Block 0241, lot 027
600 California St
- City’s use
- Commercial Office
- Built
- 1991
- Stories
- 20
- Building
- 403,629 sq ft
- Lot
- 31,797 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
171 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Nov 2026 | 600 California St | Novo Construction Inc | 14th floor: t.i demo of non-structural partitions+ building new non-structural partitions. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)Details
14th floor: t.i demo of non-structural partitions+ building new non-structural partitions. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $1,063,722 |
| Sep 18, 2026 | In progress issued Nov 2026 | 600 California St | Novo Construction Inc | 9th floor: space suite: t.i. includes demo, construction of (n) non-str partitions and upgrades to existing restrooms. all new or revised meps, sprinklers and fire alarm work will be design-build and submitted separately(bldg is fully sprinklered)Details
9th floor: space suite: t.i. includes demo, construction of (n) non-str partitions and upgrades to existing restrooms. all new or revised meps, sprinklers and fire alarm work will be design-build and submitted separately(bldg is fully sprinklered) | $2,381,908 |
| Sep 10, 2026 | In progress issued Nov 2026 | 600 California St | Novo Construction Inc | 5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered)Details
5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $2,750,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 600 California St | Novo Construction Inc | 16th and 17th floors: partial demolition to include non-structural partitions. suspended ceilings, finishes etc. ab-017Details
16th and 17th floors: partial demolition to include non-structural partitions. suspended ceilings, finishes etc. ab-017 | $35,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 600 California St | Novo Construction Inc | 19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017Details
19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017 | $85,000 |
| Oct 24, 2025 | Completed final sign-off Oct 2025 | 600 California St | Pioneer Fire Inc. | 2nd flr. add (2) pendents. ref: 202508274044Details
2nd flr. add (2) pendents. ref: 202508274044 | $500 |
| Apr 14, 2022 | Completed final sign-off Dec 2022 | 600 California St | Novo Construction Inc | 18/f: mep for t.i. consists of new lighting, new receptacles, new teledata, & av devides. new hvac system, new ducts. ref 202201276756.Details
18/f: mep for t.i. consists of new lighting, new receptacles, new teledata, & av devides. new hvac system, new ducts. ref 202201276756. | $75,000 |
| Oct 8, 2021 | Completed final sign-off Oct 2021 | 600 California St | Siemens Industry, Inc. | fire work to add a speaker/strobe in the "bridge housing" space on 9th fl, the work also includes revised candela & wattage settings for existing strobes & speakers. ref permit #2021/0826/7175Details
fire work to add a speaker/strobe in the "bridge housing" space on 9th fl, the work also includes revised candela & wattage settings for existing strobes & speakers. ref permit #2021/0826/7175 | $635 |
| Sep 16, 2021 | Never finaled issued Sep 2021, no final | 600 California St | Siemens Industry, Inc. | fire only work to add a relay module for release of lobby door on 1/f; no ref permit.Details
fire only work to add a relay module for release of lobby door on 1/f; no ref permit. | $500 |
| Aug 26, 2021 | Completed final sign-off Oct 2021 | 600 California St | Novo Construction Inc | 9th floor:demolition of non-structure partitions new finishes. mechanical/electrical under separate permit as needed.Details
9th floor:demolition of non-structure partitions new finishes. mechanical/electrical under separate permit as needed. | $120,000 |
| Dec 15, 2020 | Completed final sign-off Aug 2021 | 600 California St | Pioneer Fire Inc. | replace existing diesel jockey pump.Details
replace existing diesel jockey pump. | $79,000 |
| Dec 14, 2020 | Completed final sign-off May 2021 | 600 California St | 5th fl: barrier removal, non structural modifications of (e) restrooms to fully accessible. new or revised mep, life safety & sprinklers under separate permit if needed (bldg is fully sprinklered)Details
5th fl: barrier removal, non structural modifications of (e) restrooms to fully accessible. new or revised mep, life safety & sprinklers under separate permit if needed (bldg is fully sprinklered) | $170,000 | |
| Dec 10, 2020 | Completed final sign-off Mar 2021 | 600 California St | Pioneer Fire Inc. | relocate (6) pendents. relocate (2) uprights. remove (5) pendents.Details
relocate (6) pendents. relocate (2) uprights. remove (5) pendents. | |
| Dec 8, 2020 | Completed final sign-off Feb 2021 | 600 California St | Siemens Industry, Inc. | fire alarm work for partial-area remodels on floors 19/20; additions are 2 speaker/strobes (floor 20) and 1 module (floor 19), as well as the relocation of 3 speaker/strobes (floor 20), ref permit app # 2020 0921 4670Details
fire alarm work for partial-area remodels on floors 19/20; additions are 2 speaker/strobes (floor 20) and 1 module (floor 19), as well as the relocation of 3 speaker/strobes (floor 20), ref permit app # 2020 0921 4670 | $2,600 |
| Nov 6, 2020 | Completed final sign-off Sep 2021 | 600 California St | Novo Construction Inc | waterproofing/paver maintenance and barrier removal at exterior upper plaza. removal of exerior stone pavers, waterproofing system, exerior wall panels, and planter. construction of new paving, waterproofing systems, and reinstallation of (e) exterior wall panels and planter.Details
waterproofing/paver maintenance and barrier removal at exterior upper plaza. removal of exerior stone pavers, waterproofing system, exerior wall panels, and planter. construction of new paving, waterproofing systems, and reinstallation of (e) exterior wall panels and planter. | $120,000 |
| Oct 21, 2020 | Completed final sign-off Mar 2021 | 600 California St | M C S Construction Services | 19 & 20 fl: demo of non-load bearing walls to create open office space and classrooms. mechanical & electrical upgrades. no plumbing. upgrades to lighting and finishes. ref pa # 202009214670.Details
19 & 20 fl: demo of non-load bearing walls to create open office space and classrooms. mechanical & electrical upgrades. no plumbing. upgrades to lighting and finishes. ref pa # 202009214670. | $141,280 |
| Oct 20, 2020 | Expired or cancelled cancelled Jan 2026 | 600 California St | 4th & 5th level t.i office space. demo (e) non-load bearing partitions, flooring, ceiling & light fixtures and replace with new. install (n) millwork, plumb fixtures & finishes. no change of use, area or occupancy. revision at 4th level-lounge & open office are switched, 3 gender neutral baths inDetails
4th & 5th level t.i office space. demo (e) non-load bearing partitions, flooring, ceiling & light fixtures and replace with new. install (n) millwork, plumb fixtures & finishes. no change of use, area or occupancy. revision at 4th level-lounge & open office are switched, 3 gender neutral baths in | $1,821,609 | |
| Sep 24, 2020 | Completed final sign-off Feb 2021 | 600 California St | restripe of (e) accessible parking and addition of new parking signage. add an accessible van stall. sprinkler pipe re-routing under separate permit.Details
restripe of (e) accessible parking and addition of new parking signage. add an accessible van stall. sprinkler pipe re-routing under separate permit. | $24,000 | |
| Sep 21, 2020 | Completed final sign-off Jun 2021 | 600 California St | M C S Construction Services | tenant improvement of office space. scope includes: demolition of existing ceilings & lighting fixtures. installtion of new non-load bearing partitions, millwork, ceilings, lighting & finishes. no change of use, area, or occupancy.Details
tenant improvement of office space. scope includes: demolition of existing ceilings & lighting fixtures. installtion of new non-load bearing partitions, millwork, ceilings, lighting & finishes. no change of use, area, or occupancy. | $141,280 |
| Sep 4, 2020 | Completed final sign-off Oct 2020 | 600 California St | Novo Construction Inc | revision to pa# 201910114277 to provide structural details for exit stair hand rail modificationDetails
