Atlas General Construction
- Based in
- Newark
- On San Francisco permits
- Dec 2019 to Jun 2026
- Last 24 months
- 16 permits filed
41 permits since 2000: 25 completed, 9 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Aug 2026 | 101 New Montgomery St | interior tenant improvement for converstion of e coffee shop to a cocktail lounge w limited food preparation. scope includes interior demo, construction of bar and service area, new bathrooms, new finishes, millwork, lighting. electrical, plumbing. no changes to building envelope.Details
interior tenant improvement for converstion of e coffee shop to a cocktail lounge w limited food preparation. scope includes interior demo, construction of bar and service area, new bathrooms, new finishes, millwork, lighting. electrical, plumbing. no changes to building envelope. | $188,000 |
| Dec 12, 2025 | In progress issued Dec 2025 | 518 Connecticut St | to obtain final inspection for work approved under pa 202308114215. all work is complete.Details
to obtain final inspection for work approved under pa 202308114215. all work is complete. | |
| Dec 8, 2025 | In progress issued Feb 2026 | 2036 Green St | add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door for common access.Details
add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door for common access. | $200,000 |
| Sep 18, 2025 | In progress issued Dec 2025 | 1180 Guerrero St | convert ground floor storage to habitable space, add 173 sf stair in rear yardDetails
convert ground floor storage to habitable space, add 173 sf stair in rear yard | $45,000 |
| Jun 25, 2025 | In progress issued Jun 2025 | 45 Anzavista Av | rewire for entir house, 7 skylights replacements in kind, 2 complete bathrooms remodel. no walls or layout changes. one shower pan. nothing is visible from the street.Details
rewire for entir house, 7 skylights replacements in kind, 2 complete bathrooms remodel. no walls or layout changes. one shower pan. nothing is visible from the street. | $30,000 |
| Jun 9, 2025 | In progress issued Jun 2025 | 2715 37th Av | revision to pa #202505076001. alterations to extg bathroom at 2nd floor. alterations to existing kitchen at 2nd floor. remove existing wall between kichen and living room. see structural drawing.Details
revision to pa #202505076001. alterations to extg bathroom at 2nd floor. alterations to existing kitchen at 2nd floor. remove existing wall between kichen and living room. see structural drawing. | $35,000 |
| Jun 3, 2025 | Completed final sign-off Sep 2025 | 219 Moscow St | rev to pa# 2024-0719-6907 comply with nov 201996671 and nov 202537203 dry rot repair of (e) exterior stair like for like more than 50% (front of house)Details
rev to pa# 2024-0719-6907 comply with nov 201996671 and nov 202537203 dry rot repair of (e) exterior stair like for like more than 50% (front of house) | $15,000 |
| May 19, 2025 | Completed final sign-off May 2025 | 125 Edinburgh St | revise sheets a2.1, a2.2 of drawing for pa #202406204874 to document approved scope of work was reduced to eliminate the bathroom remodel portion of the project previously approved project new consists solely of a kichen redodel.Details
revise sheets a2.1, a2.2 of drawing for pa #202406204874 to document approved scope of work was reduced to eliminate the bathroom remodel portion of the project previously approved project new consists solely of a kichen redodel. | |
| May 7, 2025 | In progress issued May 2025 | 2715 37th Av | like for like kitchen remodel. like for like bathroom remodel.Details
like for like kitchen remodel. like for like bathroom remodel. | $75,000 |
| May 7, 2025 | Completed final sign-off Oct 2025 | 1212 Hampshire St | 2/f upper unit: bathroom remodel- no change in plumbing fixture count.Details
2/f upper unit: bathroom remodel- no change in plumbing fixture count. | $33,000 |
| Feb 20, 2025 | Completed final sign-off Jul 2025 | 524 Filbert St | alterations to existing bathroom. no exterior work.Details
alterations to existing bathroom. no exterior work. | $28,000 |
| Jan 10, 2025 | Completed final sign-off Sep 2025 | 2501 30th Av | like for like kitchen remodel. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3.Details
like for like kitchen remodel. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $39,000 |
| Dec 11, 2024 | Completed final sign-off Dec 2024 | 813 Washington St | upgrade existing backflow preventer and install a secondary backflow prevention device t0 prevent water back up through basement floors drains during heavy rains. apply new red guard waterproofing to basement floor and install new tile over it. app 360 sqftDetails
upgrade existing backflow preventer and install a secondary backflow prevention device t0 prevent water back up through basement floors drains during heavy rains. apply new red guard waterproofing to basement floor and install new tile over it. app 360 sqft | $21,876 |
