Matthew Pietras
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Mk Think
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to Jul 2017
58 permits since 2000 (architect on 51 permits, engineer on 3 permits, authorized agent-others on 2 permits, designer on 2 permits): 38 completed, 13 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 11, 2017 | Expired or cancelled cancelled Jan 2026 | 730 Harrison St | partial 2nd floor t.i. new non-structural partitions, millwork, lauy-in ceilings, light fixtures & small sink @ millwork area. mep, fire alarm & fire sprinkler for deferred submittal (under seperate permit) ** maher: n/a **Details
partial 2nd floor t.i. new non-structural partitions, millwork, lauy-in ceilings, light fixtures & small sink @ millwork area. mep, fire alarm & fire sprinkler for deferred submittal (under seperate permit) ** maher: n/a ** | $150,244 | |
| Dec 9, 2016 | Expired or cancelled expired Oct 2023 | 8 16th Av | A M V Construction | revision to pa 2016-1011-9866 relocate bathroom & gym, closets, revised lighting layout. add powder roomDetails
revision to pa 2016-1011-9866 relocate bathroom & gym, closets, revised lighting layout. add powder room | |
| Nov 14, 2016 | Completed final sign-off Nov 2017 | 201 Mission St | Richlen Construction | on the 28th floor only - remove & relocate non-load bearing interior partitions, new paint, new flooring, ceilings, lights & pantry fixtures, for single tenant occupancy (e) fire separation is reconfiguresd, but maintained. mep & sprinklers under separate permit. n/a for maher.Details
on the 28th floor only - remove & relocate non-load bearing interior partitions, new paint, new flooring, ceilings, lights & pantry fixtures, for single tenant occupancy (e) fire separation is reconfiguresd, but maintained. mep & sprinklers under separate permit. n/a for maher. | $390,000 |
| Oct 12, 2016 | Completed final sign-off May 2018 | 2750 Jackson St | Plant Construction Co, Lp | development of existing shell space for gym and theater use including new finishes, lighting, mechanical and structural framing at 2nd fl (maher not req).Details
development of existing shell space for gym and theater use including new finishes, lighting, mechanical and structural framing at 2nd fl (maher not req). | $1,800,000 |
| Oct 11, 2016 | Expired or cancelled expired Oct 2023 | 8 16th Av | minor interior renovation of lower level, including non-structural demolition & new partitions, new baths, new bedroom, gym & plus replacing (e) stair. mechanical, electrical, plumbing under separate permit.Details
minor interior renovation of lower level, including non-structural demolition & new partitions, new baths, new bedroom, gym & plus replacing (e) stair. mechanical, electrical, plumbing under separate permit. | $12,000 | |
| Jul 29, 2016 | Completed final sign-off Nov 2016 | 2 Harrison St | Gci, Inc | suite 138: minor ti -adding two doors and frames to office space maher naDetails
suite 138: minor ti -adding two doors and frames to office space maher na | $65,000 |
| May 24, 2016 | Completed final sign-off Jul 2016 | 730 Harrison St | Gci, Inc | 2/f: interior non-structural demolition of (e) office space on floor 2. remain vacant under ab-017.Details
2/f: interior non-structural demolition of (e) office space on floor 2. remain vacant under ab-017. | $26,000 |
| May 5, 2016 | Expired or cancelled cancelled Jan 2026 | 1161 Mission St | Spediacci Construction Inc | minor revision to pa 2015-1207-4277 addition/upgrade to second path of egress. floor layout to return to existing layout. maher naDetails
minor revision to pa 2015-1207-4277 addition/upgrade to second path of egress. floor layout to return to existing layout. maher na | |
| Apr 26, 2016 | Completed final sign-off Jun 2016 | 180 Golden Gate Av | Bcci Construction Company | 1st floor - structural work associated with approved pa 20150921 7519 for play structure. maher naDetails
1st floor - structural work associated with approved pa 20150921 7519 for play structure. maher na | $1,500 |
| Mar 30, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 14th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit.Details
14th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit. | $580,000 |
| Mar 30, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 13th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit.Details
13th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit. | $580,000 |
| Mar 30, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 15th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit.Details
