Marsha Maytum
- Listed as
- architect
- Firm
- Leddy Maytum Stacy Archi
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to Dec 2022
21 permits since 2000 (architect on 21 permits): 16 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 1, 2022 | In progress issued Oct 2025 | 1501 Sunnydale Av | Truebeck Construction | block 3a/lot 3: ti of g/f commercial space for use as an early care and education (ece) center.ti. consists of interior non-structural partitions, finishes & exterior courtyard improvements; mep, fp, lv will be design-build & submitted under seperate permits; (base permit # 202106031523)Details
block 3a/lot 3: ti of g/f commercial space for use as an early care and education (ece) center.ti. consists of interior non-structural partitions, finishes & exterior courtyard improvements; mep, fp, lv will be design-build & submitted under seperate permits; (base permit # 202106031523) | $737,876 |
| Jul 12, 2021 | Completed final sign-off Oct 2024 | 1500 Sunnydale Av | Swinerton Builders, Mc Guire And Hester | priority processing. mayor's dir #17-02. erect a 2-story, type 3b,community center with childcare center. 1500 sunnydale aka 1550 sunnydaleDetails
priority processing. mayor's dir #17-02. erect a 2-story, type 3b,community center with childcare center. 1500 sunnydale aka 1550 sunnydale | $17,700,000 |
| Mar 26, 2021 | Completed final sign-off Jun 2026 | 160 Hahn St | S J Amoroso Construction | to erect a one story, no dwelling, no basement, type v-b building. new recreation center and herz playground improvements. interior gymnasium and multipurpose room, supporting office space, storage, kitchen. exterior fitness plaza, outdoor recreation spaces. small maintenance shed/yard.Details
to erect a one story, no dwelling, no basement, type v-b building. new recreation center and herz playground improvements. interior gymnasium and multipurpose room, supporting office space, storage, kitchen. exterior fitness plaza, outdoor recreation spaces. small maintenance shed/yard. | $10,000,000 |
| Dec 8, 2020 | Completed final sign-off Feb 2021 | 1522 Bush St | Gci, Inc | revision to the approved addendum #2 (arch, interior improvements) to site pa# 201906203952, providing details and locations of smoke alarm access hatches in elevator shafts, as require by ssfd.Details
revision to the approved addendum #2 (arch, interior improvements) to site pa# 201906203952, providing details and locations of smoke alarm access hatches in elevator shafts, as require by ssfd. | $2,000 |
| May 5, 2020 | Completed final sign-off Jan 2021 | 1522 Bush St | Gci, Inc | installation of bullet-resistant glazing sliding panels adjacent to the exterior windows (at both the bush street 2nd floor facade, and at both the 1st and 2nd floor facades at the austin street facade) to provide additional security for the planned parenthood clinic.**related to permit201906203952.Details
installation of bullet-resistant glazing sliding panels adjacent to the exterior windows (at both the bush street 2nd floor facade, and at both the 1st and 2nd floor facades at the austin street facade) to provide additional security for the planned parenthood clinic.**related to permit201906203952. | $440,000 |
| Jun 20, 2019 | Completed final sign-off Jun 2021 | 1522 Bush St | Gci, Inc | change of use from auto repair to a combination of community clinic and supporting administrative uses, including renovations to the exterior facade.**maher n/a**Details
change of use from auto repair to a combination of community clinic and supporting administrative uses, including renovations to the exterior facade.**maher n/a** | $7,500,000 |
| Aug 10, 2018 | Completed final sign-off Nov 2018 | 1522 Bush St | Gci, Inc | removal of interior non-structural walls, doors, & glazing; ab-017 per plans.Details
removal of interior non-structural walls, doors, & glazing; ab-017 per plans. | $60,000 |
| May 19, 2017 | Completed final sign-off Dec 2017 | 110 The Embarcadero | Oliver & Company Inc. | provide card readers to roof deck maher naDetails
provide card readers to roof deck maher na | $1,100 |
| May 15, 2017 | Completed final sign-off Dec 2017 | 110 The Embarcadero | Oliver & Company Inc. | mep only - revision to 2013-1217-4360 - basement level installation of high temperature dishwasherDetails
mep only - revision to 2013-1217-4360 - basement level installation of high temperature dishwasher | $1,000 |
| Mar 16, 2017 | Expired or cancelled cancelled Jan 2026 | 121 Steuart St | Oliver & Company Inc. | install expansion joint to exterior of the building. n/a ordinance #155-13Details
