Block 3704, lot 078
995 Market St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 15
- Rooms
- 15 bathrooms
- Building
- 90,552 sq ft
- Lot
- 11,007 sq ft
- Zoning
- C3G
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
118 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 20, 2026 | In progress filed Feb 2026, not yet issued | 995 Market St | Via Construction | 5th fl: new gym space in (e) office. (n) showers, tub, sauna room, locker rooms.Details
5th fl: new gym space in (e) office. (n) showers, tub, sauna room, locker rooms. | $55,000 |
| Jul 20, 2022 | Never finaled issued Aug 2022, no final | 995 Market St | San Francisco Commercial Builders Inc | main lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit.Details
main lobby upgrade including replaced lighting between desk and finishes added exteior metal box covers electrical and life safety plans will be submitted as a separate permit. | $275,000 |
| Apr 5, 2021 | Never finaled issued Apr 2022, no final | 995 Market St | Esquivel Grading & Paving, Inc. | alteration of subsidewalk basement roof slab to install new acessible curb ramps and installaion of new light pole foundations inside sub sidewalk basement.Details
alteration of subsidewalk basement roof slab to install new acessible curb ramps and installaion of new light pole foundations inside sub sidewalk basement. | $57,750 |
| Sep 25, 2019 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | to obtain final inspection for work approved under pa#201509248008, 201510230701 & 201509248014. all work is complete.Details
to obtain final inspection for work approved under pa#201509248008, 201510230701 & 201509248014. all work is complete. | |
| Sep 25, 2019 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | to obtain final inspection for work approved under pa#201508194691, 201510280998 & 201510079054. all work is complete.Details
to obtain final inspection for work approved under pa#201508194691, 201510280998 & 201510079054. all work is complete. | |
| Sep 25, 2019 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | to obtain final inspection for work approved under pa#201509096463, 201606109668 & 201509036134. all work is complete.Details
to obtain final inspection for work approved under pa#201509096463, 201606109668 & 201509036134. all work is complete. | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | renewal of pa 2015-1106-2053, 2015-1105-1921 and 2015-1106-2050 for final inspectionDetails
renewal of pa 2015-1106-2053, 2015-1105-1921 and 2015-1106-2050 for final inspection | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | renewal of pa 2015-1106-2051, 2015-0903-6135, 2015-1026-0746 for final inspectionDetails
renewal of pa 2015-1106-2051, 2015-0903-6135, 2015-1026-0746 for final inspection | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | renewal of pa 2015-0706-0689, 2015-0615-8928 and 2015-0706-0687 for final inspectionDetails
renewal of pa 2015-0706-0689, 2015-0615-8928 and 2015-0706-0687 for final inspection | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | renewal of pa 2015-0917-7342, 2015-1216-5212 and 2015-1203-4039 for final inspectionDetails
renewal of pa 2015-0917-7342, 2015-1216-5212 and 2015-1203-4039 for final inspection | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | renewal of pa 2015-0728-2594, 2015-0728-2593 and 2015-0615-8929 for final inspectionDetails
renewal of pa 2015-0728-2594, 2015-0728-2593 and 2015-0615-8929 for final inspection | |
| Nov 28, 2018 | Completed final sign-off Feb 2019 | 995 Market St | Narrowback Construction Co. | 5th - 7th flrs. demo of non-structural & non load-bearing interior partitions and ceilings incl walls, glazing doors and finishesDetails
5th - 7th flrs. demo of non-structural & non load-bearing interior partitions and ceilings incl walls, glazing doors and finishes | $337,513 |
| Nov 27, 2018 | Never finaled issued Nov 2018, no final | 995 Market St | street space w/mta | ||
| Aug 16, 2018 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | install "push to override" door button for floors mezzanine to 16th floorDetails
install "push to override" door button for floors mezzanine to 16th floor | $2,000 |
| Aug 10, 2018 | Expired or cancelled cancelled Jan 2026 | 995 Market St | project consists of demolition of non-structural and non-load bearing interior partitions and ceiling on floors 5, 6 and 7. no structural demo includedDetails
project consists of demolition of non-structural and non-load bearing interior partitions and ceiling on floors 5, 6 and 7. no structural demo included | $90,000 | |
| Sep 6, 2017 | Never finaled issued Sep 2017, no final | 995 Market St | street space | ||