15th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit. | $580,000 |
| Mar 18, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 11th flr: interior tenant fit out of a full floor including interior non load nearing partitions, partial ceilings, lighting & finishes for single tenant. maher naDetails
11th flr: interior tenant fit out of a full floor including interior non load nearing partitions, partial ceilings, lighting & finishes for single tenant. maher na | $576,600 |
| Mar 18, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 12th flr: interior tenant fit out of a full floor including interior non load nearing partitions, partial ceilings, lighting & finishes for single tenant. maher naDetails
12th flr: interior tenant fit out of a full floor including interior non load nearing partitions, partial ceilings, lighting & finishes for single tenant. maher na | $576,600 |
| Feb 26, 2016 | Completed final sign-off Mar 2017 | 3220 Sacramento St | classroom alteration that includes non-structural demo, new partitions, ceilings and finishes.Details
classroom alteration that includes non-structural demo, new partitions, ceilings and finishes. | $69,300 | |
| Feb 17, 2016 | Expired or cancelled cancelled Jan 2026 | 1161 Mission St | to revise pa#201512074277 to reduce scope regarding existing fire escape. n/a ordinance #155-13Details
to revise pa#201512074277 to reduce scope regarding existing fire escape. n/a ordinance #155-13 | ||
| Feb 1, 2016 | Completed final sign-off Sep 2020 | 995 Market St | Trainor Commercial Construction Inc. | demo of extg walls non-bearing, carpet, misc., doors and frames.Details
demo of extg walls non-bearing, carpet, misc., doors and frames. | $50,000 |
| Dec 7, 2015 | Completed final sign-off Jun 2016 | 1161 Mission St | Spediacci Construction Inc | penthouse- interior tenant fit out of an office use including non-load bearing partitions, partial ceilings and finishes, single tenant occupancy. mechanical, electrical, electrical, plumbing & sprinkler under seperate permit. n/a ordinance #155-13Details
penthouse- interior tenant fit out of an office use including non-load bearing partitions, partial ceilings and finishes, single tenant occupancy. mechanical, electrical, electrical, plumbing & sprinkler under seperate permit. n/a ordinance #155-13 | $147,301 |
| Nov 6, 2015 | Completed final sign-off Sep 2016 | 3580 California St | Rod Heisler Construction | ste. 201: commercial interior t.i. includes non structural demolitions, new partitions, ceiling and finishes at 2nd flDetails
ste. 201: commercial interior t.i. includes non structural demolitions, new partitions, ceiling and finishes at 2nd fl | $48,125 |
| Nov 4, 2015 | Never finaled issued Dec 2015, no final | 536 Mission St | occupant load adjustment to level 6 of bldgDetails
occupant load adjustment to level 6 of bldg | ||
| Oct 6, 2015 | Completed final sign-off Jun 2016 | 1161 Mission St | Spediacci Construction Inc | 4th flr: interior tenant fit-out of an office use, including interior non-load bearing partitions, partial ceilings, lighting & finishes. floors to be single tenant occupancy; maher n/aDetails
4th flr: interior tenant fit-out of an office use, including interior non-load bearing partitions, partial ceilings, lighting & finishes. floors to be single tenant occupancy; maher n/a | $539,000 |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 180 Golden Gate Av | Bcci Construction Company | 1st floor:partial renovation to extg bldg including new walls, new doors, new finishes, new millwork, new ceilings and new lights and associated mep and structural upgrade. fire ls under seperate permit. n/a for maher.Details
1st floor:partial renovation to extg bldg including new walls, new doors, new finishes, new millwork, new ceilings and new lights and associated mep and structural upgrade. fire ls under seperate permit. n/a for maher. | $550,000 |
| Aug 25, 2015 | Completed final sign-off Sep 2015 | 536 Mission St | Cahill Contractors Inc | revision to pa 2015-0115-5843 - 6/f storage converted to workroom (n) casework, (n) ceiling, (n) lights; faculty lounge - new accoustic ceiling clouds and (n) lightsDetails
revision to pa 2015-0115-5843 - 6/f storage converted to workroom (n) casework, (n) ceiling, (n) lights; faculty lounge - new accoustic ceiling clouds and (n) lights | $100,000 |
| Jul 29, 2015 | Completed final sign-off Sep 2016 | 3580 California St | Rod Heisler Construction | demolition of existing non structural partitions, new partitions, ceilings, finishesDetails
demolition of existing non structural partitions, new partitions, ceilings, finishes | $38,500 |