revision to pa# 201910114277 to provide structural details for exit stair hand rail modification | $15,000 |
| Jul 21, 2020 | Completed final sign-off Oct 2020 | 600 California St | Siemens Industry, Inc. | fire only replacements of 68 detectors & modules, as well as the additions of 2 strobe power supplies, 8 modules, & 95 speaker/strobes for the floor 2 & 3 'wework" remodels; 10 modules are added for 2-way comm stations on fls 2, 3, 4, 7, 9, 12, 14, 17 & 19. ref pa# 201910114277Details
fire only replacements of 68 detectors & modules, as well as the additions of 2 strobe power supplies, 8 modules, & 95 speaker/strobes for the floor 2 & 3 'wework" remodels; 10 modules are added for 2-way comm stations on fls 2, 3, 4, 7, 9, 12, 14, 17 & 19. ref pa# 201910114277 | $89,090 |
| Jun 16, 2020 | Completed final sign-off Oct 2020 | 600 California St | Siemens Industry, Inc. | fire alarm work on parking levels b1,b2 and b3 to replace 53 speaker/strobes & 2 strobes, at their (e) locations, in order to provide strobe synchronization throught each level. no reference bldg permitDetails
fire alarm work on parking levels b1,b2 and b3 to replace 53 speaker/strobes & 2 strobes, at their (e) locations, in order to provide strobe synchronization throught each level. no reference bldg permit | $17,400 |
| Mar 11, 2020 | Completed final sign-off Apr 2021 | 600 California St | Novo Construction Inc | structural work to add independent fale arrest anchorage to the 11th fl roof.Details
structural work to add independent fale arrest anchorage to the 11th fl roof. | $25,000 |
| Mar 2, 2020 | Expired or cancelled cancelled Jan 2026 | 600 California St | tenant improvement of (e) office building including demo of (e) duct work and installation of new mechanical distribution, new light fixutes, ne recepatalces, and new plumbing fixtuesDetails
tenant improvement of (e) office building including demo of (e) duct work and installation of new mechanical distribution, new light fixutes, ne recepatalces, and new plumbing fixtues | ||
| Feb 24, 2020 | Completed final sign-off Dec 2020 | 600 California St | Pioneer Fire Inc. | 2/f & 3/f: fire sprinkler: relocate 6 uprights, 4 pendents, add 37 uprights and 6 added pendents. ref pa201910114277.Details
2/f & 3/f: fire sprinkler: relocate 6 uprights, 4 pendents, add 37 uprights and 6 added pendents. ref pa201910114277. | $26,500 |
| Feb 7, 2020 | Never finaled issued Mar 2020, no final | 600 California St | M C S Construction Services | level 4 and 5: t.i. of office space: demolition of extg ceilings and lighting fixtures, installation of new non load bearing partitions,millwork, ceilings, lighting, plmg fixtures, and finishes. no change of use, area, or occupancy. mep scope under seperate permit.Details
level 4 and 5: t.i. of office space: demolition of extg ceilings and lighting fixtures, installation of new non load bearing partitions,millwork, ceilings, lighting, plmg fixtures, and finishes. no change of use, area, or occupancy. mep scope under seperate permit. | $1,516,000 |
| Jan 6, 2020 | Expired or cancelled cancelled Jan 2026 | 600 California St | demolition of e non load bearing partitons, millwork, ceilings, lighting, fixtures and finishes. all e sprinklers, life safety speakers and systems, strobe lights, smoke detectors, related control equipment to remain in place and operationDetails
demolition of e non load bearing partitons, millwork, ceilings, lighting, fixtures and finishes. all e sprinklers, life safety speakers and systems, strobe lights, smoke detectors, related control equipment to remain in place and operation | $150,000 | |
| Oct 11, 2019 | Completed final sign-off Jun 2021 | 600 California St | M C S Construction Services | 2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes.Details
2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes. | $1,797,500 |
| Sep 24, 2019 | Expired or cancelled cancelled Jan 2026 | 600 California St | demolition of extg non load bearing partitions,millwork, ceilings, lighting, fixtures and finishes. all extg sprinklers, life safety speakers and systems. strobe lights, smoke detectors and related control equipment to remain in place and in operation. n/a for maher. per ab-017.Details
demolition of extg non load bearing partitions,millwork, ceilings, lighting, fixtures and finishes. all extg sprinklers, life safety speakers and systems. strobe lights, smoke detectors and related control equipment to remain in place and in operation. n/a for maher. per ab-017. | $179,000 | |
| Apr 24, 2019 | Completed final sign-off Apr 2021 | 600 California St | Novo Construction Inc | to obtain a final inspection for work approved under pa# 201602190044, all work is completeDetails
to obtain a final inspection for work approved under pa# 201602190044, all work is complete | |
| Apr 19, 2019 | Completed final sign-off May 2021 | 600 California St | Novo Construction Inc | revisiton to pa 201705156641 for technically infeasibility along path of travelDetails
revisiton to pa 201705156641 for technically infeasibility along path of travel | |
| Mar 6, 2019 | Completed final sign-off Mar 2019 | 600 California St | Siemens Industry, Inc. | fire alarm work for the audentes partial floor remodel on floor 16 including a new tenant stairwell between floors 16 and 17; additions are 5 speaker/strobes on floor 16 and a relocated speaker/strobe on floor 17. ref pa 2018-1004-2310. n/a for maher.Details
fire alarm work for the audentes partial floor remodel on floor 16 including a new tenant stairwell between floors 16 and 17; additions are 5 speaker/strobes on floor 16 and a relocated speaker/strobe on floor 17. ref pa 2018-1004-2310. n/a for maher. | $3,170 |
| Dec 21, 2018 | Completed final sign-off Feb 2019 | 600 California St | Pioneer Fire Inc. | floors 16 & 17: relocate 12 pendents add 8 pendents, remove 1 pendent, relcocate 7 uprights adding 17th fl to scope of work ref 201809271608Details
floors 16 & 17: relocate 12 pendents add 8 pendents, remove 1 pendent, relcocate 7 uprights adding 17th fl to scope of work ref 201809271608 | $7,972 |
| Dec 12, 2018 | Completed final sign-off Mar 2019 | 600 California St | Siemens Industry, Inc. | fire alarm work for the phase 2 remodels on floors 16 and 17 for "audentes"; additions are 9 speaker/strobes. ref pa #201809211010.Details
fire alarm work for the phase 2 remodels on floors 16 and 17 for "audentes"; additions are 9 speaker/strobes. ref pa #201809211010. | $5,700 |
| Oct 29, 2018 | Completed final sign-off May 2019 | 600 California St | Novo Construction Inc | mechanical work tenant improvement on the 16th/17th fl ref 201809210101Details
mechanical work tenant improvement on the 16th/17th fl ref 201809210101 | $35,000 |
| Oct 26, 2018 | Never finaled issued Oct 2018, no final | 600 California St | Siemens Industry, Inc. | 16th fl - fire alarm work for the "audentes"' additions are 14 speaker/strobes and 1 speaker. ref pa 2018-0921-1010. maher naDetails
16th fl - fire alarm work for the "audentes"' additions are 14 speaker/strobes and 1 speaker. ref pa 2018-0921-1010. maher na | $9,420 |
| Oct 12, 2018 | Completed final sign-off Mar 2019 | 600 California St | Build Group Inc. | structural calculations of partition wall on 20th fl. ref ti #201804116086 & 201809261393Details
structural calculations of partition wall on 20th fl. ref ti #201804116086 & 201809261393 | $4,000 |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 600 California St | Pioneer Fire Inc. | f/s on 16th fl: relocate (14) pendents, relocate (5) uprights. ti #201809211010.Details
f/s on 16th fl: relocate (14) pendents, relocate (5) uprights. ti #201809211010. | $18,616 |
| Sep 26, 2018 | Completed final sign-off Mar 2019 | 600 California St | Build Group Inc. | revision to 201804116086, reconfigure 20th fl presentation rooms. relocate operable partitionDetails
revision to 201804116086, reconfigure 20th fl presentation rooms. relocate operable partition | |
| Sep 25, 2018 | Never finaled issued Sep 2018, no final | 600 California St | Siemens Industry, Inc. | fire alarm work for the "wework" remodel floor 20; additions are 1 strobe power supply, 1 speaker, 40 speaker/strobes, and 6 strobes. ref pa #201804116086. maher naDetails
fire alarm work for the "wework" remodel floor 20; additions are 1 strobe power supply, 1 speaker, 40 speaker/strobes, and 6 strobes. ref pa #201804116086. maher na | $30,870 |