| May 31, 2017 | Expired or cancelled withdrawn Apr 2018 | 995 Market St | United States Information Systems Inc | 2,3,4,8,9,10,11,12,14,15 floors: install additional device on access control doors. emergency push to enter button and sirenDetails
2,3,4,8,9,10,11,12,14,15 floors: install additional device on access control doors. emergency push to enter button and siren | $10,000 |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 995 Market St | Red Hawk Fire & Security Ca Llc | 2nd floor and mezzanine: permit renewal, pa#2015-10-23-0701. all work complete.Details
2nd floor and mezzanine: permit renewal, pa#2015-10-23-0701. all work complete. | |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 995 Market St | Red Hawk Fire & Security Ca Llc | permit renewal, pa#2015-09-17-7342. all work complete.Details
permit renewal, pa#2015-09-17-7342. all work complete. | |
| Oct 28, 2016 | Completed final sign-off Oct 2017 | 995 Market St | Arrow Sign Company | erect indirect illum new electric double faced projecting signDetails
erect indirect illum new electric double faced projecting sign | $8,000 |
| Oct 28, 2016 | Completed final sign-off Oct 2017 | 995 Market St | Arrow Sign Company | erect indirect illum new electrical single faced wall signDetails
erect indirect illum new electrical single faced wall sign | $6,000 |
| Jun 10, 2016 | Completed final sign-off Oct 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | 2/f & mezzanine- revision to pa#201510230701, add (1) duct detector for outside air unit, (5) pendent smoke detectors for evap. unit, (2) control relay for shut down function. add 5 duct detectors with relay for tsd & 1 duct detector for oa-2-1 for shutdown. t.i. pa#201507060689 & 201507060687.Details
2/f & mezzanine- revision to pa#201510230701, add (1) duct detector for outside air unit, (5) pendent smoke detectors for evap. unit, (2) control relay for shut down function. add 5 duct detectors with relay for tsd & 1 duct detector for oa-2-1 for shutdown. t.i. pa#201507060689 & 201507060687. | $5,000 |
| Apr 15, 2016 | Completed final sign-off May 2016 | 995 Market St | Red Hawk Fire & Security Ca Llc | 11th & 12th flrs: fire alarm, add (25) speaker/strobes,(13)speakers,(1)smoke detector,(1)booster supply,(2)control relay for hvac unit shutdown, & (14) duct detectors, ref. 201601257867.Details
11th & 12th flrs: fire alarm, add (25) speaker/strobes,(13)speakers,(1)smoke detector,(1)booster supply,(2)control relay for hvac unit shutdown, & (14) duct detectors, ref. 201601257867. | $8,000 |
| Apr 5, 2016 | Expired or cancelled cancelled Jan 2026 | 995 Market St | Trainor Commercial Construction Inc. | floors 11 and 12: title 24 only. ref arch #201601257867Details
floors 11 and 12: title 24 only. ref arch #201601257867 | $270,000 |
| Mar 8, 2016 | Never finaled issued Mar 2016, no final | 995 Market St | All Air Mechanical Contractors Inc. | install two new fsds on 11 and 12th floors and associated duct detectors and hvac duct work. ref. 2016-01-25-7867Details
install two new fsds on 11 and 12th floors and associated duct detectors and hvac duct work. ref. 2016-01-25-7867 | $231,196 |
| Mar 4, 2016 | Completed final sign-off Oct 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | 11th floor: add 6 pendent, plug 3, relocate 8 sprinklers. 12th floor: add 7 pendents, 2 uprights, plug 3, release to upright. ref app#201602018457Details
11th floor: add 6 pendent, plug 3, relocate 8 sprinklers. 12th floor: add 7 pendents, 2 uprights, plug 3, release to upright. ref app#201602018457 | $15,000 |
| Mar 3, 2016 | Completed final sign-off May 2016 | 995 Market St | Firemaster | ansul - 6 gallon 12-102Details
ansul - 6 gallon 12-102 | $6,000 |
| Feb 1, 2016 | Completed final sign-off Sep 2020 | 995 Market St | Trainor Commercial Construction Inc. | demo of extg walls non-bearing, carpet, misc., doors and frames.Details
demo of extg walls non-bearing, carpet, misc., doors and frames. | $50,000 |
| Jan 25, 2016 | Completed final sign-off Oct 2020 | 995 Market St | Trainor Commercial Construction Inc. | 11 & 12 fl: interior tenant fit out of 2 full floors as office use, including interior non-load bearing partitions, partial ceilings, lighting, finishes. floors to be single tenant occupancy. mep, life safety deferred.Details
11 & 12 fl: interior tenant fit out of 2 full floors as office use, including interior non-load bearing partitions, partial ceilings, lighting, finishes. floors to be single tenant occupancy. mep, life safety deferred. | $490,000 |
| Dec 16, 2015 | Completed final sign-off Oct 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 8th & 9th floor add (23) speaker strobes, (16) speakers, replace (4) smoke detectors, add (11) pendant smoke detectors, (2) duct mount smoke detectors, (4) control relay modules. 8th floor 2015-0728-2593 & 9th floor 2015-0728-2594Details
