John Richard Pena
- License
- E21824
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E21824 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Arup
- On San Francisco permits
- Jul 2017 to Aug 2017
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dome Construction Corp (2)
- Engineers
- R. Daswani (2), Matthew Williamson
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2017 | Completed final sign-off Apr 2018 | 44 Montgomery St | Dome Construction Corp | 3rd & 4th fl: mep for ti: installation of electrical outlets (devices & lighting controls) to replace (e) & meet t-24 requirements. installation of new supply ductwork and van boxes; split-systems for it rooms. installation of insta-hot water heaters & new piping. ref arch #201708074116. maher naDetails
3rd & 4th fl: mep for ti: installation of electrical outlets (devices & lighting controls) to replace (e) & meet t-24 requirements. installation of new supply ductwork and van boxes; split-systems for it rooms. installation of insta-hot water heaters & new piping. ref arch #201708074116. maher na | |
| Jul 17, 2017 | Completed final sign-off May 2018 | 2 Embarcadero Center | Dome Construction Corp | 17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with (e) electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404Details
17/f- re-fit of mechanical hvac system, new ductwork, pipework and zone boxes. office fit out with (e) electrical panels, new t-24 lighting controls, new restroom plumbing fixtures & water heater, revise fire sprinkler layout. n/a ordinance #155-13, ti ref pa#201707101404 |