| Sep 25, 2018 | Completed final sign-off Oct 2018 | 600 California St | Siemens Industry, Inc. | 19th floor - fire alarm work for the "wework" remodel; additions are 1 strobe power supply, 5 speakers, 35 speaker/strobes, and 6 strobes. ref pa #201804116086. maher naDetails
19th floor - fire alarm work for the "wework" remodel; additions are 1 strobe power supply, 5 speakers, 35 speaker/strobes, and 6 strobes. ref pa #201804116086. maher na | $30,240 |
| Sep 21, 2018 | Completed final sign-off May 2019 | 600 California St | Novo Construction Inc | 16th & 17th fl - ti to include paint carpet and wall demolition electrical includedDetails
16th & 17th fl - ti to include paint carpet and wall demolition electrical included | $200,000 |
| Sep 20, 2018 | Expired or cancelled cancelled Jan 2026 | 600 California St | Build Group Inc. | rev to pa201805027947: 19/f & 20/f: add the following notes to sheets m319 & m320: "provide duct smoke detector in main return duct for floor. shut down all fan powered boxes (fpb's) on signal from smoke detector." 2 sheets added to pa201805027947. maher n/a.Details
rev to pa201805027947: 19/f & 20/f: add the following notes to sheets m319 & m320: "provide duct smoke detector in main return duct for floor. shut down all fan powered boxes (fpb's) on signal from smoke detector." 2 sheets added to pa201805027947. maher n/a. | |
| Sep 12, 2018 | Completed final sign-off May 2019 | 600 California St | Novo Construction Inc | 16th and 17th flr. interior demolition of non-structural partitions and finishes. ab-017, no ceiling demolition. maher n/aDetails
16th and 17th flr. interior demolition of non-structural partitions and finishes. ab-017, no ceiling demolition. maher n/a | $20,000 |
| Aug 30, 2018 | Never finaled issued Oct 2018, no final | 551 Kearny St | Discount Signs & Neon Inc | install (1) new (to ameritrade) illuminated projecting sign. 18"x42"Details
install (1) new (to ameritrade) illuminated projecting sign. 18"x42" | $4,000 |
| Jun 5, 2018 | Completed final sign-off Oct 2018 | 600 California St | Alliance Roofing Co Inc | re-roofingDetails
re-roofing | $516,261 |
| Apr 11, 2018 | Completed final sign-off Mar 2019 | 600 California St | Novo Construction Inc | 19th & 20th floors - demolition of existing and installation of new office suite on 2 floors of an existing building includes: partitions, ceilings, millwork, finishes and security card readers. life safety, mep under separate permit. maher naDetails
19th & 20th floors - demolition of existing and installation of new office suite on 2 floors of an existing building includes: partitions, ceilings, millwork, finishes and security card readers. life safety, mep under separate permit. maher na | $3,036,057 |
| Mar 15, 2018 | Never finaled issued Jun 2018, no final | 551 Kearny St | Discount Signs & Neon Inc | install 1 illuminate interior window sign maher naDetails
install 1 illuminate interior window sign maher na | $2,000 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 600 California St | Installation Services Inc. Dba Bay Area | 2 aluminum (no electric) single faced plaques on pillar. n/a maher ordiananceDetails
2 aluminum (no electric) single faced plaques on pillar. n/a maher ordianance | $600 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 600 California St | Installation Services Inc. Dba Bay Area | one vinyl window sign | $100 |
| Oct 27, 2017 | Completed final sign-off Jan 2019 | 600 California St | Siemens Industry, Inc. | replacement of fire alarm system panels and addressable field devices. the project is done as an upgrade to the existing system.Details
replacement of fire alarm system panels and addressable field devices. the project is done as an upgrade to the existing system. | $265,000 |
| Oct 5, 2017 | Completed final sign-off Nov 2017 | 600 California St | Siemens Industry, Inc. | fire alarm work for the "blue bottle coffee co" remodel on floor 1; additions are 2 speaker/strobes. ref pa 2016-1118-3084. n/a for maher.Details
fire alarm work for the "blue bottle coffee co" remodel on floor 1; additions are 2 speaker/strobes. ref pa 2016-1118-3084. n/a for maher. | $1,020 |
| Sep 28, 2017 | Completed final sign-off Oct 2017 | 600 California St | f/s: relocate 6, add 1, and delete 2 pendent sprinklers on the 1st fl. ref ti #201611183084. maher naDetails
f/s: relocate 6, add 1, and delete 2 pendent sprinklers on the 1st fl. ref ti #201611183084. maher na | $2,000 | |
| Aug 22, 2017 | Completed final sign-off Sep 2017 | 600 California St | Siemens Industry, Inc. | fire alarm work for the "roof deck" on floor 11; addition is 1 speaker/strobe ref pa 201704194299. maher naDetails
fire alarm work for the "roof deck" on floor 11; addition is 1 speaker/strobe ref pa 201704194299. maher na | $510 |
| Jun 5, 2017 | Completed final sign-off Jul 2017 | 600 California St | Siemens Industry, Inc. | 16th flr: fire alarm - add 1 strobe power supply, 1 speaker, 15 speaker/strobes ref 201703080958 maher naDetails
16th flr: fire alarm - add 1 strobe power supply, 1 speaker, 15 speaker/strobes ref 201703080958 maher na | $10,200 |
| May 16, 2017 | Never finaled issued May 2017, no final | 600 California St | Novo Construction Inc | structural work for roof deck on 11th floor. ref pa 2017-0419-4299. 11th flDetails
structural work for roof deck on 11th floor. ref pa 2017-0419-4299. 11th fl | $5,000 |
| May 15, 2017 | Never finaled issued Aug 2017, no final | 600 California St | Novo Construction Inc | demo plaza level: exterior stone pavers & panels & waterproofing system. construct with paving & waterproofing system, modify handrails. n/a maher ordinanceDetails
demo plaza level: exterior stone pavers & panels & waterproofing system. construct with paving & waterproofing system, modify handrails. n/a maher ordinance | $1,000,000 |
| Apr 24, 2017 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | mechanical and elec for ti on 16th fl ref 2017-0308-0958 maher not reqDetails
mechanical and elec for ti on 16th fl ref 2017-0308-0958 maher not req | $45,000 |
| Apr 19, 2017 | Completed final sign-off Oct 2017 | 600 California St | new exterior roof deck adding 2 doors through existing window wall and planter perimeter barrier maher notDetails
new exterior roof deck adding 2 doors through existing window wall and planter perimeter barrier maher not | $130,000 | |
| Mar 8, 2017 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | 16/f-tenant improvement to include new partitions and finishes. construction includes meeting rooms, private offices, open office and pantry. mep. life safety & sprinkler under seperate permit. n/a ordinance #155-13Details
16/f-tenant improvement to include new partitions and finishes. construction includes meeting rooms, private offices, open office and pantry. mep. life safety & sprinkler under seperate permit. n/a ordinance #155-13 | $950,000 |
| Feb 15, 2017 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | 16/f -interior tenant improvement to include demolition of interior partitions and new partitions. new flooring & paint. mechanical, electrical & plumbing includedDetails
16/f -interior tenant improvement to include demolition of interior partitions and new partitions. new flooring & paint. mechanical, electrical & plumbing included | $350,000 |
| Nov 18, 2016 | Completed final sign-off Nov 2017 | 600 California St | Eric F Anderson Incorporated | 1st flr, coffee bar: millwork, drywall, ceilings, hvac & lighting & ele. maher naDetails
1st flr, coffee bar: millwork, drywall, ceilings, hvac & lighting & ele. maher na | $162,000 |
| Oct 5, 2016 | Never finaled issued Oct 2016, no final | 600 California St | Siemens Industry, Inc. | fire alarm "as-built" revisions for the "wework" remodels on floors 11 and 12; the changes were to correct the functional matrix on each floor to meet the sffd testing inspector's notes. maher naDetails
fire alarm "as-built" revisions for the "wework" remodels on floors 11 and 12; the changes were to correct the functional matrix on each floor to meet the sffd testing inspector's notes. maher na | |
