Block 3618, lot 005
940 Guerrero St
- City’s use
- Multi-Family Residential
- Built
- 1962
- Stories
- 3
- Units
- 21
- Rooms
- 21 bathrooms
- Building
- 13,443 sq ft
- Lot
- 7,168 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Jul 2026 | 940 Guerrero St | Star Waterproofing And Roofing | revision to 202605010481: 1st floor only, waterproof grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 240 sq ftDetails
revision to 202605010481: 1st floor only, waterproof grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 240 sq ft | $8,000 |
| May 1, 2026 | In progress issued May 2026 | 940 Guerrero St | Star Waterproofing And Roofing | waterproof 5 walkways. grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 1,580 sqft.Details
waterproof 5 walkways. grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 1,580 sqft. | $45,000 |
| Apr 28, 2025 | In progress issued Apr 2025 | 940 Guerrero St | Star Waterproofing And Roofing | re-roofing w/ hot works. to comply with nov 202432079 violation #1.Details
re-roofing w/ hot works. to comply with nov 202432079 violation #1. | $95,000 |
| Jan 9, 2025 | Completed final sign-off Apr 2025 | 940 Guerrero St | Xspace Builder | to comply with nov: 202432079 item #1, #2. dry rot repair, partial demolition of exterior wall at 1st, 2nd and 3rd floors, redo framing wall repair stucco. work is located in the interior lightwellDetails
to comply with nov: 202432079 item #1, #2. dry rot repair, partial demolition of exterior wall at 1st, 2nd and 3rd floors, redo framing wall repair stucco. work is located in the interior lightwell | $50,000 |
| Feb 22, 2024 | Completed final sign-off Mar 2024 | 940 Guerrero St | Polichio And Horne Inc | unit #1 remodel kitchen and bathroom like for like. build new closet for washer and dryer. paint interior and install vinly flooring.Details
unit #1 remodel kitchen and bathroom like for like. build new closet for washer and dryer. paint interior and install vinly flooring. | $50,000 |
| Jul 11, 2023 | Completed final sign-off Nov 2023 | 940 Guerrero St | Polichio And Horne Inc | unit 2: build new laundry closet, remodel bathroom like for like. paint & new vinyl flooring thruout.Details
unit 2: build new laundry closet, remodel bathroom like for like. paint & new vinyl flooring thruout. | $20,000 |
| Mar 8, 2023 | Completed final sign-off Jun 2023 | 940 Guerrero St | Polichio And Horne Inc | 2/f- units# 9 & 22 (3 level): build new laundry closet, install laundry box. new closet wall is nonstructural partition wall.Details
2/f- units# 9 & 22 (3 level): build new laundry closet, install laundry box. new closet wall is nonstructural partition wall. | $8,000 |
| Feb 2, 2023 | Completed final sign-off May 2023 | 940 Guerrero St | Byington Electric Corp | fire alarm upgrade to comply with ca state fire marshall code #12-001 (7/23/2012) bulletin (9/4/2008). replace fire alarm panel and add lf horns in units and wireless radio communicator.Details
fire alarm upgrade to comply with ca state fire marshall code #12-001 (7/23/2012) bulletin (9/4/2008). replace fire alarm panel and add lf horns in units and wireless radio communicator. | $10,000 |
| Sep 6, 2022 | Completed final sign-off Jun 2023 | 940 Guerrero St | Polichio And Horne Inc | unit 14,15,16,17,18: kitchen remodel like for like. replace cabinets, countertops, appliances.Details
unit 14,15,16,17,18: kitchen remodel like for like. replace cabinets, countertops, appliances. | $100,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 940 Guerrero St | Polichio And Horne Inc | dry rot repair at south property line wall (35% approx 600sf). replace siding in kind. maintain 1-hour fire rated assembly including 1 exterior layer of gypsum wall board. maintain (e) plywood nailing pattern6d nails, 6" spaceing at edges 12" nailing at field.Details
dry rot repair at south property line wall (35% approx 600sf). replace siding in kind. maintain 1-hour fire rated assembly including 1 exterior layer of gypsum wall board. maintain (e) plywood nailing pattern6d nails, 6" spaceing at edges 12" nailing at field. | $5,000 |
| Aug 4, 2022 | Never finaled filed Aug 2022, never issued | 940 Guerrero St | Mcdp Dba Geothersun Construction | comply with 201756722/ 201964741: exterior siding repair dry rotDetails
comply with 201756722/ 201964741: exterior siding repair dry rot | $8,000 |
| Jul 29, 2022 | Completed final sign-off Jun 2023 | 940 Guerrero St | Polichio And Horne Inc | unit 3,5,6,11,12,14,15,16,17,18: build new laundry closet. install laundry box, saffit for vent 4", install electric for dryer.Details
unit 3,5,6,11,12,14,15,16,17,18: build new laundry closet. install laundry box, saffit for vent 4", install electric for dryer. | $4,000 |
| Jun 7, 2022 | Completed final sign-off Jun 2023 | 940 Guerrero St | Polichio And Horne Inc | unit #14,15,16,17,18: bathroom remodel like for like. paint. lvt flooring. 5 units with 1 bath in each unit.Details
unit #14,15,16,17,18: bathroom remodel like for like. paint. lvt flooring. 5 units with 1 bath in each unit. | $18,000 |
| Jun 7, 2022 | Completed final sign-off Jun 2023 | 940 Guerrero St | Polichio And Horne Inc | unit #3,6,11,12: kitchen remodel in-kind. bathroom remodel in-kind. lvt flooring. paint. remodel 1 bath and 1 kitchen in each of 4 units.Details
unit #3,6,11,12: kitchen remodel in-kind. bathroom remodel in-kind. lvt flooring. paint. remodel 1 bath and 1 kitchen in each of 4 units. | $40,000 |
| Dec 20, 2012 | Never finaled issued Dec 2012, no final | 940 Guerrero St | street spaceDetails
street space | ||
| Dec 18, 2012 | Never finaled issued Dec 2012, no final | 940 Guerrero St | street spaceDetails
street space | ||
| Jul 20, 2007 | Never finaled issued Jul 2007, no final | 940 Guerrero St | street space permit.Details
street space permit. | ||
| Oct 17, 2005 | Completed final sign-off Apr 2006 | 940 Guerrero St | replacing kitchen cabs & sink, adding gfi plugs in kitchen & bath. replacing bathtubs in no 5,8. replacing bathroom vanities, replacing shower valves in 5,8. provide flour light in kitchen & bathrm, at least 50 percent of kitchen lights must be flour lightDetails
replacing kitchen cabs & sink, adding gfi plugs in kitchen & bath. replacing bathtubs in no 5,8. replacing bathroom vanities, replacing shower valves in 5,8. provide flour light in kitchen & bathrm, at least 50 percent of kitchen lights must be flour light | $25,000 | |
| Apr 8, 2005 | Never finaled issued Apr 2005, no final | 940 Guerrero St | replacing 1 fire door from stairwell to roof - 1 hr (in kind replacement)Details
replacing 1 fire door from stairwell to roof - 1 hr (in kind replacement) | $600 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.