R. Daswani

License
M31875
Look the license up with the state
Listed as
engineer
Firm
Arup
Based in
San Francisco
On San Francisco permits
Feb 2017 to Aug 2024

22 permits since 2000 (engineer on 22 permits): 17 completed, 2 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 13, 2024Expired or cancelled
withdrawn Sep 2024
2 Lake StPlant Construction Co, Lprevision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.
Details
Permit
202408138496
Status
withdrawn
Filed
Aug 13, 2024
Address
2 Lake St

revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.

Open the permit page

Sep 16, 2022Completed
final sign-off Oct 2023
100 ChannelHathaway Dinwiddie Co.revision to mechanical fan and smoke damper matrix for cfc closeout. ref pa# 201509227707.
Details
Permit
202209162626
Status
complete
Filed
Sep 16, 2022
Permit issued
Jan 20, 2023
Final sign-off
Oct 27, 2023
Address
100 Channel

revision to mechanical fan and smoke damper matrix for cfc closeout. ref pa# 201509227707.

Open the permit page

Apr 22, 2022Completed
final sign-off May 2022
100 ChannelHathaway Dinwiddie Co.arch & mep revision to document approved ab-005 for fsd monitoring. ref pa# 201509227707 s3.
Details
Permit
202204222805
Status
complete
Filed
Apr 22, 2022
Permit issued
Apr 26, 2022
Final sign-off
May 13, 2022
Address
100 Channel

arch & mep revision to document approved ab-005 for fsd monitoring. ref pa# 201509227707 s3.

Open the permit page

Apr 21, 2022Completed
final sign-off Nov 2022
100 34th AvHathaway Dinwiddie Co.demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include gallery
Details
Permit
202204212736
Status
complete
Filed
Apr 21, 2022
Permit issued
May 6, 2022
Final sign-off
Nov 17, 2022
Declared cost
$494,797
Address
100 34th Av

demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include gallery

Open the permit page

$494,797
Mar 25, 2021Completed
final sign-off Sep 2021
415 Mission StDome Construction Corp37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a.
Details
Permit
202103257331
Status
complete
Filed
Mar 25, 2021
Permit issued
Mar 31, 2021
Final sign-off
Sep 28, 2021
Address
415 Mission St

37/f & 38/f: rev to pa202012181350 - revise damper matix on sheet m-900. maher n/a.

Open the permit page

Dec 18, 2020Completed
final sign-off Sep 2021
415 Mission StDome Construction Corprevision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation.
Details
Permit
202012181350
Status
complete
Filed
Dec 18, 2020
Permit issued
Feb 5, 2021
Final sign-off
Sep 28, 2021
Address
415 Mission St

revision to pa #2018-0625-2845: update to the smoke control narrative per pre-application meeting confirmation.

Open the permit page

Mar 2, 2020Expired or cancelled
cancelled Jan 2026
600 California Sttenant improvement of (e) office building including demo of (e) duct work and installation of new mechanical distribution, new light fixutes, ne recepatalces, and new plumbing fixtues
Details
Permit
202003025803
Status
cancelled
Filed
Mar 2, 2020
Address
600 California St

tenant improvement of (e) office building including demo of (e) duct work and installation of new mechanical distribution, new light fixutes, ne recepatalces, and new plumbing fixtues

Open the permit page

Feb 27, 2020Expired or cancelled
cancelled Jan 2026
415 Mission StDome Construction Corp36th- 38th floor: revision to app#201806252845. adding of single duct smoke detector. adjustment of t-24 test (checklist, mech forms) requirements.
Details
Permit
202002275656
Status
cancelled
Filed
Feb 27, 2020
Declared cost
$1,000
Address
415 Mission St

36th- 38th floor: revision to app#201806252845. adding of single duct smoke detector. adjustment of t-24 test (checklist, mech forms) requirements.

Open the permit page

$1,000
Feb 18, 2020Completed
final sign-off Sep 2021
415 Mission StDome Construction Corprevision to pa #201806252845, 37th fl (n) card reader at scrubber; 38th fl wellness redesigned to office; partitions and ceilings, installation of card readers, duct rerouting and electrical/lighting reconfiguration. maher na
Details
Permit
202002184644
Status
complete
Filed
Feb 18, 2020
Permit issued
Jun 24, 2020
Final sign-off
Sep 28, 2021
Declared cost
$476,032
Address
415 Mission St

revision to pa #201806252845, 37th fl (n) card reader at scrubber; 38th fl wellness redesigned to office; partitions and ceilings, installation of card readers, duct rerouting and electrical/lighting reconfiguration. maher na

Open the permit page

$476,032
Oct 11, 2019Completed
final sign-off Jun 2021
600 California StM C S Construction Services2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes.
Details
Permit
201910114277
Status
complete
Filed
Oct 11, 2019
Permit issued
Jan 14, 2020
Final sign-off
Jun 23, 2021
Declared cost
$1,797,500
Address
600 California St

2nd & 3rd fl: tenant improvement of office space. installation of new non-load bearing partitions, millwork, cielings, lighting, plumbing fixtures and finishes.

Open the permit page

$1,797,500
Jun 7, 2018Completed
final sign-off Nov 2018
44 Montgomery StDome Construction Corp17th fl - mep of tenant space. adding 2 fire smoke dampers. ref pa 2018-0502-7950- sprinklers and fire alarm separate permits. no new fsd's. n/a for maher.
Details
Permit
201806071289
Status
complete
Filed
Jun 7, 2018
Permit issued
Jun 14, 2018
Final sign-off
Nov 21, 2018
Declared cost
$910,000
Address
44 Montgomery St

17th fl - mep of tenant space. adding 2 fire smoke dampers. ref pa 2018-0502-7950- sprinklers and fire alarm separate permits. no new fsd's. n/a for maher.