| Jul 28, 2015 | Never finaled issued Aug 2015, no final | 995 Market St | Rod Heisler Construction | 9th, 15th, & 16th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit.Details
9th, 15th, & 16th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit. | $525,900 |
| Jul 28, 2015 | Never finaled issued Aug 2015, no final | 995 Market St | Rod Heisler Construction | 8th, 10th,& 14th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit.Details
8th, 10th,& 14th floors: interior tenant fit-out of a full floor as office use including interior non-load bearing partitions, partial ceilings, lighting and finishes. floor is single tenant occupancy. m e p, f p under seperate permit. | $528,900 |
| Jul 14, 2015 | Completed final sign-off Aug 2015 | 536 Mission St | Cahill Contractors Inc | revision to 201503029644 and 201504173908. add ceiling above cafe. kitchenn/storage and counter, per sfdph requirementsDetails
revision to 201503029644 and 201504173908. add ceiling above cafe. kitchenn/storage and counter, per sfdph requirements | $1,000 |
| Jul 6, 2015 | Never finaled issued Sep 2015, no final | 995 Market St | Rod Heisler Construction | 2nd floor: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit.Details
2nd floor: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit. | $576,600 |
| Jul 6, 2015 | Never finaled issued Sep 2015, no final | 995 Market St | Rod Heisler Construction | mezzanine: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit. floor in-fill under separate permit. sprinkler retro under pa# 2015-0326-1965Details
mezzanine: interior t.i. full floor office use, including interior non-load bearing partitions, ceilings, lights and finishes. single tenant occupancy. mep/fp/fa under separate permit. floor in-fill under separate permit. sprinkler retro under pa# 2015-0326-1965 | $323,100 |
| Jun 15, 2015 | Never finaled issued Jul 2015, no final | 995 Market St | Rod Heisler Construction | 4th floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit.Details
4th floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit. | $199,750 |
| Jun 15, 2015 | Never finaled issued Jul 2015, no final | 995 Market St | Rod Heisler Construction | 3rd floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit.Details
3rd floor: interior tenant fit out of a full floor as office use includes interior non-load bearing partition ceilings and finishes. floor to be single tenant occupancy. mep and fire sprinklers under seperate permit. | $416,550 |
| Jun 3, 2015 | Completed final sign-off Jun 2015 | 536 Mission St | Rcm Fire Protection Inc. | 2nd floor - relocate fire sprinkler heads for tenant improvement. ref #2015.0316.0912.Details
2nd floor - relocate fire sprinkler heads for tenant improvement. ref #2015.0316.0912. | $8,500 |
| Jun 3, 2015 | Completed final sign-off Apr 2016 | 1161 Mission St | Bioneer Builders | 1st and 2nd floor: interior t.i. of full first floor and partial 2nd floor as office use, including interior non-load bearing partition, partial ceilings, lighting and finishes. mep, fire alarm and sprinkler under separate permit. no exterior work. maher n/a.Details
1st and 2nd floor: interior t.i. of full first floor and partial 2nd floor as office use, including interior non-load bearing partition, partial ceilings, lighting and finishes. mep, fire alarm and sprinkler under separate permit. no exterior work. maher n/a. | $593,500 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 1161 Mission St | Bioneer Builders | 5th floor: interior ti of office including non load bearing partitions, partial ceiling, finishes. single tenant occupancy. mep/fire/life saftey under sep permit. maher naDetails
5th floor: interior ti of office including non load bearing partitions, partial ceiling, finishes. single tenant occupancy. mep/fire/life saftey under sep permit. maher na | $585,000 |
| May 12, 2015 | Never finaled issued May 2015, no final | 535 Mission St | Novo Construction Inc | 15th floor: revision to app#201504204013 to correct smoke control report date. ref app#201504204013Details
15th floor: revision to app#201504204013 to correct smoke control report date. ref app#201504204013 | |
| May 12, 2015 | Never finaled issued May 2015, no final | 535 Mission St | Novo Construction Inc | 16th floor: revision to app#201504204012 to correct smoke control report date. ref app#201504204013Details
16th floor: revision to app#201504204012 to correct smoke control report date. ref app#201504204013 | |