| Nov 21, 2024 | Completed final sign-off May 2025 | 219 Moscow St | like for like window replacement of 3 front windows facing street. alminum clad windows. u--factor 0.30 max.Details
like for like window replacement of 3 front windows facing street. alminum clad windows. u--factor 0.30 max. | $7,140 |
| Nov 21, 2024 | Completed final sign-off May 2025 | 26 Glenview Dr | 3 like for like window replacement. front windows alluminum clad. others vinyl. six windows totoal. u-factror 0.30 max.Details
3 like for like window replacement. front windows alluminum clad. others vinyl. six windows totoal. u-factror 0.30 max. | $8,600 |
| Nov 14, 2024 | Completed final sign-off May 2025 | 591 Flood Av | alterations to existing bathroom-bathroom remodel. converting an existing closet into a half bath-powder room.Details
alterations to existing bathroom-bathroom remodel. converting an existing closet into a half bath-powder room. | $40,000 |
| Jul 19, 2024 | Completed final sign-off Sep 2025 | 219 Moscow St | 1 - like for like kitchen remodel. 2 - like for like bathroom remodel. 3 - dry rot repair as required in kitchen & bath. 4 - fix (e) stairs less than 50% to complying w/ nov#201996671Details
1 - like for like kitchen remodel. 2 - like for like bathroom remodel. 3 - dry rot repair as required in kitchen & bath. 4 - fix (e) stairs less than 50% to complying w/ nov#201996671 | $50,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 1470 32nd Av | demo existing 2 windows next to each other at the rear yar and replace with 6' width & 6'-8' height french door at same location. install (n) 4"-5" landing for french doorsDetails
demo existing 2 windows next to each other at the rear yar and replace with 6' width & 6'-8' height french door at same location. install (n) 4"-5" landing for french doors | $8,000 |
| Jul 18, 2024 | Completed final sign-off Oct 2024 | 78 Rudden Av | kitchen remodeling and replace the (e) cabinet with new and update lighting and outlet according to the electrical code, replace the flooring, etc.Details
kitchen remodeling and replace the (e) cabinet with new and update lighting and outlet according to the electrical code, replace the flooring, etc. | $25,000 |
| Jul 18, 2024 | Completed final sign-off Oct 2025 | 427 26th Av | unit 2 - 2/f: remove 2 partition walls, add inland without sink. update lighting and outlet according to the electrical code, replace flooring. no exterior work.Details
unit 2 - 2/f: remove 2 partition walls, add inland without sink. update lighting and outlet according to the electrical code, replace flooring. no exterior work. | $18,000 |
| Jun 20, 2024 | Completed final sign-off May 2025 | 125 Edinburgh St | remove (e) tub in (e) bathroom and install new shower. remove (e) wall between (e) laundry & (e) kitchen & add (n) beam and new kitchen layout design.Details
remove (e) tub in (e) bathroom and install new shower. remove (e) wall between (e) laundry & (e) kitchen & add (n) beam and new kitchen layout design. | $50,000 |
| Apr 16, 2024 | Completed final sign-off Aug 2024 | 338 Spear St | new kitchen cabinets, new countertop, new island, new recessed lighting, new outlets. like for like remodel.Details
new kitchen cabinets, new countertop, new island, new recessed lighting, new outlets. like for like remodel. | $20,000 |
| Oct 16, 2023 | Completed final sign-off Dec 2024 | 1478 Church St | relocate 2 tank water heater to roof (tankless) gas.Details
relocate 2 tank water heater to roof (tankless) gas. | $3,800 |
| Sep 13, 2023 | Completed final sign-off Feb 2024 | 1478 Church St | revision to pa# 202307192451. add drain for future outdoor tub & sink.Details
revision to pa# 202307192451. add drain for future outdoor tub & sink. | $3,800 |
| Aug 11, 2023 | In progress issued Nov 2024 | 518 Connecticut St | demo e) 2 car garage interior partition at middle cmu wall. replace (e) 2 one car garage door w/(n). no interior work w/in the dwelling. fire sprinkler is not requiredDetails
demo e) 2 car garage interior partition at middle cmu wall. replace (e) 2 one car garage door w/(n). no interior work w/in the dwelling. fire sprinkler is not required | $60,000 |
| Jul 19, 2023 | Completed final sign-off Feb 2024 | 1478 Church St | convert (e) closet to a bathroom add sink, toilet, shower 2'x6' (n) bathrooom fan (2) light (1) fanDetails
convert (e) closet to a bathroom add sink, toilet, shower 2'x6' (n) bathrooom fan (2) light (1) fan | $50,000 |
| Sep 12, 2022 | Expired or cancelled cancelled Jan 2026 | 737 Moultrie St | revision to pa# 202206075797: extend mudroom into lightwell.Details
revision to pa# 202206075797: extend mudroom into lightwell. | $3,000 |
| Jun 7, 2022 | Completed final sign-off May 2023 | 737 Moultrie St | (n) deck in (e) lightwell. replace (e) ext stairs & landing. remodel(e) mudroom, partially expand into lightwell.Details
(n) deck in (e) lightwell. replace (e) ext stairs & landing. remodel(e) mudroom, partially expand into lightwell. | $50,000 |