fire alarm ti on 8th & 9th floor add (23) speaker strobes, (16) speakers, replace (4) smoke detectors, add (11) pendant smoke detectors, (2) duct mount smoke detectors, (4) control relay modules. 8th floor 2015-0728-2593 & 9th floor 2015-0728-2594 | $24,000 |
| Dec 3, 2015 | Completed final sign-off Oct 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | floors 10,14,15,16 fire alarm - add 46 speaker/strobes, 21 pendant mounted smoke detectors, (4) duct mounted smoke detectors, (4) ocntrol relay for fsd, (4) control relays for evap units per floor. replace (7) existing smoke detectors.Details
floors 10,14,15,16 fire alarm - add 46 speaker/strobes, 21 pendant mounted smoke detectors, (4) duct mounted smoke detectors, (4) ocntrol relay for fsd, (4) control relays for evap units per floor. replace (7) existing smoke detectors. | $43,100 |
| Nov 6, 2015 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | lighting only for ti in office floors 8, 10, 14Details
lighting only for ti in office floors 8, 10, 14 | $30,000 |
| Nov 6, 2015 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | lighting only for ti oin mezz and 2nd fl.Details
lighting only for ti oin mezz and 2nd fl. | |
| Nov 6, 2015 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | lighting only for ti in office floors 9,15, 16.Details
lighting only for ti in office floors 9,15, 16. | $30,000 |
| Nov 5, 2015 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | t-24 electrical compliance for pa#201507060687 & 201507060689 3rd and 4thDetails
t-24 electrical compliance for pa#201507060687 & 201507060689 3rd and 4th | |
| Oct 28, 2015 | Never finaled issued Oct 2015, no final | 995 Market St | Red Hawk Fire & Security Ca Llc | relocate 71 and add 38 new sprinkler heads for ti floors 8, 9, 10, 14, 15, 16. ref pa 2015-0728-2594 (9, 15 & 16), ref pa 2015-0728-2593 (8, 10 and 14 floors). maher naDetails
relocate 71 and add 38 new sprinkler heads for ti floors 8, 9, 10, 14, 15, 16. ref pa 2015-0728-2594 (9, 15 & 16), ref pa 2015-0728-2593 (8, 10 and 14 floors). maher na | $60,000 |
| Oct 26, 2015 | Completed final sign-off Oct 2020 | 995 Market St | All Air Mechanical Contractors Inc. | installation of hvac work for 8,9,10,14,15,16 floors: reference 2015.0728.2593 for 8,10,14 fl. 2015.0728.2594 for 9,15,16 fl.Details
installation of hvac work for 8,9,10,14,15,16 floors: reference 2015.0728.2593 for 8,10,14 fl. 2015.0728.2594 for 9,15,16 fl. | $278,000 |
| Oct 23, 2015 | Completed final sign-off Oct 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | mezz & 2nd floors: fire alarm ti - ref pa 2015-0706-0689 & 2015-0706-0687: add 30 speakers/strobes, 45 speakers and 1 strobeDetails
mezz & 2nd floors: fire alarm ti - ref pa 2015-0706-0689 & 2015-0706-0687: add 30 speakers/strobes, 45 speakers and 1 strobe | $22,000 |
| Oct 7, 2015 | Completed final sign-off Sep 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | mezanine & 1st flr: red hawk/century shall relocate and add new sprinkler heads for tenant improvement. 68 upright and 43 pendantsDetails
mezanine & 1st flr: red hawk/century shall relocate and add new sprinkler heads for tenant improvement. 68 upright and 43 pendants | $38,000 |
| Sep 24, 2015 | Completed final sign-off Sep 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | revision to app#201509177342. add 3 duct detectors.Details
revision to app#201509177342. add 3 duct detectors. | $4,000 |
| Sep 24, 2015 | Completed final sign-off Oct 2020 | 995 Market St | Rod Heisler Construction | revision to pa# 201509036134, adding 2 fire smoke dampersDetails
revision to pa# 201509036134, adding 2 fire smoke dampers | $350 |
| Sep 17, 2015 | Completed final sign-off Sep 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | 3rd & 4th floor fire alarm t.i. - add (27) speaker/strobes, (37) speakers, (4) strobes, (1) duct detector, (4) smoke detectors. ref #2015-0615-8928 (3rd floor) & #2015-0615-8929 (4th floor).Details
3rd & 4th floor fire alarm t.i. - add (27) speaker/strobes, (37) speakers, (4) strobes, (1) duct detector, (4) smoke detectors. ref #2015-0615-8928 (3rd floor) & #2015-0615-8929 (4th floor). | $18,000 |
| Sep 9, 2015 | Completed final sign-off Sep 2020 | 995 Market St | Red Hawk Fire & Security Ca Llc | 3rd and 4th floor - relocating 78 uprights, 7 pendents for ti. light hazard occupancy. ref pa 2015-0615-8959 and 2015-0615-8928Details
3rd and 4th floor - relocating 78 uprights, 7 pendents for ti. light hazard occupancy. ref pa 2015-0615-8959 and 2015-0615-8928 | $16,000 |
| Sep 3, 2015 | Never finaled issued Oct 2015, no final | 995 Market St | All Air Mechanical Contractors Inc. | 2nd and mezzanine - installation of fan coils 34 (4) condemn. title 24 combine & ductworkDetails
