibility.Details
to comply w/ nov 202316135: removal of unpermitted work including showers, stoves in commercial space 100a, 100b, 100c. to comply w/ planning enforcement: 2023-003827enf. new door opener at entry for accessibility. | $20,000 |
| Mar 19, 2024 | Completed final sign-off Feb 2025 | 1720 Polk St | Hong's Custom Builders Pc | revision to pa# 202311160921. new scope includes demolition of non-structural partition.Details
revision to pa# 202311160921. new scope includes demolition of non-structural partition. | |
| Jan 19, 2024 | In progress issued Sep 2025 | 834 Green St | legalize (e)undocumented dwelling unit at 1st flr of front bldg, into an adu. inclds the alteration of the (e)undocumented unit to bring the unit into code compliance as an adu. no changes to the rear bldg or upper floors of the front bldg. (n)applicances + (n) nfpa 13 sprinklers at ground floor.Details
legalize (e)undocumented dwelling unit at 1st flr of front bldg, into an adu. inclds the alteration of the (e)undocumented unit to bring the unit into code compliance as an adu. no changes to the rear bldg or upper floors of the front bldg. (n)applicances + (n) nfpa 13 sprinklers at ground floor. | $20,000 | |
| Nov 16, 2023 | Completed final sign-off Feb 2025 | 1720 Polk St | Hong's Custom Builders Pc | interior renovation of an (e) donut and pastry shop into a new donut and pastry shop in addition to new cooking equipment. project includes interior improvements including finishes, equipment and exterior details. project includes necessary documentation for accessibility.Details
interior renovation of an (e) donut and pastry shop into a new donut and pastry shop in addition to new cooking equipment. project includes interior improvements including finishes, equipment and exterior details. project includes necessary documentation for accessibility. | $100,000 |
| Nov 2, 2023 | In progress filed Nov 2023, not yet issued | 354 Crescent Av | legalization of a ground level unit of an (e) duplex. project includes legalizing a 2 bedroom unit without changing the upper 2 units of the duplex.Details
legalization of a ground level unit of an (e) duplex. project includes legalizing a 2 bedroom unit without changing the upper 2 units of the duplex. | $5,000 | |
| Nov 2, 2023 | Completed final sign-off Dec 2023 | 1675 Eddy St | Future General Construction Inc | #308: adding in a washer and dryer into a condo unit.Details
#308: adding in a washer and dryer into a condo unit. | $7,000 |
| Oct 13, 2023 | Completed final sign-off Jul 2025 | 1426 39th Av | Zhongwei Construction | interior remodel of ground floor addition of bathroom, laundry and office. demolition of non-structural partitions. 2nd floor nic. the rear is modified new doors and windowsDetails
interior remodel of ground floor addition of bathroom, laundry and office. demolition of non-structural partitions. 2nd floor nic. the rear is modified new doors and windows | $60,000 |
| Sep 29, 2023 | In progress issued Nov 2023 | 740 Washington St | Success Construction ***See Notes*** | to comply w/abe per ordinance 51-16, abe#202306137562, create accessible entry into retail spaceDetails
to comply w/abe per ordinance 51-16, abe#202306137562, create accessible entry into retail space | $7,000 |
| Sep 22, 2023 | Completed final sign-off Mar 2024 | 651 37th Av | Future General Construction Inc | interior remodel of existing house. new mudroom on 1st fl. 2.5 bathroom remodel. non structural partition removal and additions.Details
interior remodel of existing house. new mudroom on 1st fl. 2.5 bathroom remodel. non structural partition removal and additions. | $60,000 |
| Sep 8, 2023 | Never finaled issued Sep 2023, no final | 143 The Embarcadero | Pinnacle Installations, Inc. | installation of temporary padel courts on top of existing plaza. project at embarcadero plaza. sept '23 to jul '24.Details
installation of temporary padel courts on top of existing plaza. project at embarcadero plaza. sept '23 to jul '24. | $40,000 |
| Aug 31, 2023 | Completed final sign-off Aug 2026 | 1338 28th Av | Paul O'driscoll Inc | exterior addition & interior revovation. 2 story rear addition comprised of bedrm w/ windows & stair to 2nd story. renovate kitchen, bathrm, (n) interior stairwell & ground flr space. (n) skylight.Details
exterior addition & interior revovation. 2 story rear addition comprised of bedrm w/ windows & stair to 2nd story. renovate kitchen, bathrm, (n) interior stairwell & ground flr space. (n) skylight. | $300,000 |