| Oct 5, 2016 | Completed final sign-off Nov 2016 | 600 California St | Siemens Industry, Inc. | fire alarm "as-built" revisions for the "wework" remodels on floors 13, 14, 15; 3 tenant side smoke detectors were added on floors 13, 14 and 15 the functional matrix was corrected for all 3 floors to meet the sffd testing inspector's notes. 2016.0624.0759, 2016.06.27.0899, 2016.0627.0900 maher naDetails
fire alarm "as-built" revisions for the "wework" remodels on floors 13, 14, 15; 3 tenant side smoke detectors were added on floors 13, 14 and 15 the functional matrix was corrected for all 3 floors to meet the sffd testing inspector's notes. 2016.0624.0759, 2016.06.27.0899, 2016.0627.0900 maher na | $1,830 |
| Oct 4, 2016 | Expired or cancelled cancelled Jan 2026 | 600 California St | partial non structural demo. new non rated, non structural partitions, ceilings, light fixtures, power and signal, millwork, finishes. no change in occupancy or use. mep sprinkler ls sep permitDetails
partial non structural demo. new non rated, non structural partitions, ceilings, light fixtures, power and signal, millwork, finishes. no change in occupancy or use. mep sprinkler ls sep permit | $430,560 | |
| Sep 8, 2016 | Completed final sign-off Jan 2017 | 600 California St | Peacock Construction | t-24 electrical for work under pa 2016-0204-8877Details
t-24 electrical for work under pa 2016-0204-8877 | $6,000 |
| Aug 17, 2016 | Completed final sign-off Dec 2016 | 600 California St | Peacock Construction | mechanical and electrical for work done under pa 2015-1211-4827. maher naDetails
mechanical and electrical for work done under pa 2015-1211-4827. maher na | $22,000 |
| Aug 4, 2016 | Completed final sign-off Dec 2016 | 600 California St | Peacock Construction | 3rd flr: revision to app#201603222738 to reduce scope of work. this includes t-24 electrical and mechanical for revised scope. maher naDetails
3rd flr: revision to app#201603222738 to reduce scope of work. this includes t-24 electrical and mechanical for revised scope. maher na | |
| Jun 27, 2016 | Completed final sign-off Nov 2016 | 600 California St | Siemens Industry, Inc. | 14th floor: fire alarm - add 1 duct detector, 3 modules, 1 strobe power supply, 28 speaker/strobes and 11 strobes. ref pa 201603303430Details
14th floor: fire alarm - add 1 duct detector, 3 modules, 1 strobe power supply, 28 speaker/strobes and 11 strobes. ref pa 201603303430 | $23,610 |
| Jun 27, 2016 | Completed final sign-off Nov 2016 | 600 California St | Siemens Industry, Inc. | 15th floor: fire alarm - add 1 duct detector, 2 modules, 30 speaker/strobes and 10 strobes. ref pa 201603303431Details
15th floor: fire alarm - add 1 duct detector, 2 modules, 30 speaker/strobes and 10 strobes. ref pa 201603303431 | $22,030 |
| Jun 24, 2016 | Completed final sign-off Nov 2016 | 600 California St | Siemens Industry, Inc. | 13th flr: fire alarm- add 1 duct detector, 3 modules, 1 strobe power supply, 28 speaker/strobes and 11 strobes. referenced ti 2016.0330.3429 n/a for maher.Details
13th flr: fire alarm- add 1 duct detector, 3 modules, 1 strobe power supply, 28 speaker/strobes and 11 strobes. referenced ti 2016.0330.3429 n/a for maher. | $23,100 |
| Jun 20, 2016 | Never finaled issued Jun 2016, no final | 600 California St | Pioneer Fire Inc. | relocate 87 pendents, 15th floor. ref pa 2016-0330-3431.Details
relocate 87 pendents, 15th floor. ref pa 2016-0330-3431. | $40,500 |
| Jun 7, 2016 | Never finaled issued Jun 2016, no final | 600 California St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 31 heads; add 1 head for federal home loan bank 2nd floor. ref pa 2016-0204-8877. maher naDetails
fire sprinkler only - relocate 31 heads; add 1 head for federal home loan bank 2nd floor. ref pa 2016-0204-8877. maher na | $16,000 |
| May 4, 2016 | Completed final sign-off May 2016 | 600 California St | Golden Gate Fire Protection Inc | 2nd floor phase 4b fire sprinkler only - relcoate 18 pendents for fhlb. ref #201602048877. n/a maher ordinanceDetails
2nd floor phase 4b fire sprinkler only - relcoate 18 pendents for fhlb. ref #201602048877. n/a maher ordinance | $9,000 |
| Apr 22, 2016 | Never finaled issued Jul 2016, no final | 600 California St | Thomas Swan Sign Co Inc | erect (2) single faced electric wall illum sign. maher naDetails
erect (2) single faced electric wall illum sign. maher na | $10,000 |
| Apr 22, 2016 | Never finaled issued Jul 2016, no final | 600 California St | Thomas Swan Sign Co Inc | erect single faced electric wall illum sign. maher naDetails
erect single faced electric wall illum sign. maher na | $2,000 |
| Apr 13, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | (3) evacuation signage for the 17th floor, ref. to arch. pa#201601126884. n/a ordinance #155-13Details
(3) evacuation signage for the 17th floor, ref. to arch. pa#201601126884. n/a ordinance #155-13 | $750 |
| Apr 13, 2016 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | electrical work for t.i. on the 17th floor. arch. pa#201601126884. n/a ordinance #155-13Details
electrical work for t.i. on the 17th floor. arch. pa#201601126884. n/a ordinance #155-13 | $28,000 |
| Apr 12, 2016 | Never finaled issued Jun 2016, no final | 600 California St | Richlen Construction | ground floor: revision to app#2015-1201-3828. additional scope of work includes new gypsum board backdrop and surround, and structural design for securing new wall-hung art work. n/a for maher.Details
ground floor: revision to app#2015-1201-3828. additional scope of work includes new gypsum board backdrop and surround, and structural design for securing new wall-hung art work. n/a for maher. | $75,000 |
| Apr 12, 2016 | Completed final sign-off Apr 2016 | 600 California St | Golden Gate Fire Protection Inc | 2nd flr: fire sprinkler - relocate 18 pendents ref pa 2016 0204 8877. n/a ordinance #155-13Details
2nd flr: fire sprinkler - relocate 18 pendents ref pa 2016 0204 8877. n/a ordinance #155-13 | $9,000 |
| Apr 11, 2016 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | 16th floor: install new bathroom exhaust and supply diffusers. install new supply diffuser in elevator lobby. compliance with maher ordinance no 155-13 not required.Details
16th floor: install new bathroom exhaust and supply diffusers. install new supply diffuser in elevator lobby. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Apr 11, 2016 | Expired or cancelled cancelled Jan 2026 | 600 California St | Novo Construction Inc | 16th floor: demo extg low pressure ductwork install 9 new fpbs per sheet 16m2.1. install new low pressure ductwork. ref app#201512094541Details
16th floor: demo extg low pressure ductwork install 9 new fpbs per sheet 16m2.1. install new low pressure ductwork. ref app#201512094541 | $15,000 |
| Apr 5, 2016 | Completed final sign-off Dec 2016 | 600 California St | Peacock Construction | 2nd floor - demolition of non-structural partitions, glazing, ceiling tile & grid, light fixtures, electrical, & finishes. build back non-structural partitions, glazing, mllwork & light fixtures. sprinkler & life safety under separate permit. n/a maher ordinanceDetails
2nd floor - demolition of non-structural partitions, glazing, ceiling tile & grid, light fixtures, electrical, & finishes. build back non-structural partitions, glazing, mllwork & light fixtures. sprinkler & life safety under separate permit. n/a maher ordinance | $923,000 |
| Mar 31, 2016 | Completed final sign-off Apr 2016 | 600 California St | Pioneer Fire Inc. | relocate 4 pendents, add 1 pendent, lower 3 pendents to new ceiling elevation. t.i. pa#201512094541. n/a ordinance#155-13Details
relocate 4 pendents, add 1 pendent, lower 3 pendents to new ceiling elevation. t.i. pa#201512094541. n/a ordinance#155-13 | $9,456 |
| Mar 30, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 14th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit.Details
14th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit. | $580,000 |
| Mar 30, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 15th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit.Details
15th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit. | $580,000 |
| Mar 30, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 13th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit.Details
13th floor - interior tenant buildout of a full floor for office use including interior non-load bearing partitions, partial ceilings, lighting & finishes. floor to be single tenant occupancy. n/a maher ordinance. mep under seperate permit. | $580,000 |
