Back to bathroom remodel contractors
Atlas General Construction
- Based in
- Newark
- On San Francisco permits
- Dec 2019 to Jun 2026
- Last 24 months
- 16 permits filed
41 permits since 2000: 25 completed, 9 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 9 completed, 5 in progress, 3 never finaled. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Aug 2026 | 101 New Montgomery St | interior tenant improvement for converstion of e coffee shop to a cocktail lounge w limited food preparation. scope includes interior demo, construction of bar and service area, new bathrooms, new finishes, millwork, lighting. electrical, plumbing. no changes to building envelope.Details
interior tenant improvement for converstion of e coffee shop to a cocktail lounge w limited food preparation. scope includes interior demo, construction of bar and service area, new bathrooms, new finishes, millwork, lighting. electrical, plumbing. no changes to building envelope. | $188,000 |
| Dec 8, 2025 | In progress issued Feb 2026 | 2036 Green St | add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door for common access.Details
add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door for common access. | $200,000 |
| Jun 25, 2025 | In progress issued Jun 2025 | 45 Anzavista Av | rewire for entir house, 7 skylights replacements in kind, 2 complete bathrooms remodel. no walls or layout changes. one shower pan. nothing is visible from the street.Details
rewire for entir house, 7 skylights replacements in kind, 2 complete bathrooms remodel. no walls or layout changes. one shower pan. nothing is visible from the street. | $30,000 |
| Jun 9, 2025 | In progress issued Jun 2025 | 2715 37th Av | revision to pa #202505076001. alterations to extg bathroom at 2nd floor. alterations to existing kitchen at 2nd floor. remove existing wall between kichen and living room. see structural drawing.Details
revision to pa #202505076001. alterations to extg bathroom at 2nd floor. alterations to existing kitchen at 2nd floor. remove existing wall between kichen and living room. see structural drawing. | $35,000 |
| May 19, 2025 | Completed final sign-off May 2025 | 125 Edinburgh St | revise sheets a2.1, a2.2 of drawing for pa #202406204874 to document approved scope of work was reduced to eliminate the bathroom remodel portion of the project previously approved project new consists solely of a kichen redodel.Details
revise sheets a2.1, a2.2 of drawing for pa #202406204874 to document approved scope of work was reduced to eliminate the bathroom remodel portion of the project previously approved project new consists solely of a kichen redodel. | |
| May 7, 2025 | In progress issued May 2025 | 2715 37th Av | like for like kitchen remodel. like for like bathroom remodel.Details
like for like kitchen remodel. like for like bathroom remodel. | $75,000 |
| May 7, 2025 | Completed final sign-off Oct 2025 | 1212 Hampshire St | 2/f upper unit: bathroom remodel- no change in plumbing fixture count.Details
2/f upper unit: bathroom remodel- no change in plumbing fixture count. | $33,000 |
| Feb 20, 2025 | Completed final sign-off Jul 2025 | 524 Filbert St | alterations to existing bathroom. no exterior work.Details
alterations to existing bathroom. no exterior work. | $28,000 |
| Nov 14, 2024 | Completed final sign-off May 2025 | 591 Flood Av | alterations to existing bathroom-bathroom remodel. converting an existing closet into a half bath-powder room.Details
alterations to existing bathroom-bathroom remodel. converting an existing closet into a half bath-powder room. | $40,000 |
| Jul 19, 2024 | Completed final sign-off Sep 2025 | 219 Moscow St | 1 - like for like kitchen remodel. 2 - like for like bathroom remodel. 3 - dry rot repair as required in kitchen & bath. 4 - fix (e) stairs less than 50% to complying w/ nov#201996671Details
1 - like for like kitchen remodel. 2 - like for like bathroom remodel. 3 - dry rot repair as required in kitchen & bath. 4 - fix (e) stairs less than 50% to complying w/ nov#201996671 | $50,000 |
| Jun 20, 2024 | Completed final sign-off May 2025 | 125 Edinburgh St | remove (e) tub in (e) bathroom and install new shower. remove (e) wall between (e) laundry & (e) kitchen & add (n) beam and new kitchen layout design.Details
remove (e) tub in (e) bathroom and install new shower. remove (e) wall between (e) laundry & (e) kitchen & add (n) beam and new kitchen layout design. | $50,000 |
| Jul 19, 2023 | Completed final sign-off Feb 2024 | 1478 Church St | convert (e) closet to a bathroom add sink, toilet, shower 2'x6' (n) bathrooom fan (2) light (1) fanDetails
convert (e) closet to a bathroom add sink, toilet, shower 2'x6' (n) bathrooom fan (2) light (1) fan | $50,000 |
| Nov 3, 2021 | Never finaled issued Nov 2021, no final | 582 25th Av | remove (e) elec. panel. install new panel. install drywall next to panel, change faucet and toilet in bathroom. non structuralDetails
remove (e) elec. panel. install new panel. install drywall next to panel, change faucet and toilet in bathroom. non structural | $4,000 |
| Oct 19, 2021 | Completed final sign-off Nov 2022 | 2900 22nd St | unit 7 (on 2nd floor): lower level: convert (e) full bathroom into a powder room & storage room. remodel kitchen. upper level: future bathroom remodel.Details
unit 7 (on 2nd floor): lower level: convert (e) full bathroom into a powder room & storage room. remodel kitchen. upper level: future bathroom remodel. | $3,000 |
| Sep 28, 2021 | Never finaled issued Apr 2023, no final | 45 Anzavista Av | convert living area of lower floor into an adu. convert 113 sq ft of the garage to adu. install kitchen in lower level. convert current powder room of lower level to full bathroom. install separate entrance. convert current office in lower level to a bedroom.Details
convert living area of lower floor into an adu. convert 113 sq ft of the garage to adu. install kitchen in lower level. convert current powder room of lower level to full bathroom. install separate entrance. convert current office in lower level to a bedroom. | $200,000 |
| Nov 4, 2020 | Completed final sign-off Jan 2021 | 618 Lisbon St | remodel existing bathroom. keep existing layout same. new electrical and new plumbing. 2 bathroom we will remodel.Details
remodel existing bathroom. keep existing layout same. new electrical and new plumbing. 2 bathroom we will remodel. | $25,000 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 1824 23rd St | revise plan to permit #201911066560. changes to kitchen design and changes to bathroom design.Details
revise plan to permit #201911066560. changes to kitchen design and changes to bathroom design. |