| May 12, 2015 | Never finaled issued May 2015, no final | 535 Mission St | Novo Construction Inc | 14th floor: revision to app201504204014 to correct smoke control report date. ref arch #201504204014Details
14th floor: revision to app201504204014 to correct smoke control report date. ref arch #201504204014 | |
| Apr 17, 2015 | Completed final sign-off Aug 2015 | 536 Mission St | Cahill Contractors Inc | revision to appl #2015.0302.9644 - tenant improvement fo rselected tenant for retail food service facility & details for vendor area. change occupant load assembly permit from sffd required.Details
revision to appl #2015.0302.9644 - tenant improvement fo rselected tenant for retail food service facility & details for vendor area. change occupant load assembly permit from sffd required. | $15,000 |
| Apr 9, 2015 | Completed final sign-off Oct 2015 | 995 Market St | Novo Construction Inc | m,2,3,4,8,9,10,14,15 & 16th flrs: demo of non-loading partitions, finishes, lighting and ceilings. ab.017Details
m,2,3,4,8,9,10,14,15 & 16th flrs: demo of non-loading partitions, finishes, lighting and ceilings. ab.017 | $50,000 |
| Mar 16, 2015 | Completed final sign-off Aug 2015 | 536 Mission St | Cahill Contractors Inc | partial renovation of 2/f, 3/f & 5/f of (e) building including demolition of (e) non structural partitions & (e) finishes. (n) non structural partitions, (n) ceilings, (n) lighting and (n) finishes.Details
partial renovation of 2/f, 3/f & 5/f of (e) building including demolition of (e) non structural partitions & (e) finishes. (n) non structural partitions, (n) ceilings, (n) lighting and (n) finishes. | $1,600,000 |
| Mar 16, 2015 | Expired or cancelled cancelled Aug 2015 | 536 Mission St | Cahill Contractors Inc | revision to pa# 201503029644 doors removed from scope.Details
revision to pa# 201503029644 doors removed from scope. | |
| Mar 16, 2015 | Completed final sign-off Jan 2016 | 535 Mission St | Novo Construction Inc | ti to include new non-load bearing partitions, partial ceiling, lighting and finishes. mep & life saftey under seperate permitDetails
ti to include new non-load bearing partitions, partial ceiling, lighting and finishes. mep & life saftey under seperate permit | $60,000 |
| Mar 2, 2015 | Completed final sign-off Aug 2015 | 536 Mission St | Cahill Contractors Inc | partial renovation of the 1st flr & mezz of (e) bld. include demo of non-structural partitions and finishes, and new toilet rooms, new non-structural partitions and new finishesDetails
partial renovation of the 1st flr & mezz of (e) bld. include demo of non-structural partitions and finishes, and new toilet rooms, new non-structural partitions and new finishes | $2,750,000 |
| Feb 17, 2015 | Completed final sign-off Jan 2016 | 535 Mission St | Novo Construction Inc | tenant improvement to include new non load bearing partitions, partial ceilings, lighting and finishes. mep and life safety under separate permitDetails
tenant improvement to include new non load bearing partitions, partial ceilings, lighting and finishes. mep and life safety under separate permit | $250,000 |
| Jan 15, 2015 | Never finaled issued Jan 2015, no final | 536 Mission St | Cahill Contractors Inc | partial renovation of the plaza, 1/f & 6/f of (e) bldg including demo of (e) non-structural partitions & (e) finishes. (n) non-structural partitions, (n) finishes & associated acessibility upgrades. no change in use or occupancy. electrical mechanical, fire alarm & fire sprinklerDetails
partial renovation of the plaza, 1/f & 6/f of (e) bldg including demo of (e) non-structural partitions & (e) finishes. (n) non-structural partitions, (n) finishes & associated acessibility upgrades. no change in use or occupancy. electrical mechanical, fire alarm & fire sprinkler | $2,200,000 |
| Nov 13, 2014 | Completed final sign-off Aug 2015 | 536 Mission St | Cahill Contractors Inc | 5th flr: renovations to the 5th flr classrooms of existing building including new interior partitions, new finishes, new exterior windows, new lighting and electrical, new mechanical distribution and associated accessibility upgrades, no change in use or occupancy.Details
5th flr: renovations to the 5th flr classrooms of existing building including new interior partitions, new finishes, new exterior windows, new lighting and electrical, new mechanical distribution and associated accessibility upgrades, no change in use or occupancy. | $1,500,000 |
| Jul 2, 2014 | Completed final sign-off Oct 2014 | 536 Mission St | Cahill Const Service Inc | revision to permit 201404304585, additional 208 sq. ft. balcony enclosed.Details
revision to permit 201404304585, additional 208 sq. ft. balcony enclosed. | $14,000 |