| Mar 22, 2016 | Completed final sign-off Dec 2016 | 600 California St | Peacock Construction | 3rd flr: demo of non structural partitions, glazing, ceiling grid, light fixtures, electrical and finishes. build back of non structural partitions, glazing, millwork and light fixtures. fire/life safety under sep permit. maher naDetails
3rd flr: demo of non structural partitions, glazing, ceiling grid, light fixtures, electrical and finishes. build back of non structural partitions, glazing, millwork and light fixtures. fire/life safety under sep permit. maher na | $524,750 |
| Mar 18, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 12th flr: interior tenant fit out of a full floor including interior non load nearing partitions, partial ceilings, lighting & finishes for single tenant. maher naDetails
12th flr: interior tenant fit out of a full floor including interior non load nearing partitions, partial ceilings, lighting & finishes for single tenant. maher na | $576,600 |
| Mar 18, 2016 | Completed final sign-off Mar 2017 | 600 California St | Novo Construction Inc | 11th flr: interior tenant fit out of a full floor including interior non load nearing partitions, partial ceilings, lighting & finishes for single tenant. maher naDetails
11th flr: interior tenant fit out of a full floor including interior non load nearing partitions, partial ceilings, lighting & finishes for single tenant. maher na | $576,600 |
| Mar 14, 2016 | Completed final sign-off Mar 2016 | 600 California St | Golden Gate Fire Protection Inc | 4th floor: fire sprinkler only. relocate 6 pendents and 1 add for federal home loan bank. n/a for maher.Details
4th floor: fire sprinkler only. relocate 6 pendents and 1 add for federal home loan bank. n/a for maher. | $3,500 |
| Mar 9, 2016 | Completed final sign-off Aug 2016 | 600 California St | Pioneer Fire Inc. | relocate 69 pendents and 5 uprights. ref pa 2016-0112-6884. maher naDetails
relocate 69 pendents and 5 uprights. ref pa 2016-0112-6884. maher na | $29,412 |
| Mar 9, 2016 | Expired or cancelled cancelled Jan 2026 | 600 California St | Novo Construction Inc | for admimnistrative purpose only. replace lost drawings. permit application 201511061966 microfilm copies not available. have job card and original permit application; maher n/aDetails
for admimnistrative purpose only. replace lost drawings. permit application 201511061966 microfilm copies not available. have job card and original permit application; maher n/a | |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 600 California St | Golden Gate Fire Protection Inc | 3rd flr: relocate fire sprinklers pendents in bathroom, conference room and two offices. 8 total add 1 delete. maher naDetails
3rd flr: relocate fire sprinklers pendents in bathroom, conference room and two offices. 8 total add 1 delete. maher na | $4,000 |
| Feb 19, 2016 | Completed final sign-off Apr 2021 | 600 California St | Novo Construction Inc | remove & discard existing partitions & finishes, lighting and ceilings. partitial removal of mechanical & electrical systems, ab017. n/a for maher.Details
remove & discard existing partitions & finishes, lighting and ceilings. partitial removal of mechanical & electrical systems, ab017. n/a for maher. | $100,000 |
| Feb 9, 2016 | Completed final sign-off Feb 2016 | 600 California St | Golden Gate Fire Protection Inc | 2nd fl fire sprinkler only, ref pa 2016-0204-8877 relocate 14 sprinkler pendents; add 3 pendent relocate 3 uprights - 20 heads total. maher naDetails
2nd fl fire sprinkler only, ref pa 2016-0204-8877 relocate 14 sprinkler pendents; add 3 pendent relocate 3 uprights - 20 heads total. maher na | $10,000 |
| Feb 4, 2016 | Completed final sign-off Dec 2016 | 600 California St | Peacock Construction | demo of non-structural partitions, glazing, ceiling tile and grid, light fixtures, electrical. build back of non-structural partitions, glazing, millwork and light fixtures. sprinkler, electrical, life safety deferred. maher naDetails
demo of non-structural partitions, glazing, ceiling tile and grid, light fixtures, electrical. build back of non-structural partitions, glazing, millwork and light fixtures. sprinkler, electrical, life safety deferred. maher na | $257,000 |
| Feb 3, 2016 | Completed final sign-off Mar 2018 | 600 California St | Pioneer Fire Inc. | relocate 1o pendents. n/a for maher.Details
relocate 1o pendents. n/a for maher. | $4,206 |
| Feb 2, 2016 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | 11th and 12th floors. selective demolition of extg non-structural partitions, doors/frames, ceiling grid and tile. ab-017. n/a for maherDetails
11th and 12th floors. selective demolition of extg non-structural partitions, doors/frames, ceiling grid and tile. ab-017. n/a for maher | $22,000 |
| Jan 12, 2016 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | interior demolition and reconfigurate of office space to include meeting rooms, phone rooms & equipment rooms. mep. life safety & fire sprinkler under seperate permit. n/a ordinance #155-13.Details
interior demolition and reconfigurate of office space to include meeting rooms, phone rooms & equipment rooms. mep. life safety & fire sprinkler under seperate permit. n/a ordinance #155-13. | $1,310,326 |
| Dec 30, 2015 | Completed final sign-off Jan 2016 | 600 California St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 32 sprinkler pendents; add 2 pendents, add 16 uprights for federal home loan bank on the 2nd floor. n/a for maher.Details
fire sprinkler only - relocate 32 sprinkler pendents; add 2 pendents, add 16 uprights for federal home loan bank on the 2nd floor. n/a for maher. | $25,000 |
| Dec 16, 2015 | Completed final sign-off Aug 2016 | 600 California St | Pioneer Fire Inc. | relocate (7) pendents. maher naDetails
relocate (7) pendents. maher na | $4,206 |
| Dec 11, 2015 | Completed final sign-off Dec 2016 | 600 California St | Peacock Construction | demolition of non structural partitions, glazing ceilings, light fixtures, electrical and finishes . build back non structural partitons, new doors, frames, millwork, and light fixtures. fire alarm, and sprinklers maher nor reqDetails
demolition of non structural partitions, glazing ceilings, light fixtures, electrical and finishes . build back non structural partitons, new doors, frames, millwork, and light fixtures. fire alarm, and sprinklers maher nor req | $626,400 |
| Dec 9, 2015 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | 16th flr -demolitoin of (e) non-structural partitions, ceiling grid, tile, & light fixtures. construct new non-structural partitions, ceiling grid, tile, & light fixtures. gyp bd ceilings, & finishes. no change in occupancy, use. mep, life safety & sprinklers are under separate permit. n/a maher ordDetails
16th flr -demolitoin of (e) non-structural partitions, ceiling grid, tile, & light fixtures. construct new non-structural partitions, ceiling grid, tile, & light fixtures. gyp bd ceilings, & finishes. no change in occupancy, use. mep, life safety & sprinklers are under separate permit. n/a maher ord | $200,000 |
| Dec 4, 2015 | Never finaled issued Dec 2015, no final | 600 California St | Siemens Industry, Inc. | fire alarm work for the "bldg management office" ti remodel on floor 5; additions are 3 speaker/strobes maher naDetails
fire alarm work for the "bldg management office" ti remodel on floor 5; additions are 3 speaker/strobes maher na | $1,500 |
| Dec 1, 2015 | Completed final sign-off Nov 2016 | 600 California St | Siemens Industry, Inc. | fire alarm work for the bike storage remodel on floor 1, additions are 4 speaker strobes maher not reqDetails
fire alarm work for the bike storage remodel on floor 1, additions are 4 speaker strobes maher not req | $2,000 |
| Dec 1, 2015 | Completed final sign-off Mar 2017 | 600 California St | Richlen Construction | new floor finishes, new guard desk, new exterior doors, new lighting, auxillary furniture, selective demo: lighting, finishes, guard desk. maher naDetails
new floor finishes, new guard desk, new exterior doors, new lighting, auxillary furniture, selective demo: lighting, finishes, guard desk. maher na | $1,800,000 |
| Dec 1, 2015 | Completed final sign-off Mar 2016 | 600 California St | Siemens Industry, Inc. | fire alarm work for the fitness center ti on floor 3. additions are 5 speaker/strobesDetails
