Permit GraphShortlistSan Francisco building permits since 2000

Todd Ravenscroft

License
E17996
Look the license up with the state
Listed as
authorized agent-others, engineer
Firm
Arup North America Ltd.
Based in
San Francisco
On San Francisco permits
Jul 2001 to Jul 2021

13 permits since 2000 (engineer on 12 permits, authorized agent-others on 1 permit): 11 completed, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 19, 2021Completed
final sign-off Dec 2021
1 Dr. Carlton B. Goodlett PlPaganini Electric Corp(See Signatories)replacement of interior lighting on level 4 and colonnade for city hall. surface mounted light fixtures.
Details
Permit
202107194653
Status
complete
Filed
Jul 19, 2021
Permit issued
Sep 9, 2021
Final sign-off
Dec 9, 2021
Declared cost
$200,000
Address
1 Dr. Carlton B. Goodlett Pl

replacement of interior lighting on level 4 and colonnade for city hall. surface mounted light fixtures.

Open the permit page

$200,000
Sep 26, 2020Never finaled
issued Dec 2020, no final
1 Post StEmcor Services/Mesa Energy Systems Increplace (1) 523-ton water cooled centrifugal chiller & 2 160-ton reciprocating chillers w/ 12 (n) 76.6 ton modular chillers. replace 2 (e) single speed chilled water pumps w/ new. replace 2 (e) condenser water pumps w/ new. demo existing refirdgerator leak ventilation exhaust fan.
Details
Permit
202009265096
Status
issued
Filed
Sep 26, 2020
Permit issued
Dec 10, 2020
Declared cost
$1,400,000
Address
1 Post St

replace (1) 523-ton water cooled centrifugal chiller & 2 160-ton reciprocating chillers w/ 12 (n) 76.6 ton modular chillers. replace 2 (e) single speed chilled water pumps w/ new. replace 2 (e) condenser water pumps w/ new. demo existing refirdgerator leak ventilation exhaust fan.

Open the permit page

$1,400,000
Aug 16, 2017Never finaled
issued Sep 2017, no final
303 02nd StNovo Construction Inc8/f: electrical & plumbing work for tenant improvement. ref #201707182110. maher na
Details
Permit
201708164961
Status
issued
Filed
Aug 16, 2017
Permit issued
Sep 20, 2017
Declared cost
$2,500
Address
303 02nd St

8/f: electrical & plumbing work for tenant improvement. ref #201707182110. maher na

Open the permit page

$2,500
Feb 1, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corp4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.
Details
Permit
201702018438
Status
complete
Filed
Feb 1, 2017
Permit issued
Mar 23, 2017
Final sign-off
Oct 25, 2018
Declared cost
$634,987
Address
201 Spear St

4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.

Open the permit page

$634,987
Feb 1, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corp5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.
Details
Permit
201702018435
Status
complete
Filed
Feb 1, 2017
Permit issued
Mar 23, 2017
Final sign-off
Nov 6, 2018
Declared cost
$1,269,974
Address
201 Spear St

5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.

Open the permit page

$1,269,974
Apr 13, 2016Completed
final sign-off Jun 2017
600 California StNovo Construction Inc11th flr: mep work for ti ref pa 2016 0318 2415
Details
Permit
201604134626
Status
complete
Filed
Apr 13, 2016
Permit issued
Apr 13, 2016
Final sign-off
Jun 23, 2017
Declared cost
$100,000
Address
600 California St

11th flr: mep work for ti ref pa 2016 0318 2415

Open the permit page

$100,000
Apr 13, 2016Completed
final sign-off Jun 2017
600 California StNovo Construction Inc14th flr: mep work for ti ref pa 2016 0330 3430. n/a ordinance #155-13
Details
Permit
201604134627
Status
complete
Filed
Apr 13, 2016
Permit issued
Apr 13, 2016
Final sign-off
Jun 23, 2017
Declared cost
$200,000
Address
600 California St

14th flr: mep work for ti ref pa 2016 0330 3430. n/a ordinance #155-13

Open the permit page

$200,000
Jan 13, 2016Completed
final sign-off Nov 2016
333 Brannan StPrincipal Builders Inc.under terrace - title 24 lighting to install new fixtures & outlets on lower terrace level. refer to pa #201510087231. n/a maher ordinance
Details
Permit
201601136985
Status
complete
Filed
Jan 13, 2016
Permit issued
Jan 29, 2016
Final sign-off
Nov 16, 2016
Declared cost
$608,820
Address
333 Brannan St

under terrace - title 24 lighting to install new fixtures & outlets on lower terrace level. refer to pa #201510087231. n/a maher ordinance

Open the permit page

$608,820
Dec 29, 2015Completed
final sign-off Nov 2016
333 Brannan StPrincipal Builders Inc.3rd flr: t-24 lighting and power for 3rd flr t.i. ref. pa 201510210423 for architectural work; maher n/a
Details
Permit
201512296044
Status
complete
Filed
Dec 29, 2015
Permit issued
Jan 29, 2016
Final sign-off
Nov 16, 2016
Declared cost
$291,465
Address
333 Brannan St

3rd flr: t-24 lighting and power for 3rd flr t.i. ref. pa 201510210423 for architectural work; maher n/a

Open the permit page

$291,465
Aug 6, 2015Completed
final sign-off Mar 2018
560 Mission StTurner Construction Co15th floor, interior ti to include new non-load bearing partitions, doors, accoustical ceiling system, rework hvac & electrical mep's. maher n/a
Details
Permit
201508063506
Status
complete
Filed
Aug 6, 2015
Permit issued
Jan 14, 2016
Final sign-off
Mar 23, 2018
Declared cost
$1,500,000
Address
560 Mission St

15th floor, interior ti to include new non-load bearing partitions, doors, accoustical ceiling system, rework hvac & electrical mep's. maher n/a

Open the permit page

$1,500,000
Mar 30, 2015Completed
final sign-off Aug 2015
1 Dr Carlton B Goodlett PlPaganini Electric Corp(See Signatories)replace (e) exterior light fixtures with new at (e) locations with (e) conduit. (e) exterior lights are facade lighting. maher - not req'd
Details
Permit
201503302156
Status
complete
Filed
Mar 30, 2015
Permit issued
Jul 20, 2015
Final sign-off
Aug 5, 2015
Declared cost
$820,000
Address
1 Dr Carlton B Goodlett Pl

replace (e) exterior light fixtures with new at (e) locations with (e) conduit. (e) exterior lights are facade lighting. maher - not req'd

Open the permit page

$820,000
Dec 17, 2013Completed
final sign-off Dec 2017
110 The EmbarcaderoOliver & Company Inc.structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit.
Details
Permit
201312174360
Status
complete
Filed
Dec 17, 2013
Permit issued
Feb 12, 2015
Final sign-off
Dec 20, 2017
Declared cost
$6,800,000
Address
110 The Embarcadero

structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit.

Open the permit page

$6,800,000
Jul 25, 2001Completed
final sign-off Oct 2002
43 Naglee Avpost-construct insulation of property line walls as fire separation upgrade in connect w/lot subdivi
Details
Permit
200107254567
Status
complete
Filed
Jul 25, 2001
Permit issued
Jun 18, 2002
Final sign-off
Oct 9, 2002
Declared cost
$1,500
Address
43 Naglee Av

post-construct insulation of property line walls as fire separation upgrade in connect w/lot subdivi

Open the permit page

$1,500
Todd Ravenscroft, license E17996 | Permit Graph