Permit GraphShortlistSan Francisco building permits since 2000

Block 1366, lot 005

121 06th Ave

City’s use
Multi-Family Residential
Built
1905
Stories
2
Rooms
2 bathrooms
Building
2,270 sq ft
Lot
2,996 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

6 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 8, 2023Completed
final sign-off Aug 2024
121 06th AvHang C Construction Increnovation of 2/f unit. inner wall partitions rearraged to open up the living spaces. outer walls are left as is. remodel (e) kitchen, 2 bathrooms.
Details
Permit
202306089549
Status
complete
Filed
Jun 8, 2023
Permit issued
Sep 14, 2023
Final sign-off
Aug 5, 2024
Declared cost
$250,000
Address
121 06th Av

renovation of 2/f unit. inner wall partitions rearraged to open up the living spaces. outer walls are left as is. remodel (e) kitchen, 2 bathrooms.

Open the permit page

$250,000
Feb 14, 2017Completed
final sign-off Apr 2017
121 06th Avinstalling (n) insulation in a existing room by inserting insulation in walls & ceiling. installing new vinyl windows, not facing street. replacing old windows. adding a new sheetrock. provide 5/8" type "x" gyp where (n) sheetrock is placed.
Details
Permit
201702149389
Status
complete
Filed
Feb 14, 2017
Permit issued
Feb 14, 2017
Final sign-off
Apr 4, 2017
Declared cost
$5,000
Address
121 06th Av

installing (n) insulation in a existing room by inserting insulation in walls & ceiling. installing new vinyl windows, not facing street. replacing old windows. adding a new sheetrock. provide 5/8" type "x" gyp where (n) sheetrock is placed.

Open the permit page

$5,000
Apr 6, 2012Completed
final sign-off Nov 2012
119 06th AvT W Y Incremodel kitchen, bathroom and bedroom. replace (3) wood windows, not visible from street. all egress to meet st clear opening. non-bearing wall removed in kitchen and bathroom.
Details
Permit
201204067855
Status
complete
Filed
Apr 6, 2012
Permit issued
Apr 26, 2012
Final sign-off
Nov 6, 2012
Declared cost
$95,000
Address
119 06th Av

remodel kitchen, bathroom and bedroom. replace (3) wood windows, not visible from street. all egress to meet st clear opening. non-bearing wall removed in kitchen and bathroom.

Open the permit page

$95,000
Mar 1, 2012Completed
final sign-off Mar 2012
119 06th Avcomply with physical inspection report #cc-7052, no corrective work required.
Details
Permit
201203015216
Status
complete
Filed
Mar 1, 2012
Permit issued
Mar 1, 2012
Final sign-off
Mar 2, 2012
Address
119 06th Av

comply with physical inspection report #cc-7052, no corrective work required.

Open the permit page

Apr 7, 2008Completed
final sign-off May 2008
119 06th AvDonald Lewis Gen. Contr.Inc.perform work to complete & clear 3r report# 3r-5056.
Details
Permit
200804078984
Status
complete
Filed
Apr 7, 2008
Permit issued
Apr 7, 2008
Final sign-off
May 15, 2008
Declared cost
$4,000
Address
119 06th Av

perform work to complete & clear 3r report# 3r-5056.

Open the permit page

$4,000
Feb 21, 2007Completed
final sign-off Sep 2007
119 06th Avremove wood posts in garage and add steel beam and footings. add shearwalls and holdowns.
Details
Permit
200702214622
Status
complete
Filed
Feb 21, 2007
Permit issued
Feb 21, 2007
Final sign-off
Sep 17, 2007
Declared cost
$30,000
Address
119 06th Av

remove wood posts in garage and add steel beam and footings. add shearwalls and holdowns.

Open the permit page

$30,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Donald Lewis Gen. Contr.Inc., Hang C Construction Inc, T W Y Inc
Architects
Elias Horat
Engineers
Andy Forrest

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.