fire alarm work for the fitness center ti on floor 3. additions are 5 speaker/strobes | $2,500 |
| Nov 17, 2015 | Completed final sign-off Oct 2016 | 600 California St | Siemens Industry, Inc. | fire alarm work for the fhl bank ti remodel on floor 2. additions are 5 speakers and 9 speaker/strobes. n/a for maher.Details
fire alarm work for the fhl bank ti remodel on floor 2. additions are 5 speakers and 9 speaker/strobes. n/a for maher. | $7,000 |
| Nov 13, 2015 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | mechanical & electrical work for ti on the 3rd floor. ref pa 2015-1106-1968. compliance with maher ordinance no 155-13 not required.Details
mechanical & electrical work for ti on the 3rd floor. ref pa 2015-1106-1968. compliance with maher ordinance no 155-13 not required. | $19,000 |
| Nov 13, 2015 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | mechanical & electrical work for ti on the 5th floor, ref pa 2015-1106-1966Details
mechanical & electrical work for ti on the 5th floor, ref pa 2015-1106-1966 | $15,000 |
| Nov 6, 2015 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | demo of existing non structural partitions, millwork ceiling grid and tile, light fixtures and finishes. construction new non structural partitions, ceilings, light fixtures, finishes. no change in use. mep and life safety to be submitted under separateDetails
demo of existing non structural partitions, millwork ceiling grid and tile, light fixtures and finishes. construction new non structural partitions, ceilings, light fixtures, finishes. no change in use. mep and life safety to be submitted under separate | $77,616 |
| Nov 6, 2015 | Completed final sign-off Oct 2017 | 600 California St | Novo Construction Inc | tenant improvement including demo of non structural partitions, ceilings and lighting, millwork, finishes. construction of non structural partitions and glazing, ceiling and lighting, millwork and new finishes. no change in occupancy or use. mep and life safety under sep permitDetails
tenant improvement including demo of non structural partitions, ceilings and lighting, millwork, finishes. construction of non structural partitions and glazing, ceiling and lighting, millwork and new finishes. no change in occupancy or use. mep and life safety under sep permit | $423,961 |
| Aug 13, 2015 | Completed final sign-off Apr 2016 | 600 California St | Skyline Construction | revision to pa #201507222108 -restroom revision for technical infeasability. n/a maher ordinanceDetails
revision to pa #201507222108 -restroom revision for technical infeasability. n/a maher ordinance | $40,000 |
| Jul 22, 2015 | Completed final sign-off Mar 2021 | 600 California St | Skyline Construction | restroom revision for accessibility to pa# 201406300116. n/a ordinance #155-13Details
restroom revision for accessibility to pa# 201406300116. n/a ordinance #155-13 | $40,000 |
| Jun 5, 2015 | Never finaled issued Jun 2015, no final | 600 California St | Bcci Construction Company | new evacuation signs for 19/f & 20/f of 600 california street. n/a ordinance #155-13Details
new evacuation signs for 19/f & 20/f of 600 california street. n/a ordinance #155-13 | $1,800 |
| May 7, 2015 | Never finaled issued Jun 2015, no final | 600 California St | Turner Construction Co | 15th floor: new evacuation signage.Details
15th floor: new evacuation signage. | $900 |
| May 4, 2015 | Never finaled issued May 2015, no final | 600 California St | Bcci Construction Company | 19th & 20th floors. associated with approved app#201502037379Details
19th & 20th floors. associated with approved app#201502037379 | $18,500 |
| Apr 15, 2015 | Completed final sign-off Jun 2015 | 600 California St | Acco Engineered Systems Inc. Dba Acco En | 15th flr - mechanical: hvac - install duct downstream of (e) fan powered box. provide & install (2) slot diffusers & (2) return air grilles & new grilles for restroom air balance. maher - not req'dDetails
15th flr - mechanical: hvac - install duct downstream of (e) fan powered box. provide & install (2) slot diffusers & (2) return air grilles & new grilles for restroom air balance. maher - not req'd | $12,000 |
| Apr 9, 2015 | Completed final sign-off May 2015 | 600 California St | Sc Builders, Inc | 18th floor: work includes demolition of glass wall and door patch and repair paint, carpet tiles. no new mechanical or electrical. no structural work. compliance with maher ordinance no 155-13 not required.Details
18th floor: work includes demolition of glass wall and door patch and repair paint, carpet tiles. no new mechanical or electrical. no structural work. compliance with maher ordinance no 155-13 not required. | $8,200 |
| Mar 19, 2015 | Completed final sign-off May 2015 | 600 California St | Siemens Industry, Inc. | fire alarm work for the ti on floor 8; additions are 1 duct detector, 1 module, 1 strobe power supply, 2 speakers, and 38 speaker/strobes; maher n/aDetails
fire alarm work for the ti on floor 8; additions are 1 duct detector, 1 module, 1 strobe power supply, 2 speakers, and 38 speaker/strobes; maher n/a | $21,700 |
| Mar 19, 2015 | Completed final sign-off May 2015 | 600 California St | Siemens Industry, Inc. | fire alarm work for the ti on floor 7; additions are 1 duct detector, 1 module, 1 strobe power supply, 1 speakers, and 38 speaker/strobes; maher n/aDetails
fire alarm work for the ti on floor 7; additions are 1 duct detector, 1 module, 1 strobe power supply, 1 speakers, and 38 speaker/strobes; maher n/a | $21,200 |
| Mar 13, 2015 | Never finaled issued Mar 2015, no final | 600 California St | Turner Construction Co | 15/f-demolition on non structural partitions, glazing, ceiling grid & tile, light fixtures & finishes. partial build back of non structural partitions, glazing, millwork & light fixtures. no change in occupancy or use. mep., life safety, sprinklers to be submitted under separate permit. n/a #155-13Details
15/f-demolition on non structural partitions, glazing, ceiling grid & tile, light fixtures & finishes. partial build back of non structural partitions, glazing, millwork & light fixtures. no change in occupancy or use. mep., life safety, sprinklers to be submitted under separate permit. n/a #155-13 | $788,118 |
| Mar 5, 2015 | Completed final sign-off Jul 2015 | 600 California St | Gci, Inc | 8th floor lighting & power systems. connecting power to new or relocated light fixtures, power outlets & tenant equipment. consists of making connections to base bld (e) panels. no changes have been made tp the (e) base bld electrical systems. maher - not req'd ref pa # 2015 03 03 9813Details
8th floor lighting & power systems. connecting power to new or relocated light fixtures, power outlets & tenant equipment. consists of making connections to base bld (e) panels. no changes have been made tp the (e) base bld electrical systems. maher - not req'd ref pa # 2015 03 03 9813 | $600,000 |
| Mar 5, 2015 | Completed final sign-off Jul 2015 | 600 California St | Gci, Inc | lighting & power systems. connecting power to new or relocated light fixtures, power outlets & tenant equipment. consists of making connections to base bld (e) panels. no changes have been made tp the (e) base bld electrical systems. maher - not req'd ref pa# 2015 0303 9809Details
lighting & power systems. connecting power to new or relocated light fixtures, power outlets & tenant equipment. consists of making connections to base bld (e) panels. no changes have been made tp the (e) base bld electrical systems. maher - not req'd ref pa# 2015 0303 9809 | $600,000 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 600 California St | Bcci Construction Company | revision to 201502037379 to reconfigure 2 officesDetails
revision to 201502037379 to reconfigure 2 offices | |
| Mar 3, 2015 | Completed final sign-off Jul 2015 | 600 California St | Gci, Inc | 8th floor - demo all (e) low pressure ductwork, install 21 new fan power boxes , 1 new fan coil unit, 1 new exhaust fan, & new low pressure ductwork. reference construction #201501054878, 201502249175. electrical 2015/03/05/0093 n/a maher ordinanceDetails
8th floor - demo all (e) low pressure ductwork, install 21 new fan power boxes , 1 new fan coil unit, 1 new exhaust fan, & new low pressure ductwork. reference construction #201501054878, 201502249175. electrical 2015/03/05/0093 n/a maher ordinance | $10,000 |