Open the permit page

$910,000
Dec 21, 2017Completed
final sign-off Jul 2021
415 Mission StDome Construction Corp36th fl: installation of non-bearing partitions, ceiling, millworks & fixtures. card readers at elevator lobbies. sprinkler & fire alarm on separate permits. maher na
Details
Permit
201712217133
Status
complete
Filed
Dec 21, 2017
Permit issued
Jan 18, 2018
Final sign-off
Jul 21, 2021
Declared cost
$2,762,934
Address
415 Mission St

36th fl: installation of non-bearing partitions, ceiling, millworks & fixtures. card readers at elevator lobbies. sprinkler & fire alarm on separate permits. maher na

Open the permit page

$2,762,934
Aug 25, 2017Completed
final sign-off May 2018
44 Montgomery StDome Construction Corp22/f: mep's & t24 for t.i. install new insta-hst water heaters & plumbing piping, install new electrical outlets (devices/lighting controls) to replace exisitng & meet t-24 requirements. instal new supply deuctwork & vav boxes: sput system for it rooms. - ref t.i. under pa#201708013446.
Details
Permit
201708255876
Status
complete
Filed
Aug 25, 2017
Permit issued
Sep 5, 2017
Final sign-off
May 2, 2018
Address
44 Montgomery St

22/f: mep's & t24 for t.i. install new insta-hst water heaters & plumbing piping, install new electrical outlets (devices/lighting controls) to replace exisitng & meet t-24 requirements. instal new supply deuctwork & vav boxes: sput system for it rooms. - ref t.i. under pa#201708013446.

Open the permit page

Aug 22, 2017Completed
final sign-off Apr 2018
44 Montgomery StDome Construction Corp3rd & 4th fl: mep for ti: installation of electrical outlets (devices & lighting controls) to replace (e) & meet t-24 requirements. installation of new supply ductwork and van boxes; split-systems for it rooms. installation of insta-hot water heaters & new piping. ref arch #201708074116. maher na
Details
Permit
201708225468
Status
complete
Filed
Aug 22, 2017
Permit issued
Sep 5, 2017
Final sign-off
Apr 6, 2018
Address
44 Montgomery St

3rd & 4th fl: mep for ti: installation of electrical outlets (devices & lighting controls) to replace (e) & meet t-24 requirements. installation of new supply ductwork and van boxes; split-systems for it rooms. installation of insta-hot water heaters & new piping. ref arch #201708074116. maher na

Open the permit page

Aug 3, 2017Completed
final sign-off Sep 2019
510 Townsend StPrincipal Builders Inc.4th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13
Details
Permit
201708033839
Status
complete
Filed
Aug 3, 2017
Permit issued
Aug 11, 2017
Final sign-off
Sep 11, 2019
Declared cost
$600,000
Address
510 Townsend St

4th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13

Open the permit page

$600,000
Aug 3, 2017Completed
final sign-off Sep 2019
510 Townsend StPrincipal Builders Inc.5th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13
Details
Permit
201708033842
Status
complete
Filed
Aug 3, 2017
Permit issued
Aug 16, 2017
Final sign-off
Sep 11, 2019
Declared cost
$600,000
Address
510 Townsend St

5th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13

Open the permit page

$600,000
Aug 1, 2017Completed
final sign-off Sep 2019
510 Townsend StPrincipal Builders Inc.3/f- interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under seperate permit. new bldg. pa#201503050110. n/a ordinance #155-13
Details
Permit
201708013474
Status
complete
Filed
Aug 1, 2017
Permit issued
Aug 10, 2017
Final sign-off
Sep 10, 2019
Declared cost
$600,000
Address
510 Townsend St

3/f- interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under seperate permit. new bldg. pa#201503050110. n/a ordinance #155-13

Open the permit page

$600,000
Jul 17, 2017Completed
final sign-off May 2018
2 Embarcadero CenterDome Construction Corp17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with (e) electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404
Details
Permit
201707172003
Status
complete
Filed
Jul 17, 2017
Permit issued
Jul 18, 2017
Final sign-off
May 7, 2018
Address
2 Embarcadero Center

17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with (e) electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404

Open the permit page

Jun 14, 2017Never finaled
issued Jul 2017, no final
655 Montgomery StDome Construction Corp6/f & 7/f: ref t.i. 201706078642: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required.
Details
Permit
201706149369
Status
issued
Filed
Jun 14, 2017
Permit issued
Jul 27, 2017
Declared cost
$300,000
Address
655 Montgomery St

6/f & 7/f: ref t.i. 201706078642: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required.

Open the permit page

$300,000
Jun 14, 2017Never finaled
issued Jul 2017, no final
655 Montgomery StDome Construction Corp5/f: ref t.i. 2017-0607-8639: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required. life safety deferred.
Details
Permit
201706149366
Status
issued
Filed
Jun 14, 2017
Permit issued
Jul 27, 2017
Declared cost
$150,000
Address
655 Montgomery St

5/f: ref t.i. 2017-0607-8639: mep's including t24: mechanical: install of new terminal vents,ductwork, pipework,pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required. life safety deferred.

Open the permit page

$150,000
Feb 1, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corp5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.
Details
Permit
201702018435
Status
complete
Filed
Feb 1, 2017
Permit issued
Mar 23, 2017
Final sign-off
Nov 6, 2018
Declared cost
$1,269,974
Address
201 Spear St

5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.

Open the permit page

$1,269,974
Feb 1, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corp4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.
Details
Permit
201702018438
Status
complete
Filed
Feb 1, 2017
Permit issued
Mar 23, 2017
Final sign-off
Oct 25, 2018
Declared cost
$634,987
Address
201 Spear St

4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.

Open the permit page

$634,987