| Aug 9, 2023 | Completed final sign-off Nov 2023 | 271 Francisco St | 7 Hills Construction | change of use from baking school to bakery and retail space. new equipment and finishes.Details
change of use from baking school to bakery and retail space. new equipment and finishes. | $15,000 |
| Jul 24, 2023 | Never finaled filed Jul 2023, never issued | 3338 San Bruno Av | to erect a 3-story/type vb, two-unit residential building plus state adu on vacant lot.Details
to erect a 3-story/type vb, two-unit residential building plus state adu on vacant lot. | $2,000,000 | |
| Jun 30, 2023 | Never finaled filed Jun 2023, never issued | 108 Corbett Av | addition of an adu in the currently vacant basementDetails
addition of an adu in the currently vacant basement | $150,000 | |
| Jun 12, 2023 | Completed final sign-off Aug 2023 | 58 Havelock St | Mireles Construction Inc | rev to pa202009011968: only change of rear guardrail type.Details
rev to pa202009011968: only change of rear guardrail type. | |
| Jun 8, 2023 | Completed final sign-off Aug 2024 | 121 06th Av | Hang C Construction Inc | renovation of 2/f unit. inner wall partitions rearraged to open up the living spaces. outer walls are left as is. remodel (e) kitchen, 2 bathrooms.Details
renovation of 2/f unit. inner wall partitions rearraged to open up the living spaces. outer walls are left as is. remodel (e) kitchen, 2 bathrooms. | $250,000 |
| Jun 8, 2023 | Completed final sign-off Aug 2023 | 58 Havelock St | Mireles Construction Inc | revision of pa# 202210063858. new structural details. removal and replacement of front stair. finishes to remain per previous approval.Details
revision of pa# 202210063858. new structural details. removal and replacement of front stair. finishes to remain per previous approval. | |
| May 4, 2023 | Completed final sign-off Aug 2023 | 701 Haight St | Alsterlind Construction Inc. | revision to permit 202212218839. changes include new accessible seat location, and new basement door location.Details
revision to permit 202212218839. changes include new accessible seat location, and new basement door location. | |
| Apr 12, 2023 | Completed final sign-off May 2023 | 4625 Mission St | Future General Construction Inc | revision to bpa#202302272646, add food prep sink to sculleryDetails
revision to bpa#202302272646, add food prep sink to scullery | |
| Mar 3, 2023 | Never finaled issued Aug 2023, no final | 6304 Geary Bl | Shao Fat Construction Inc | to comply with nov # 202297048, interior remodel including new partition for massage rooms entry upgrade to be ascssible, new plumbing and electricalDetails
to comply with nov # 202297048, interior remodel including new partition for massage rooms entry upgrade to be ascssible, new plumbing and electrical | $80,000 |
| Feb 27, 2023 | Completed final sign-off May 2023 | 4625 Mission St | Future General Construction Inc | interior remodel of e office space. change of use to bar.Details
interior remodel of e office space. change of use to bar. | $80,000 |
| Jan 30, 2023 | Completed final sign-off Mar 2024 | 109 Porter St | M & L Construction | new backyard deck w/ stairs and guard, demo of existing 2nd flr door, replaced w/ new doors that connect to the new deck.Details
new backyard deck w/ stairs and guard, demo of existing 2nd flr door, replaced w/ new doors that connect to the new deck. | $20,000 |
| Jan 19, 2023 | Completed final sign-off May 2024 | 2027 Market St | The Frame Construction | unit 12: removal/replacement of (e) loft, to be larger, new ladder stairs & railing. interior work only.Details
unit 12: removal/replacement of (e) loft, to be larger, new ladder stairs & railing. interior work only. | $20,000 |
| Dec 21, 2022 | Completed final sign-off Aug 2023 | 701 Haight St | Alsterlind Construction Inc. | interior renovation of an (e) restaurant/bar. new millwork and furniture added, including new bars, booths, tables. bathrooms modified, and new interior partitions for the new kitchen area.Details
interior renovation of an (e) restaurant/bar. new millwork and furniture added, including new bars, booths, tables. bathrooms modified, and new interior partitions for the new kitchen area. | $150,000 |
| Dec 15, 2022 | Expired or cancelled withdrawn Jun 2024 | 87 Loomis St | demolition of rear un-permitted second floor to bring building back to original condition. no rear construction, no exterior work. to abate nov #202297506.Details
