Back to kitchen remodel contractors
Atlas General Construction
- Based in
- Newark
- On San Francisco permits
- Dec 2019 to Jun 2026
- Last 24 months
- 16 permits filed
41 permits since 2000: 25 completed, 9 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 8 completed, 3 in progress, 3 never finaled. Typically 0 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2025 | In progress issued Jun 2025 | 2715 37th Av | revision to pa #202505076001. alterations to extg bathroom at 2nd floor. alterations to existing kitchen at 2nd floor. remove existing wall between kichen and living room. see structural drawing.Details
revision to pa #202505076001. alterations to extg bathroom at 2nd floor. alterations to existing kitchen at 2nd floor. remove existing wall between kichen and living room. see structural drawing. | $35,000 |
| May 7, 2025 | In progress issued May 2025 | 2715 37th Av | like for like kitchen remodel. like for like bathroom remodel.Details
like for like kitchen remodel. like for like bathroom remodel. | $75,000 |
| Jan 10, 2025 | Completed final sign-off Sep 2025 | 2501 30th Av | like for like kitchen remodel. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3.Details
like for like kitchen remodel. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $39,000 |
| Jul 19, 2024 | Completed final sign-off Sep 2025 | 219 Moscow St | 1 - like for like kitchen remodel. 2 - like for like bathroom remodel. 3 - dry rot repair as required in kitchen & bath. 4 - fix (e) stairs less than 50% to complying w/ nov#201996671Details
1 - like for like kitchen remodel. 2 - like for like bathroom remodel. 3 - dry rot repair as required in kitchen & bath. 4 - fix (e) stairs less than 50% to complying w/ nov#201996671 | $50,000 |
| Jul 18, 2024 | Completed final sign-off Oct 2024 | 78 Rudden Av | kitchen remodeling and replace the (e) cabinet with new and update lighting and outlet according to the electrical code, replace the flooring, etc.Details
kitchen remodeling and replace the (e) cabinet with new and update lighting and outlet according to the electrical code, replace the flooring, etc. | $25,000 |
| Jun 20, 2024 | Completed final sign-off May 2025 | 125 Edinburgh St | remove (e) tub in (e) bathroom and install new shower. remove (e) wall between (e) laundry & (e) kitchen & add (n) beam and new kitchen layout design.Details
remove (e) tub in (e) bathroom and install new shower. remove (e) wall between (e) laundry & (e) kitchen & add (n) beam and new kitchen layout design. | $50,000 |
| Apr 16, 2024 | Completed final sign-off Aug 2024 | 338 Spear St | new kitchen cabinets, new countertop, new island, new recessed lighting, new outlets. like for like remodel.Details
new kitchen cabinets, new countertop, new island, new recessed lighting, new outlets. like for like remodel. | $20,000 |
| Mar 9, 2022 | In progress issued Aug 2024 | 2759 40th Av | home addition to (e) residence and addition of a legal adu in (e) garage space. home is to extend out 10 ft into rear yard. project includes demo of (e) walls, windows, doors & partitions. new rooms, adu, living space, kitchen space and balcony to be added.Details
home addition to (e) residence and addition of a legal adu in (e) garage space. home is to extend out 10 ft into rear yard. project includes demo of (e) walls, windows, doors & partitions. new rooms, adu, living space, kitchen space and balcony to be added. | $200,000 |
| Feb 22, 2022 | Never finaled issued Feb 2022, no final | 322 22nd Av | keep same layout kitchen. install new outlet and upgrade wire. install new cabinet and countertop. no any alteration.Details
keep same layout kitchen. install new outlet and upgrade wire. install new cabinet and countertop. no any alteration. | $20,000 |
| Nov 3, 2021 | Completed final sign-off May 2022 | 429 Country Club Dr | one kitchen remodel. demolish (e) kitchen. new wire for kitchen. same layout kitchen. change angel stop & install new faucet in kitchen. new cabinet, new flooring. non structural.Details
one kitchen remodel. demolish (e) kitchen. new wire for kitchen. same layout kitchen. change angel stop & install new faucet in kitchen. new cabinet, new flooring. non structural. | $17,000 |
| Oct 19, 2021 | Completed final sign-off Nov 2022 | 2900 22nd St | unit 7 (on 2nd floor): lower level: convert (e) full bathroom into a powder room & storage room. remodel kitchen. upper level: future bathroom remodel.Details
unit 7 (on 2nd floor): lower level: convert (e) full bathroom into a powder room & storage room. remodel kitchen. upper level: future bathroom remodel. | $3,000 |
| Sep 28, 2021 | Never finaled issued Apr 2023, no final | 45 Anzavista Av | convert living area of lower floor into an adu. convert 113 sq ft of the garage to adu. install kitchen in lower level. convert current powder room of lower level to full bathroom. install separate entrance. convert current office in lower level to a bedroom.Details
convert living area of lower floor into an adu. convert 113 sq ft of the garage to adu. install kitchen in lower level. convert current powder room of lower level to full bathroom. install separate entrance. convert current office in lower level to a bedroom. | $200,000 |
| Oct 29, 2020 | Completed final sign-off Jan 2021 | 1446 Cabrillo St | full kitchen remodel: no walls removed, new electric & plumbing same location, new cabinet and applianceDetails
full kitchen remodel: no walls removed, new electric & plumbing same location, new cabinet and appliance | $8,000 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 1824 23rd St | revise plan to permit #201911066560. changes to kitchen design and changes to bathroom design.Details
revise plan to permit #201911066560. changes to kitchen design and changes to bathroom design. |