install expansion joint to exterior of the building. n/a ordinance #155-13 | $2,500 |
| Mar 16, 2017 | Expired or cancelled cancelled Jan 2026 | 100 The Embarcadero | Oliver & Company Inc. | install expansion joint to exterior of the building. n/a ordinance #155-13Details
install expansion joint to exterior of the building. n/a ordinance #155-13 | $2,500 |
| Jun 29, 2016 | Completed final sign-off Dec 2017 | 110 The Embarcadero | Oliver & Company Inc. | revision to ref pa 2013 1217 4360 to modify certain wall & shaft construction. mech shaft to be changed from 1hr to 2 hr construction & add use for a-2 per sffd, no change in layout.Details
revision to ref pa 2013 1217 4360 to modify certain wall & shaft construction. mech shaft to be changed from 1hr to 2 hr construction & add use for a-2 per sffd, no change in layout. | |
| May 16, 2016 | Completed final sign-off Dec 2017 | 110 The Embarcadero | Oliver & Company Inc. | revision to pa 2013-1217-4360/r1, removal of plywood sheating from exterior walls between building. maher naDetails
revision to pa 2013-1217-4360/r1, removal of plywood sheating from exterior walls between building. maher na | $1,000 |
| Jul 10, 2014 | Completed final sign-off Jun 2015 | 888 Turk St | City Building Inc. | revision to appl. #2014.04.10.2968 to include a new opening at shear wall on 2nd floor per plan.Details
revision to appl. #2014.04.10.2968 to include a new opening at shear wall on 2nd floor per plan. | |
| Jul 10, 2014 | Completed final sign-off Jun 2015 | 930 Gough St | City Building Inc. | revision to appl # 2014.0410.2966. work include revised building ties for bldg bracing per plan.Details
revision to appl # 2014.0410.2966. work include revised building ties for bldg bracing per plan. | |
| Jun 20, 2014 | Completed final sign-off Dec 2015 | 888 Turk St | City Building Inc. | change of occupancy. ti to include partitions, door, casework & finishes at 1st floor & 2nd floor. exterior work to include new parking lot, entry court, landscaping window & entry canopy. mep under separate permit. fire sprinkler & alarm under separate permit.Details
change of occupancy. ti to include partitions, door, casework & finishes at 1st floor & 2nd floor. exterior work to include new parking lot, entry court, landscaping window & entry canopy. mep under separate permit. fire sprinkler & alarm under separate permit. | $1,100,000 |
| Jun 20, 2014 | Completed final sign-off Dec 2015 | 930 Gough St | City Building Inc. | change of occupancy. ti scope of work to include new interior partitions doors, casework & finishes on floors 1,2 & 3. exterior improvements include new playyard, landscape, breezway, windows & roof deck, mep under separate permit. fire alarm & sprinkler separate permit.Details
change of occupancy. ti scope of work to include new interior partitions doors, casework & finishes on floors 1,2 & 3. exterior improvements include new playyard, landscape, breezway, windows & roof deck, mep under separate permit. fire alarm & sprinkler separate permit. | $1,100,000 |
| Apr 10, 2014 | Completed final sign-off Jun 2015 | 888 Turk St | City Building Inc. | demo existing interior partitions, mep, floor finishes, and ceiling too. buidling to be seisimically strengthend. all work to be performed under ab17. ti under separate permit. change in use to e occupancy under separate permit.Details
demo existing interior partitions, mep, floor finishes, and ceiling too. buidling to be seisimically strengthend. all work to be performed under ab17. ti under separate permit. change in use to e occupancy under separate permit. | $40,000 |
| Dec 17, 2013 | Completed final sign-off Dec 2017 | 110 The Embarcadero | Oliver & Company Inc. | structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit.Details
structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit. | $6,800,000 |
| Dec 19, 2011 | Never finaled issued Mar 2012, no final | 2000 Mason St | demolish two story library building.Details
demolish two story library building. | $325,000 | |
| Dec 19, 2011 | Never finaled issued Mar 2012, no final | 2000 Mason St | at site of demolished library, retaining berm & new fence to be constructed. existing irrigation system to be extended. new site light fixture added. new drinking fountain added.Details
at site of demolished library, retaining berm & new fence to be constructed. existing irrigation system to be extended. new site light fixture added. new drinking fountain added. | $105,000 |