2nd and mezzanine - installation of fan coils 34 (4) condemn. title 24 combine & ductwork | $180,000 |
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 995 Market St | All Air Mechanical Contractors Inc. | installation of 19 fan coil units, 3 condemn. title 24 combine including duct work, mechanical plans for phase 1 on 3rd and 4th floors. ref t.i. #201506158928 & 201506158929.Details
installation of 19 fan coil units, 3 condemn. title 24 combine including duct work, mechanical plans for phase 1 on 3rd and 4th floors. ref t.i. #201506158928 & 201506158929. | $180,000 |
| Aug 26, 2015 | Never finaled issued Aug 2015, no final | 995 Market St | street space w/mta | ||
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 995 Market St | minor mechanical revision to bldg. appl. 2015.0227.9585. maher n/a. to clarify sffd bullentin met ab205 for work in basement per m1.1 on original plan.Details
minor mechanical revision to bldg. appl. 2015.0227.9585. maher n/a. to clarify sffd bullentin met ab205 for work in basement per m1.1 on original plan. | ||
| Aug 6, 2015 | Completed final sign-off Oct 2015 | 995 Market St | Red Hawk Fire & Security Ca Llc | 1st floor, fire alarm ti on 1st floor and basement. add (12) speaker/strobes, (8) addressable duct smoke detector & relay; add (2) addressable duct detectors for fsd.Details
1st floor, fire alarm ti on 1st floor and basement. add (12) speaker/strobes, (8) addressable duct smoke detector & relay; add (2) addressable duct detectors for fsd. | $12,000 |
| Aug 3, 2015 | Never finaled issued Aug 2015, no final | 995 Market St | Eric F Anderson Incorporated | cvs: ground floor: vrc lift & anchoring system for shelving ref pa# 201502279585Details
cvs: ground floor: vrc lift & anchoring system for shelving ref pa# 201502279585 | $65,000 |
| Jul 28, 2015 | Never finaled issued Aug 2015, no final | 995 Market St | Rod Heisler Construction | 8th, 10th,& 14th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit.Details
8th, 10th,& 14th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit. | $528,900 |
| Jul 28, 2015 | Never finaled issued Aug 2015, no final | 995 Market St | Rod Heisler Construction | 9th, 15th, & 16th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit.Details
9th, 15th, & 16th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit. | $525,900 |
| Jul 27, 2015 | Completed final sign-off Aug 2015 | 995 Market St | Red Hawk Fire & Security Ca Llc | #104- fire alarm t.i. for 1/f, for two added fire smoke dampers (by others), provide (1) smoke detector & (1) relay for fire smoke damper closure. t.i. pa#201502178437Details
#104- fire alarm t.i. for 1/f, for two added fire smoke dampers (by others), provide (1) smoke detector & (1) relay for fire smoke damper closure. t.i. pa#201502178437 | $10,000 |
| Jul 27, 2015 | Completed final sign-off Jul 2015 | 995 Market St | American Mechanical Inc | storage #104 - install new supply grille, new return grille, install two new fire smoke dampers. replace outside air fan. ref pa #201406269653Details
storage #104 - install new supply grille, new return grille, install two new fire smoke dampers. replace outside air fan. ref pa #201406269653 | $5,400 |
| Jul 6, 2015 | Never finaled issued Sep 2015, no final | 995 Market St | Rod Heisler Construction | mezzanine: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit. floor in-fill under separate permit. sprinkler retro under pa# 2015-0326-1965Details
mezzanine: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit. floor in-fill under separate permit. sprinkler retro under pa# 2015-0326-1965 | $323,100 |
| Jul 6, 2015 | Never finaled issued Sep 2015, no final | 995 Market St | Rod Heisler Construction | 2nd floor: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit.Details
2nd floor: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit. | $576,600 |
| Jun 15, 2015 | Never finaled issued Jul 2015, no final | 995 Market St | Rod Heisler Construction | 3rd floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit.Details
3rd floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit. | $416,550 |
| Jun 15, 2015 | Never finaled issued Jul 2015, no final | 995 Market St | Rod Heisler Construction | 4th floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit.Details
4th floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit. | $199,750 |
| Jun 11, 2015 | Never finaled issued Jun 2015, no final | 995 Market St | street space & mta | ||
| Jun 11, 2015 | Completed final sign-off Aug 2015 | 995 Market St | All Valley Fire Protection **See Notes* | basement & ground floor - add 72 pendant heads from existing outlets & 14 upright heads for new ceiling layout. ref t.i. #201502279585.Details