| Mar 3, 2015 | Completed final sign-off Jul 2015 | 600 California St | Gci, Inc | 7th floor - demo all (e) low pressure ductwork, install 21 new fan power boxes , 2 mew fan coil units, 1 new exhaust fan, & new low pressure ductwork. ref #201501054879, 201502249173 and electrical 201503050087. n/a maher ordinanceDetails
7th floor - demo all (e) low pressure ductwork, install 21 new fan power boxes , 2 mew fan coil units, 1 new exhaust fan, & new low pressure ductwork. ref #201501054879, 201502249173 and electrical 201503050087. n/a maher ordinance | $10,000 |
| Feb 25, 2015 | Never finaled issued Mar 2015, no final | 600 California St | Ingram Fire Protection Inc | 15th floor: t.i. to extg fire sprinkler system. n/a for the maher. t.i. pa#201503130783Details
15th floor: t.i. to extg fire sprinkler system. n/a for the maher. t.i. pa#201503130783 | $20,000 |
| Feb 24, 2015 | Completed final sign-off Jul 2015 | 600 California St | Gci, Inc | revision to app#201501054879.7th floor. revise hardware schedule, add finish, revise partition, power and ceiling layout. no elevator lobby locks or access control egress locks on this permit. f/a, sprinkler, mep under separate permit.Details
revision to app#201501054879.7th floor. revise hardware schedule, add finish, revise partition, power and ceiling layout. no elevator lobby locks or access control egress locks on this permit. f/a, sprinkler, mep under separate permit. | $5,000 |
| Feb 3, 2015 | Never finaled issued Feb 2015, no final | 600 California St | Bcci Construction Company | 19th & 20th flrs: t.i. including demo of some existing ceiling height partitions,construction of new ceiling height partitions, mech,elec & l/s under separate permit; maher n/aDetails
19th & 20th flrs: t.i. including demo of some existing ceiling height partitions,construction of new ceiling height partitions, mech,elec & l/s under separate permit; maher n/a | $125,000 |
| Jan 5, 2015 | Completed final sign-off Jul 2015 | 600 California St | Gci, Inc | ceilings & finishes, mech, electrical, fire sprinkler & life safety under sep permit.Details
ceilings & finishes, mech, electrical, fire sprinkler & life safety under sep permit. | $1,124,800 |
| Jan 5, 2015 | Completed final sign-off Jul 2015 | 600 California St | Gci, Inc | 7/f: ceilings & finishes, mech, electrical, fire sprinkler & life safety under sep permit. compliance with maher ordinance no 155-13 not required.Details
7/f: ceilings & finishes, mech, electrical, fire sprinkler & life safety under sep permit. compliance with maher ordinance no 155-13 not required. | $1,124,800 |
| Oct 6, 2014 | Never finaled issued Oct 2014, no final | 600 California St | Turner Construction Co | 13th and 14th floors: demo only. no change in occupancy or floor area. no disable access drawing. upgrades to d.a. under seperate permit ab-017. n/a for the maher.Details
13th and 14th floors: demo only. no change in occupancy or floor area. no disable access drawing. upgrades to d.a. under seperate permit ab-017. n/a for the maher. | $120,000 |
| Sep 24, 2014 | Expired or cancelled cancelled Jan 2026 | 600 California St | 3rd floor: new non-structural partitions, ceiling, lights, electrical, millwork, finishes. no change in occupancy, use, or area. mep under seperate permit. n/a for the maher ordinance #155-13Details
3rd floor: new non-structural partitions, ceiling, lights, electrical, millwork, finishes. no change in occupancy, use, or area. mep under seperate permit. n/a for the maher ordinance #155-13 | $70,725 | |
| Sep 16, 2014 | Expired or cancelled cancelled Jan 2026 | 600 California St | Hathaway Dinwiddie Co. | lobby/plaza: replace existing waterproof membrane and pavers at plaza, replace existing handrails, minor modifications/changes to lighting.Details
lobby/plaza: replace existing waterproof membrane and pavers at plaza, replace existing handrails, minor modifications/changes to lighting. | $500,000 |
| Sep 11, 2014 | Expired or cancelled withdrawn Sep 2014 | 600 California St | non-structural demo, (n) structural partitions, ceiling, lights, electrical, millwork, finishes. no change in occupancy or area. change of use. mep. under seperate permit.Details
non-structural demo, (n) structural partitions, ceiling, lights, electrical, millwork, finishes. no change in occupancy or area. change of use. mep. under seperate permit. | $70,725 | |
| Sep 8, 2014 | Never finaled issued Sep 2014, no final | 600 California St | Yesco Signs Llc | install (1) illuninated wall sign "600 california". n/a ordinance #155-13Details
install (1) illuninated wall sign "600 california". n/a ordinance #155-13 | $3,000 |
| Jun 18, 2014 | Completed final sign-off Jul 2014 | 600 California St | Sc Builders, Inc | mep 18th fl for 201404153220. n/a maher ordinanceDetails
mep 18th fl for 201404153220. n/a maher ordinance | $150,000 |
| Jun 18, 2014 | Completed final sign-off Aug 2014 | 600 California St | Sc Builders, Inc | 18th fl restroom revivision due to disable access problems in the field. revision to 201404153220Details
18th fl restroom revivision due to disable access problems in the field. revision to 201404153220 | |
| Jun 6, 2014 | Expired or cancelled cancelled Jan 2026 | 600 California St | revise bathroom layout to approved appl. 201404153220. maher n/a.Details
revise bathroom layout to approved appl. 201404153220. maher n/a. | $91,532 | |
| Jun 5, 2014 | Completed final sign-off Jun 2014 | 600 California St | Ayoob & Peery Plumbing Co Inc | 18th flr: add, relocate & remove fire sprinklers per tenant improvements (4 add) (14 relocate) (6 remove) 18th flr, ref 201404153220; compliance with ord 155-13 not requiredDetails
18th flr: add, relocate & remove fire sprinklers per tenant improvements (4 add) (14 relocate) (6 remove) 18th flr, ref 201404153220; compliance with ord 155-13 not required | $9,252 |
| May 15, 2014 | Never finaled issued Jun 2014, no final | 600 California St | 9th floor - new electrified lockset & card key system on elevator lobby doors, per sffd ab 2.10 compliance with maher ordinance #155-13 not requiredDetails
9th floor - new electrified lockset & card key system on elevator lobby doors, per sffd ab 2.10 compliance with maher ordinance #155-13 not required | $10,000 | |
| Apr 15, 2014 | Completed final sign-off Aug 2014 | 600 California St | Sc Builders, Inc | 18th floor tenant imprvement to include demolition, new partitions, ceiling tiles, electrical , mechanical,plumbing, life safety, millwork & finishes. mep under separate permit.Details
18th floor tenant imprvement to include demolition, new partitions, ceiling tiles, electrical , mechanical,plumbing, life safety, millwork & finishes. mep under separate permit. | $557,100 |
| Mar 17, 2014 | Completed final sign-off May 2014 | 600 California St | 6th floor tenant improvement fire sprinkler permit - 153 sprinklers, relocate 140 heads at ceiling, relocate 2 uprights, add 11 heads. compliance with ordinance #155-13 not requiredDetails
6th floor tenant improvement fire sprinkler permit - 153 sprinklers, relocate 140 heads at ceiling, relocate 2 uprights, add 11 heads. compliance with ordinance #155-13 not required | $38,182 | |
| Feb 7, 2014 | Never finaled issued Feb 2014, no final | 600 California St | Comfort Dynamics Inc. | mechanical work on the 9th floor. t.i. approved under app#201312093635. n/a for the maher ordinance # 155-13Details
mechanical work on the 9th floor. t.i. approved under app#201312093635. n/a for the maher ordinance # 155-13 | $225,000 |
| Jan 31, 2014 | Completed final sign-off Feb 2014 | 600 California St | Pribuss Engineering Inc | gc pa# 201312093635. fire sprinkler t.i. relocate/change out - 39 heads, add 10 heads, total 49 heads. compliance w/ordiance no. 155-13 not required.Details
gc pa# 201312093635. fire sprinkler t.i. relocate/change out - 39 heads, add 10 heads, total 49 heads. compliance w/ordiance no. 155-13 not required. | $25,200 |
| Dec 9, 2013 | Completed final sign-off Apr 2014 | 600 California St | C C I Commercial Construction & Improv | 9th floor t.i. (interior office remodel). construction of non-rated partitions and interior finishes. no structural work. m.e.p. under separate permit. fire alarm and sprinkler under separate permit.Details
