Xspace Builder
- Based in
- Antioch
- On San Francisco permits
- Oct 2020 to Sep 2026
- Last 24 months
- 20 permits filed
48 permits since 2000: 34 completed, 8 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 5 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 1259 11th Av | revision to pa# 202608277305: to incorporate new w/d (stackable) at 2/fDetails
revision to pa# 202608277305: to incorporate new w/d (stackable) at 2/f | $3,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 1259 11th Av | unit 1: replace kitchen appliances like for like. remodel (2) bathrooms, like for like. relocate subpanel from closet to hallway. add 6 recessed lights at living room.Details
unit 1: replace kitchen appliances like for like. remodel (2) bathrooms, like for like. relocate subpanel from closet to hallway. add 6 recessed lights at living room. | $48,000 |
| Aug 13, 2026 | In progress issued Sep 2026 | 486 Arlington St | to comply w/ complaint 2026-60382: construct new shed & add 2 outlets & 1 receiver, new shed to be 10'x12', include 2 windows.Details
to comply w/ complaint 2026-60382: construct new shed & add 2 outlets & 1 receiver, new shed to be 10'x12', include 2 windows. | $18,862 |
| Jul 27, 2026 | Completed final sign-off Sep 2026 | 120 Webster St | unit#7: new appliances. new kitchen faucet. new vanity & sink at bathroom. no demo work.Details
unit#7: new appliances. new kitchen faucet. new vanity & sink at bathroom. no demo work. | $10,000 |
| Jun 18, 2026 | In progress issued Jul 2026 | 2243 Mission St | revision to 202603248145. new rear parlor bar and millworkDetails
revision to 202603248145. new rear parlor bar and millwork | $15,000 |
| Mar 24, 2026 | In progress issued Apr 2026 | 2243 Mission St | renovation of "e" restaurant and night time entertainment use. project will have new fixtures and new equipment. no structural work. new operator will undergo a cua. partial wiring (n) circuits, underground plumbing and updated bathroom plumbing.Details
renovation of "e" restaurant and night time entertainment use. project will have new fixtures and new equipment. no structural work. new operator will undergo a cua. partial wiring (n) circuits, underground plumbing and updated bathroom plumbing. | $250,000 |
| Mar 9, 2026 | In progress issued May 2026 | 252 Chattanooga St | construct new stucco-clad, wood stud wall about 5'8"x7'8" and associated concrete foundation to support new 400-amp electrical panels and meters in existing landscape area facing the street.Details
construct new stucco-clad, wood stud wall about 5'8"x7'8" and associated concrete foundation to support new 400-amp electrical panels and meters in existing landscape area facing the street. | $2,500 |
| Nov 12, 2025 | Completed final sign-off Jan 2026 | 2137 Grove St | #2137: add 2 (n)pocket doors at master bathroom & living room. install shear wall at bathroom. electrical and plumbing work for washer and dryerDetails
#2137: add 2 (n)pocket doors at master bathroom & living room. install shear wall at bathroom. electrical and plumbing work for washer and dryer | $4,600 |
| Oct 7, 2025 | In progress issued Dec 2025 | 486 Arlington St | renovation and small addition to incorporate (e) structure in rear yard into main residence. some demo, drainage, and foundation work included. (e) home is 1669 sf, increasing to 1776 sf. (e) structure permit under #200805131973 and 201302190415. increase garage door to 8'-0" wide.Details
renovation and small addition to incorporate (e) structure in rear yard into main residence. some demo, drainage, and foundation work included. (e) home is 1669 sf, increasing to 1776 sf. (e) structure permit under #200805131973 and 201302190415. increase garage door to 8'-0" wide. | $200,000 |
| Sep 24, 2025 | Completed final sign-off Mar 2026 | 1696 Hayes St | t.i. of an existing food & beverage space on ground floor of an existing residencial building: work to include new full and half height non-load bearing walls; new service counter; new finishes and new fixed/unfixed furniture; mechanical, electrical and plumbing under seperate permit.Details
t.i. of an existing food & beverage space on ground floor of an existing residencial building: work to include new full and half height non-load bearing walls; new service counter; new finishes and new fixed/unfixed furniture; mechanical, electrical and plumbing under seperate permit. | $150,000 |
