Matthew Williamson
- Listed as
- authorized agent-others, engineer
- Firm
- Arup North America Ltd.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Nov 2020
15 permits since 2000 (engineer on 14 permits, authorized agent-others on 1 permit): 8 completed, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 6, 2020 | Expired or cancelled withdrawn Dec 2021 | 345 04th St | t.i. of 40,783 sf of office space on 7 fls (ground to 7th ) & misc on rooftop. electrical panels, branch circuiting & distribution to outlets, hvac & plumbing equipment & lighting. mech hvac terminal units & downstream hvac. restroom exhaust connections. plumbing fixture connection in t.i. space.Details
t.i. of 40,783 sf of office space on 7 fls (ground to 7th ) & misc on rooftop. electrical panels, branch circuiting & distribution to outlets, hvac & plumbing equipment & lighting. mech hvac terminal units & downstream hvac. restroom exhaust connections. plumbing fixture connection in t.i. space. | $3,000,000 | |
| Aug 7, 2020 | Never finaled issued Mar 2021, no final | 50 Fremont St | Gci, Inc | interior single floor ti for single tenant on level 41. new buildout will consist of non-load bearing partitions, suspended ceiling systems, floors, wall finishes, casework & mep.Details
interior single floor ti for single tenant on level 41. new buildout will consist of non-load bearing partitions, suspended ceiling systems, floors, wall finishes, casework & mep. | $2,200,000 |
| Mar 2, 2020 | Expired or cancelled cancelled Jan 2026 | 600 California St | tenant improvement of (e) office building including demo of (e) duct work and installation of new mechanical distribution, new light fixutes, ne recepatalces, and new plumbing fixtuesDetails
tenant improvement of (e) office building including demo of (e) duct work and installation of new mechanical distribution, new light fixutes, ne recepatalces, and new plumbing fixtues | ||
| Oct 11, 2019 | Completed final sign-off Jun 2021 | 600 California St | M C S Construction Services | 2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes.Details
2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes. | $1,797,500 |
| Apr 17, 2019 | Completed final sign-off Jan 2020 | 222 02nd St | Dome Construction Corp | 25/f: full floor ti w/new partitions, ceilings, finishes, illwork, furniture, lighting, plumbing, mechanical, electrical including employee cafeteria w/ltd prep (mostly prepackaged food, some prep as some loosedry goods, prepackaged goods and/or beverage service-espresso)Details
25/f: full floor ti w/new partitions, ceilings, finishes, illwork, furniture, lighting, plumbing, mechanical, electrical including employee cafeteria w/ltd prep (mostly prepackaged food, some prep as some loosedry goods, prepackaged goods and/or beverage service-espresso) | $1,500,000 |
| Apr 17, 2019 | Completed final sign-off Jan 2020 | 222 02nd St | Dome Construction Corp | 23/f: full floor ti w/new partitions, ceiling, finishes, millwork, furniture, lighting, plumbing, mech, & elec including employee cafeteria w/limited prep/mostly pre-packaged food, some prep such as loose dry goods, packaged good and/or expanded beverage services (drinks & espresso). maher naDetails
23/f: full floor ti w/new partitions, ceiling, finishes, millwork, furniture, lighting, plumbing, mech, & elec including employee cafeteria w/limited prep/mostly pre-packaged food, some prep such as loose dry goods, packaged good and/or expanded beverage services (drinks & espresso). maher na | $1,500,000 |
| Mar 14, 2019 | Completed final sign-off May 2022 | 100 Channel | Hathaway Dinwiddie Co. | for pid review of storm water management system.ref pa# 2015/09/22/7707-s. ** maher: n/a **Details
for pid review of storm water management system.ref pa# 2015/09/22/7707-s. ** maher: n/a ** | |
| Aug 16, 2017 | Never finaled issued Sep 2017, no final | 303 02nd St | Novo Construction Inc | 8/f: electrical & plumbing work for tenant improvement. ref #201707182110. maher naDetails
8/f: electrical & plumbing work for tenant improvement. ref #201707182110. maher na | $2,500 |
| Jul 17, 2017 | Completed final sign-off May 2018 | 2 Embarcadero Center | Dome Construction Corp | 17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with (e) electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404Details
17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with (e) electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404 | |
| Jun 14, 2017 | Never finaled issued Jul 2017, no final | 655 Montgomery St | Dome Construction Corp | 5/f: ref t.i. 2017-0607-8639: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required. life safety deferred.Details
5/f: ref t.i. 2017-0607-8639: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required. life safety deferred. | $150,000 |
| Jun 14, 2017 | Never finaled issued Jul 2017, no final | 655 Montgomery St | Dome Construction Corp | 6/f & 7/f: ref t.i. 201706078642: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required.Details
6/f & 7/f: ref t.i. 201706078642: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required. | $300,000 |
| Feb 1, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.Details
4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378. | $634,987 |
| Feb 1, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | 5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.Details
5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381. | $1,269,974 |
| Dec 17, 2013 | Completed final sign-off Dec 2017 | 110 The Embarcadero | Oliver & Company Inc. | structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit.Details
structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit. | $6,800,000 |
| Jun 7, 2004 | Never finaled issued Jan 2005, no final | 2298 Market St | change of use/add full bar currently beer & wine/extended hoursDetails
change of use/add full bar currently beer & wine/extended hours |