9th floor t.i. (interior office remodel). construction of non-rated partitions and interior finishes. no structural work. m.e.p. under separate permit. fire alarm and sprinkler under separate permit. | $1,025,809 |
| Jun 20, 2013 | Completed final sign-off Aug 2013 | 600 California St | Pioneer Fire Inc. | suite #560-relocate 6 pendent sprinklersDetails
suite #560-relocate 6 pendent sprinklers | $4,359 |
| Dec 12, 2012 | Completed final sign-off Jan 2013 | 600 California St | Field Construction Inc. | demolition and new partitions. new finishes throughout. mech and elec under separate permitDetails
demolition and new partitions. new finishes throughout. mech and elec under separate permit | $94,500 |
| Jun 6, 2012 | Expired or cancelled cancelled Jan 2026 | 600 California St | add 2 exit signs, 2 acrylic signs above existing door releaseDetails
add 2 exit signs, 2 acrylic signs above existing door release | $6,000 | |
| Dec 3, 2010 | Never finaled issued Feb 2011, no final | 707 Sacramento St | Coast Sign Incorporated | erect a electric wall single faced direct new signDetails
erect a electric wall single faced direct new sign | $3,000 |
| Dec 3, 2010 | Never finaled issued Jan 2011, no final | 707 Sacramento St | Coast Sign Incorporated | erect a electric wall single faced direct new signDetails
erect a electric wall single faced direct new sign | $4,000 |
| Oct 29, 2010 | Completed final sign-off Apr 2011 | 707 Sacramento St | Anderson, Rowe & Buckley, Inc. | first floor:fire sprinkler system: relocate 8, add 2Details
first floor:fire sprinkler system: relocate 8, add 2 | $2,000 |
| Sep 20, 2010 | Completed final sign-off Apr 2011 | 707 Sacramento St | Bcci Construction Company | charles schwab interior ti on the ground fl. work includes mep w/in (e) bldg shell. no structural work. new exterior roll up grille. fire protection and exterior signage under deferred submittalDetails
charles schwab interior ti on the ground fl. work includes mep w/in (e) bldg shell. no structural work. new exterior roll up grille. fire protection and exterior signage under deferred submittal | $146,000 |
| Jul 22, 2009 | Never finaled issued Jul 2009, no final | 585 Kearny St | street space | ||
| Jul 22, 2009 | Never finaled issued Jul 2009, no final | 585 Kearny St | West Coast Sign | install a single faced electric sign.Details
install a single faced electric sign. | $2,900 |
| Mar 19, 2009 | Completed final sign-off Apr 2009 | 600 California St | Skyline Construction | remove extg partitions and mill work and extg finishes. addition of 1 new office and new wall at extg coffee room new finishes. mep life safety and fire sprnklr under sepeate permit as necessary.Details
remove extg partitions and mill work and extg finishes. addition of 1 new office and new wall at extg coffee room new finishes. mep life safety and fire sprnklr under sepeate permit as necessary. | $35,000 |
| Mar 19, 2008 | Completed final sign-off Jul 2008 | 600 California St | demo ex. chillers and 2 chilled water pumps, install 2 new chillers and 2 chilled water pumps, modify ex. exhaust monitoring system and exhaust air system. relocate ex. stairwell presurization fanDetails
demo ex. chillers and 2 chilled water pumps, install 2 new chillers and 2 chilled water pumps, modify ex. exhaust monitoring system and exhaust air system. relocate ex. stairwell presurization fan | $115,000 | |
| Mar 7, 2008 | Completed final sign-off Mar 2008 | 585 Kearny St | Retail Construction Services | tenant improvement on ground floor. add 1 power supply, 4 ceil.mnt speaker/strobe. 1 - sync module connect speaker to existing speaker loop (s4)Details
tenant improvement on ground floor. add 1 power supply, 4 ceil.mnt speaker/strobe. 1 - sync module connect speaker to existing speaker loop (s4) | $8,000 |
| Feb 29, 2008 | Completed final sign-off Oct 2009 | 600 California St | Golden Gate Eletric Co | 3rd floor: upgrade life safety including 16 amoke, 2 duct, 5 pull , 16 relay, 9 strobes, 30 speaker strobes, 12 speakers.Details
3rd floor: upgrade life safety including 16 amoke, 2 duct, 5 pull , 16 relay, 9 strobes, 30 speaker strobes, 12 speakers. | $67,000 |
| Feb 29, 2008 | Completed final sign-off Oct 2009 | 600 California St | Golden Gate Eletric Co | 2nd floor: upgrade life safety includingDetails
2nd floor: upgrade life safety including | $67,000 |
| Feb 27, 2008 | Completed final sign-off Mar 2008 | 585 Kearny St | Rcm Fire Protection Inc. | ti for sprinkler on the ground floor. relocate 33 headsDetails
ti for sprinkler on the ground floor. relocate 33 heads | $6,000 |
| Jan 14, 2008 | Never finaled issued Jan 2008, no final | 600 California St | Skyline Construction | electrical and lighting work on the eleventh floor. ref. pa# 2007/11/30/9305.Details
electrical and lighting work on the eleventh floor. ref. pa# 2007/11/30/9305. | $20,000 |
| Dec 7, 2007 | Never finaled issued Dec 2007, no final | 585 Kearny St | address assignment | ||
| Dec 3, 2007 | Never finaled issued Dec 2007, no final | 585 Kearny St | Sign Of Light | non-str'l vinyl signs only | $50 |
| Dec 3, 2007 | Never finaled issued Dec 2007, no final | 585 Kearny St | Sign Of Light | install 1 projecting (blade) sign; sign size = 37"x16"Details
install 1 projecting (blade) sign; sign size = 37"x16" | $350 |
| Dec 3, 2007 | Never finaled issued Dec 2007, no final | 585 Kearny St | Sign Of Light | install illuminated channel letters on raceway, 300# total wt, approx 13' x 11"Details
install illuminated channel letters on raceway, 300# total wt, approx 13' x 11" | $1,000 |
| Nov 30, 2007 | Completed final sign-off Mar 2008 | 585 Kearny St | non-structural interior partitions, fixtures & finishes in vacated alphagraphics tenant space. same use/occupancy.Details
non-structural interior partitions, fixtures & finishes in vacated alphagraphics tenant space. same use/occupancy. | $40,000 | |
| Sep 17, 2007 | Completed final sign-off Dec 2007 | 600 California St | Golden Gate Sign Company Inc. | two projecting signs. one sign at the corner and one facing sacramento st. illuminated signs.Details
two projecting signs. one sign at the corner and one facing sacramento st. illuminated signs. | |
| Apr 21, 2006 | Completed final sign-off Jul 2006 | 628 California St | remove existing casework. add wall & door. replace (e) garment conveyor ground floor.Details
remove existing casework. add wall & door. replace (e) garment conveyor ground floor. | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Novo Construction Inc (39), Siemens Industry, Inc. (25), Pioneer Fire Inc. (12), Gci, Inc (7), Golden Gate Fire Protection Inc (7), Peacock Construction (7), Bcci Construction Company (5), M C S Construction Services (4), Sc Builders, Inc (4), Skyline Construction (4), Build Group Inc. (3), Sign Of Light (3), Turner Construction Co (3), Coast Sign Incorporated (2), Discount Signs & Neon Inc (2), Golden Gate Eletric Co (2), Installation Services Inc. Dba Bay Area (2), Richlen Construction (2), Thomas Swan Sign Co Inc (2), Acco Engineered Systems Inc. Dba Acco En, Alliance Roofing Co Inc, Anderson, Rowe & Buckley, Inc., Ayoob & Peery Plumbing Co Inc, C C I Commercial Construction & Improv, Comfort Dynamics Inc., Eric F Anderson Incorporated, Field Construction Inc., Golden Gate Sign Company Inc., Hathaway Dinwiddie Co., Ingram Fire Protection Inc, Pribuss Engineering Inc, Rcm Fire Protection Inc., Retail Construction Services, West Coast Sign, Yesco Signs Llc
- Architects
- George S Soskin (10), Denis Akio Henmi (5), Matthew Pietras (5), Ariane Lebrilla (4), David D. Ross (3), Seth Hanley (3), Douglas Mehl (2), Greg Sheppard (2), Albert Law, Gregory Mottola, Joseph Remling, Michel St.Pierre, Robert D Kerns, Rudolfo P Bustos Iii, Shawn M Anderson, Siemens Bldg Tech
- Engineers
- Kevin Carter (3), Alan Charles Burr (2), Jesus B Cabellon Jr (2), Marc Press (2), Matthew Williamson (2), Raj Daswani (2), Alexander Joseph Pacheco, Benjamin Jones, Craig Ristow, Darby Rowland, Darby Scott Rowland, Gwenyth R. Searer, Han Yan, Justin Dewolfe, Meng Hsiu Chen, Mozart Faizi, Sherry Chaumpluke, Teresa Emery
- Authorized agents
- Ahmad Mohazab, Kevin Dearborn, Ron De Martini
- Designers
- Andrew Erickson, George Soskin
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.