Block 5957, lot 040
125 Edinburgh St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,484 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2025 | Completed final sign-off May 2025 | 125 Edinburgh St | Atlas General Construction | revise sheets a2.1, a2.2 of drawing for pa #202406204874 to document approved scope of work was reduced to eliminate the bathroom remodel portion of the project previously approved project new consists solely of a kichen redodel.Details
revise sheets a2.1, a2.2 of drawing for pa #202406204874 to document approved scope of work was reduced to eliminate the bathroom remodel portion of the project previously approved project new consists solely of a kichen redodel. | |
| Jun 20, 2024 | Completed final sign-off May 2025 | 125 Edinburgh St | Atlas General Construction | remove (e) tub in (e) bathroom and install new shower. remove (e) wall between (e) laundry & (e) kitchen & add (n) beam and new kitchen layout design.Details
remove (e) tub in (e) bathroom and install new shower. remove (e) wall between (e) laundry & (e) kitchen & add (n) beam and new kitchen layout design. | $50,000 |
| Jul 9, 2010 | Completed final sign-off Sep 2010 | 125 Edinburgh St | Tww Associates | window replacement - 7 total; new interior window trimDetails
window replacement - 7 total; new interior window trim | $10,000 |
| May 9, 2005 | Completed final sign-off May 2006 | 125 Edinburgh St | Tww Associates | this is phase 2 of a horizontal addition at 125 edinburge st. phase 2 completes the porject byDetails
this is phase 2 of a horizontal addition at 125 edinburge st. phase 2 completes the porject by | $45,000 |
| Jun 3, 2004 | Completed final sign-off Dec 2005 | 125 Edinburgh St | demolish + reconstruct front stairs + landing to main bldg in new location. move front door + basemeDetails
demolish + reconstruct front stairs + landing to main bldg in new location. move front door + baseme | $14,500 | |
| Jun 3, 2004 | Completed final sign-off Dec 2005 | 125 Edinburgh St | A C Bonifacio Const Co | erect a garage(with a room above for rear house only)Details
erect a garage(with a room above for rear house only) | $85,000 |
| Jun 3, 2004 | Completed final sign-off Dec 2005 | 125 Edinburgh St | A C Bonifacio Const Co | demolish 2 stories of garage + roomDetails
demolish 2 stories of garage + room | |
| Mar 2, 2004 | Expired or cancelled withdrawn Jun 2004 | 125 Edinburgh St | demolish extg detached residntl garage & rm above/construct nw garage with 2 levels above thatDetails
demolish extg detached residntl garage & rm above/construct nw garage with 2 levels above that | $144,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A C Bonifacio Const Co (2), Atlas General Construction (2), Tww Associates (2)
- Architects
- Thomas N. Burnham
- Engineers
- Ralph H. Kratz
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.