basement & ground floor - add 72 pendant heads from existing outlets & 14 upright heads for new ceiling layout. ref t.i. #201502279585. | $15,000 |
| Jun 5, 2015 | Never finaled issued Jun 2015, no final | 995 Market St | street space | ||
| May 12, 2015 | Completed final sign-off Mar 2016 | 995 Market St | Superior Electrical Advertising Inc | cvs pharmacy: erect two illuminated channel letter signsDetails
cvs pharmacy: erect two illuminated channel letter signs | $10,000 |
| May 12, 2015 | Completed final sign-off Mar 2016 | 995 Market St | Superior Electrical Advertising Inc | erect two illuminated blade signsDetails
erect two illuminated blade signs | $10,000 |
| May 4, 2015 | Never finaled issued Jun 2015, no final | 995 Market St | Eric F Anderson Incorporated | ground flr: removal & replacement of a portion of (e) slab. ti approved under separate permit 2015 0227 9585Details
ground flr: removal & replacement of a portion of (e) slab. ti approved under separate permit 2015 0227 9585 | $100,000 |
| Apr 21, 2015 | Never finaled issued Jun 2015, no final | 995 Market St | street space | ||
| Apr 9, 2015 | Completed final sign-off Oct 2015 | 995 Market St | Novo Construction Inc | m,2,3,4,8,9,10,14,15 & 16th flrs: demo of non-loading partitions, finishes, lighting and ceilings. ab.017Details
m,2,3,4,8,9,10,14,15 & 16th flrs: demo of non-loading partitions, finishes, lighting and ceilings. ab.017 | $50,000 |
| Mar 26, 2015 | Completed final sign-off Jul 2015 | 995 Market St | umbrella permit: compliance with high rise sprinkler ordinace 377-93. apn 201502279502 - as buildDetails
umbrella permit: compliance with high rise sprinkler ordinace 377-93. apn 201502279502 - as build | ||
| Mar 23, 2015 | Completed final sign-off Aug 2015 | 995 Market St | Balfour Beatty Construction Llc | to abate nov numbers 200993151, 200236116, which were performed under permit #201409226984Details
to abate nov numbers 200993151, 200236116, which were performed under permit #201409226984 | |
| Mar 10, 2015 | Completed final sign-off Apr 2015 | 995 Market St | American Mechanical Inc | revision to app#201406269653 per ab-005 garage exhaust termination requirement notation changed.Details
revision to app#201406269653 per ab-005 garage exhaust termination requirement notation changed. | |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 995 Market St | Aaa Restaurant Fire Control/Dba Aaa Fire | fire sprinkler as built to pa# 201312184534. converted dry standpipe to manual wet standpipe and relocated hose valves on each floor to new location.Details
fire sprinkler as built to pa# 201312184534. converted dry standpipe to manual wet standpipe and relocated hose valves on each floor to new location. | |
| Feb 27, 2015 | Completed final sign-off Oct 2015 | 995 Market St | Eric F Anderson Incorporated | ti for (n) cvs pharmacy on grnd flr & basement. work includes (n) partitions, fixtures, finished, restrooms mep, installation of (n) freight lift from basement to grnd flr. fire protection & shelving under seperate permit. no exterior workDetails
ti for (n) cvs pharmacy on grnd flr & basement. work includes (n) partitions, fixtures, finished, restrooms mep, installation of (n) freight lift from basement to grnd flr. fire protection & shelving under seperate permit. no exterior work | $1,600,000 |
| Feb 23, 2015 | Completed final sign-off Aug 2015 | 995 Market St | Maguire Inc Dba Lahue And Associates | evacuation signs (35) basement, 1st, mezz., 2nd thru 16th floors, no 13th floor.Details
evacuation signs (35) basement, 1st, mezz., 2nd thru 16th floors, no 13th floor. | $10,500 |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 995 Market St | Balfour Beatty Construction Llc | 1st floor: demo select partitions, power/data, & construction of demising wall & slab infill @ (e) stair location between ground floor & mezz.Details
1st floor: demo select partitions, power/data, & construction of demising wall & slab infill @ (e) stair location between ground floor & mezz. | $100,000 |
| Nov 5, 2014 | Never finaled issued Nov 2014, no final | 995 Market St | street space and mta parking | ||
| Oct 28, 2014 | Completed final sign-off Aug 2015 | 995 Market St | Balfour Beatty Construction Llc | revision to app#201312264763. removing 2 accessible restrooms from mezz level. tenant space to remain vacant per ab-017 until all accessible features and required fixture counts are returned. ada restroom to be installed under separate permit.Details
revision to app#201312264763. removing 2 accessible restrooms from mezz level. tenant space to remain vacant per ab-017 until all accessible features and required fixture counts are returned. ada restroom to be installed under separate permit. | |