| Sep 17, 2025 | Completed final sign-off Feb 2026 | 1012 Grant Av | remodel laundry room like for like in common area with safety shut off valve for gas dryerDetails
remodel laundry room like for like in common area with safety shut off valve for gas dryer | $12,000 |
| Sep 15, 2025 | In progress issued Sep 2025 | 48 Pond St | kitchen and bathroom work in kind in unit 50 pond street.Details
kitchen and bathroom work in kind in unit 50 pond street. | $60,000 |
| Jul 30, 2025 | Completed final sign-off Apr 2026 | 849 Valencia St | electrical, wall lettering, single faced. sign name as: international library of youth writing.Details
electrical, wall lettering, single faced. sign name as: international library of youth writing. | $20,000 |
| Jul 18, 2025 | Completed final sign-off Sep 2025 | 4035 26th St | unit 2: (1) kitchen and (1) bathroom remodel. install subpanel, rewire (2) outlets, switches and light. no adding or removing wallsDetails
unit 2: (1) kitchen and (1) bathroom remodel. install subpanel, rewire (2) outlets, switches and light. no adding or removing walls | $60,000 |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 455 Warren Dr | unit 11: kitchen and bathroom remodel. new electrical wiring for kitchen and bathroom. new shower valve, new faucet and toilet. no alteration of wall, window or door.Details
unit 11: kitchen and bathroom remodel. new electrical wiring for kitchen and bathroom. new shower valve, new faucet and toilet. no alteration of wall, window or door. | $65,000 |
| Feb 26, 2025 | Completed final sign-off May 2025 | 1259 11th Av | kitchen and bath remodel. tub to shower. elec subpanel relocate from closet to hallway.Details
kitchen and bath remodel. tub to shower. elec subpanel relocate from closet to hallway. | $37,500 |
| Jan 9, 2025 | Completed final sign-off Apr 2025 | 940 Guerrero St | to comply with nov: 202432079 item #1, #2. dry rot repair, partial demolition of exterior wall at 1st, 2nd and 3rd floors, redo framing wall repair stucco. work is located in the interior lightwellDetails
to comply with nov: 202432079 item #1, #2. dry rot repair, partial demolition of exterior wall at 1st, 2nd and 3rd floors, redo framing wall repair stucco. work is located in the interior lightwell | $50,000 |
| Oct 22, 2024 | Completed final sign-off May 2025 | 237 Fillmore St | commercial ti: replace kitchen flooring remove and replace dining room flooring (n) accessible sink in (e) accessible restroom. install (n) pizza oven (n) grease trap (n) mixerDetails
commercial ti: replace kitchen flooring remove and replace dining room flooring (n) accessible sink in (e) accessible restroom. install (n) pizza oven (n) grease trap (n) mixer | $98,500 |
| Oct 16, 2024 | Completed final sign-off Apr 2025 | 2154 Union St | change use (e) retail to exercise studio at 1st and 2nd fl. 1 full height partition w/doors on ground fl. 1 full height partition & full height partitions for shower & restroom stalls. renovate (e) restroom to be accessible w/shower & employee laundry. minor finish upgrades, millwork throughoutDetails
change use (e) retail to exercise studio at 1st and 2nd fl. 1 full height partition w/doors on ground fl. 1 full height partition & full height partitions for shower & restroom stalls. renovate (e) restroom to be accessible w/shower & employee laundry. minor finish upgrades, millwork throughout | $78,200 |
| Oct 9, 2024 | Completed final sign-off Dec 2024 | 3909 17th St | unit# 9: (1) kitchen remodel (1) bathroom remodel. electrical and plumbing, bathroom and kitchen (replace in kind). add new 60 amp subpanel.Details
unit# 9: (1) kitchen remodel (1) bathroom remodel. electrical and plumbing, bathroom and kitchen (replace in kind). add new 60 amp subpanel. | $68,000 |
| Aug 15, 2024 | Completed final sign-off Nov 2024 | 3909 17th St | kitchen remodeling, bathroom remodeling, electrical and plumbing for bathroom and kitchen. add new 60 amp sub panel. (replace in kind)Details
kitchen remodeling, bathroom remodeling, electrical and plumbing for bathroom and kitchen. add new 60 amp sub panel. (replace in kind) | $68,000 |
| Jul 2, 2024 | Completed final sign-off Mar 2025 | 3848 California St | residential interior remodel of (e) 2 story unit in (e) 3 story, 2 family bldg. demo of (e) partitions, restrooms and wet bar. (n) full height, non-rated partitions, relocation of restrooms, 1 (n) bedrooms, (1)(n) laundry room.Details