| Apr 30, 2014 | Completed final sign-off Sep 2014 | 536 Mission St | Cahill Const Service Inc | classroom & lecture hall renovtions to the mezzanine & 2nd floor of (e) bldg including (n) interior partitions, (n) finishes, (n) tiered concrete floor, (n) exterior windows & associated accessibility upgrades. no change in use or occupany.Details
classroom & lecture hall renovtions to the mezzanine & 2nd floor of (e) bldg including (n) interior partitions, (n) finishes, (n) tiered concrete floor, (n) exterior windows & associated accessibility upgrades. no change in use or occupany. | $984,000 |
| Apr 24, 2014 | Expired or cancelled withdrawn Apr 2014 | 536 Mission St | Cahill Const Service Inc | classroom and lecture hall renovations to the mezzanine & 2/f including (n) interior partitions, (n) finishes, (n) tiered concrete floor & associated accessibility upgrades. no change in use or occupancy, (n) exterior windows.Details
classroom and lecture hall renovations to the mezzanine & 2/f including (n) interior partitions, (n) finishes, (n) tiered concrete floor & associated accessibility upgrades. no change in use or occupancy, (n) exterior windows. | $984,000 |
| Dec 5, 2013 | Completed final sign-off Apr 2014 | 536 Mission St | Cahill Const Service Inc | 3rd flr: renovation of classrooms in 3rd floor of existing building, new interior partitions and finishes, required accessibility upgrade. mechanical and electrical under separate permitDetails
3rd flr: renovation of classrooms in 3rd floor of existing building, new interior partitions and finishes, required accessibility upgrade. mechanical and electrical under separate permit | $1,000,000 |
| Jun 13, 2013 | Completed final sign-off Jul 2014 | 2723 Pacific Av | Herrero Builders Incorporated | shoring and soil nails in relation to excavation at 2750 jackson street.Details
shoring and soil nails in relation to excavation at 2750 jackson street. | |
| Jun 13, 2013 | Completed final sign-off Jul 2014 | 2721 Pacific Av | Herrero Builders Incorporated | shoring and soile nails in realation to excavation at 2750 jacksonDetails
shoring and soile nails in realation to excavation at 2750 jackson | $1,000 |
| Jun 13, 2013 | Completed final sign-off Jul 2014 | 2719 Pacific Av | Herrero Builders Incorporated | shoring and soile nails in realation to excavation at 2750 jacksonDetails
shoring and soile nails in realation to excavation at 2750 jackson | $1,000 |
| Apr 23, 2013 | Completed final sign-off Aug 2013 | 536 Mission St | Cahill Const Service Inc | renovation to 4th fl of existing bldg including (n) interior partitions, (n) finishes, (n) exterior windows and associated accessibility upgrades. no change to use or occupancy. mech under seperate permit.Details
renovation to 4th fl of existing bldg including (n) interior partitions, (n) finishes, (n) exterior windows and associated accessibility upgrades. no change to use or occupancy. mech under seperate permit. | $1,142,000 |
| Apr 15, 2013 | Completed final sign-off Jul 2014 | 2770 Jackson St | Herrero Builders Incorporated | excavation shoring system for the construction of below grade improvements at the town shcool for boys site in s.f maximum cut heights of 37-feet will be retained with a temporary soil neil system.Details
excavation shoring system for the construction of below grade improvements at the town shcool for boys site in s.f maximum cut heights of 37-feet will be retained with a temporary soil neil system. | $1,000 |
| Sep 24, 2012 | Completed final sign-off Mar 2013 | 433 California St | Nibbi Bros Assoc Inc. | work in suite 210 & 220: non structural interior tenant improvement to e office spaces on the 2nd fl. combine 2 suites and associated restroom accessibility. mep, sprinkler/life safety separate permits.Details
work in suite 210 & 220: non structural interior tenant improvement to e office spaces on the 2nd fl. combine 2 suites and associated restroom accessibility. mep, sprinkler/life safety separate permits. | $1,167,446 |
| Jun 7, 2012 | Completed final sign-off Jun 2012 | 275 28th St | add 3 new skylights on roof (flat roof)Details
add 3 new skylights on roof (flat roof) | $5,000 | |
| Dec 22, 2011 | Completed final sign-off Oct 2012 | 2750 Jackson St | Fisher Development Inc | includes interior renovation of a private school, seismic improvements, renovation of a theater space, & replacement of windows at rear elevation.Details
includes interior renovation of a private school, seismic improvements, renovation of a theater space, & replacement of windows at rear elevation. | $2,000,000 |