| Oct 28, 2014 | Completed final sign-off Nov 2015 | 995 Market St | Balfour Beatty Construction Llc | barrier removal only. install new restrooms in kadvance of new t.i. on mezzanine. mep and fire projection under seperate permits.Details
barrier removal only. install new restrooms in kadvance of new t.i. on mezzanine. mep and fire projection under seperate permits. | |
| Oct 16, 2014 | Completed final sign-off Mar 2015 | 995 Market St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. for basement through 16/f (no 13/f) 19 smoke detectors, 2 relays, 60 speaker/strobes. t.i. pa#201312204763Details
fire alarm t.i. for basement through 16/f (no 13/f) 19 smoke detectors, 2 relays, 60 speaker/strobes. t.i. pa#201312204763 | $20,000 |
| Sep 22, 2014 | Completed final sign-off Aug 2015 | 995 Market St | Balfour Beatty Construction Llc | to comply with nov 200236116. restoring aluminum and non-structrual cladding system in designated exterior area with the following. remaining all deteriorated components and installing new flashing system, hand scrub cleaning panels, restoring operation of windows. new structural framework will beDetails
to comply with nov 200236116. restoring aluminum and non-structrual cladding system in designated exterior area with the following. remaining all deteriorated components and installing new flashing system, hand scrub cleaning panels, restoring operation of windows. new structural framework will be | $2,340,000 |
| Jun 26, 2014 | Completed final sign-off Apr 2015 | 995 Market St | American Mechanical Inc | install new exhaust grilles and duct on floors 4-15 to e duct riser. install ceiling exhaust fans to serve mezz, 2nd, and 3rd fl restrooms. install ceiling exhaust fans and intake hoods to provide o/a to gr fl and 3rd fl exit corridors, install garage ventilation system. 3 psds. comply maher not reqDetails
install new exhaust grilles and duct on floors 4-15 to e duct riser. install ceiling exhaust fans to serve mezz, 2nd, and 3rd fl restrooms. install ceiling exhaust fans and intake hoods to provide o/a to gr fl and 3rd fl exit corridors, install garage ventilation system. 3 psds. comply maher not req | $59,200 |
| May 19, 2014 | Never finaled issued May 2014, no final | 995 Market St | street space w/mta | ||
| Apr 28, 2014 | Completed final sign-off Jul 2015 | 995 Market St | Balfour Beatty Construction Llc | comply w/nov 200236116-mock up w/intend to later repair. exterior repair: restore alum & glass curtain wall sys, remove deteriorated components, install new flashing, hand-scrub cleaning panels, restore operation of windows, install 3-coat stucco cladding panel sys to replace miss ext panels.Details
comply w/nov 200236116-mock up w/intend to later repair. exterior repair: restore alum & glass curtain wall sys, remove deteriorated components, install new flashing, hand-scrub cleaning panels, restore operation of windows, install 3-coat stucco cladding panel sys to replace miss ext panels. | $10,000 |
| Dec 20, 2013 | Completed final sign-off Apr 2015 | 995 Market St | Balfour Beatty Construction Llc | voluntary structural upgrade, interior upgrades, restroom upgrades. mep deferred permits. no exterior work in job scope. ** interim controls - market street & soma: see attached. **Details
voluntary structural upgrade, interior upgrades, restroom upgrades. mep deferred permits. no exterior work in job scope. ** interim controls - market street & soma: see attached. ** | $1,330,000 |
| Dec 20, 2013 | Completed final sign-off Apr 2015 | 995 Market St | Balfour Beatty Construction Llc | barrier removal at restrooms on 4, 5, 6, 7, 10, 11, & 14 floors. project scope consists demo of partitions, and associated elec,plumbing and ceiling work at restrooms. install new ceilings,finishes, elec, plumbing. no modifaction of e mech or structural. mech,elec, ls,sprinklers, separate permit.Details
barrier removal at restrooms on 4, 5, 6, 7, 10, 11, & 14 floors. project scope consists demo of partitions, and associated elec,plumbing and ceiling work at restrooms. install new ceilings,finishes, elec, plumbing. no modifaction of e mech or structural. mech,elec, ls,sprinklers, separate permit. | $250,000 |
| Dec 18, 2013 | Completed final sign-off Apr 2015 | 995 Market St | Aaa Restaurant Fire Control/Dba Aaa Fire | addition of new sprinklers at each floor in all unsprinklered areas per nfpa 13Details
addition of new sprinklers at each floor in all unsprinklered areas per nfpa 13 | $140,000 |
| Nov 5, 2013 | Completed final sign-off Apr 2015 | 995 Market St | Balfour Beatty Construction Llc | project scope consists of path of travel upgrades with minor construction involved for compliance with sf dbi administrative bulletin #056. no modification to (e) mechanical or structural system is required.Details