residential interior remodel of (e) 2 story unit in (e) 3 story, 2 family bldg. demo of (e) partitions, restrooms and wet bar. (n) full height, non-rated partitions, relocation of restrooms, 1 (n) bedrooms, (1)(n) laundry room. | $100,000 |
| Mar 28, 2023 | Completed final sign-off May 2023 | 4537 California St | unit#a: build new 45sqft storage, add 2 new outlets, 3 lights and 2 switches.Details
unit#a: build new 45sqft storage, add 2 new outlets, 3 lights and 2 switches. | $13,600 |
| Jan 18, 2023 | Completed final sign-off Mar 2023 | 56 Sanchez St | master bath remodel, electrical & plumbing work. no alteration of walls. size 9'x8'Details
master bath remodel, electrical & plumbing work. no alteration of walls. size 9'x8' | $17,000 |
| Jan 10, 2023 | Completed final sign-off Apr 2023 | 418 Union St | remodel kitchen, primary bath & guest bath: no wall demo like for likeDetails
remodel kitchen, primary bath & guest bath: no wall demo like for like | $44,500 |
| Dec 19, 2022 | Completed final sign-off May 2024 | 3138 Moraga St | revision to permit #202109077888. reduction of scope from (2) bath to (1) bath, double patio door to single door.Details
revision to permit #202109077888. reduction of scope from (2) bath to (1) bath, double patio door to single door. | |
| Oct 31, 2022 | Completed final sign-off Nov 2023 | 850 Rutland St | to comply w/bid nov#202183586 dated 12/27/2021 & eid complaint #202185679 dated 12/27/2021. remove all partition walls @ garage level, upgrade main electrical service.Details
to comply w/bid nov#202183586 dated 12/27/2021 & eid complaint #202185679 dated 12/27/2021. remove all partition walls @ garage level, upgrade main electrical service. | $6,500 |
| Sep 21, 2022 | Never finaled issued Sep 2022, no final | 295 31st Av | repair front stairs, in-kind. less than 50%.Details
repair front stairs, in-kind. less than 50%. | $2,500 |
| Sep 16, 2022 | Never finaled issued Sep 2022, no final | 1715 Buchanan St | repair dryrot above front door, left side stucco and molding repair. in kind. no interior workDetails
repair dryrot above front door, left side stucco and molding repair. in kind. no interior work | $1,500 |
| Sep 2, 2022 | Never finaled issued May 2023, no final | 418 Union St | the scope of the work is a change of use from a commercial retail space to an residential adu on the 1st floor per planning code section 207(c)(4).Details
the scope of the work is a change of use from a commercial retail space to an residential adu on the 1st floor per planning code section 207(c)(4). | $93,000 |
| Jul 18, 2022 | Completed final sign-off Nov 2022 | 3250 Ortega St | 6 windows replacement (4) street facingDetails
6 windows replacement (4) street facing | $2,500 |
| Jul 11, 2022 | Never finaled issued Aug 2023, no final | 418 Union St | remodel of unit 418b and storage room. window replacement at residential units. relocation and replacement of hvac equipment.Details
remodel of unit 418b and storage room. window replacement at residential units. relocation and replacement of hvac equipment. | $365,000 |
| May 17, 2022 | Completed final sign-off Sep 2022 | 3830 Divisadero St | to comply with bid nov#202289993. addendum to building bpa#202112083945, revision to (e) bathrooms: refinish surfaces, install new lights, new plumbing fixtures & finishes.Details
to comply with bid nov#202289993. addendum to building bpa#202112083945, revision to (e) bathrooms: refinish surfaces, install new lights, new plumbing fixtures & finishes. | $24,000 |
| Apr 14, 2022 | Completed final sign-off Jun 2022 | 1301 La Playa | unit 15: kitchen & bathroom remodel, relocate subpanel. vacancy sensor, led occupency sensor, work is like for like, unit no sprinkler.Details
unit 15: kitchen & bathroom remodel, relocate subpanel. vacancy sensor, led occupency sensor, work is like for like, unit no sprinkler. | $28,000 |
| Apr 14, 2022 | Completed final sign-off Jun 2022 | 1301 La Playa | unit 8: kitchen & bathroom remodel, relocate subpanel, replace (2) windows mx u factor 0.30. lighting led. work is like for like, unit no sprinkler.Details
unit 8: kitchen & bathroom remodel, relocate subpanel, replace (2) windows mx u factor 0.30. lighting led. work is like for like, unit no sprinkler. | $49,300 |
| Mar 4, 2022 | Never finaled issued Mar 2022, no final | 5501 California St | repair / replace exterior siding at front entire wall facing 17th ave. in kind to match existing. no structural changes to wall.Details