demolition of rear un-permitted second floor to bring building back to original condition. no rear construction, no exterior work. to abate nov #202297506. | $20,000 | |
| Nov 22, 2022 | Never finaled issued Dec 2022, no final | 701 Haight St | Alsterlind Construction Inc. | project includes only demoltion work. no new work to be completed. non structural partitions to be removed equipment and finishes throughout. no exterior work.Details
project includes only demoltion work. no new work to be completed. non structural partitions to be removed equipment and finishes throughout. no exterior work. | $10,000 |
| Oct 6, 2022 | Completed final sign-off Aug 2023 | 58 Havelock St | Mireles Construction Inc | removel of front stair finishes existing and proposed brick inkind replacement. no structural.Details
removel of front stair finishes existing and proposed brick inkind replacement. no structural. | $15,000 |
| Sep 7, 2022 | Completed final sign-off Aug 2023 | 58 Havelock St | Mireles Construction Inc | revision to 202206287304 stair location has changed from previous approved permit. new stair rear addition of main bldg.Details
revision to 202206287304 stair location has changed from previous approved permit. new stair rear addition of main bldg. | |
| Sep 1, 2022 | Completed final sign-off Aug 2024 | 281 Moultrie St | upgrade facade with pain, remove illegal shed like rear addition. add new windows and doors in rear of home. remove interior wall and remodel kitchen. added by dakota spycher - aluminum windows on front facade to match existing, wood siding to match existing.Details
upgrade facade with pain, remove illegal shed like rear addition. add new windows and doors in rear of home. remove interior wall and remodel kitchen. added by dakota spycher - aluminum windows on front facade to match existing, wood siding to match existing. | $80,000 | |
| Aug 23, 2022 | Completed final sign-off Jan 2025 | 220 Richardson Av | Ot Bay Builders Inc. | demolition of partitions, equipment, plumbing fixtures, windows & doors. new partitions, skylights, doors, plumbing fixtures, lighting fixtures & casework to be adde on 2n fl minor renovation in the garage. demolition of casework & equipment. new window & door to be added. lightwell infill.Details
demolition of partitions, equipment, plumbing fixtures, windows & doors. new partitions, skylights, doors, plumbing fixtures, lighting fixtures & casework to be adde on 2n fl minor renovation in the garage. demolition of casework & equipment. new window & door to be added. lightwell infill. | $50,000 |
| Jul 26, 2022 | Completed final sign-off Feb 2023 | 2028 Fillmore St | Winfield Building Group Dba C.W. Dillion | minor interior retail renovation. no change to exterior, fire safety, plumbing or mechanical. millwork and non structural partitions to be removed. new partitions, millwork and lighting to be added.Details
minor interior retail renovation. no change to exterior, fire safety, plumbing or mechanical. millwork and non structural partitions to be removed. new partitions, millwork and lighting to be added. | $70,000 |
| Jun 29, 2022 | Completed final sign-off Jan 2024 | 2367 37th Av | Bay Remodels | renovation of bathrooms, kitchen, and adding/removing interior partitions to open up interior space. removal and addition of interior stairs, and new skylight. new doors and windows on rear of building. infill lightwell against a blank wall.Details
renovation of bathrooms, kitchen, and adding/removing interior partitions to open up interior space. removal and addition of interior stairs, and new skylight. new doors and windows on rear of building. infill lightwell against a blank wall. | $150,000 |
| May 3, 2022 | Never finaled filed May 2022, never issued | 2652 Mcallister St | this project involves the addition of a deck to the existing building. new doors on rear of the building to access the deck.Details
this project involves the addition of a deck to the existing building. new doors on rear of the building to access the deck. | $150,000 | |
| Apr 26, 2022 | Never finaled filed Apr 2022, never issued | 51 Noe St | this project involves the demolition of the rear exterior staircases. new exterior stairs to be added to the rear as well as a new door.Details