project scope consists of path of travel upgrades with minor construction involved for compliance with sf dbi administrative bulletin #056. no modification to (e) mechanical or structural system is required. | $18,500 |
| Jul 16, 2013 | Never finaled issued Jul 2013, no final | 995 Market St | street space | ||
| Jun 28, 2013 | Completed final sign-off Jul 2015 | 995 Market St | Howard S. Wright Constructors Lp | soft demolitoin of drywall, plaster and flooring materials on 4 floors. approx 25000 sq ft. includes 1st, 2nd, 3rd floors. (partial ground floor) - comply with nov# 200236116 & 20099315Details
soft demolitoin of drywall, plaster and flooring materials on 4 floors. approx 25000 sq ft. includes 1st, 2nd, 3rd floors. (partial ground floor) - comply with nov# 200236116 & 20099315 | $135,000 |
| Aug 17, 2012 | Expired or cancelled withdrawn Jan 2016 | 995 Market St | Vulcan Fire Protection | replace failing class 2 standpipe riser for floor 3-15.Details
replace failing class 2 standpipe riser for floor 3-15. | $14,000 |
| Feb 24, 2012 | Never finaled issued Feb 2012, no final | 995 Market St | to obtain final inspection for work approved under pa # 200208073359. all work has been completed.Details
to obtain final inspection for work approved under pa # 200208073359. all work has been completed. | ||
| Dec 20, 2011 | Completed final sign-off Jul 2012 | 995 Market St | Red Hawk Fire & Security Ca Llc | 7th,9th,10th,12th & 15th flrs-fire alarm t.i for security, door release. 5 relays & 2 smokesDetails
7th,9th,10th,12th & 15th flrs-fire alarm t.i for security, door release. 5 relays & 2 smokes | $6,000 |
| Nov 2, 2011 | Completed final sign-off Jul 2012 | 995 Market St | construction of corridor passage doors on 9th & 10th floors. install grab bars @ bathroom on 9th & 10th floors.Details
construction of corridor passage doors on 9th & 10th floors. install grab bars @ bathroom on 9th & 10th floors. | $4,000 | |
| Jul 1, 2011 | Completed final sign-off Jul 2011 | 995 Market St | to obtain final inspection for work approved under pa# 200802095872. all work is complete.Details
to obtain final inspection for work approved under pa# 200802095872. all work is complete. | ||
| Jul 1, 2011 | Never finaled issued Jul 2011, no final | 995 Market St | to obtain final inspection for work approved under pa# 200307109212. all work is complete.Details
to obtain final inspection for work approved under pa# 200307109212. all work is complete. | ||
| Jul 1, 2011 | Never finaled issued Jul 2011, no final | 995 Market St | to obtain final inspection for work approved under pa#200305053838. all work is complete.Details
to obtain final inspection for work approved under pa#200305053838. all work is complete. | ||
| Feb 1, 2011 | Never finaled issued Feb 2011, no final | 995 Market St | to obtain final inspection for work approved under pa 200208093591; all work is completeDetails
to obtain final inspection for work approved under pa 200208093591; all work is complete | ||
| Oct 27, 2010 | Completed final sign-off Mar 2011 | 995 Market St | remove painted wall sign from building per dcp nov 9908.Details
remove painted wall sign from building per dcp nov 9908. | $1,500 | |
| Feb 9, 2004 | Expired or cancelled expired Sep 2005 | 995 Market St | Metropolitan Electrical Construction | delete installation of valvetamper switches and will be installed at a future date when sprinklerDetails
delete installation of valvetamper switches and will be installed at a future date when sprinkler | |
| Jul 10, 2003 | Expired or cancelled expired Mar 2004 | 995 Market St | remove (e)panels for exploratory testing to prepare for abatement of violation due to falling hazardDetails
remove (e)panels for exploratory testing to prepare for abatement of violation due to falling hazard | $20,000 | |
| Jun 10, 2003 | Expired or cancelled expired Dec 2004 | 995 Market St | Metropolitan Electrical Construction | add 1 smoke, 1 door release pull station on floors: mezz, 2nd, 3rd, 4th, 5th, 6th, 8th,& 9th floorsDetails
add 1 smoke, 1 door release pull station on floors: mezz, 2nd, 3rd, 4th, 5th, 6th, 8th,& 9th floors | $4,000 |
| Jun 3, 2003 | Expired or cancelled expired Dec 2004 | 995 Market St | removal of all remaining vinyl from southern facing wall, left behind after painting out general advDetails
removal of all remaining vinyl from southern facing wall, left behind after painting out general adv | $500 | |
| May 5, 2003 | Expired or cancelled expired Dec 2004 | 995 Market St | additional location of work to previously apprvd permit app 200302268374-for emergency removal-to inDetails
additional location of work to previously apprvd permit app 200302268374-for emergency removal-to in | $10,000 | |