| Mar 9, 2022 | In progress issued Aug 2024 | 2759 40th Av | home addition to (e) residence and addition of a legal adu in (e) garage space. home is to extend out 10 ft into rear yard. project includes demo of (e) walls, windows, doors & partitions. new rooms, adu, living space, kitchen space and balcony to be added.Details
home addition to (e) residence and addition of a legal adu in (e) garage space. home is to extend out 10 ft into rear yard. project includes demo of (e) walls, windows, doors & partitions. new rooms, adu, living space, kitchen space and balcony to be added. | $200,000 |
| Feb 22, 2022 | Never finaled issued Feb 2022, no final | 322 22nd Av | keep same layout kitchen. install new outlet and upgrade wire. install new cabinet and countertop. no any alteration.Details
keep same layout kitchen. install new outlet and upgrade wire. install new cabinet and countertop. no any alteration. | $20,000 |
| Nov 3, 2021 | Never finaled issued Nov 2021, no final | 582 25th Av | remove (e) elec. panel. install new panel. install drywall next to panel, change faucet and toilet in bathroom. non structuralDetails
remove (e) elec. panel. install new panel. install drywall next to panel, change faucet and toilet in bathroom. non structural | $4,000 |
| Nov 3, 2021 | Completed final sign-off May 2022 | 429 Country Club Dr | one kitchen remodel. demolish (e) kitchen. new wire for kitchen. same layout kitchen. change angel stop & install new faucet in kitchen. new cabinet, new flooring. non structural.Details
one kitchen remodel. demolish (e) kitchen. new wire for kitchen. same layout kitchen. change angel stop & install new faucet in kitchen. new cabinet, new flooring. non structural. | $17,000 |
| Oct 19, 2021 | Completed final sign-off Nov 2022 | 2900 22nd St | unit 7 (on 2nd floor): lower level: convert (e) full bathroom into a powder room & storage room. remodel kitchen. upper level: future bathroom remodel.Details
unit 7 (on 2nd floor): lower level: convert (e) full bathroom into a powder room & storage room. remodel kitchen. upper level: future bathroom remodel. | $3,000 |
| Sep 28, 2021 | Never finaled issued Apr 2023, no final | 45 Anzavista Av | convert living area of lower floor into an adu. convert 113 sq ft of the garage to adu. install kitchen in lower level. convert current powder room of lower level to full bathroom. install separate entrance. convert current office in lower level to a bedroom.Details
convert living area of lower floor into an adu. convert 113 sq ft of the garage to adu. install kitchen in lower level. convert current powder room of lower level to full bathroom. install separate entrance. convert current office in lower level to a bedroom. | $200,000 |
| Jun 4, 2021 | Completed final sign-off Dec 2021 | 425 Buena Vista East Av | we propose to build dividing wall to divide one bedroo into 2 on the upper floors. each bedroom has a compliant egress window and sufficient ceiling height. no other changes are proposed to any areas of the houseDetails
we propose to build dividing wall to divide one bedroo into 2 on the upper floors. each bedroom has a compliant egress window and sufficient ceiling height. no other changes are proposed to any areas of the house | $10,000 |
| May 6, 2021 | Expired or cancelled withdrawn May 2021 | 425 Buena Vista East Av | build wall converting 1 bedroom into 2 on upper flr. each bedrm has compliant egress window & sufficient ceiling ht. no other changesDetails
build wall converting 1 bedroom into 2 on upper flr. each bedrm has compliant egress window & sufficient ceiling ht. no other changes | $10,000 |
| Nov 4, 2020 | Completed final sign-off Jan 2021 | 618 Lisbon St | remodel existing bathroom. keep existing layout same. new electrical and new plumbing. 2 bathroom we will remodel.Details
remodel existing bathroom. keep existing layout same. new electrical and new plumbing. 2 bathroom we will remodel. | $25,000 |
| Oct 29, 2020 | Completed final sign-off Jan 2021 | 1824 23rd St | change siding with new oneDetails
change siding with new one | $12,000 |
| Oct 29, 2020 | Completed final sign-off Jan 2021 | 1446 Cabrillo St | full kitchen remodel: no walls removed, new electric & plumbing same location, new cabinet and applianceDetails
full kitchen remodel: no walls removed, new electric & plumbing same location, new cabinet and appliance | $8,000 |
| Jan 9, 2020 | Expired or cancelled cancelled Feb 2021 | 980 Oak St | unit #1: remove wall no t supporting wall. new framing. run electric, gas, plumbing.install washer/dryer, 10 feet non-rated wallDetails
unit #1: remove wall no t supporting wall. new framing. run electric, gas, plumbing.install washer/dryer, 10 feet non-rated wall | $5,000 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 1824 23rd St | revise plan to permit #201911066560. changes to kitchen design and changes to bathroom design.Details
revise plan to permit #201911066560. changes to kitchen design and changes to bathroom design. |