this project involves the demolition of the rear exterior staircases. new exterior stairs to be added to the rear as well as a new door. | $40,000 | |
| Apr 26, 2022 | Completed final sign-off Jan 2023 | 2667 21st St | Future General Construction Inc | renovation of 2/f & 3/f kitchens. remodel 3/f bathroom. 3/f ktichen to add and remoe non-structural partiions, doors, fixtures and finishes.Details
renovation of 2/f & 3/f kitchens. remodel 3/f bathroom. 3/f ktichen to add and remoe non-structural partiions, doors, fixtures and finishes. | $40,000 |
| Apr 12, 2022 | Completed final sign-off Mar 2023 | 650 02nd St | Pointy Construction Inc | unit #403: remodel of bathroom and kitchen, additon of storage and soffit, new cabintry, fixtures and finishesDetails
unit #403: remodel of bathroom and kitchen, additon of storage and soffit, new cabintry, fixtures and finishes | $30,000 |
| Mar 24, 2022 | Completed final sign-off Nov 2022 | 433 Pacheco St | Custom Built By Crawford Inc | existing fixtures and finishes to be removed in kitchen and 2 bathrooms. doors, windows, and partitions to be removed. new cabinets, doors, window and fixtures to be added.Details
existing fixtures and finishes to be removed in kitchen and 2 bathrooms. doors, windows, and partitions to be removed. new cabinets, doors, window and fixtures to be added. | $68,000 |
| Mar 9, 2022 | In progress issued Aug 2024 | 2759 40th Av | Atlas General Construction | home addition to (e) residence and addition of a legal adu in (e) garage space. home is to extend out 10 ft into rear yard. project includes demo of (e) walls, windows, doors & partitions. new rooms, adu, living space, kitchen space and balcony to be added.Details
home addition to (e) residence and addition of a legal adu in (e) garage space. home is to extend out 10 ft into rear yard. project includes demo of (e) walls, windows, doors & partitions. new rooms, adu, living space, kitchen space and balcony to be added. | $200,000 |
| Aug 27, 2021 | Never finaled issued Nov 2021, no final | 51 Noe St | this project includes the demolition of an entry gate, window, and wall. new siding details added to the facade. beatification project to return facade to original aesthetic.minor ductwork and repair.Details
this project includes the demolition of an entry gate, window, and wall. new siding details added to the facade. beatification project to return facade to original aesthetic.minor ductwork and repair. | $15,000 | |
| Aug 11, 2021 | Completed final sign-off Jul 2022 | 411 Panorama Dr | Future General Construction Inc | addition of deck and stair on rear of building and remove of extg window and replace with new door.Details
addition of deck and stair on rear of building and remove of extg window and replace with new door. | $30,000 |
| Jul 13, 2021 | Completed final sign-off Jul 2022 | 1111 Oak St | Advantage Roofing (See Notes) | reroofing - (e) roofing to be removed and replaced. no floor plan changes, only new shingles on the roof. replace all aluminum valley flashing, eaz metal, and rake flashing with new copper flashing.Details
reroofing - (e) roofing to be removed and replaced. no floor plan changes, only new shingles on the roof. replace all aluminum valley flashing, eaz metal, and rake flashing with new copper flashing. | $30,000 |
| May 24, 2021 | Expired or cancelled expired Feb 2025 | 2701 Folsom St | Hugo Tejada/Dba Alpha & Omega Renovation | existing retail space to be turned into preschool. project includes addition of break area, cabinets, plumbing fixtures, and non structural partitions (29 students)Details
existing retail space to be turned into preschool. project includes addition of break area, cabinets, plumbing fixtures, and non structural partitions (29 students) | $18,000 |
| Oct 15, 2019 | Expired or cancelled withdrawn Feb 2024 | 45 Fremont St | Sc Builders, Inc | 27th floor:demolition of non-structural partitions, ceilings & finishes. construction of non structural partitions, ceilings, door frames/hardware, millwork, drywallk, acoustic ceiling grid, finshes, mechanical, electrical & plmg. fire sprinkler and life safty under defered submittal. n/a for maherDetails
27th floor:demolition of non-structural partitions, ceilings & finishes. construction of non structural partitions, ceilings, door frames/hardware, millwork, drywallk, acoustic ceiling grid, finshes, mechanical, electrical & plmg. fire sprinkler and life safty under defered submittal. n/a for maher | $3,500,000 |