| Feb 26, 2003 | Expired or cancelled expired Sep 2005 | 995 Market St | emergency removal of exterior wall panels per plans to mitigate falling hazard, temporary fix subjecDetails
emergency removal of exterior wall panels per plans to mitigate falling hazard, temporary fix subjec | $25,000 | |
| Dec 18, 2002 | Expired or cancelled expired Jul 2003 | 995 Market St | add ceiling height walls to make a small office spach and storage ( additional work to the permit#Details
add ceiling height walls to make a small office spach and storage ( additional work to the permit# | $2,000 | |
| Nov 26, 2002 | Expired or cancelled expired Dec 2004 | 995 Market St | stablize (e) sheet metal panel facing with (e) brick wall facing steveson st-cosmetic work only.Details
stablize (e) sheet metal panel facing with (e) brick wall facing steveson st-cosmetic work only. | $38,000 | |
| Sep 12, 2002 | Completed final sign-off Jul 2003 | 995 Market St | new 2 hr rated shaft enclosure associated with like safety upgrade. no flrs 3 to 15. permit #974011Details
new 2 hr rated shaft enclosure associated with like safety upgrade. no flrs 3 to 15. permit #974011 | $6,000 | |
| Aug 9, 2002 | Expired or cancelled expired Dec 2004 | 995 Market St | replace counters & remodel seating area.incl-non structural decourated columns, re-arrange seatings.Details
replace counters & remodel seating area.incl-non structural decourated columns, re-arrange seatings. | $28,800 | |
| Aug 7, 2002 | Expired or cancelled expired Dec 2004 | 995 Market St | Metropolitan Electrical Construction | upgrade fire alarm system. new back bone & annunciation panel & replace all (e) devicesDetails
upgrade fire alarm system. new back bone & annunciation panel & replace all (e) devices | $114,000 |
| Dec 5, 2001 | Completed final sign-off May 2002 | 995 Market St | Safeshields Incorporated | removal of aluminum pavels in front of building, removal of illegal sign pasted on the panelsDetails
removal of aluminum pavels in front of building, removal of illegal sign pasted on the panels | $39,000 |
| Nov 29, 2001 | Expired or cancelled expired May 2002 | 995 Market St | street space permit | ||
| Jun 8, 2001 | Expired or cancelled expired Sep 2002 | 995 Market St | Peacock Construction Inc | oti-1 15th floor el, l/s, sp | $68,000 |
| May 14, 2001 | Expired or cancelled expired May 2002 | 995 Market St | Peacock Construction Inc | oti-1, 12th flr,el,ls,sp | $45,000 |
| Apr 26, 2001 | Expired or cancelled expired May 2002 | 995 Market St | Peacock Construction Inc | oti-1, 8th floor, el, ls, sp | $77,000 |
| Feb 21, 2001 | Expired or cancelled expired Sep 2001 | 995 Market St | Peacock Construction Inc | oti-1 16th floor el,me,ls,sp | $8,500 |
| Jun 15, 2000 | Expired or cancelled cancelled Jan 2002 | 995 Market St | Mazzys Fire Protection | add fire sprinkler to storage area in basement. | $4,000 |
| Feb 9, 2000 | Expired or cancelled expired Dec 2001 | 995 Market St | A Total Fire Protectoin | replacement of defective omega fire sprinkler head shall have same specificationsDetails
replacement of defective omega fire sprinkler head shall have same specifications | |
| Feb 3, 2000 | Expired or cancelled cancelled Feb 2001 | 995 Market St | renewal of app #9803591 | ||
| Jan 28, 2000 | Expired or cancelled expired Dec 2001 | 995 Market St | renew expired appl #9807665 | ||
| Jan 28, 2000 | Expired or cancelled expired Dec 2001 | 995 Market St | renew expired appl #9803250 | ||
| Jan 28, 2000 | Expired or cancelled expired Dec 2001 | 995 Market St | renew expired appl #9725721 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rod Heisler Construction (20), Red Hawk Fire & Security Ca Llc (17), Balfour Beatty Construction Llc (9), All Air Mechanical Contractors Inc. (4), Peacock Construction Inc (4), American Mechanical Inc (3), Eric F Anderson Incorporated (3), Metropolitan Electrical Construction (3), Trainor Commercial Construction Inc. (3), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Arrow Sign Company (2), Superior Electrical Advertising Inc (2), A Total Fire Protectoin, All Valley Fire Protection **See Notes*, Esquivel Grading & Paving, Inc., Firemaster, Howard S. Wright Constructors Lp, Maguire Inc Dba Lahue And Associates, Mazzys Fire Protection, Narrowback Construction Co., Novo Construction Inc, Safeshields Incorporated, San Francisco Commercial Builders Inc, United States Information Systems Inc, Via Construction, Vulcan Fire Protection
- Architects
- Matthew Pietras (8), Martha L. Breed (4), James Heilbronner (2), John Thiele (2), Avram Forman, Elias Hoat, Irving Gonzales, Sashikala Murthy, Steven Kelley
- Engineers
- Jeremy Latterman (2), Raymond Lui, Thomas Yan
- Authorized agents
- Joyce Mizuhara
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.