13 permits since 2000 (engineer on 12 permits, authorized agent-others on 1 permit): 11 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 19, 2021 | Completed final sign-off Dec 2021 | 1 Dr. Carlton B. Goodlett Pl | Paganini Electric Corp(See Signatories) | replacement of interior lighting on level 4 and colonnade for city hall. surface mounted light fixtures.Details
replacement of interior lighting on level 4 and colonnade for city hall. surface mounted light fixtures. | $200,000 |
| Sep 26, 2020 | Never finaled issued Dec 2020, no final | 1 Post St | Emcor Services/Mesa Energy Systems Inc | replace (1) 523-ton water cooled centrifugal chiller & 2 160-ton reciprocating chillers w/ 12 (n) 76.6 ton modular chillers. replace 2 (e) single speed chilled water pumps w/ new. replace 2 (e) condenser water pumps w/ new. demo existing refirdgerator leak ventilation exhaust fan.Details
replace (1) 523-ton water cooled centrifugal chiller & 2 160-ton reciprocating chillers w/ 12 (n) 76.6 ton modular chillers. replace 2 (e) single speed chilled water pumps w/ new. replace 2 (e) condenser water pumps w/ new. demo existing refirdgerator leak ventilation exhaust fan. | $1,400,000 |
| Aug 16, 2017 | Never finaled issued Sep 2017, no final | 303 02nd St | Novo Construction Inc | 8/f: electrical & plumbing work for tenant improvement. ref #201707182110. maher naDetails
8/f: electrical & plumbing work for tenant improvement. ref #201707182110. maher na | $2,500 |
| Feb 1, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.Details
4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378. | $634,987 |
| Feb 1, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | 5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.Details
5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381. | $1,269,974 |
| Apr 13, 2016 | Completed final sign-off Jun 2017 | 600 California St | Novo Construction Inc | 11th flr: mep work for ti ref pa 2016 0318 2415Details
11th flr: mep work for ti ref pa 2016 0318 2415 | $100,000 |
| Apr 13, 2016 | Completed final sign-off Jun 2017 | 600 California St | Novo Construction Inc | 14th flr: mep work for ti ref pa 2016 0330 3430. n/a ordinance #155-13Details
14th flr: mep work for ti ref pa 2016 0330 3430. n/a ordinance #155-13 | $200,000 |
| Jan 13, 2016 | Completed final sign-off Nov 2016 | 333 Brannan St | Principal Builders Inc. | under terrace - title 24 lighting to install new fixtures & outlets on lower terrace level. refer to pa #201510087231. n/a maher ordinanceDetails
under terrace - title 24 lighting to install new fixtures & outlets on lower terrace level. refer to pa #201510087231. n/a maher ordinance | $608,820 |
| Dec 29, 2015 | Completed final sign-off Nov 2016 | 333 Brannan St | Principal Builders Inc. | 3rd flr: t-24 lighting and power for 3rd flr t.i. ref. pa 201510210423 for architectural work; maher n/aDetails
3rd flr: t-24 lighting and power for 3rd flr t.i. ref. pa 201510210423 for architectural work; maher n/a | $291,465 |
| Aug 6, 2015 | Completed final sign-off Mar 2018 | 560 Mission St | Turner Construction Co | 15th floor, interior ti to include new non-load bearing partitions, doors, accoustical ceiling system, rework hvac & electrical mep's. maher n/aDetails
15th floor, interior ti to include new non-load bearing partitions, doors, accoustical ceiling system, rework hvac & electrical mep's. maher n/a | $1,500,000 |
| Mar 30, 2015 | Completed final sign-off Aug 2015 | 1 Dr Carlton B Goodlett Pl | Paganini Electric Corp(See Signatories) | replace (e) exterior light fixtures with new at (e) locations with (e) conduit. (e) exterior lights are facade lighting. maher - not req'dDetails
replace (e) exterior light fixtures with new at (e) locations with (e) conduit. (e) exterior lights are facade lighting. maher - not req'd | $820,000 |
| Dec 17, 2013 | Completed final sign-off Dec 2017 | 110 The Embarcadero | Oliver & Company Inc. | structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit.Details
structural upgrade of (e) foundation. tenant improvement 1st & 2nd floor. add 1 story to accomade assembly, office & storage. sprinkler & fire alarm on separate permit. | $6,800,000 |
| Jul 25, 2001 | Completed final sign-off Oct 2002 | 43 Naglee Av | post-construct insulation of property line walls as fire separation upgrade in connect w/lot subdiviDetails
post-construct insulation of property line walls as fire separation upgrade in connect w/lot subdivi | $1,500 |