repair / replace exterior siding at front entire wall facing 17th ave. in kind to match existing. no structural changes to wall. | $2,500 |
| Feb 24, 2022 | Completed final sign-off Mar 2022 | 528 34th Av | administrative permit to correct the addres on issued pa 202104279404 from 526 34th av to "528 34th avenue"Details
administrative permit to correct the addres on issued pa 202104279404 from 526 34th av to "528 34th avenue" | |
| Jan 4, 2022 | Completed final sign-off Sep 2022 | 16 Saturn St | renovate on level 03 of 4 level, 2 unit residential building over garage. work includes: expansion & remodel of an (e) bathroom on the upper level. removal of (e) 2nd bathroom on upper level & replace w/ (n) walk in closet & (n) can lighting throughout.Details
renovate on level 03 of 4 level, 2 unit residential building over garage. work includes: expansion & remodel of an (e) bathroom on the upper level. removal of (e) 2nd bathroom on upper level & replace w/ (n) walk in closet & (n) can lighting throughout. | $28,000 |
| Dec 30, 2021 | Completed final sign-off Sep 2022 | 16 Saturn St | removal of (e) solarium on front elevation and replace with (n) large picture windowDetails
removal of (e) solarium on front elevation and replace with (n) large picture window | $12,000 |
| Dec 29, 2021 | Completed final sign-off Mar 2022 | 962 Corbett Av | remove balcony & door from 3rd floor,east elevation.Details
remove balcony & door from 3rd floor,east elevation. | $5,000 |
| Dec 8, 2021 | Completed final sign-off Sep 2022 | 3830 Divisadero St | #304: kitchen remodelDetails
#304: kitchen remodel | $18,500 |
| Nov 12, 2021 | Completed final sign-off Mar 2022 | 962 Corbett Av | front balcony repair. less than 50%. in kind.Details
front balcony repair. less than 50%. in kind. | $1,000 |
| Oct 7, 2021 | Completed final sign-off Dec 2021 | 821 Hampshire St | unit 821 only: kitchen, bathroom, livingroom and bedrooms remodeling. kitchen work- install sink top and base cabinet. install stove kitchen hood. replace washer and dryer at laundry room. rewire for electrical outlets and ceiling lights and relocate subpanels, relocate switch at bathroom.Details
unit 821 only: kitchen, bathroom, livingroom and bedrooms remodeling. kitchen work- install sink top and base cabinet. install stove kitchen hood. replace washer and dryer at laundry room. rewire for electrical outlets and ceiling lights and relocate subpanels, relocate switch at bathroom. | $31,000 |
| Jul 8, 2021 | Expired or cancelled cancelled Jan 2026 | 132 Beaumont Av | dryrot repair and paint at front of house, approx 50sf. all work in kindDetails
dryrot repair and paint at front of house, approx 50sf. all work in kind | $500 |
| May 25, 2021 | Completed final sign-off Jul 2021 | 73 Valparaiso St | one kitchen and one bathroom remodeling. add 60 amps to electric panel. no change to layout of walls & openings.Details
one kitchen and one bathroom remodeling. add 60 amps to electric panel. no change to layout of walls & openings. | $42,500 |
| Apr 27, 2021 | Completed final sign-off Mar 2022 | 526 34th Av | 1. kitchen remodeling - existing kitchen electrical and cabinets. 2. two hallway bathroom remodeling - remove & replace tiles, one tub & one shower. no structural work - no framing modificationDetails
1. kitchen remodeling - existing kitchen electrical and cabinets. 2. two hallway bathroom remodeling - remove & replace tiles, one tub & one shower. no structural work - no framing modification | $65,000 |
| Oct 21, 2020 | Completed final sign-off Jan 2021 | 201 Anzavista Av | replace sill and window casing of two windows in kind due to dry rot in the street facing side of the building. the windows are located on the floor above the garage existing aluminum proposed will be aluminumDetails
replace sill and window casing of two windows in kind due to dry rot in the street facing side of the building. the windows are located on the floor above the garage existing aluminum proposed will be aluminum | $500 |
| Oct 14, 2020 | Completed final sign-off Jan 2021 | 80 Palm Av | dry rot repair on exterior wall on second floor above garage on fire escape area. area to be repaired about 2x8Details
dry rot repair on exterior wall on second floor above garage on fire escape area. area to be repaired about 2x8 | $1,000 |